This document provides details for a federal construction contract opportunity issued by the Indian Health Service. The project involves replacing a water main crossing at Shitike Creek in Warm Springs, Oregon, with a estimated value between $1,000,000 to $5,000,000. The solicitation is set aside 100% for small businesses with preference given to Indian Economic Enterprise firms. The scope of work includes replacing a bridge and relocating communication cables. The response due date is June 20, 2022. The period of performance for construction work is 150 calendar days from the notice to proceed. The contract type will be firm fixed price.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Job Name: Shitike Creek Bridge Replacement Job Number: N.932920
Line Item Description Unit Qty Unit Cost Sub-Total 1 New Pedestals Each 3.00 245.96$ 737.88$ 2 1 way galvanized duct materials - 4" with hangers LF 150.00 44.13$ 6,619.50$ 3 1 way galvanized duct labor - 4" to install LF 150.00 100.00$ 15,000.00$ 4 Directional bore 200 lineal feet and pull in 4" HDPE LF 200.00 14.50$ 2,900.00$ 5 Conduit Removal 120 Lineal Feet Attached every 16' LS 120.00 100.00$ 12,000.00$
6 SF 120.00 30.00$ 3,600.00$
7 Copper cable 600 pair installed in newly placed pipe and splicing LF 350.00 33.13$ 11,594.30$ 8 Excavation 4 bore pits/receiving pits 10 lineal feet each LF 40.00 80.00$ 3,200.00$ 9 Hydro-seeding 200 square feet Sq Ft 200.00 1.50$ 300.00$
10 Surveying Hour 8.00 250.00$ 2,000.00$ 11 Traffic Control LS 10.00 1,000.00$ 10,000.00$ 12 Sub-Total 67,951.68$ 13 Engineering 19,000.00$ 14 Construction Management 4,000.00$ 15 Contingency 14,000.00$ 16 Total 104,951.68$