J.1 Unpriced Bills of Quantities J.1.3 - 5 Wastewater Facilities.xlsx

XLSX spreadsheet 246 KB Posted

Attached to
WATER AND SANITATION INFRASTRUCTURE SUPPORT ACTIVITY (WISA) Federal contract opportunity
Solicitation number
72062124R00003
Issued by
US Agency for International Development Tanzania

About this file

This document contains an unpriced bill of quantities for five wastewater facilities projects in Tanzania. The projects include site clearance, earthworks, civil works like concrete structures and blockwork, piping, media installation, fencing, electrical works, and attendant buildings. Quantities and unit rates are provided for each work item under the facilities in Ifakara, Mafinga, Makete, Ludewa, and Namanyere. The total estimated costs are not included. Reinforced concrete, blockwork, plumbing, roofing, doors and windows, electrical installation, and finishes are specified for incinerators, ash pits, waste storage rooms, and attendant offices at each site. Fencing, irrigation systems, and landscaping are also outlined.

View the file

Other files for this federal contract opportunity

Other files attached to WATER AND SANITATION INFRASTRUCTURE SUPPORT ACTIVITY (WISA), newest first.
File Type Posted
Solicitation No. 72062124R00003 – USAID Water and Sanitation Infrastructure Support Activity (WISA) AMENDMENT No.2 of the RFP.pdf PDF
J.1 Unpriced Bills of Quantities J 1.1 - 43 Water Supply Projects - Amendment_1 to the RFP.xlsx XLSX spreadsheet
J.2 Technical Specifications J.2.1 43 Water Supply projects and Wastewater Facilities Amendment_1.pdf PDF
J.10 Questions and Answers to the RFP.pdf PDF
Request for Proposal (RFP) Solicitation No.pdf PDF
J.9 Pre Bid Conference - Presentation March 29 2024.pptx PPTX presentation
J.3 Enginering Drawings J.3.4 Electrical Wiring_ Amendment_1 to the RFP.pdf PDF
J.1 Unpriced Bills of Quantities J.1.2 -38 Boreholes projects.xlsx XLSX spreadsheet
J.2 Technical Specifications J.2.1 43 Water Supply projects and Wastewater Facilities.pdf PDF
J.3 Engineering Drawings J.3.2 38 Boreholes projects.pdf PDF
J.3 Enginering Drawings J.3.3 5 Wastewater Facilities.pdf PDF
Solicitation No. 72062124R00003 – USAID Water and Sanitation Infrastructure Support Activity (WISA)..pdf PDF
J.3 Engineering Drawings J.3.1 - 43 Water Supply Project.pdf PDF
J.4 Work Permit & Residence Permit Tips.pdf PDF
J.1 Unpriced Bills of Quantities J.1.1 - 43 Water Supply Projects.xlsx XLSX spreadsheet
J.2 Technical Specifications J.2.2 38 Boreholes Technical Specifications & Hydrogeological Survey.pdf PDF
J.5 Updated Value Added Tax Allowability Guidance.pdf PDF
J.7 Environmental Monitoring and Mitigation Plan.pdf PDF
J.8.1 WASH Initial Environmental Examination (IEE).pdf PDF
J.8.2 Amendment #1 WASH Initial Environmental Examination (IEE).pdf PDF
J.6 Allowability and Value added Tax on De Minimus Purchases.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

PRELIMINARIES AND GENERAL REQUIREMENTSCIVIL WORKSINCINERATOR, ASHPIT & WASTE STORAGE ROOMATTENDANT'S BUILDINGTOTAL
1IFAKARA- 0- 0- 0
2MAFINGA- 0- 0- 0- 0
3MAKETE- 0- 0- 0- 0
4LUDEWA- 0- 0- 0- 0- 0
5NAMANYERE- 0- 0- 0- 0- 0
TOTAL- 0- 0- 0- 0- 0

Preliminaries

BILL 1A: PRELIMINARIES AND GENERAL REQUIREMENTS
Item No.Item DescriptionUnitRate $IFAKARAMAFINGAMAKETELUDEWANAMANYERE
QTYAMOUNTQTYAMOUNTQTYAMOUNTQTYAMOUNTQTYAMOUNT
1.1CONTRACTUAL REQUIREMENTS
1.1.1Performance BondSum- 01.00- 01.00- 01.00- 01.00- 01.00- 0
1.1.2Contractors All Risks (CAR)Sum- 01.00- 01.00- 01.00- 01.00- 01.00- 0
- 0- 0- 0- 0- 0
1.2GENERAL REQUIREMENTS- 0- 0- 0- 0- 0
- 0- 0- 0- 0- 0
1.2.1Facilities and Items for the Contractor- 0- 0- 0- 0- 0
1.2.1.1Establish the Contractor's camp and plant and offices, including mobilisation and demobilisation of all required plants, site, infrastructure, equipment, tools, machinery and personnel and their accommodationSum1.00- 01.00- 01.00- 01.00- 01.00- 0
1.2.1.2Operate and maintain the Contractor's camp(s)Month10.00- 010.00- 010.00- 010.00- 08.00- 0
1.2.1.3Provide sign boards for each of the construction sites, as per description in the Particular SpecificationsSum1.00- 01.00- 01.00- 01.00- 01.00- 0
- 0- 0- 0- 0- 0
1.2.2Testing of Works- 0- 0- 0- 0- 0
1.2.3.1Testing of materials; concrete test cubes;pipes;sand;agregate;reinfocement bars; samples and methods of testing as per Specifications and guidelinesSum1.00- 01.00- 01.00- 01.00- 01.00- 0
- 0- 0- 0- 0- 0
1.2.3Records and Documents- 0- 0- 0- 0- 0
1.2.3.1Photographical records of the site prior, during and after completion of works. Documentation is to be prepared as per SpecificationsMonth8.00- 08.00- 08.00- 08.00- 06.00- 0
1.2.3.2"As-built" drawings as specified in the SpecificationsSum1.00- 01.00- 01.00- 01.00- 01.00- 0
- 0- 0- 0- 0- 0
1.2.4Road work- 0- 0- 0- 0- 0
1.2.4.1Construction of gravel access road aproach road towards the fstp site including subgrade, subbase, base and all neccesaary roads and drainage workssum1.00- 01.00- 01.00- 01.00- 01.00- 0

