This document is a Phase 4 Final Construction Document set for the iHouse Apartment Project, a 19-unit apartment building located at Indian Route 6290, Tonalea, AZ 86044. The project, designated as Project No. 23-390 and issued August 13, 2024, comprises comprehensive architectural, civil, structural, mechanical, plumbing, electrical, and fire protection construction drawings prepared by Johnson Smitthipong & Rosamond Associates, Inc. (Architect) in coordination with DOWL (Civil Engineer), Schneider & Associates Structural Engineers, and Bernhard TME (Electrical/Mechanical Engineer). The building is classified as R-2 occupancy (multi-family residential) with Type V-B construction, is fully sprinklered, and totals 19,510 square feet.

The construction documents detail extensive site improvements including a new road extension approximately 9,100 linear feet with utility infrastructure, drainage systems, and stormwater pollution prevention requirements compliant with EPA and Navajo Nation regulations. Water and sanitary sewer utilities include 8-inch water mains, 6-inch sanitary sewer lines, fire hydrant assemblies, and service connections conforming to Navajo Tribal Utility Authority (NTUA) technical specifications. The project incorporates post-tensioned concrete slab-on-grade foundation systems, wood-frame construction with specific lumber grades, accessible parking with ADA compliance, riprap swales for erosion control, and pavement sections per MAG (Maricopa Association of Governments) standards. All work must comply with the 2021 International Building Code, 2017 National Electrical Code, applicable NFPA standards, and Navajo Nation environmental and utility regulations, with mandatory 24-hour notification to tribal agencies, blue-stake utility locating, approved materials submittals, and continuous special inspection during construction activities including post-tensioning operations and anchor installation.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDIAN HEALTH SERVICES

INSCRIPTION HOUSE HEALTH CENTER

Indian Rte 6290, Tonalea, AZ 86044 iHouse Apartment

Project No: 23-390

Issue Date: August 13, 2024

P H

A S

E

F in a l

C o n s tr u c ti o n

D o c u m e n ts

R

VI

H

P

S

N I

D

C E

I

A

A N

HE TL H

S

E

E

H

N M

E

A R

P

T O

F T

C D

SU

S

A

E

TAE L &H

N V

I S

E R

U M

A H

A

B

C

D

1 2 3 4 5

1 2 3 4 5

Sheet Number:

Sheet Title:

Checked By:

Drawn By:

Scale:

Project No:

Issue Date:

Consultants:

JOHNSON SMITTHIPONG &

ROSAMOND ASSOCIATES, INC.

5210 E Williams Cir Ste 600 Tucson, AZ 85711

(520) 547-7904 www.jsra.com

U. S.

DEPARTMENT OF

HEALTH AND

HUMAN SERVICES

INDIAN HEALTH SERVICE

NAVAJO AREA OFFICE

THIS DOCUMENT IS

NOT TO BE USED FOR

REGULATORY

APPROVAL, PERMIT, OR

CONSTRUCTION

Vernon Rosamond Arizona Lic #: 9793 Date:

ISSUED FOR INTERIM REVIEW

/1

/2

:3 :5

P

M

A u to d e s k D o c s /2

-3

I H

S i H o u s e

A p t v

/2

-3

A rc h i H o u s e

A p t

.r v t

G000

COVER SHEET

HARGREAVES

KADDOURA

23-390

8/13/24

PHASE IV (Final CD) iHOUSE APARTMENT

Tonalea, AZ 86044

8/13/24

No. Date Description

IN

D

IA

N

R O

U T

E

6SITE

PHOENIX

FLAGSTAFF

TUCSON

PROJECT

LOCATION

INSCRIPTION

HOUSE HEALTH

CENTER

R

VI

H

P

S

N I

D

C E

I

A

A N

HE TL H

S

E

E

H

N M

E

A R

P

T O

F T

C D

SU

S

A

E

TAE L &H

N V

I S

E R

U M

A H

A

B

C

D

1 2 3 4 5

1 2 3 4 5

Sheet Number:

Sheet Title:

Checked By:

Drawn By:

Scale:

Project No:

Issue Date:

Consultants:

JOHNSON SMITTHIPONG &

ROSAMOND ASSOCIATES, INC.

5210 E Williams Cir Ste 600 Tucson, AZ 85711

(520) 547-7904 www.jsra.com

U. S.

DEPARTMENT OF

HEALTH AND

HUMAN SERVICES

INDIAN HEALTH SERVICE

NAVAJO AREA OFFICE

THIS DOCUMENT IS

NOT TO BE USED FOR

REGULATORY

APPROVAL, PERMIT, OR

CONSTRUCTION

Vernon Rosamond Arizona Lic #: 9793 Date:

ISSUED FOR INTERIM REVIEW

/1

/2

:3 :5

P

M

A u to d e s k D o c s /2

-3

I H

S i H o u s e

A p t v

/2

-3

A rc h i H o u s e

A p t

.r v t

12" = 1'-0"

G001

INFORMATION

SHEET

HARGREAVES

KADDOURA

23-390

8/13/24

PHASE IV (Final CD) iHOUSE APARTMENT

Tonalea, AZ 86044

8/13/24

SHEET INDEX

Sht No Sheet Name

GENERAL

G000 COVER SHEET

G001 INFORMATION SHEET

G101 CODE SHEET

CIVIL

C001 NOTES SHEET

C002 UTILITY NOTES SHEET

C101 SITE PLAN

C201 GRADING PLAN

C301 UTILITY PLAN

C302 ROAD EXTENSION PLAN & PROFILE I

C303 ROAD EXTENSION PLAN & PROFILE II

C500 DETAILS I

C501 DETAILS II

C502 DETAILS III

C503 DETAILS IV

C504 DETAILS V

STRUCTURAL

S001 STRUCTURAL NOTES

S002 SPECIAL INSPECTIONS,I.O.D.

S121 FOUNDATION PLAN WEST

S122 FOUNDATION PLAN EAST

S123 PT LAYOUT WEST

S124 PT LAYOUT EAST

S151 ROOF FRAMING PLAN WEST

S152 ROOF FRAMING PLAN EAST

S501 TYPICAL DETAILS

S502 TYPICAL DETAILS

S503 TYPICAL DETAILS

S521 FOUNDATION DETAILS

S551 ROOF FRAMING DETAILS

S601 SCHEDULES

ARCHITECTURAL

A101 SITE PLAN

A121 OVERALL FLOOR PLAN & WALL TYPES

A122 FLOOR PLAN

A131 DIMENSION PLAN

A141 REFLECTIVE CEILING PLAN

A151 ROOF PLAN

A201 ELEVATIONS

A211 INTERIOR ELEVATIONS

A212 INTERIOR ELEVATIONS

A301 BUILDING SECTIONS

A302 WALL SECTIONS

A303 WALL SECTIONS

A304 WALL SECTIONS

A411 ENLARGED FLOOR PLANS

A421 DIMENSION ENLARGED FLOOR PLANS

A501 EXTERIOR & DOOR DETAILS

A511 INTERIOR DETAILS

A512 INTERIOR DETAILS

A601 DOOR SCHEDULES 100 thru 110

A602 DOOR SCHEDULES 111 thru 130

A603 SIGNAGE SCHEDULE

A611 ROOM SCHEDULE

A612 FLOOR FINISH PLAN

A701 FURNITURE PLAN

A801 PERSPECTIVE VIEWS

A901 SPACE PROGRAM FLOOR PLANS

INTERIORS

I101 INTERIOR PAINT PLAN & FINISH SCHEDULE

FIRE PROTECTION

F001 GENERAL NOTES AND DETAILS - FIRE PROTECTION

F002 SPRINKLER DETAILS - FIRE PROTECTION

F201 FIRST FLOOR PLAN - FIRE PROTECTION

PLUMBING

P001 LEGENDS, NOTES AND SCHEDULES - PLUMBING

P002 SCHEDULES - PLUMBING

P201 FIRST FLOOR PLAN - PLUMBING

P401 PARTIAL FLOOR PLAN - PLUMBING SANITARY

P402 PARTIAL FLOOR PLAN - PLUMBING DOMESTIC

P501 RISERS - PLUMBING SANITARY

P502 RISERS - PLUMBING DOMESTIC MECHANICAL ROOMS

P601 DETAILS - PLUMBING

MECHANICAL

M001 SCHEDULE AND LEGEND - HVAC

M002 SCHEDULES - HVAC

M201 FIRST FLOOR PLAN - HVAC DUCTWORK

M301 PARTIAL FLOOR PLANS - HVAC

M401 DETAILS - HVAC

ELECTRICAL

E001 SCHEDULES, LEGENDS AND GENERAL NOTES - ELECTRICAL

E101 SITE PLAN - ELECTRICAL

E121 ELECTRICAL PLAN

E131 LOW VOLTAGE SYSTEMS PLAN

E141 FIRE ALARM SYSTEM PLAN

E401 PARTIAL ELECTRICAL PLANS

E601 ONE-LINE DIAGRAM - ELECTRICAL

E602 PANEL SCHEDULES - ELECTRICAL

E603 PANEL SCHEDULES - ELECTRICAL

BLK(G) BLOCK(ING)

BM BENCH MARK

BO BOTTOM OF

BOT BOTTOM

BRG BEARING

BRK BRICK

BSMT BASEMENT

BUR BUILT UP ROOFING

CMWP COMPOSITE METAL WALL PANEL

C CHANNEL

C/C CENTER TO CENTER

CAB CABINET

CB CHALK BOARD,CATCH BASIN

CEM CEMENT

CG CORNER GUARD

CI CAST IRON

CIP CAST IN PLACE

CJ CONTROL JOINT

CLG CEILING

CLR CLEAR(ANCE)

CMP CORRUGATED METAL PIPE

CMTSCOMMENTS

CMU CONCRETE MASONRY UNIT

CO CLEAN OUT

COL COLUMN

COMB COMBINATION

CONC CONCRETE

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUOUS OR CONTINUE

CORR CORRIDOR,CORRUGATED

CPT CARPET

CR CLEAN ROOM

CSK COUNTERSINK

CT CERAMIC TILE

CU CUBIC

CU FT CUBIC FOOT (FEET)

