This document provides details for a federal construction contract opportunity issued by the Indian Health Service. The project involves replacing a water main crossing at Shitike Creek in Warm Springs, Oregon, with a estimated value between $1,000,000 to $5,000,000. The solicitation is set aside 100% for small businesses with preference given to Indian Economic Enterprise firms. The scope of work includes replacing a bridge and relocating communication cables. The response due date is June 20, 2022. The period of performance for construction work is 150 calendar days from the notice to proceed. The contract type will be firm fixed price.

View the file

Other files

File Type Posted
J09 Section B Price Schedule (OFFEROR FILL-IN) (REVISED as of A00006).xlsx XLSX spreadsheet
J04 WD OR20220069 dated 07082022.pdf PDF
75H70122R00045-A00006.pdf PDF
RFP 75H70122R00045 as of A00005.pdf PDF
75H70122R00045-A00005.pdf PDF
J09 Section B Price Schedule (OFFEROR FILL-IN).xlsx XLSX spreadsheet
75H70122R00045-A00004.pdf PDF
J01 Technical Specifications - Shitike Creek Crossing (REVISED as of A00003).pdf PDF
75H70122R00045-A00003.pdf PDF
75H70122R00045-A00002.pdf PDF
J02a Plans - Bridge Water Main Crossing.pdf PDF
75H70122R00045-A00001.pdf PDF
Exhibit 3 - Warm Springs Interdisciplinary Team - Small Project Approval Resolution.pdf PDF
J06 Company Specialized Experience Form.docx DOCX document
J08 IHS IEE Representation Form.pdf PDF
Exhibit 1 - Geotechnical Evaluation and Utility Research Report.pdf PDF
J05 Self Performed Calculation Sheet (Construction).docx DOCX document
J02 Plans - Shitike Creek Crossing.pdf PDF
J04 WD OR20220069 04012022.pdf PDF
J03 Submittal and Testing Log.xlsx XLSX spreadsheet
J09 Section B Price Schedule (OFFEROR FILL-IN).xlsx XLSX spreadsheet
Exhibit 2 - Shitike Creek Crossing PP and Detail Sheets from As-builts.pdf PDF
J07 PPQ.docx DOCX document
J01 Technical Specifications - Shitike Creek Crossing.pdf PDF
RFP 75H70122R00045.pdf PDF
Exhibit 5 - Lumen Cable Relocation Special Construction Proposal.pdf PDF
Exhibit 4 - Example BIA Control Plan.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Job Name: Shitike Creek Bridge Replacement Job Number: N.932920

Line Item Description Unit Qty Unit Cost Sub-Total 1 New Pedestals Each 3.00 245.96$ 737.88$ 2 1 way galvanized duct materials - 4" with hangers LF 150.00 44.13$ 6,619.50$ 3 1 way galvanized duct labor - 4" to install LF 150.00 100.00$ 15,000.00$ 4 Directional bore 200 lineal feet and pull in 4" HDPE LF 200.00 14.50$ 2,900.00$ 5 Conduit Removal 120 Lineal Feet Attached every 16' LS 120.00 100.00$ 12,000.00$

6 SF 120.00 30.00$ 3,600.00$

7 Copper cable 600 pair installed in newly placed pipe and splicing LF 350.00 33.13$ 11,594.30$ 8 Excavation 4 bore pits/receiving pits 10 lineal feet each LF 40.00 80.00$ 3,200.00$ 9 Hydro-seeding 200 square feet Sq Ft 200.00 1.50$ 300.00$

10 Surveying Hour 8.00 250.00$ 2,000.00$ 11 Traffic Control LS 10.00 1,000.00$ 10,000.00$ 12 Sub-Total 67,951.68$ 13 Engineering 19,000.00$ 14 Construction Management 4,000.00$ 15 Contingency 14,000.00$ 16 Total 104,951.68$