SUB TOTAL - 0 - 0 - 0 - 0 - 0

- 0

Civil Work

IFAKARAMAFINGAMAKETELUDEWANAMANYERE
ItemDescriptionUnitQtyQtyQtyQtyAmountQtyAmount
IFAKARA
1.0Site Clearance
1.1General clearancem273,07156,08466,36966,369- 056,083.50- 0
- 0- 0
2.0Earthwork & Geotechnical Survey- 0- 0
2.1Geotechnical Survey and Topographical survey- 0- 0
2.1.1Provisional Sum for Geotechnical Study and Topographical surveyPS1111.00- 01.00- 0
2.2Excavation- 0- 0
2.2.1Excavation depth from 0.3-1m (rate to include maintaining the required levels and slopes as per drawings and specifications)m3428.4404.625206.5721206.57- 0187.87- 0
- 0- 0
2.2.2Excavation depth from 1-2m (rate to include maintaining the required levels and slopes as per drawings and specifications)m34,134.754,315.392,847.152,847.15- 02,444.63- 0
- 0- 0
2.2.3Excavation depth above 2m (rate to include maintaining the required levels and slopes as per drawings and specifications)m330303030.00- 030.00- 0
- 0- 0
2.3Fill- 0- 0
2.3.1Foundation- 0- 0
2.3.1.1Selected fill materials well ramed and consolidated (rate to include hauling and compaction)m3565.11960.54565.11565.11- 0550.15- 0
2.3.1.2Selected crushed stones of size 300mm and above for hardcore for foundation according to drawing and specificationm3403.65392.97106.80106.80- 0392.97- 0
- 0- 0
2.3.2Embankment, Parking, access road and Truck Turning- 0- 0
- 0- 0
2.3.2.1Selected fill materials well ramed and consolidated to form Embankment. Top 200mm finish to be gravel material of G40 (rate to include hauling and compaction)m32,915.673,789.805,115.903,536.82- 04,272.42- 0
- 0- 0
2.4Disposal of excavated material- 0- 0
- 0- 0
2.4.1Topsoilm31377.9451425.00375925.11609925.12- 0798.75- 0
- 0- 0
2.4.2Excavated unsuitable rockm31377.9451425.00375925.11609925.12- 0798.75- 0
- 0- 0
3PIPE WORKS, FITTINGS AND VALVES- 0- 0
3.1Supply and Install slotted uPVC Pipe class C DN 160mmm301315141141.00- 0200.00- 0
- 0- 0
3.2Supply and Install uPVC Pipe class C DN160mmm696750420427.00- 0470.00- 0
- 0- 0
3.3Supply and Install uPVC Pipe class C 160mm complete for vent (2.5 m long)Nr56532727.00- 030.00- 0
3.4Supply and Install Control Valve DN 60Nr1111.00- 01.00- 0
- 0- 0
3.5Supply and Install control valve DN 160Nr30302121.00- 030.00- 0
- 0- 0
3.9Supply and Install 2.5m long flexible valve for effluent level control complete with attachment galvanised chain and hook acoording to the drawingNr2222.00- 02.00- 0
- 0- 0
4.0Insitu Plain Concrete- 0- 0
- 0- 0
Provision of Concrete, designed mix for ordinary concrete, supply, mix, place, cure, complete (rate to include formworks)- 0- 0
4.1Blinding 50mm thick- Grade 15 cement to BS 12, aggregate to BS 5328m328.22212527.35115.8077515.72- 014.85- 0
4.2Slab Concrete - Grade 25 cement to B.S. 12 , aggregate to BS 5328m3584.255056610.096536206.620512206.62- 0264.31- 0
4.3Foundation Footing- Grade 25 cement to B.S 12, aggregates to B.S 5328.m3158.0439153.165688.523488.05- 087.59- 0
4.4Walk way platform - Grade 25 to BS 12, aggregates to BS 5328m317.514.78.48.40- 010.50- 0
4.5Columns 80 in Nos., 230 x 300 mm in size as per specifications and drawings - Grade 25 cement to B.S 12, aggregates to B.S 5328.m323.5720.1916.7716.77- 010.34- 0
4.6Tie Beams- Grade 25 cement to B.S 12, aggregates to B.S 5328.m344.1142.1822.3622.36- 019.32- 0
4.7Retaining wall for supporting decanting activities as per drawings - Grade 25 cement to B.S 12, aggregates to B.S 5328.m35.285.285.285.28- 05.28- 0
4.8Concrete gutter for collecting sludge spills back to attenuation chamberm30.900.900.900.90- 00.90- 0
4.9Foundation walling 230mm thick mortor to mixing ratio 1:3m2616.491589.5312.462312.46- 0270.00- 0
4.10Walling 230mm thick mortor to mixing ratio 1:3m21434.93841369.8717.5088717.51- 0668.16- 0
4.11Supply and instal RC concrete precast paving blocks (60X60cm) X2" for walk waysm2123.0096.0060.0060.00- 042.60- 0
4.12Two coat wall internal plastering and flooring to mixing ratio 1:3 and additional single coat of corrosive resistance water proofing according to specificationsm23460.253400.031484.281,484.28- 0662.40- 0
4.13Two coat external plastering to mixing ratio 1:3 according to specificationsm2908.3796.4485.1485.10- 0453.40- 0
4.14Supply and place sloped stone pitchingm2486.5744.699468.24383.00- 0417.00- 0
- 0- 0
5.0Supply and install steel reinforcement bars (Provisional) to BS 4449- 0- 0
5.1Bottom slab 200mm in thickness- 0- 0
- 0- 0
5.1.1BRC (A142) for bottom slabs of the drying beds - 6 in Nos., attenuation and screen chambersm22,023.502,061.53649.68793.91- 0919.81- 0
- 0- 0
5.2Columns 80 in Nos and Tie Beams- 0- 0
5.2.14ɸ12mm with 230 x 300 mm in size as per specifications and drawingstonne1.000.870.210.21- 00.47- 0
5.2.2Tie beams for both drying beds, attenuation and screen chambers as per drawing- 0- 0
4ɸ12mm doubly reinforced c/ctonne5.004.662.502.50- 02.15- 0
- 0- 0
5.3Foundation Footing- 0- 0
ɸ12mm as per specifications and drawingstonne5.55.333.00- 05.27- 0
- 0- 0
5.4Concrete Platform (Walk Way)- 0- 0
ɸ12mmtonne1.251.3361.001.00- 00.75- 0
5.5Retaining wall for supporting decanting activities- 0- 0
Supply and install the reinforcement bars (T12 in size) as per drawingtonne0.850.850.850.85- 00.85- 0
- 0- 0
6.0Manholes- 0- 0
6.1Supply materials and construct block work manhole manhole with depth not exceeding 1m including coverno17101515.00- 010.00- 0
6.2Supply materials and construct block work Manhole with depth exceeding 1mno33201815.00- 022.00- 0
- 0- 0
7.0Supply and fix Media- 0- 0