CW COLD WATER

D DEPTH

DEMO DEMOLISH, DEMOLITION

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DISP DISPENSER

DN DOWN

DO DITTO

DP DAMPPROOFING

DR DOOR

DS DOWNSPOUT

DTL DETAIL

DWG DRAWING

DWC DRYWALL CHANNELS (HAT)

E EAST

EA EACH

EF EACH FACE

EJ EXPANSION JOINT

ELEC ELECTRIC(AL)

ELEV ELEVATION,ELEVATOR

EMER EMERGENCY

EP EPOXY PAINT

EPS EXPANDED POLYSTYRENE

EQ EQUAL EQUIP EQUIPMENT

ES EXPOSED STRUCTURE

EST ESTIMATE

EW EACH WAY

EWC ELECTRIC WATER COOLER

EXC EXCAVAT(E)(ION)

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION, EXPOSED

EXT EXTERIOR

EIFS EXT. INSULATION FINISH SYSTEM

F FAHRENHEIT

FA FIRE ALARM

FAB FABRICATE

FD FLOOR DRAIN

FDN FOUNDATION

FE(C) FIRE EXTINGUISHER(CABINET)

FF FINISH FLOOR

FHC FIREHOSE CABINET

FHR FIREHOSE RACK

FIN FINSH(ED)

FL FLOOR

FLA FLASHING

FLEX FLEXIBLE

FLUOR FLUORESCENT

FO FACE OF

FP FIREPROOF

FR FIRE RETARDANT

FRP FIBER REINFORCED PLASTIC

FT FOOT,FEET

FTG FOOTING

FUR FURRED(ING)

FUT FUTURE

GA GAGE,(GUAGE)

GALV GALVANIZED

GC GENERAL CONTRACT(OR)

GD GRADE

GL GLASS, GLAZING

GWB GYPSUM WALLBOARD

GYP GYPSUM

H(T) HEIGHT

HB HOSE BIBB

HC HOLLOW CORE

HDBD HARDBOARD

HD HEAVY DUTY

HDWD HARDWOOD

HDWR HARDWARE

HM HOLLOW METAL

HORZ HORIZONTAL

HP HIGH POINT

HR HOUR

HVAC HEATING/VENTILATING/ AIR

CONDITIONING

HW HOT WATER

ICMWP INSULATED COMPOSITE METAL WALL

PANEL

ID INSIDE DIAMETER

IE INVERT ELEVATION

IN INCH(ES)

INCL INCLUDING

INSUL INSULATION

INT INTERIOR

JC JANITORS CLOSET

JST JOIST

JT JOINT

KD KNOCKED DOWN

KIT KITCHEN

KO KNOCK OUT

KP KICK PLATE

L LENGTH,LONG

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LF LINEAL FEET

LH LEFT HAND

LL LIVE LOAD

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LP LOW POINT

LT LIGHT

LTWT LIGHTWEIGHT

LVR LOUVER

MAS MASONRY

MAX MAXIMUM

MATL MATERIAL

MED MEDIUM

MECH MECHANICAL

MET METAL

MEZZ MEZZANINE

MFR MANUFACTURER

MH MANHOLE

MM MILLIMETER

MIN MINIMUM

MISC MISCELLANOUS

MO MASONRY OPENING

MOD MODULAR

MOV MOVABLE

MTD MOUNTED

MWP METAL WALL PANEL (SYSTEM)

N NORTH

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NOM NOMINAL

NRC NOISE REDUCTION COEFFICIENTS

NTS NOT TO SCALE

NO NUMBER

OA OVERALL

OC ON CENTER(S)

OD OUTSIDE DIAMETER

OFF OFFICE

OH OVERHEAD,OPPOSITE HAND

OPG OPENING

OPP OPPOSITE

ORD OVERFLOW ROOF DRAIN

P PAINT(ED)

PAR PARALLEL

PART PARTITION

PART BD PARTICLE BOARD

PC PIECE

PCC PRECAST CONCRETE

PCF POUNDS PER CUBIC FOOT

PREFAB PERFORATE(D)

PERIM PERIMETER

PERP PERPENDICULAR

PF PREFABRICATED

PJ PANEL JOINT

PL PLASTER,PLATE,PROPERTY LINE

PLBG PLUMBING

PLAM PLASTIC LAMINATE

PLF POUNDS PER LINEAL FOOT

PNL PANEL

PO POWER OPERATED

PR PAIR

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT POINT

PTD PAPER TOWEL DISPENSER

PTR PAPER TOWEL RECEPTOR

PVC POLYVINYL CHLORIDE

PVMT PAVEMENT

PLWD PLYWOOD

QT QUARRY TILE

QTR QUARTER

QTY QUANTITY

(R) RECESSED

R RADIUS,RISER ROUND

RA RETURN AIR

RB RESILIENT BASE

RCP REINFORCED CONCRETE PIPE,

REFLECTED CEILING PLAN

RD ROOF DRAIN

RE(F) REFERENCE

RELO RELOCATION

REPL REPLACE

RES RESILIENT

REV REVISION(S),REVISED

RF RIGID FIBERGLASS

RFG ROOFING

RH RIGHT HAND

RM ROOM

RO ROUGH OPENING

ROW RIGHT OF WAY

RRF ROLLED RUBBER FLOORING

REQ'D REQUIRED

RWL RAINWATER LEADER

S SEALED, SOUTH

(S) SURFACE MOUNTED

SC SOLID CORE, SEALED CONCRETE

SCHED SCHEDULE

SECT SECTION

SD STORM DRAIN

SDG SIDING

SF SQUARE FEET

SHT SHEET

SHWR SHOWER

SIM SIMILAR

SL SHEET LINOLEUM

SM SHEET METAL

SP SOUNDPROOF

SPECS SPECIFICATIONS

SPKR SPEAKER

SPL SPECIAL

SQ SQUARE

SS SERVICE SINK

SST STAINLESS STEEL

STD STANDARD ST STEEL, STREET

STOR STORAGE

STRUC STRUCTURAL

SUSP SUSPENDED

SV SEAMLESS VINYL

SW SWITCH

SWR SEWER

SYM SYMMETRY(ICAL)

T THICKNESS, TEE

TD TRENCH DRAIN

T&G TONGUE AND GROOVE

TB TACKBOARD TEL TELEPHONE

TEMP TEMPERATURE,TEMPORARY

TERR TERRAZZO

THK THICK(NESS)

TO TOP OF

TOC TOP OF CONCRETE

TOIL TOILET

TOP TOP OF PARAPET

TOS TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TV TELEVISION

TYP TYPICAL

U URINAL

UG UNDERGROUND

UL UNDERWRITERS LABORATORY

UNF UNFINISHED

UNO UNLESS NOTED OTHERWISE

VB VAPOR BARRIER

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VNR VENEER

VPL VENEER PLASTER

VIF VERIFY IN FIELD

VWC VINYL WALL COVERING

W WIDTH, WIDE, WEST

W/ WITH

W/O WITHOUT

W/W WALL TO WALL

WC WATER CLOSET

WD WOOD

WDW WINDOW

WH WALL HUNG, WATER HEATER

WI WROUGHT IRON

WM WIRE MESH

WP WATERPROOFING

WR WATER REPELLENT

WS WEATHERSTRIP

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

YD YARD

ABBREVIATIONS PROJECT DIRECTORY

CODE DATA & STANDARDS

1. ALL DIMENSIONS GIVEN ARE TO FACE OF STUD. EXCEPTIONS AS INDICATED ON

THE DOCUMENTS.

2. LARGE SCALE DETAILS AND PLANS TAKE PRECEDENCE OVER SMALL SCALE

DRAWINGS.

3. CIVIL DRAWINGS FINISH FLOOR DATUM ELEVATION EQUALS ARCHITECTURAL

ELEVATION OF 0'=0" FOR EACH BUILDING INDEPENDANT OF OTHER BUILDINGS.

4. COORDINATE AND VERIFY ALL DIMENSIONS, OPENINGS AND CONDITIONS WITH

CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL AND ALL OTHER PERTINENT

DRAWINGS AND TRADES PRIOR TO CONSTRUCTION. NOTIFY ARCHITECT OF

DISCREPANCIES PRIOR TO FABRICATION AND INSTALLATION.

5. FIRE RATINGS SHALL BE MAINTAINED AT FIRE RATED PARTITIONS BY A U.L.

ASSEMBLY AT GAPS AND VOIDS CREATED BY PENETRATIONS, STRUCTURAL

MEMBERS AND INTERSECTIONS WITH ADJACENT SURFACES.

6. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE CODES

AND REGULATIONS.

OWNER

NAVAJO AREA INDIAN HEALTH SERVICE

272 HIGHWAY 264

WINDOW ROCK, AZ 86515

CONTACT: ANTOINE PANTHER

PHONE: (928) 871-5823

ARCHITECT

JOHNSON SMITTHIPONG & ROSAMOND

5120 E. WILLIAMS CIR, SUITE 600

TUCSON, AZ 85711

CONTACT: DANIEL HARGREAVES

PHONE: (520) 547-7904

CIVIL ENGINEER

DOWL

4686 EAST VAN BUREN STREET, SUITE 175

PHOENIX, AZ 85008

CONTACT: RUDY ING

PHONE: (480) 753-0800

STRUCTURAL ENGINEER

SCHNEIDER & ASSOCIATES

STRUCTURAL ENGINEERS, INC

435 EAST 9TH STREET

TUCSON, AZ 85705

CONTACT: RON SCHNEIDER

PHONE: (520) 512-8183

ELECTRICAL/MECHANICAL ENGINEER

BERNHARD TME

2990 N SWAN RD., SUITE 227

TUCSON, AZ 85712

CONTACT: MARK ALVAREZ

PHONE: (520) 247-3443

OCCUPANCY R-2

CONSTRUCTION TYPE V-B

SEISMIC ZONE REFER TO STRUCTURAL

SPRINKLERS FULLY SPRINKLERED

GENERAL ARCHITECTURAL NOTES

PROJECT LOCATION

INTERNATIONAL BUILDING CODE 2021

2021 INTERNATIONAL BUILDING CODE

2021 INTERNATIONAL PLUMBING CODE

2021 INTERNATIONAL MECHANICAL CODE

2021 INTERNATIONAL ENERGY CONSERVATION CODE

2021 INTERNATIONAL FIRE CODE

2017 NATIONAL ELECTRIC CODE

2010 ARCHITECTURAL BARRIERS ACT

2021 A/E IHS DESIGN GUIDE

2021 NFPA 101 - LIFE SAFETY CODE

2021 NFPA 72

2021 NFPA 10

2021 NFPA 13

2021 NFPA 20

2021 NFPA 22

2021 NFPA 24

GPS COORDINATES: 36.59716, -110.79115

16' - 0" 150' - 6"

34 sec

158' - 1"

36 sec 47' - 3"

11 sec

LEGEND

OCCUPANCY @ EXIT

EGRESS START (OR OPTION)

EGRESS PATH

EGRESS DIRECTION

EGRESS DISTANCE &

TRAVEL TIME

1/2 HOUR RATED WALL

R

VI

H

P

S

N I

D

C E

I

A

A N

HE TL H

S

E

E

H

N M

E

A R

P

T O

F T

C D

SU

S

A

E

TAE L &H

N V

I S

E R

U M

A H

A

B

C

D

1 2 3 4 5

1 2 3 4 5

Sheet Number:

Sheet Title:

Checked By:

Drawn By:

Scale:

Project No:

Issue Date:

Consultants:

JOHNSON SMITTHIPONG &

ROSAMOND ASSOCIATES, INC.

5210 E Williams Cir Ste 600 Tucson, AZ 85711

(520) 547-7904 www.jsra.com

U. S.

DEPARTMENT OF

HEALTH AND

HUMAN SERVICES

INDIAN HEALTH SERVICE

NAVAJO AREA OFFICE

THIS DOCUMENT IS

NOT TO BE USED FOR

REGULATORY

APPROVAL, PERMIT, OR

CONSTRUCTION

Vernon Rosamond Arizona Lic #: 9793 Date:

ISSUED FOR INTERIM REVIEW

/1

/2

:3 :5

P

M

A u to d e s k D o c s /2

-3

I H

S i H o u s e

A p t v

/2

-3

A rc h i H o u s e

A p t

.r v t

As indicated

G101

CODE SHEET

HARGREAVES

KADDOURA

23-390

8/13/24

PHASE IV (Final CD) iHOUSE APARTMENT

Tonalea, AZ 86044

8/13/24

1/16" = 1'-0"A1 CODE FLOOR PLAN 1/4" = 1'-0"

Code Legend

Applicable Codes and Standards:

2021 IBC -International Building Code 2017 National Electrical Code (NEC) 2021 IMC - International Mechanical Code 2021 IPC - International Plumbing Code 2021 IFC - International Fire Code 2021 IECC - International Energy Conservation Code

2021 NFPA 101

Chapter 30 Apartments 2010 Standards for Architectural Barriers Act

In addition to the above codes, the contractor is responsible for constructing the project so as to comply with all applicable referenced standards, including but not limited to:

NFPA (National Fire Protection Association) Codes:

10 - Standard for Portable Fire Extinguishers 13 – Sprinklers for Commercial Buildings 24 - Installation of Private Fire Service Mains and their Appurtenance 1142 - Standard on water Supplies for Suburban and Rural Fire Fighting Navajo Tribal Utility Authority (NTUA) Standard Details Navajo Nation EPA Regulations Navajo Nation Clean Water Act Navajo Nation Domestic Wastewater Regulations Navajo Nation Safe Drinking Water Act Navajo Nation Primary Drinking Water Regulation

1. Administration :

1. Multi-Family, Transient: IBC applies to the apartment building.

2. All construction is new

II. Definitions:

A. APARTMENT: NFPA Defines any building with three or more dwelling units as an apartment.

B. DWELLING UNIT: A single unit providing complete independent living facilities for one or more persons.

C. HABITABLE SPACE. A space in a building for living, sleeping, eating or cooking.

Bathrooms, toilet rooms, closets, halls, storage or utility spaces and similar areas are not considered habitable spaces.

III. Occupancy Class A. Apartment = IBC, R-2

IV. IBC Area & Construction Type A. Construction Type VB B. Area Limit per Sprinklered VB = R-2: 28,000sf C. 19 Apartment Units = 18,250sf (R-2)

V. Exterior Walls:

A. IBC – Table 602, Type VB construction, No fire resistance requirements when greater than 10’

VI. Light, Ventilation and Heating:

A. IBC 1204.2: Habitable rooms shall have a glazing area not less than 8% of the floor area.

VII. Minimum Room Areas:

A. IBC – 1207 Habitable space (other than kitchen) shall not be less than 7’ in any plan dimension.

VIII. Ceiling Height:

A. IBC 1207.2 Habitable spaces and corridors shall have a ceiling height of not less than 7 feet 6 inches above the finish floor. Bathrooms, toilet rooms, kitchens, storage rooms and laundry rooms shall have a ceiling height not less than 7 feet above finished floor. Exception: Sloping Ceilings

IX. Sanitation:

A. IBC – 1209.2.3 Shower and bathtubs with showers shall be finished with a nonabsorbent surface extending to a height of 6 feet above the drain inlet.

X. Glazing:

A. IBC – 2406 Individual glazed area, including glass mirrors, in hazardous locations shall comply with the IBC per table 2406.2 B. Hazardous locations include glazing in doors. Glazing adjacent to doors (lowest edge

24” AFF). Windows with lowest part of glazing less than 18” AFF.

XI. Emergency Escape and Rescue Openings:

A. NFPA 24.2.2.1 – Dwelling Units of 2 or more rooms, every sleeping room shall have one primary means of escape and a secondary means of escape.

1. Secondary Means of escape shall be an outside window or door not less than 5.7sf Clear height -24" Clear width 20". Sill height of not more than 44 inches AFF. Window shall be within 20ft of grade.

B. NFPA 30.2.1.2 – Apartment means of escape shall comply with Section 24.2.

C. IBC - 1030 Basements and every sleeping room shall have at least one operable emergency escape and rescue opening. Minimum Dimensions: Clear opening -5.7 s.f. Clear height -24" Clear width 20". Sill height of not more than 44 inches.

XII. Means of Egress:

1. IBC 1004 Occupant Load factor is 200 gross (2 Bedroom is largest unit at 830sf = 5) All

Units only require one means of egress.

2. IBC 1010.1 Means of Egress doors shall be clear width of 32”. Measurement shall be from door face to door stop when door is 90 degrees open.

3. IBC 1020.1 Corridors serving more than 10 occupants shall have a 30 minute rating if fully sprinklered.

4. IBC 1020.2 Hallways (Corridors) within the dwelling unit shall not be less than 36” clear.

XIII. Smoke Alarms A. NFPA 24.3.4.1 & 30.3.4.5, IBC 907.2.10.2 Smoke alarms shall be installed in each sleeping room, outside each sleeping area, and on each additional story.

B. NFPA 24.3.4.2 – Carbon Monoxide alarms or detectors shall be provided with dwelling units that have an attached garage.

XIV. insulation & Foam Plastic IBC 2603:

A. All foam plastic shall have a name spread index of not more than 75 and shall have a smoke-developed Index of not more than 450 when tested by ASTM E 84.

B. Foam plastic shall be separated from the interior of a building by an approved thermal barrier of minimum ½ inch gypsum wallboard or an approved thermal barrier material.

C. IBC 2603.4.1.7 Foam Filled Exterior doors in R2 are not required to have a fire protection rating

XV. Flame Spread and Smoke Density:

A. IBC 803.1.2 (Class C) Wall and ceiling finishes shall have a flame spread classification of not greater than 200 nor a smoke-developed index greater than 460 as tested by

ASTME84.

XVI. Dwelling Unit Separation:

A. NFPA 30.3.7.2 – Buildings protected by an approved automatic sprinkler system, each dwelling unit shall be separated by ½ hour fire resistive rating.

B. IBC 420.2 Walls separating Dwelling units shall constructed as fire partitions per 708.

C. IBC 708.3 Walls shall be 1hour unless Type VB construction with automatic sprinkler system shall be not less than ½ hour.

XVII. Moisture decay & Termites: N/A

XVIII. Accessibility:

A. IBC Chapter 11 refers to ICC A117.1. Accessible Units shall comply with the technical section of the 2010 ABA & ICC A117.1

XIX. Energy Efficiency IECC Chapter 4:

A. Climate zone: 5 B. Insulation and fenestration requirements by component (Table C402.4)

1. Fenestration U-factor. 0.30

2. Skylight U-factor: 0.55

3. Glazing SHGC: No Requirement

4. Roof R-Value: R30ci

5. Wood frame wall R-value: 20+3.8ci - or- 13+7.5ci

6. Slab R-value and depth: R20, 2ft

C. The building thermal envelope shall be durably sealed to limit infiltration. The sealing methods between dissimilar materials shall allow for differential expansion and contraction. The following shall be caulked, gasketed, weather-stripped or otherwise sealed with an air barrier material, suitable film or solid material.

1. All joints, seams and penetrations.

2. Site-built windows, doors and skylights.

3. Openings between window and door assemblies and their respective jambs and framing.

4. Utility penetrations.

5. Dropped ceilings or chases adjacent to the thermal envelope.

6. Knee walls.

7. Walls and ceilings separating the garage from conditioned spaces.

8. Behind tubs and showers on exterior walls.

9. Common walls between dwelling units.

10. Other sources of infiltration.

D. Refer to mechanical, plumbing, and electrical drawings for systems compliance.

XX. Additional Requirements:

A. Refer to structural, mechanical, plumbing, and electrical drawings for discipline specific code requirements and compliance.

iHOUSE APARTMENT

PROJECT

INDIAN ROUTE 6290,

TONALEA, AZ 86044

E

H

N M

E

AR

P

T

OF

T

C D

SU

S

A

E

TAE L &H

N

VI

SER

UMA

H

RVI

HP

S

NI

D

91 55

CE

I

A

AN

HE TL H SE

A

B

C

D

1 2 3 4 5

1 2 3 4 5

Sheet Number:

Sheet Title:

Checked By:

Drawn By:

Scale:

Project No:

Issue Date:

SC

GSS

AS SHOWN

23-390

08/13/2024

No. Date Description

PHASE IV (FINAL CD)

Consultants:

JOHNSON SMITTHIPONG &

ROSAMOND ASSOCIATES, INC.