7.15-10mm gravel, 5cm thick two intermediate layers for the constructed wetland and 10cm thick layers for drying beds according to drawing and specificationsm3310.9275295.3373007145.1242137.43- 0201.60- 0
7.2(0.3-0.75)mm sand, 45cm thick for the constructed wetland and 25cm thick layers for drying beds according to drawing and specificationsm3714.13875845.4620532299.9009282.13- 0371.80- 0
7.3Approved 20-40mm gravel, 15cm thick for both drying beds and constructed wetland according to thedrawing and specificationsm3473.4275468.5547426209.4498188.89- 0235.03- 0
7.4HDPE Geomembrane for waterproofing, min thickness 1.0mm, puncture resistance 320 N and superior according to ASTM D 4833m24291311.4436441033.128741.90- 0882.00- 0
8.0Miscellaneous works – Power, Water Utility Service Connection, etc.- 0- 0
8.1Provisional sum for extension of water utility service taping from distribution pipe HDPE DN63 approximately 0.4 km from the tapping point located within landfill vicinity (rate to include supply and installation of all necessary fiffings and valves)m700700700700.00- 0700.00- 0
8.2Supply and fix sluice gate complete according to the drawings (galvanised plate)no1111.00- 01.00- 0
- 0- 0
8.3Provisional sum for the supply and installation of 4 solar power panel of 120 W each and 4 solar power batteries of 100Ah for electrification of the proposed FSTP siteno1111.00- 01.00- 0
8.4Supply and Install Solar Powered Street Lights (60W Panel complete connected battery) erected on the casted concrete pad foundation (40x40, depth 1m), ɸ10mm at 200mm doubly reinforced c/c as per specifications and drawingNo.5.005.005.005.00- 05.00- 0
8.5Provisional sum for esatblishment of co-composting unit including:construction of Co-composting hut, solidwaste shredding machine, seiving machine, balancing scale, thermometer, moisture meter, logbook, pH meter, Wheel barrows, spades, waste pickers.no1111.00- 01- 0
8.6Supply and instal high tunnel greenhouse designed for drying purposes; Approximately (7 m x 12 m);Ridge height: Approximately (4 m);End wall height: Approximately 12 ft (3.7 m); Side wall height: Approximately 6 ft (1.8 m);UV-resistant, 6 mil (150 microns) polyethylene film; Foundation: Ground posts made of galvanized steel, embedded securely into the ground with Ventilation System: Roof and side wall roll-up mechanisms for passive ventilation.no2222.00- 02- 0
8.7Provision of Plants for drying bedm24704470447044,704.00- 04704- 0
8.8Provision of wetland plantsm24902490249024,902.00- 04902- 0
8.9Supply and fix guard rails and steel steps (25mm, 460N/mm2 bars) according to the drawings (including coating and finishing)LS1111.00- 014- 0
8.10Provision of precasted RC concrete (400mmX400mmX50mm) for sludge falling platform ontop dryingbed sand media.no14141- 0- 01- 0
8.11Supply and fix (manual operated) course screen (galvanised ) bars framed to a screen chamber (spacing 5 - 10 mm, inclination angle 45 - 60 with its drying plaform galvanised plate (47"X25X6)-2.5mm thick as per drawing)LS1111.00- 01- 0
8.12Provission sum for site restoration, beautification including tree planting, grasses planting, levlling landscapingLS1111.00- 01- 0
9.0Chain Link fence and gates- 0- 0
9.1Supply and install chainlink for fence (2.5mm gauge)m1,110.00948.451,008.751,090.00- 0948.45- 0
9.2Supply and install barbeb wires (2.5mm gauge)m4,440.003,793.804,035.004,360.00- 03,793.80- 0
9.3Supply and install chain link poles placed at the interval of 3.0 m each including supportive polespcs407.00347.77369.88399.67- 0347.77- 0
9.4Supply and Install the gate-6m wide (double leafs) at the entry point of the FSTP location as per drawing and specificationsNos.1.001.001.001.00- 01.00- 0
9.5Provide mass concrete (C-15) for achoring the chain link wire at the bottomm321.3421.3422.7024.53- 021.34- 0
9.6Provide galvised straining wire to be fixed to the pre-drilled wires on the concrete polesm3,330.002,845.353,026.253,270.00- 02,845.35- 0
10.0Supply of irrigation system for eefluent- 0- 0
10.1Provisional sum for buried simtank (for storage of treated effluent) (10,000 Liters)Ps1111.00- 01.00- 0
10.2Provisional sum for installation of drip irrigation system for tree nurseryPs1111.00- 01.00- 0
10.3Provisional sum for installation of 5000 litres raised tank (with a 4 steel meters raiser sufficiently designed to support the wait)Ps2222.00- 02.00- 0
10.4Provissional sum for supply and installation of solar pump system complete with solar panel and control pannel for pumping water to the raised tank for drip irrigation; Pump head minimum 30 metres, and minimum power of 1.5 HP.Ps1111.00- 01.00- 0
11.0ROOFING- 0- 0
11.1Supply and install transparent roof sheet(uv light resistant 1-2mm thickness)M21394.16462.5462.50- 0- 0- 0
11.2Supply and install circular hollow section black pipe for columns(100mm diameter,6mm thickness, 1.8m height), painted with red oxide and gross/acralic painting.M724040.00- 0- 0- 0
11.3Supply and install circular hollow section black pipe for bottom chord(50mm diameter,5mm thickness), red oxide painted and painted with gross/acralic painting.M666205205.00- 0- 0- 0
11.4Supply and install circular hollow section black pipe for top chord(50mm diameter,5mm thickness), red oxide painted and painted with gross/acralic painting.M670215215.00- 0- 0- 0
11.5Supply and install circular hollow section black pipe for struts(50mm diameter,5mm thickness), red oxide painted and painted with gross/acralic painting.M1026360360.00- 0- 0- 0
11.6Supply and install treated timber 50mm X 50mm for purlinsM1657.92490490.00- 0- 0- 0