5210 E Williams Cir Ste 600 Tucson, AZ 85711

(520) 547-7904 www.jsrarchinc.com

U. S.

DEPARTMENT OF

HEALTH AND

HUMAN SERVICES

INDIAN HEALTH SERVICE

NAVAJO AREA OFFICE

480-753-0800

4686 East Van Buren Street, Suite 175 Phoenix, Arizona 85008

WWW.DOWL.COM

C001

NOTES SHEET

GENERAL NOTES

1. ALL CONSTRUCTION SHALL CONFORM TO THE LATEST EDITION OF THE MARICOPA ASSOCIATION OF GOVERNMENTS' (MAG)

UNIFORM STANDARD SPECIFICATIONS AND DETAILS FOR PUBLIC WORKS CONSTRUCTION (MAG STANDARDS) AND THE NAVAJO TRIBAL UTILITY AUTHORITY (NTUA) TECHNICAL SPECIFICATIONS AND DETAILS UNLESS OTHERWISE NOTED.

2. THE OWNER, UTILITY AGENCY AND JURISDICTION HAVING AUTHORITY, AS APPLICABLE, SHALL BE NOTIFIED 24-HOURS PRIOR TO ANY CONSTRUCTION WORK. ANY WORK CONCEALED WITHOUT INSPECTION SHALL BE SUBJECT TO REMOVAL

AND REPLACEMENT AT THE CONTRACTOR'S/DEVELOPER'S EXPENSE.

3. AN APPROVED SET OF PLANS MUST BE AVAILABLE ON THE JOB SITE AT ALL TIMES. THE CONTRACTOR'S REPRESENTATIVE (CAPABLE OF COMMUNICATING WITH TRIBAL REPRESENTATIVES) SHALL BE ON THE JOB AT ALL TIMES THE WORK IS BEING

PURSUED.

4. THE CONTRACTOR IS RESPONSIBLE TO PROVIDE EMERGENCY TELEPHONE NUMBERS TO THE NAVAJO TRIBE AND HAVE PERSONNEL AVAILABLE 24-HOURS A DAY TO RESPOND TO EMERGENCIES. IF TRIBAL AGENCIES ARE REQUIRED TO

RESPOND AND MAKE EMERGENCY REPAIRS ON BEHALF OF THE CONTRACTOR/DEVELOPER, THE

CONTRACTOR/DEVELOPER IS RESPONSIBLE TO REIMBURSE THE TRIBE FOR ALL COSTS INCURRED.

5. IT SHALL BE THE RESPONSIBILITY OF THE PERMITTEE TO ARRANGE FOR THE RELOCATION AND RELOCATION COSTS OF

ALL UTILITIES AND SUBMIT A UTILITY RELOCATION SCHEDULE.

6. THE PROCEDURES AND METHODS USED TO SAMPLE, TEST MATERIALS, AND REPORT TEST RESULTS WILL BE APPROVED BY TRIBAL AGENCIES. FOR ALL PHASES OF CONSTRUCTION, THE TYPE, SCHEDULING, FREQUENCY AND LOCATION OF ALL MATERIALS TESTING AND SAMPLING SHALL BY TRIBAL AGENCIES. ALL TEST RESULTS SHALL BE REPORTED DIRECTLY (IN WRITING) TO THE TRIBAL AGENCIES. FOR EACH PHASE OF CONSTRUCTION, TEST RESULTS (IN WRITING) MUST BE RECEIVED FROM THE TESTING LABORATORY, PRIOR TO START OF THE NEXT PHASE OF CONSTRUCTION.

7. THE CONTRACTOR MUST GIVE A LOCATION FOR WASTING EXCESS EXCAVATION MATERIALS AND A LETTER FROM THE

OWNER GIVING PERMISSION FOR DUMPING PRIOR TO STARTING ON-SITE CONSTRUCTION.

8. THE LOCATION OF UTILITIES SHOWN IS BASED ON INFORMATION AVAILABLE AT THE TIME OF DESIGN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO VERIFY THE PRESENCE AND LOCATION OF ALL EXISTING OVERHEAD AND/OR UNDERGROUND UTILITIES THAT MAY INTERFERE WITH THIS CONSTRUCTION, WHETHER OR NOT SAID UTILITIES ARE SHOWN ON THE CONSTRUCTION PLANS FOR THIS PROJECT AND TO ADEQUATELY PROTECT AND

MAINTAIN ANY SUCH UTILITIES.

9. THE CONTRACTOR SHALL CONTACT BLUE STAKE (602) 263-1100 PRIOR TO CONSTRUCTION. IT IS THE RESPONSIBILITY OF

THE CONTRACTOR TO MAINTAIN CURRENT BLUE STAKE MARKINGS THROUGHOUT CONSTRUCTION.

10. THE CONTRACTOR MAY OBTAIN CONSTRUCTION WATER FROM THE LOAD OUT FACILITY LOCATED IN PEACH SPRINGS.

COORDINATE WITH TRIBAL PUBLIC SERVICES ON OPERATIONS AND PAYMENT.

11. CONTRACTOR IS RESPONSIBLE TO CONSTRUCT STABILIZED CONSTRUCTION ENTRANCES IN ORDER TO REDUCE OR

ELIMINATE THE TRACKING OF SEDIMENT ONTO PUBLIC RIGHTS-OF-WAYS OR STREETS.

12. ALL DRAINAGE PROTECTIVE DEVICES SUCH AS SWALES, INTERCEPTION DITCHES, PIPES PROTECTIVE BERMS, CONCRETE CHANNELS OR OTHER MEASURES DESIGNED TO PROTECT IMPROVEMENTS, WHETHER EXISTING OR PROPOSED, FROM RUNOFF OR DAMAGE FROM STORM WATER, MUST BE CONSTRUCTED PRIOR TO THE CONSTRUCTION OF ANY

IMPROVEMENTS.

13. ANY AND ALL OBSTRUCTIONS WITHIN THE RIGHTS-OF-WAY AND EASEMENTS SHALL BE REMOVED BEFORE ANY

CONSTRUCTION IS COMMENCED.

14. ALL CONTRACTORS ARE RESPONSIBLE TO OBTAIN A NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT IN ACCORDANCE WITH FEDERAL AND STATE REGULATIONS, INCLUDING NOTICE OF INTENT (NOI), NOTICE OF TERMINATION, AND STORM WATER POLLUTION PREVENTION PLAN (SWPPP), IF REQUIRED. A COPY OF THE NOI AND SWPPP SHALL BE AVAILABLE ON THE JOB SITE AT ALL TIMES IF REQUIRED. ALL SWPPP PLANS MUST INCLUDE THE NOI TRACKING NUMBER ADMINISTERED BY ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY (ADEQ) ON THE BOTTOM RIGHT HAND

CORNER OF THE SHEET, IF REQUIRED.

15. CONTRACTOR IS RESPONSIBLE TO OBTAIN THE NECESSARY 401 AND 404 PERMITS, IF REQUIRED.

16. CONTRACTOR SHALL OBTAIN ANY AND ALL PERMITS AS REQUIRED BY OTHER AGENCIES WHICH HAVE JURISDICTION AT

THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL MEET THE REQUIREMENTS OF THESE PERMITS AS SET FORTH

THEREIN.

17. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL JOB SITE SAFETY, INCLUDING BUT NOT LIMITED TO MEETING ALL

REQUIREMENTS OF OSHA AND ADOSH.

18. CONSTRUCTION WORK HOURS SHALL BE AS 6:00 AM TO 7:00 PM UNLESS OTHERWISE APPROVED BY TRIBAL

REPRESENTATIVES.

1. PROJECT APPROVAL BY THE NAVAJO TRIBE FOR COMPLIANCE WITH TRIBAL REQUIREMENTS SHALL NOT PREVENT THE TRIBAL REPRESENTATIVES FROM REQUIRING CORRECTION OF ERRORS FOUND TO BE IN VIOLATION OF ANY LAW, ORDINANCE, OR REQUIREMENTS FOR UTILITY CONSTRUCTION.

2. PROPER NOTIFICATION MUST BE MADE TO ALL AFFECTED RESIDENTS. THIS INCLUDES NOTIFICATION/INFORMATION SIGNS AND HANGING OF DOOR NOTICES. DOOR NOTICES SHALL BE DISTRIBUTED PRIOR TO BLUE-STAKING AND COMMENCING

NON-EMERGENCY WORK.

3. ALL WORK REQUIRING ASPHALT REPLACEMENT, CONCRETE REPLACEMENT OR RESURFACING WILL REQUIRE A FINAL INSPECTION WITH THE UTILITY COMPANY REPRESENTATIVE AT THE TIME OF COMPLETION. TEMPORARY PAVEMENT REPLACEMENT THAT USES COLD-MIX ASPHALT SHALL BE REPLACED NO LATER THAN 7-BUSINESS DAYS AFTER INITIAL

PLACEMENT. THIS ALSO INCLUDES PAVEMENT MARKINGS.

4. ALL POTHOLES FOR EXISTING UTILITY CROSSINGS OR SOIL BORINGS FOR FUTURE UTILITIES WILL BE REPAIRED WITH A

FULL DEPTH T-TOP PER MAG STANDARD DETAIL 212.

5. ALL TRENCHES IN EXISTING AND FUTURE PAVEMENT OR WITHIN 2 FEET OF BACK OF CURB ARE REQUIRED TO BE BACKFILLED AND WILL REQUIRE ABC COMPACTED TO 95% OR ½ SACK SLURRY CONTROLLED LOW-STRENGTH MATERIAL

PER MAG SECTIONS 604 AND 728.

6. ANY DAMAGE TO PUBLIC OR PRIVATE PROPERTY SHALL BE REPORTED TO THE TRIBAL PUBLIC WORKS AND THE PROPERTY OWNER. REPAIR AND/OR REPLACEMENT, IN KIND, SHALL BE COORDINATED WITH THE PROPERTY OWNER AND/OR TRIBAL

AUTHORITIES.