Total for Civil Works - 0 - 0

ATTENDANT BUILDING

Construction of Plant Attendats Office BuildingIFAKARAMAFINGAMAKETELUDEWANAMANYERE
Item No.DescriptionUnitUnit Rate $QTYAmountQTYAmountQTYRATEQTYRATEQTYRATE
EWEARTH WORKS
EW 1Site Clearance
EW 1.1Setting OutSum1.00- 01.00- 01.00- 01.00- 01.00- 0
- 0- 0- 0- 0- 0
EW 2Excavation and Backfilling- 0- 0- 0- 0- 0
Pit and inspection chamber- 0- 0- 0- 0- 0
EW 2.1Excavate in normal laterite soil not exceeding 1.0 m deep for foundation trenches, column base and set aside material for backfilling on-site or disposal. Include for compaction of subgrade to maximum density and dewatering during construction.m³13.65- 013.65- 013.65- 013.65- 013.65- 0
EW 2.2Load stored, excavated material and dispose up to 1000 m maximum distance.m³13.65- 013.65- 013.65- 013.65- 013.65- 0
EW 2.3Backfill around the foundation trench and pipe work as directed by the Engineer. All filling to be compacted in layers not exceeding 30 cm.m³9.20- 09.10- 09.10- 09.10- 09.10- 0
CWCIVIL WORKS- 0- 0- 0- 0- 0
CW 1.1Reinforced in-situ concrete, Grade 25 (nominal mix 1:1.5:3; N/mm² at 28 days)- 0- 0- 0- 0- 0
CW 1.3Reinforced concrete for foundation footings with 230mmx700mm in sizem³3.15- 03.15- 03.15- 03.15- 03.15- 0
CW 1.4Reinforced concrete slab, 100mm thick as specifiedm³1.41- 01.41- 01.41- 01.41- 01.41- 0
CW 1.5Reinforced concrete for ring/tie beams with 150mmx250m in size (2 in Nos.) supported with sawn formwork to both vertical and horizontal surfacesm³0.74- 00.74- 00.74- 00.74- 00.74- 0
CW 1.6Inspection chamber, depth 0.4m, internal dimension 600x600mm, completely finished with removable concrete coverNo.1.00- 01.00- 01.00- 01.00- 01.00- 0
CW 1.4Gully trap (conrete 300x300mm)No.1.00- 01.00- 01.00- 01.00- 01.00- 0
CW 2BLOCK WORK- 0- 0- 0- 0- 0
CW 2.1.1Foundation footing 230mm thickm²20.00- 020.00- 020.00- 020.00- 020.00- 0
Damp proof coursem19.40- 019.40- 019.40- 019.40- 019.40- 0
CW 2.1.7Selected crushed stones of size 150mm and above for foundation hardcore according to drawing and specificationm³2.25- 02.25- 02.25- 02.25- 02.25- 0
CW 2.1.3External Superstructure walls, 150mm thick wallsm²60.00- 060.00- 060.00- 060.00- 060.00- 0
CW 2.2Plaster inside and outside walls, not exceeding 20mm thickm²140.00- 0140.00- 0140.00- 0140.00- 0140.00- 0
CW 2.3Apply three coats of approved bituminous based protection paint to inside and outside wallsm²20.00- 020.00- 020.00- 020.00- 020.00- 0
CW 2.4Supply and install steel reinforcement bars (Provisional)- 0- 0- 0- 0- 0
CW 2.4.14T10mm bars fo the ring beam with 150mmx250mm in sizetonne0.20- 00.20- 00.20- 00.20- 00.20- 0
CW 2.4.2BRC (A142) for floor slabm²54.00- 054.00- 054.00- 054.00- 054.00- 0
CW 2.4.3Y8mm drum rings spaced at 300mm intervaltonne0.08- 00.08- 00.08- 00.08- 00.08- 0
- 0- 0- 0- 0- 0
CW 3DOORS, WINDOWS, ROOF AND FLOOR- 0- 0- 0- 0- 0
CW 3.1Complete work wooden framed single door 900/2100mm in local materials; finished flush bothsides in local structural with hardwood ledges between and including all ironmongery, lockable from inside and outside, including padlockNo.1.00- 01.00- 01.00- 01.00- 01.00- 0
CW 3.2Complete work wooden framed single door 750/2100mm in local materials; finished flush bothsides in local structural with hardwood ledges between, lockable from inside.No.1.00- 01.00- 01.00- 01.00- 01.00- 0
CW 3.3Casement window(top hung) with mosquito mesh and frame (1000x750mm)No.1.00- 01.00- 01.00- 01.00- 01.00- 0
CW 3.4Window complete with anti burgular grill,mosquito mesh and frame (1800x1200mm)No.1.00- 01.00- 01.00- 01.00- 01.00- 0
CW 3.5Window complete with anti burgular grill,mosquito mesh and frame (1500x1200mm)No.1.00- 01.00- 01.00- 01.00- 01.00- 0
CW 3.6Provide, place and fix corrugated iron sheets on 50x150mm treated timber including all fixing materialsm²35.00- 035.00- 035.00- 035.00- 035.00- 0
CW 3.7Ridge capm6.20- 06.20- 06.20- 06.20- 06.20- 0
CW 3.8Internal Floor Finishings, cement and sand screed (1:4) paving in one coat (40 mm to floor)m²35.79- 035.79- 035.79- 035.79- 035.79- 0
CW 3.9Ceramic wall tiles,6mm thick bedding and jointing with cement and sand (1:4) mortarm²8.70- 08.70- 08.70- 08.70- 08.70- 0
CW 3.10Ceramic tiles, non slippery,6mm thick bedding and jointing with cement and sand (1:4) mortarm²13.00- 013.00- 013.00- 013.00- 013.00- 0
CW 3.1150mm x 50mm Treated softwood branderingm66.15- 066.15- 066.15- 066.15- 066.15- 0
CW 3.1212mm Gypsum board ceiling fixed to softwoodm²14.14- 014.14- 014.14- 014.14- 014.14- 0
CW 3.13Gypsum Cornicem22.50- 022.50- 022.50- 022.50- 022.50- 0
CW 3.14250x25mm Fascia boardm18.00- 018.00- 018.00- 018.00- 018.00- 0
CW 3.15Prepare and apply one thinned coat and two full coats of wash n ware silky (Internal)m²65.00- 065.00- 065.00- 065.00- 065.00- 0
CW 3.16Prepare and apply Three coats of weather guard paint as per RUWASA/WSSA corporate theme colors (Externally)m²70.00- 070.00- 070.00- 0- 0- 070.00- 0
- 0- 0- 0- 0- 0
CW 4PLUMBING INSTALLATION- 0- 0- 0- 0- 0
CW 4.1Supply and fix the following sanitary appliances- 0- 0- 0- 0- 0
CW 4.2WC, asian type complete with 6ltr cisternNo.1.00- 01.00- 01.00- 01.00- 01.00- 0
CW 4.3Supply and laying of sewage PVC pipes Ø100 mm,push in socket / spigot incl. rubber gaskets, to connect soakpit, septic tank and the building.m12.00- 012.00- 012.00- 012.00- 012.00- 0
CW 4.4Hand wash basin (Complete with bottle trap and faucets)No.1.00- 01.00- 01.00- 01.00- 01.00- 0
CW 4.5Soap DishNo.1.00- 01.00- 01.00- 01.00- 01.00- 0
CW 4.6Allow for pipes and fittings (Including water tap 12mm in toilet)Lumpsum1.00- 01.00- 01.00- 01.00- 01.00- 0
CW5SEPTIC TANK AND SOAKAWAY PIT- 0- 0- 0- 0- 0
CW5.1Construction of Septic Tank and Soakaway Pit as per attached drawings(activities including Excavate, blockworks & Reinfoced concrete works) to accommodate the maximum of 15 personsLumpsum1.00- 01.00- 01.00- 01.00- 01.00- 0
E 1.0SOLAR POWERED ELECTRICAL INSTALLATION- 0- 0- 0- 0- 0
Supply, installation and commisioning of- 0- 0- 0- 0- 0
E 1.1Twin lighting switchNo.1.00- 01.00- 01.00- 01.00- 01.00- 0
E 1.2Lighting switchNo.2.00- 02.00- 02.00- 02.00- 02.00- 0
E 1.3Lighting pointsNo.6.00- 06.00- 06.00- 06.00- 06.00- 0
E 1.4Conduit layingm20.00- 020.00- 020.00- 020.00- 020.00- 0
E 1.5EarthingNo.1.00- 01.00- 01.00- 01.00- 01.00- 0
Supply and installation of electrical distribution board and wiring to connect solar system- 0- 0- 0- 0- 0
E 1.6Supply and Installation of distribution board (minimum 3 ways), Inverter 1KVA, electrical wiring to connect Solar SystemNo.1.00- 01.00- 01.00- 01.00- 01.00- 0
Total for Attendant Office Building- 0- 0- 0- 0- 0