7. THE JOBSITE SHALL BE CLEANED OF ANY DEBRIS OR SPOILS RESULTING FROM THIS PROJECT AT THE COMPLETION OF THE

PROJECT.

8. THE UTILITY PROVIDER IS RESPONSIBLE FOR OBTAINING A NATION POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT IN ACCORDANCE WITH FEDERAL AND STATE REGULATIONS, INCLUDING NOTICE OF INTENT (NOI), NOTICE OF TERMINATION (NOT), AND STORM WATER POLLUTION PREVENTION PLAN (SWPPP), AS NECESSARY.

1. THE JHA WILL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, OR PROCEDURES OR FOR SAFETY PRECAUTIONS OR PROGRAMS UTILIZED IN CONNECTION WITH THE WORK. THIS IS THE CONTRACTOR'S SOLE RESPONSIBILITY. THE COR WILL NOT BE RESPONSIBLE FOR THE CONTRACTOR'S FAILURE TO CARRY OUT THE WORK

IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.

2. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING TRUCKS AND/OR OTHER EQUIPMENT OF MUD PRIOR TO ENTERING PUBLIC STREETS. IT SHALL ALSO BE THE CONTRACTOR'S RESPONSIBILITY TO CLEAN STREETS, ALLAY DUST, AND TO TAKE WHATEVER MEASURES ARE NECESSARY TO ENSURE THAT ALL ROADWAYS AND ON-SITE PARKING LOTS/FIRE

LANES ARE MAINTAINED IN A CLEAN, MUD AND DUST-FREE CONDITION AT ALL TIMES.

3. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE UNDERGROUND UTILITY LOCATIONS AND/OR ELEVATIONS AS SHOWN ON THESE PLANS ARE BASED ON THE BEST INFORMATION AVAILABLE FROM UTILITY RECORDS AND OTHER DATA AS SUPPLIED TO THE OWNER AND JHA. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE.

THERE MAY BE OTHER UNDERGROUND UTILITY LINES, SERVICE LINES, AND STRUCTURES PRESENT IN THE SUBJECT AREA.

THE CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF EXISTING UTILITIES PRIOR TO CONSTRUCTION. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST FORTY-EIGHT (48) HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IF EXISTING UTILITIES ARE FOUND TO CONFLICT WITH THE PROPOSED IMPROVEMENTS, THE CONTRACTOR SHALL NOTIFY THE COR PRIOR TO PROCEEDING WITH WORK.

4. THE APPROPRIATE TRIBAL REPRESENTATIVES MUST APPROVE, PRIOR TO CONSTRUCTION, ANY ALTERATION OR VARIANCE FROM THESE PLANS. ANY PROPOSED VARIATIONS SHALL BE SHOWN ON CONSTRUCTION FIELD PRINTS AND TRANSMITTED

TO THE TRIBE FOR REVIEW.

5. ANY INSPECTION BY THE OWNER OR JHA SHALL NOT IN ANY WAY RELIEVE THE CONTRACTOR FROM ANY OBLIGATION TO PERFORM THE WORK IN STRICT COMPLIANCE WITH THE APPLICABLE CODES AND COMMUNITY REQUIREMENTS.

6. SHOULD THE CONTRACTOR ENCOUNTER AN EXISTING STRUCTURE (ABOVE OR BELOW GROUND) IN THE WORK FOR WHICH DISPOSITION IS NOT INDICATED ON THE PLANS, THE JHA AND TRIBAL REPRESENTATIVE SHALL BE NOTIFIED PRIOR TO DISTURBING SUCH STRUCTURE. THE DISPOSITION OF EXISTING STRUCTURES SO ENCOUNTERED SHALL BE DETERMINED

BY THE COR AND TRIBAL REPRESENTATIVE.

7. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL CONSTRUCTION DEBRIS FROM THE SITE AND DISPOSING OF THE DEBRIS IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL RULES, REGULATIONS, AND LAWS. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION AND PROPER DISPOSAL.

8. THE CONTRACTOR SHALL NOT TAKE ADVANTAGE OF ANY APPARENT ERROR OR OMISSION ON THE PLANS OR SPECIFICATIONS. IN THE EVENT THE CONTRACTOR DISCOVERS ANY APPARENT ERROR OR DISCREPANCY, HE SHALL IMMEDIATELY CALL UPON TRIBAL REPRESENTATIVES FOR HIS INTERPRETATION AND DECISION, AND SUCH DECISION SHALL

BE FINAL.

9. EXISTING SITE IMPROVEMENTS WHICH ARE DAMAGED OR DISPLACED BY THE CONTRACTOR'S OPERATIONS SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL NOTIFY THE OWNER, WHO SHALL APPROVE REPAIRS PRIOR TO CONSTRUCTION. THE OWNER MAY WITHHOLD FINAL

PAYMENT UNTIL REPAIRS ARE INSPECTED AND APPROVED.

10. THE CONTRACTOR SHALL FIELD VERIFY THE ELEVATIONS AND BENCHMARKS PRIOR TO COMMENCING WORK. THE

CONTRACTOR SHALL ALSO FIELD VERIFY LOCATION, ELEVATION, AND/OR SIZE OF EXISTING PIPE INVERTS, FLOOR ELEVATIONS, AND CURB OR PAVEMENT AT LOCATIONS WHERE MATCHING INTO EXISTING WORK. THE CONTRACTOR SHALL FIELD VERIFY HORIZONTAL CONTROL BY REFERENCING SHOWN DIMENSIONS OR COORDINATES TO KNOWN PROPERTY LINES AND NOTIFY THE JHA OF DISCREPANCIES IN EITHER VERTICAL OR HORIZONTAL CONTROL PRIOR TO PROCEEDING

WITH WORK.

11. PROPERTY CORNERS AND BENCHMARKS SHALL BE CAREFULLY PROTECTED. PROPERTY MONUMENTS DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE AND AT NO ADDITIONAL COST TO THE

OWNER.

12. AT THE COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL PROVIDE REDLINED MARK-UPS OF AS-BUILT CONDITIONS

TO THE JHA IN HARD COPY OR ELECTRONIC FORMATS.

STREET CONSTRUCTION NOTES

1. THE DENSITY REQUIRED WHEN TESTED AND DETERMINED BY AASHTO T99 METHOD "C", T167, T138, AND ASTM D2950 SHALL

MEET MAG SECTION 601, TABLE 601-2.

2. ALL BACKFILL, PAVEMENT AND SURFACE REPLACEMENT SHALL MEET THE REQUIREMENTS OF MAG STANDARD DETAIL

200-1 AND MAG SECTION 336. ALL TRENCHES SHALL MEET OSHA REQUIREMENTS.

3. ROADWAY EXCAVATION SHALL MEET THE REQUIREMENTS OF MAG STANDARD 205 MAG STANDARD 301 FOR SUBGRADE

PREPARATION.

4. CONTRACTOR SHALL REPLACE ANY INADEQUATE SUBGRADE MATERIAL WITH APPROPRIATE BACKFILL AS DIRECTED BY

THE COR.

5. AGGREGATE BASE SHALL MEET THE REQUIREMENTS OF MAG SECTION 310 AND SECTION 702, TABLE 702-1.

6. ALL ASPHALT CONCRETE PAVEMENT SHALL MEET THE REQUIREMENTS OF MAG SECTION 321, ASPHALT TO BE GRADE

PG-70-10, AND MAX AGGREGATE SIZE SHALL BE 3/4". PRIOR TO THE ASPHALT PAVING BEING PLACED, THE CONTRACTOR SHALL SUBMIT THE MIX DESIGN INCLUDING THE MARSHALL DENSITY THAT WILL BE USED FOR THE PROJECT. AT THE BEGINNING OF THE FIRST DAY'S PAVING, THE CONTRACTOR SHALL SAMPLE THE ASPHALT MIX FROM THE ROADWAY, SUBMIT TO A CERTIFIED MATERIALS LABORATORY FOR DETERMINATION OF THE ASPHALT CONTENT, GRADATION, AND MARSHALL DENSITY. ALL ASSOCIATED COSTS TO BE THE RESPONSIBILITY OF THE CONTRACTOR.

7. CONCRETE CURB AND GUTTER SHALL MEET THE REQUIREMENTS OF MAG STANDARD DETAIL 220 TYPE A AND AS

SPECIFIED HEREIN.

8. ALL POURED CONCRETE STRUCTURES SHALL MEET THE REQUIREMENTS OF MAG SECTION 505.

9. STREET SIGNING SHALL BE AS PER MOHAVE COUNTY STANDARD DETAILS 131-1,2. SEPARATE POSTS SHALL BE PROVIDED

FOR STREET AND STOP SIGNS.

10. PAVING CONSTRUCTION SHALL NOT START UNTIL ALL UTILITY WORK UNDER THE PROPOSED PAVED AREAS IS COMPLETED.

11. BASE COURSE SHALL NOT BE PLACED UNTIL SUBGRADE HAS BEEN APPROVED BY THE COR.

12. WORK ON THIS PROJECT WILL NOT BE CONSIDERED COMPLETED UNTIL ALL CURBS, SIDEWALKS AND PAVEMENTS HAVE

BEEN SWEPT CLEAN OF ALL AND DEBRIS AND ACCEPTED BY THE OWNER.

13. THE LOCATION OF ALL WATER VALVES, FIRE HYDRANTS AND SEWER MANHOLES SHALL BE REFERENCED DURING

CONSTRUCTION BY THE CONTRACTOR AT ALL TIMES AND ACCESSIBILITY MADE AVAILABLE TO THE LOCAL FIRE DEPT.

14. ALL UTILITY FACILITIES IN CONFLICT WITH THIS PROJECT SHALL BE RELOCATED AS REQUIRED BY THE CONTRACTOR. ALL

ACTIVITY SHALL BE COORDINATED WITH THE UTILITY COMPANIES AND DONE UNDER THEIR SUPERVISION AT NO EXTRA

COST TO THE OWNER.