INCINERATOR,ASHPIT & WASTE ROOM

IFAKARAMAFINGAMAKETELUDEWANAMANYERE
Item No.DescriptionUnitUnit Rate $QTYAmountQTYAmountQTYAmountQTYAmountQTY
Construction of Incinerator/Ash pit & Waste storage room in Ifakara.
1.0INCINERATOR
EWEARTH WORKS
EW 1Site Clearance
EW 1.1Setting OutSum1.00- 01.00- 01.00- 01.00- 01.00- 0
- 0- 0- 0- 0- 0
EW 2Excavation and Backfilling- 0- 0- 0- 0- 0
Pit and inspection chamber- 0- 0- 0- 0- 0
EW 2.1Excavate in normal laterite soil not exceeding 1.0 m deep for foundation trenches, column base and set aside material for backfilling on-site or disposal. Include for compaction of subgrade to maximum density and dewatering during construction.m³9.45- 09.45- 09.45- 09.45- 09.45- 0
EW 2.2Load stored, excavated material and dispose up to 1000 m maximum distance.m³9.45- 09.45- 09.45- 09.45- 09.45- 0
EW 2.3Backfill around the foundation trench and pipe work as directed by the Engineer. All filling to be compacted in layers not exceeding 30 cm.m³6.30- 06.30- 06.30- 06.30- 06.30- 0
CWCIVIL WORKS- 0- 0- 0- 0- 0
CW 1.1In-situ concrete, Grade 25 (nominal mix 1:1.5:3; N/mm² at 28 days)- 0- 0- 0- 0- 0
CW 1.2Mass concrete for for foundation footings with 230mmx700mm in sizem³3.04- 03.04- 03.04- 03.04- 03.04- 0
CW 1.3Reinforced concrete slab, 100mm thick as specifiedm³1.57- 01.57- 01.57- 01.57- 01.57- 0
CW 2BLOCK WORK- 0- 0- 0- 0- 0
CW 2.1.1Foundation walling 230mm thickm²13.50- 013.50- 013.50- 013.50- 013.50- 0
CW 2.1.2Damp proof coursem11.22- 011.22- 011.22- 011.22- 011.22- 0
CW 2.1.3Selected crushed stones of size 150mm and above for foundation hardcore according to drawing and specificationm³1.68- 01.68- 01.68- 01.68- 01.68- 0
CW 2.1.4Outer walling to mortor 1:3 of incinerator with common brick, 63.5mm thick wallsm²6.03- 06.03- 06.03- 06.03- 06.03- 0
CW 2.1.5Inner walling to mortor 1:3 of incinerator with fire brick, 63.5mm thick wallsm²6.78- 06.78- 06.78- 06.78- 06.78- 0
CW 2.1.6Base bottom walling to mortor 1:3 of incinerator with fire brick, 63.5mm thick wallsm²2.38- 02.38- 02.38- 02.38- 02.38- 0
CW 2.2Supply and install steel reinforcement bars (Provisional)- 0- 0- 0- 0- 0
CW 2.2.112mm reinforcement plain steel bars and locknuts to be wielded to an angle line of
2” x 6mm (For holding the fire bricks in position)tonne0.05- 00.05- 00.05- 00.05- 00.05- 0
CW 2.2.216mm reinforcement bar with

1.5m length locked by locknuts for holding

Incinerator coverand storing waste during burningtonne0.04- 00.04- 00.04- 00.04- 00.04- 0
CW 2.2.3Supply and fix complete ash door, top retaining, loading door handle, fire grate and top plate according to drawing.no1.00- 01.00- 01.00- 01.00- 01.00- 0
- 0- 0- 0- 0- 0
CW 3ROOFING- 0- 0- 0- 0- 0
CW 3.1Provide, place and fix corrugated iron sheets on 28G, 3mm with treated timber including all fixing materialsm²21.72- 021.72- 021.72- 021.72- 021.72- 0
CW 3.2Supply and install circular hollow section black pipe for columns(150mm diameter,6mm thickness, painted with red oxide and gross/acralic painting.m33.00- 033- 033.00- 033.00- 033.00- 0
CW 3.3250x25mm Fascia boardm19.00- 019.00- 019.00- 019.00- 019.00- 0
- 0- 0- 0- 0- 0
CW4FINISHINGS- 0- 0- 0- 0- 0
CW 4.1Floor Finishings, cement and sand screed (1:4) paving in one coat (40 mm to floor)m²11.22- 011.22- 011.22- 011.22- 011.22- 0
CW 4.2Prepare and apply one thinned coat and two full coats of wash n ware silky (Internal)m²65.00- 065.00- 065.00- 065.00- 065.00- 0
CW 4.3Prepare and apply bituminuous paint, kerosine and other coating painting on the incinerator pipe.m²1.00- 01.00- 01.00- 01.00- 01.00- 0
- 0- 0- 0- 0- 0
2.0ASHPIT- 0- 0- 0- 0- 0
EWEARTH WORKS- 0- 0- 0- 0- 0
EW 1Site Clearance- 0- 0- 0- 0- 0
EW 1.1Setting OutSum1.00- 01.00- 01.00- 01.00- 01.00- 0
- 0- 0- 0- 0- 0
EW 2Excavation and Backfilling- 0- 0- 0- 0- 0
Pit and inspection chamber- 0- 0- 0- 0- 0
EW 2.1Excavate in normal laterite soil not exceeding 1.0 m deep for foundation trenches, column base and set aside material for backfilling on-site or disposal. Include for compaction of subgrade to maximum density and dewatering during construction.m³25.00- 025.00- 025.00- 025.00- 025.00- 0
EW 2.2Load stored, excavated material and dispose up to 1000 m maximum distance.m³25.00- 025.00- 025.00- 025.00- 025.00- 0
EW 2.3Backfill around the foundation trench and pipe work as directed by the Engineer. All filling to be compacted in layers not exceeding 30 cm.m³16.67- 016.67- 016.67- 016.67- 016.67- 0
CWCIVIL WORKS- 0- 0- 0- 0- 0
CW 1.1In-situ concrete, Grade 25 (nominal mix 1:1.5:3; N/mm² at 28 days)- 0- 0- 0- 0- 0
CW 1.2Mass concrete for for foundation footings with 230mmx700mm in sizem³1.42- 01.42- 01.42- 01.42- 01.42- 0
CW 1.3Reinforced concrete beam, 230mm thick as specifiedm³0.52- 00.52- 00.52- 00.52- 00.52- 0
CW 1.4Reinforced concrete slab, 100mm thick as specifiedm³1.56- 01.56- 01.56- 01.56- 01.56- 0
CW 2BLOCK WORK- 0- 0- 0- 0- 0
CW 2.1.1Foundation walling 230mm thickm²3.87- 03.87- 03.87- 03.87- 03.87- 0
CW 2.1.2Damp proof coursem11.22- 011.22- 011.22- 011.22- 011.22- 0
CW 2.1.3Selected crushed stones of size 150mm and above for foundation hardcore according to drawing and specificationm³0.71- 00.71- 00.71- 00.71- 00.71- 0
CW 2.1.4Outer walling to mortor 1:3 of incinerator with common brick, 230mm thick wallsm²19.33- 019.33- 019.33- 019.33- 019.33- 0
- 0- 0- 0- 0- 0
CW3ROOFING- 0- 0- 0- 0- 0
CW 3.1Provide, place and fix corrugated iron sheets on 28G, 3mm with treated timber including all fixing materialsm²35.10- 035.10- 035.10- 035.10- 035.10- 0
CW 3.2Supply and install circular hollow section black pipe for columns(150mm diameter,6mm thickness, painted with red oxide and gross/acralic painting.m10.00- 010.00- 010.00- 010.00- 010.00- 0
CW 3.3Supply and fix metal swing door,frame , padlock and door hingeno1.00- 01.00- 01.00- 01.00- 01.00- 0
- 0- 0- 0- 0- 0
- 0- 0- 0- 0- 0
3.0WASTE STORAGE ROOM- 0- 0- 0- 0- 0
EWEARTH WORKS- 0- 0- 0- 0- 0
EW 1Site Clearance- 0- 0- 0- 0- 0
EW 1.1Setting OutSum1.00- 01.00- 01.00- 01.00- 01.00- 0
- 0- 0- 0- 0- 0
EW 2Excavation and Backfilling- 0- 0- 0- 0- 0
Pit and inspection chamber- 0- 0- 0- 0- 0
EW 2.1Excavate in normal laterite soil not exceeding 1.0 m deep for foundation trenches, column base and set aside material for backfilling on-site or disposal. Include for compaction of subgrade to maximum density and dewatering during construction.m³21.14- 021.14- 021.14- 021.14- 021.14- 0
EW 2.2Load stored, excavated material and dispose up to 1000 m maximum distance.m³21.14- 021.14- 021.14- 021.14- 021.14- 0