15. EXISTING STREET AND TRAFFIC CONTROL SIGNS SHALL BE MAINTAINED DURING CONSTRUCTION AND BE RELOCATED BY

THE CONTRACTOR AS DIRECTED BY THE NAVAJO PUBLIC SERVICES DIRECTOR.

UTILITY CONSTRUCTION NOTES

JURISDICTION HAVING AUTHORITY (JHA) GENERAL NOTES

STORMWATER POLLUTION PREVENTION PLAN

1. THE CONTRACTOR IS REQUIRED TO DEVELOP, IMPLEMENT, AND MAINTAIN A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IN ACCORDANCE WITH THE ENVIRONMENTAL PROTECTION AGENCY (EPA) REGULATIONS AND NAVAJO NATION ENVIRONMENTAL PROTECTION AGENCY (NNEPA), SPECIFICALLY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) CONSTRUCTION GENERAL PERMIT (CGP) REQUIREMENTS. THE PURPOSE OF THE SWPPP IS TO PREVENT STORMWATER POLLUTION AND MINIMIZE SEDIMENT RUNOFF INTO ADJACENT WATER BODIES AND THE

SURROUNDING ENVIRONMENT DURING ALL PHASES OF CONSTRUCTION.

2. REGULATORY COMPLIANCE - THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT THE SWPPP COMPLIES WITH ALL FEDERAL, STATE, AND LOCAL REGULATIONS, INCLUDING OBTAINING ANY NECESSARY PERMITS. FAILURE TO COMPLY WITH SWPPP REQUIREMENTS OR REGULATORY OBLIGATIONS MAY RESULT IN LEGAL PENALTIES, INCLUDING FINES, AND IS

SUBJECT TO ENFORCEMENT ACTION BY THE EPA OR OTHER REGULATORY AGENCIES.

3. ENGINEER'S REVIEW AND APPROVAL - THE SWPPP MUST BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TO THE START OF CONSTRUCTION. NO CONSTRUCTION ACTIVITIES SHALL COMMENCE UNTIL THE SWPPP HAS BEEN APPROVED. THE CONTRACTOR IS RESPONSIBLE FOR ANY REVISIONS OR UPDATES TO THE SWPPP AS CONSTRUCTION

PROGRESSES AND SITE CONDITIONS CHANGE.

4. PLAN DEVELOPMENT - THE CONTRACTOR SHALL PREPARE A COMPREHENSIVE SWPPP BEFORE THE COMMENCEMENT OF

ANY CONSTRUCTION ACTIVITIES. THE SWPPP MUST INCLUDE, BUT IS NOT LIMITED TO:

A. SITE DESCRIPTION: INCLUDE A DESCRIPTION OF THE CONSTRUCTION ACTIVITIES, SITE LOCATION, TOPOGRAPHY, SOIL

TYPES, AND EXISTING DRAINAGE PATTERNS.

B. POLLUTION PREVENTION PRACTICES: DETAIL THE BEST MANAGEMENT PRACTICES (BMPS) TO CONTROL SEDIMENT, EROSION, AND POLLUTANTS AT THE SITE. BMPS MUST COVER ALL PHASES OF CONSTRUCTION AND INCLUDE

STRUCTURAL, VEGETATIVE, AND PROCEDURAL MEASURES.

C. SITE MAP: PROVIDE A DETAILED SITE MAP SHOWING LOCATIONS OF ALL STORMWATER CONTROLS, BMPS, STORMWATER OUTFALLS, AND POTENTIAL POLLUTION SOURCES.

D. INSPECTION AND MAINTENANCE: OUTLINE PROCEDURES FOR REGULAR INSPECTION, MAINTENANCE, AND REPAIR OF

BMPS, INCLUDING AFTER RAIN EVENTS.

E. PERSONNEL TRAINING: DESCRIBE TRAINING PROCEDURES FOR PERSONNEL RESPONSIBLE FOR SWPPP

IMPLEMENTATION AND MAINTENANCE.

F. RECORD KEEPING: MAINTAIN RECORDS OF ALL INSPECTIONS, MAINTENANCE, AND CORRECTIVE ACTIONS TAKEN TO

ENSURE COMPLIANCE WITH THE SWPPP.

5. BEST MANAGEMENT PRACTICES (BMPS) - THE CONTRACTOR IS REQUIRED TO IMPLEMENT THE FOLLOWING BMPS AT A

MINIMUM:

A. EROSION CONTROL MEASURES:

· SILT FENCES, STRAW WATTLES, AND SEDIMENT TRAPS SHOULD BE INSTALLED AROUND THE PERIMETER OF THE

CONSTRUCTION SITE AND AT SENSITIVE AREAS.

· STABILIZE EXPOSED SOIL AREAS WITH TEMPORARY OR PERMANENT VEGETATION, MULCHING, GEOTEXTILES, OR

EROSION CONTROL BLANKETS.

B. SEDIMENT CONTROL MEASURES:

· USE SEDIMENT BASINS, CHECK DAMS, OR SEDIMENT TRAPS TO CAPTURE RUNOFF AND SETTLE OUT SEDIMENT

BEFORE WATER EXITS THE SITE.

· INSTALL INLET PROTECTION MEASURES ON STORM DRAIN INLETS WITHIN AND ADJACENT TO THE SITE.

C. RUNOFF MANAGEMENT:

· DIVERSION CHANNELS, BERMS, AND OTHER STRUCTURES SHOULD BE CONSTRUCTED TO REDIRECT STORMWATER

AWAY FROM DISTURBED AREAS.

· IMPLEMENT TEMPORARY AND PERMANENT SEEDING, PLANTING, OR SODDING TO REDUCE THE VELOCITY OF

STORMWATER RUNOFF.

D. POLLUTION PREVENTION:

· STORE CHEMICALS, FUELS, AND OTHER HAZARDOUS MATERIALS IN DESIGNATED AREAS WITH SECONDARY

CONTAINMENT TO PREVENT SPILLS.

· ENSURE THAT CONSTRUCTION DEBRIS, WASTE MATERIALS, AND OTHER POLLUTANTS ARE PROPERLY DISPOSED OF

AND DO NOT ENTER STORMWATER RUNOFF.

6. COMPLIANCE AND MONITORING

A. INSPECTIONS: THE CONTRACTOR MUST CONDUCT REGULAR SITE INSPECTIONS AT LEAST ONCE EVERY 7 DAYS AND

WITHIN 24 HOURS AFTER A STORM EVENT THAT PRODUCES 0.5 INCHES OR MORE OF RAINFALL. INSPECTIONS MUST FOCUS ON THE EFFECTIVENESS OF THE BMPS AND IDENTIFY ANY DEFICIENCIES OR AREAS WHERE ADDITIONAL

MEASURES ARE NECESSARY.

B. CORRECTIVE ACTIONS: ANY DEFICIENCIES NOTED DURING INSPECTIONS MUST BE ADDRESSED IMMEDIATELY, AND

CORRECTIVE ACTIONS MUST BE DOCUMENTED IN THE SWPPP RECORDS.

C. REPORTING: THE CONTRACTOR SHALL SUBMIT INSPECTION REPORTS, RECORDS OF CORRECTIVE ACTIONS, AND ANY OTHER REQUIRED DOCUMENTATION TO THE ENGINEER FOR REVIEW. NON-COMPLIANCE WITH SWPPP REQUIREMENTS

MAY RESULT IN WORK STOPPAGE AND ENFORCEMENT ACTIONS.

8. FINAL PROJECT DOCUMENTATION - UPON COMPLETION OF THE CONSTRUCTION PROJECT, THE CONTRACTOR SHALL SUBMIT A FINAL REPORT DETAILING THE IMPLEMENTATION AND EFFECTIVENESS OF THE SWPPP, INCLUDING A SUMMARY OF INSPECTIONS, MAINTENANCE ACTIVITIES, AND ANY ISSUES ENCOUNTERED. THIS REPORT WILL BE PART OF THE

PROJECT'S FINAL DOCUMENTATION.

iHOUSE APARTMENT

PROJECT

INDIAN ROUTE 6290,

TONALEA, AZ 86044

E

H

N M

E

AR

P

T

OF

T

C D

SU

S

A

E

TAE L &H

N

VI

SER

UMA

H

RVI

HP

S

NI

D

91 55

CE

I

A

AN

HE TL H SE

A

B

C

D

1 2 3 4 5

1 2 3 4 5

Sheet Number:

Sheet Title:

Checked By:

Drawn By:

Scale:

Project No:

Issue Date:

SC

GSS

AS SHOWN

23-390

08/13/2024

No. Date Description

PHASE IV (FINAL CD)

Consultants:

JOHNSON SMITTHIPONG &

ROSAMOND ASSOCIATES, INC.

5210 E Williams Cir Ste 600 Tucson, AZ 85711

(520) 547-7904 www.jsrarchinc.com

U. S.

DEPARTMENT OF

HEALTH AND

HUMAN SERVICES

INDIAN HEALTH SERVICE

NAVAJO AREA OFFICE

480-753-0800

4686 East Van Buren Street, Suite 175 Phoenix, Arizona 85008

WWW.DOWL.COM

C002

UTILITY

NOTES SHEET

1. SANITARY SEWER SERVICE LATERAL CONSTRUCTION SHALL BE CONSTRUCTED IN ACCORDANCE WITH

THE LATEST STANDARDS, SPECIFICATIONS, AND DETAILS OF NTUA STANDARDS.

2. EXISTING UTILITIES ARE SHOWN BASED UPON THE BEST AVAILABLE INFORMATION AVAILABLE.

CONTRACTOR TO VERIFY THE LOCATION AND ELEVATION OF EXISTING UTILITIES PRIOR TO

COMMENCING CONSTRUCTION.

3. ALL SANITARY SEWER SERVICE LATERAL MATERIAL AND MINIMUM COVER SHALL BE PER NTUA STANDARDS UNLESS OTHERWISE NOTED. ALL SANITARY SEWER LINES SHALL BE SDR-35 PVC IN

CONFORMANCE WITH ASTM D3034.

4. NO WATER PIPE SHALL PASS THROUGH OR COME INTO CONTACT WITH ANY PART OF A SEWER MANHOLE. THE MINIMUM HORIZONTAL SEPARATION BETWEEN WATER MAINS AND MANHOLES SHALL BE TEN FEET (10'), MEASURED FROM THE OUTSIDE OF THE WATER MAIN PIPE TO CENTER OF THE

MANHOLE.

5. ALL FILL MATERIAL IS TO BE PLACED AND COMPACTED PRIOR TO THE INSTALLATION OF PROPOSED

UTILITIES.

6. THE CONTRACTOR SHALL NOTIFY THE UTILITY AUTHORITIES 72 HOURS PRIOR TO CONNECTING TO

ANY EXISTING LINE.

7. IN THE EVENT OF A VERTICAL CONFLICT BETWEEN WATER MAINS, SANITARY SEWER, STORM DRAINS, AND GAS LINES (EXISTING AND PROPOSED), THE SANITARY SEWER SHALL BE DUCTILE IRON PIPE WITH MECHANICAL JOINTS AT LEAST 10 FEET ON BOTH SIDES OF CROSSING. THE WATER MAIN SHALL HAVE MECHANICAL JOINTS WITH APPROPRIATE THRUST BLOCKING AS REQUIRED TO PROVIDE A MINIMUM OF 24” CLEARANCE MEETING REQUIREMENTS OF ANSI A21.10 OR ANSI 21.11 (AWWA C-151) (CLASS 50).

8. ALL CONCRETE FOR ENCASEMENTS SHALL BE CLASS A AND HAVE A MINIMUM 28-DAY COMPRESSION

STRENGTH A 3,000 PSI.

9. THE FRAME AND GRATE ELEVATIONS OF EXISTING STRUCTURES SUCH AS, BUT NOT LIMITED TO, MANHOLES, VAULTS, AND ELECTRICAL BOXES, SHALL BE ADJUSTED AS NECESSARY TO BE FLUSH

WITH PROPOSED PAVEMENT OR FINISHED GRADE ELEVATION.

10. THE CONTRACTOR SHALL INSTALL CONTINUOUS TRACER WIRE FOR NON-METAL PIPE PER NTUA

STANDARDS.

11. THE CONTRACTOR SHALL PREPARE TRENCH BEDDING AND PROVIDE BACKFILL IN ACCORDANCE WITH

NTUA STANDARDS AND THE GEOTECHNICAL REPORT.

12. ELECTRICAL, COMMUNICATION, AND GAS UTILITY LINES SHOWN ON THE PLANS ARE FOR REFERENCE ONLY. THE CONTRACTOR SHALL COORDINATE LOCATION AND INSTALLATION REQUIREMENTS WITH

THE APPROPRIATE ENTITY FOR THESE UTILITY LINES. THE CONTRACTOR SHALL NOTIFY THE

ENGINEER OF ANY POTENTIAL CONFLICT THAT MAY ARISE WITH THE INSTALLATION OF THESE UTILITY

LINES.

13. "NTUA WATER AND WASTEWATER SPECIFICATIONS" REFERS TO NTUA TECHNICAL SPECIFICATIONS

FOR MATERIALS AND WORKMANSHIP FOR WATER AND WASTE WATER FACILITIES (2008).

14. WATER AND WASTEWATER SEPARATION REQUIREMENTS SHALL MEET THE REQUIREMENTS OF NTUA

WATER AND WASTEWATER SPECIFICATIONS TP 2.0 “WATER AND WASTEWATER LINE SEPARATION

REQUIREMENTS”. WHEN THE DUCTILE IRON WASTEWATER LINE IS INSTALLED, IT SHALL BE

POLYETHYLENE ENCASED AS REQUIRED BY TP 2.0 AND THE GEOTECHNICAL REPORT.

15. WATER SERVICE AND ALL COMPONENTS SHALL MEET THE REQUIREMENTS OF TP3.07 “WATER SERVICE

CONNECTIONS MATERIAL”. A SUMMARY BELOW FOR REFERENCE.

a. WATER SERVICE CONNECTION SHALL BE PE 200 PSI, CONFORMING TO ASTM D2239 EQUAL TO

DRISCOPIPE 5100 ULTRA-LINE.

b. SERVICE LINE FITTINGS SHALL BE NON-FLARE COMPRESSION CONNECTIONS BY MUELLER

INSA-TITE H-15426 OR APPROVED EQUAL.

c. SADDLES SHALL BE DOUBLE STRAPPED, DOUBLE BANDED, THREADS SHALL BE FIP. SADDLES

SHALL BE FORD S71 OR MUELLER H-13478.

d. CURB STOPS SHALL BE BRONZE ALLOY, QUARTER TURN FIPT X FIPT WITH STATIONARY

OPERATING ROD. MUELLER B-20287 OR FORD B11-444M.

e. CURB STOP BOX SHALL BE EXTENSION TYPE, CAST IRON WITH 1-1/2 UPPER SECTION. MUELLER H-10302 OR FORD TYPE PXL. FINISH ELEVATION SHALL BE SLIGHTLY ABOVE GROUND SURFACE.

AN 18” X 18” BY 4” DEEP REINFORCED CONCRETE COLLAR SHALL BE POURED AT EACH BOX.

f. WATER METERS SHALL RECORD FLOW FROM 14 GPM TO 20 GPM AND SHALL BE 5 8" X 3 4" SENSUS SR

MODEL WITH FROST PLATE. NOTE SR2 MODEL IS NOT ACCEPTED.

g. METER YOKE/COPPERSETTER SHALL BE FORD VB 72-12W-11-44 OR AY MCDONALD

20-212WX-DD-44. PRV SHALL BE WATTS SERIES 25AUB OR APPROVED EQUAL.

h. METER BOX SHALL BE 20 INCH DIAMETER, 30 INCH HIGH NOMETALLIC AND SHALL EXTEND 1-INCH

BELOW SERVICE LINE. METER BOX LID SHALL BE CAST IRON DOUBLE LID WITH 11-1/2 INCH

OPENING, PLASTIC INNERLID AND LOCKING OUTER LID WITH PENTAGON HEAD WORM TYPE LOCK, EQUAL TO CASTING MODEL M70.

i. DOMESTIC SHALL BE BRONZE ALLOY, QUARTER TURN CHECK, FIPT X FIPT WITH TEE HEAD, EQUAL

TO FORD B11-444 OR AY MCDONALD 610. PROVIDE VALVE BOX PER 3.07.11.

16. CONTRACTOR SHALL SUBMIT ALL MATERIALS TO ENGINEER AND NTUA FOR SUBMITAL APPROVAL

PRIOR TO START OF WORK.

17. SERVICE CONNECTIONS SHALL BE MADE USING SADDLE TAP TEES

18. PRESSURE TEST AND DISINFECTION SHALL MEET THE REQUIREMENTS OF TP 3.09 AND 3.10.

COORDINATE TESTING AND DISINFECTION WITH NTUA TO ALLOW FOR TEST OBSERVATION.

19. CONTRACTOR SHALL PREPARE A "CONNECTION SCHEDULE" SHOWING THE LOCATIONS AND DATES OF

THE PROPOSED CONNECTIONS. ANY PORTIONS OF THE SYSTEM THAT REQUIRE ISOLATION OR THAT WILL RESULT IN INTERRUPTION SHALL BE COORDINATED WITH NTUA. CONTRACTOR SHALL PROVIDE AFFECTED HOUSING RESIDENTS WITH 48 HOUR NOTICE STATING DATE TIME OF INTERRUPTION AND

TIME OF RE-ESTABLISHMENT OF SERVICE.

1. ALL MATERIALS AND WORKMANSHIP SHALL COMPLY WITH NTUA TECHNICAL SPECIFICATIONS FOR

MATERIALS AND WORKMANSHIP FOR WATER AND WASTEWATER FACILITIES, MARCH 2002.

2. CONTRACTOR SHALL OBTAIN APPROVED PERMISSION TO TAP (PTT) FORM PRIOR TO TAPPING

EXISTING WATER AND SEWER MAIN.

3. CONTRACTOR SHALL COORDINATE WITH NTUA PRESENT AT THE SITE TO VERIFY LOCATION, DEPTH, SIZE AND TYPE OF UNDERGROUND UTILITIES.

4. CONTRACTOR TO COORDINATE WITH NTUA REGARDING WATER SHUT OFF WITH AT LEAST 3 DAYS ADVANCE NOTICE TO ISOLATE LINE(S), TO NOTIFY AFFECTED CUSTOMERS AND TO MINIMIZE OUTAGE

TIME PRIOR TO CONNECTION OF NEW WATER SERVICE.

5. UNLESS OTHERWISE DIRECTED, ONLY AUTHORIZED NTUA STAFF WILL BE ALLOWED TO CLOSE/OPEN

WATER VALVES FOR ANY CONNECTIONS TO EXISTING LINES AND FOR THE USAGE OF WATER.

6. ROUGH GRADING SHALL BE COMPLETED WITHIN 1/10 OF A FOOT OF PLAN GRADE PRIOR TO

INSTALLING WATER AND WASTEWATER UTILITIES.

7. COORDINATE WITH LOCAL UTILITY PROVIDERS FOR ANY REMOVAL OF EXISTING FACILITIES PRIOR TO

CONSTRUCTION.

8. CONTRACTOR SHALL PROTECT EXISTING UTILITIES IN PLACE. CONTRACTOR SHALL RESTORE AT OWN

EXPENSE ANY DAMAGE TO EXISTING UTILITIES.

9. ALL WATER MAINS SHALL BE POLYVINYL CHLORIDE (PVC) PRESSURE PIPE WITH A MINIMUM OF 200 PSI

PRESSURE CLASS UNLESS SPECIFIED OTHERWISE.