EW 2.3Backfill around the foundation trench and pipe work as directed by the Engineer. All filling to be compacted in layers not exceeding 30 cm.m³14.09- 014.09- 014.09- 014.09- 014.09- 0
CWCIVIL WORKS- 0- 0- 0- 0- 0
CW 1.1Reinforced in-situ concrete, Grade 25 (nominal mix 1:1.5:3; N/mm² at 28 days)- 0- 0- 0- 0- 0
CW 1.3Mass concrete for foundation footings with 230mmx700mm in sizem³4.86- 04.86- 04.86- 04.86- 04.86- 0
CW 1.4Reinforced concrete slab, 100mm thick as specifiedm³5.45- 05.45- 05.45- 05.45- 05.45- 0
CW 1.5Reinforced concrete for ring/tie beams with 150mmx250m in size (2 in Nos.) supported with sawn formwork to both vertical and horizontal surfacesm³1.59- 01.59- 01.59- 01.59- 01.59- 0
CW 2BLOCK WORK- 0- 0- 0- 0- 0
CW 2.1.1Foundation footing 230mm thickm²42.28- 042.28- 042.28- 042.28- 042.28- 0
Damp proof coursem30.20- 030.20- 030.20- 030.20- 030.20- 0
CW 2.1.7Selected crushed stones of size 150mm and above for foundation hardcore according to drawing and specificationm³38.90- 038.90- 038.90- 038.90- 038.90- 0
CW 2.1.3External Superstructure walls, 150mm thick wallsm²51.50- 051.50- 051.50- 051.50- 051.50- 0
CW 2.2Plaster inside and outside walls, not exceeding 20mm thickm²55.50- 055.50- 055.50- 055.50- 055.50- 0
CW 2.4Supply and install steel reinforcement bars (Provisional)- 0- 0- 0- 0- 0
CW 2.4.14T10mm bars fo the ring beam with 150mmx250mm in sizetonne0.20- 00.20- 00.20- 00.20- 00.20- 0
CW 2.4.2BRC (A142) for floor slabm²37.65- 037.65- 037.65- 037.65- 037.65- 0
CW 2.4.3Y8mm drum rings spaced at 300mm intervaltonne0.05- 00.05- 00.05- 00.05- 00.05- 0
- 0- 0- 0- 0- 0
CW 3DOORS, WINDOWS, ROOF AND FLOOR- 0- 0- 0- 0- 0
CW 3.1Complete work wooden framed single door 1500/2500mm in local materials; finished flush bothsides in local structural with hardwood ledges between and including all ironmongery, lockable from inside and outside, including padlockNo.1.00- 01.00- 01.00- 01.00- 01.00- 0
CW 3.5Window complete with anti burgular grill,mosquito mesh and frame (3600x1500mm)No.1.00- 01.00- 01.00- 01.00- 01.00- 0
CW 3.6Provide, place and fix corrugated iron sheets on 50x150mm treated timber including all fixing materialsm²56.50- 056.50- 056.50- 056.50- 056.50- 0
CW 3.7Ridge capm30.00- 030.00- 030.00- 030.00- 030.00- 0
CW 3.8Internal Floor Finishings, cement and sand screed (1:4) paving in one coat (40 mm to floor)m²37.65- 037.65- 037.65- 037.65- 037.65- 0
CW 3.9Ceramic wall tiles,6mm thick bedding and jointing with cement and sand (1:4) mortarm²50.00- 050.00- 050.00- 050.00- 050.00- 0
CW 3.10Ceramic tiles, non slippery,6mm thick bedding and jointing with cement and sand (1:4) mortarm²37.65- 037.65- 037.65- 037.65- 037.65- 0
CW 3.1150mm x 50mm Treated softwood branderingm125.00- 0125.00- 0125.00- 0125.00- 0125.00- 0
CW 3.1212mm Gypsum board ceiling fixed to softwoodm²37.65- 037.65- 037.65- 037.65- 037.65- 0
CW 3.13Gypsum Cornicem25.00- 025.00- 025.00- 025.00- 025.00- 0
CW 3.14250x25mm Fascia boardm30.00- 030.00- 030.00- 030.00- 030.00- 0
CW 3.15Prepare and apply one thinned coat and two full coats of wash n ware silky (Internal)m²55.50- 055.50- 055.50- 055.50- 055.50- 0
- 0- 0- 0- 0- 0
CW 4PLUMBING INSTALLATION- 0- 0- 0- 0- 0
CW 4.1Supply and fix the following sanitary appliances- 0- 0- 0- 0- 0
CW 4.3Supply and laying of sewage PVC pipes Ø100 mm,push in socket / spigot incl. rubber gaskets, to connect soakpit, septic tank and the building.m12.00- 012.00- 012.00- 012.00- 012.00- 0
CW 4.4Hand wash basin (Complete with bottle trap and faucets)No.1.00- 01.00- 01.00- 01.00- 01.00- 0
CW 4.5Soap DishNo.1.00- 01.00- 01.00- 01.00- 01.00- 0
- 0- 0- 0- 0- 0
CW5WIRE FENCE- 0- 0- 0- 0- 0
CW 5.1Supply and install wirer fence (2.5mm gauge), with its chainlink polesno1.00- 01.00- 01.00- 01.00- 01.00- 0
- 0- 0- 0- 0- 0
Supply and installation of electrical distribution board and wiring to connect solar system- 0- 0- 0- 0- 0
E 1.6Supply and Installation of distribution board (minimum 3 ways), Inverter 1KVA, electrical wiring to connect Solar SystemNo.1.00- 01.00- 01.00- 01.00- 01.00- 0
Total for Incinerator, ashpit & waste storage room- 0- 0- 0- 0