10. A WARNING/DETECTABLE MARKING TAPE SHALL BE INSTALLED AT 12" MINIMUM AND 18" MAXIMUM ABOVE THE WATER AND SEWER PIPE. MARKING TAPE SHALL CONSIST OF ONE LAYER OF ALUMINUM FOIL LAMINATED BETWEEN TWO COLORED LAYERS OF INERT PLASTIC FILM. THE LAMINATION BOND SHOULD BE STRONG ENOUGH THAT THE LAYERS CANNOT BE SEPARATED BY HAND. TAPE SHALL BE A MINIMUM OF 5 MILS THICK AND 6 INCHES WIDE. TAPE SHALL BEAR A CONTINUOUS, PRINTED MESSAGE EVERY 16 TO 36 INCHES WARNING OF THE INSTALLATION BURIED BELOW. TAPE SHALL BE TERRA TAPE, LINETEC, OR AS APPROVED BY NTUA.

11. DEFLECTION (VERTICAL OR HORIZONTAL) OF PIPES IS PERMITTED AND SHALL CONFORM TO AMERICAN WATER WORKS ASSOCIATION (AWWA) JOINT DEFLECTION FOR AWWA PRESSURE PIPE AND

AT 80% OF MANUFACTURER'S RECOMMENDED MAXIMUM DEFLECTION, WHICHEVER IS MORE

STRINGENT. A COPY OF THE MANUFACTURER'S RECOMMENDATION SHALL BE SUBMITTED TO NTUA.

12. PIPES SHALL NOT BE BACKFILLED (INCLUDING BEDDING MATERIAL ABOVE THE SPRING LINE OF THE PIPE) UNTIL THE CONSTRUCTION HAS BEEN INSPECTED AND APPROVED FOR BACKFILLING BY A NTUA

REPRESENTATIVE.

13. CONTRACTOR IS TO PURCHASE AMI WATER METER(S) WITH MODULE(S) AT LOCAL NTUA DISTRICT

OFFICE.

14. CONTRACTOR SHALL PROVIDE AS-BUILT DRAWINGS OF ALL UTILITIES TO OWNER AND NTUA IN HARD

COPY AND DIGITAL FORMAT.

15. HYDROSTATIC TESTING, FLUSHING AND CHLORINATION (SHALL BE CONDUCTED IN ACCORDANCE WITH

NTUA TECHNICAL SPECIFICATIONS FOR MATERIALS AND WORKMANSHIP FOR WATER AND

WASTEWATER FACILITIES, MARCH 2002) SHALL BE COORDINATED WITH NTUA AT LEAST 3 DAYS IN ADVANCE. NTUA REPRESENTATIVE SHALL BE PRESENT TO RECORD THE INFORMATION AND CERTIFY

THE TESTING.

16. UTILITY CONSTRUCTION ACCEPTANCE AND UTILITY TRANSFER: CONTRACTOR SHALL SCHEDULE A FINAL OR PRE-FINAL INSPECTION WITH NTUA HEADQUARTERS ENGINEERING AND LOCAL DISTRICT OFFICE, OWNER AND GENERAL CONTRACTOR AT THE END OF CONSTRUCTION. DOCUMENTS SHALL BE PROVIDED BY THE CONTRACTOR AS FOLLOWS: AS-BUILT DRAWING, APPROVED PTT, HYDROSTATIC TESTING RESULTS, BACTERIOLOGICAL TESTING RESULTS, MATERIALS SUBMITTALS AND COST OF PLANT. PLEASE FOLLOW THE NTUA TECHNICAL SPECIFICATIONS FOR MATERIALS AND WORKMANSHIP

FOR WATER AND WASTEWATER FACILITIES, MARCH 2002, SECTION TP 5.0.

17. THE CONTRACTOR/ENGINEER SHALL PROVIDE WARRANTY ON ALL NEW WATER AND WASTEWATER FACILITIES AGAINST DEFECTS IN MATERIALS, WORKMANSHIP AND FOR ANY DESIGN DEFICIENCIES, ERRORS AND OMISSIONS FOR THE PERIOD OF ONE YEAR WHEN THE FACILITIES WERE INSPECTED, ACCEPTED AND APPROVED.

18. CONTRACTOR SHALL PROVIDE 48 HOUR NOTICE TO RESIDENTS, ENGINEER, AND NTUA FOR ALL

SERVICE INTERRUPTIONS.

1. PROVIDE 10' MINIMUM HORIZONTAL SEPARATION IN SEPARATE TRENCHES BETWEEN WATER AND SEWER SERVICES, PAST THE BUILDING PLUMBING. PROVIDE 5' MINIMUM HORIZONTAL SEPARATION BETWEEN WATER SERVICE AND OTHER UTILITIES. FOR WATER AND SEWER CROSSING. PROVIDE A MINIMUM OF 12" VERTICAL CLEARANCE, PIPE O.D. TO PIPE O.D. IF WATER SERVICE CROSSES OTHER

UTILITIES, ALL STIPULATIONS FOR THE OTHER UTILITY MUST BE MET.

2. BUILDING PLUMBING, WATER AND SEWER SERVICES TO BE INSTALLED IN ACCORDANCE WITH THE

NATIONAL PLUMBING CODE ADOPTED BY THE NAVAJO NATION.

3. WATER SERVICES SHALL HAVE A MINIMUM COVER OF 36" AND SHALL BE INSTALLED IN CONFORMANCE

WITH NTUA STANDARDS.

4. SADDLES SHALL BE SINGLE STRAP/BAND TYPE, FOR STEEL PIPE O.D. PVC. SADDLES SHALL BE DOUBLE STRAP/BAND TYPE, FOR D.I., A.C., OR C-900 PIPE. ON EXISTING 2" PIPING, A 2" X 1" PVC TEE SHALL BE

USED. CONTACT NTUA HEADQUARTERS ENGINEERING ON PIPING SMALLER THAN 2".

5. PROVIDE THE AS-BUILT SWING TIE INFORMATION FOR THE TAP POINT AND OTHER APPURTENANCES

INSTALLED.

6. THE WATER METER SHALL BE CENTERED AND SET A MAX. OF 24" BELOW THE TOP OF THE METER BOX

COVER.

7. THE METER CAN SHALL BE LOCATED JUST BEYOND THE SIDEWALK AT THE PROPERTY LINE OR WITH

OWNER'S PERMISSION A MINIMUM OF 10' FROM THE BUILDING.

8. WATER SERVICE LINES ARE LIMITED TO A MAXIMUM OF 200'. IF THE PRESSURE AT THE HOME SITE IS ABOVE 70 PSI, INSTALL THE APPROPRIATE TANDEM COPPERSETTER WITH AN INDIVIDUAL PRV (ITEM 8A).

9. USE FIELD MARKERS WHERE APPROPRIATE.

10. SUBMIT CONSTRUCTION COST OF NEW INSTALLATION UP TO AND INCLUDING THE METER. INDICATE AS

FOLLOWS:

A. MATERIAL COST,

B. LABOR COST,

C. EQUIPMENT COST,

D. TOTAL CONSTRUCTION COST

1. PROVIDE 10' MINIMUM HORIZONTAL SEPARATION IN SEPARATE TRENCHES BETWEEN THE WATER AND SEWER SERVICES. PROVIDE 5' MINIMUM HORIZONTAL SEPARATION BETWEEN THE SEWER SERVICE AND OTHER UTILITIES. IF SEWER SERVICE CROSSES OTHER SERVICES, SEE NTUA CROSSING POLICY

OR CONTACT NTUA HEADQUARTERS ENGINEERING.

2. SEWER CLEANOUTS ARE REQUIRED ON ALL BENDS IN EXCESS OF 45° AS PER PLUMBING CODE ADOPTED BY THE NAVAJO NATION. MODIFY MATERIAL LIST ACCORDINGLY AFTER CONSULTING WITH

NTUA HEADQUARTERS ENGINEERING.

3. ADDITIONAL SEWER CLEANOUTS ARE REQUIRED ON SEWER SERVICES LONGER THAN 50' AS PER UNIFORM PLUMBING CODE ADOPTED BY THE NAVAJO NATION. MODIFY MATERIAL LIST ACCORDINGLY AFTER CONSULTING WITH NTUA HEADQUARTERS ENGINEERING. EACH ADDITIONAL CLEANOUT IS AT THE CUSTOMERS EXPENSE INSTALL AT LEAST ONE CLEANOUT AS REQUIRED BY NOTE 2. IF CUSTOMER REQUEST FEWER AND REALIZES THIS VIOLATES NAVAJO TRIBAL CODE, THEN INSTALL PER THE

CUSTOMER'S REQUEST AND SO NOTE ON THE INDIVIDUAL AS-BUILT, NTUA RECOMMENDS THAT

CLEANOUTS BE SPACED NO MORE THAN 100'.

4. PROVIDE PROPOSED ELEVATION AT WALL. PROVIDE 6 IN. DIAMETER SLEEVE IF PIPING PENETRATES WALL OR 4 IN. DEPTH OF SAND BETWEEN FOOTING AND TOP OF PIPING IS BELOW THE FOOTING.

ORDER ASTM D-1785 SCH. 40 PIPE WITH LENGTH AS NEEDED FOR THE SLEEVE. CONTACT N.T.U.A.

HEADQUARTERS ENGINEERING ON PIPING SMALLER THAN 2 IN. IN SIZE.

5. STATE THE EXISTING PIPE TYPE AND O.D. (E.G. ASTM D-3034, SDR 35, PVC, 8. 40"). SADDLE IS TO HAVE

A GASKET SEAL OR 0-RING AND NON-CORRODIBLE STRAP SECURING SYSTEM.

6. MINIMUM SLOPE OF 1/4 INCH PER FOOT (2%) OR CONTACT N.T.U.A. HEADQUARTERS ENGINEERING.

7. BACKFILL IS TO BE HAND TAMPED (NO-MECHANICAL) AND COMPACTED IN 6 INCH LAYERS FOR AT

LEAST 12 IN. ABOVE PVC PIPE. INSTALL PER ASTM D-2321 AND UNIFORM PLUMBING CODE ADOPTED BY

THE NAVAJO NATION.

8. PROVIDE THE AS-BUILT AND SWING TIES FOR THE TAP POINT.

9. THE MATERIAL LIST SHALL BE MODIFIED IF A FIELD MARKER OF THE TAP POINT IS TO BE INSTALLED.

UNDER THE AS-BUILT TIE INFORMATION. PROVIDE THE SURFACE DESCRIPTION OF THE TAP POINT (E.G.

OPEN…