J.1 Unpriced Bills of Quantities J.1.2 -38 Boreholes projects.xlsx
XLSX spreadsheet 386 KB Posted
- Attached to
- WATER AND SANITATION INFRASTRUCTURE SUPPORT ACTIVITY (WISA) Federal contract opportunity
- Solicitation number
- 72062124R00003
About this file
This document contains cost estimates for drilling 38 boreholes across rural villages in Tanzania. The estimates were developed to support a USAID activity aimed at improving access to water and sanitation services and sustainable water resource management in Tanzania.
The cost estimates provide line item details for drilling test holes, well construction, installation, development, testing, completion and project management at each of the 38 proposed borehole sites. The work includes tasks such as drilling pilot boreholes, aquifer testing, installing casing and screens, well development, water quality testing and site restoration. Costs are provided based on estimated quantities and unit rates for each line item. The estimates also specify that payments will be made based on actual work completed and verified via drilling logs.
The level of costing detail and standardized approach across sites indicates this was prepared to support competitive procurement of borehole drilling services in multiple locations. The involvement of USAID and Tanzanian government partners further suggests this opportunity is aimed at furthering development goals around water access and management in the country.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reccommended Borehole sites
| No | Locations | Point Code | GPS Coordinates | Recommended Depth (m) | Water type | Ranking | Summary cost for minimum recommended depth | Summary cost for maximum recommended depth | Summary cost for average recommended depth | ||
| Easting | Northing | Minimum (m) | Maximum (m) | ||||||||
| Sumbawanga District Council | |||||||||||
| 1 | Ulinji Village | Point A | 357883 | 9110384 | 103 | 196 | Fresh water | 1 | |||
| 2 | Laela Misheni Site 01 | Point A | 395847 | 9053119 | 131 | 188 | Slightly saline water | 1 | |||
| 3 | Laela Misheni Site 04 | Point C | 396179 | 9053277 | 79 | 208 | Fresh water | 1 | |||
| 4 | Laela Misheni Site 05 | Point F | 396019 | 9053464 | 118 | 199 | Slightly saline water | 1 | |||
| 5 | Tunko village | Point A | 407945 | 9040713 | 117 | 198 | Slightly saline water | 1 | |||
| 6 | Kamsamba village | Point D | 401205 | 9042142 | 111 | 168 | Fresh water | 1 | |||
| 7 | Chombe | Point D | 414776 | 9052122 | 129 | 186 | Slightly saline water | 1 | |||
| 8 | Tululu village | Point C | 421099 | 9053397 | 123 | 180 | Fresh water | 1 | |||
| 9 | Ilambo village | Point C | 429479 | 9082410 | 119 | 200 | Slightly saline water | 1 | |||
| 10 | Mpande village | Point A | 427213 | 9081985 | 120 | 217 | Slightly saline water | 1 | |||
| 11 | Kilangawana village | Point A | 425281 | 9081883 | 125 | 182 | Slightly saline water | 1 | |||
| 12 | Maleza village | Point A | 423551 | 9080393 | 103 | 160 | Slightly saline water | 1 | |||
| 13 | Kiandaigonda Village | Point A | 410362 | 9059400 | 130 | 214 | Slightly saline water | 1 | |||
| 14 | Kilando Village | Point C | 423116 | 9058704 | 131 | 188 | Slightly saline water | 1 | |||
| 15 | Mpona village | Point B | 421319 | 9061864 | 131 | 217 | Slightly saline water | 1 | |||
| 16 | Kituku Village | Point A | 417730 | 9067708 | 99 | 223 | Fresh water | 1 | |||
| 17 | Liwelyamvula village | Point B | 408133 | 9076326 | 128 | 185 | Slightly saline water | 1 | |||
| 18 | Kipeta village | Point A | 418444 | 9073102 | 126 | 183 | Slightly saline water | 1 | |||
| 19 | Kilyamatundu village | Point B | 421303 | 9077226 | 128 | 185 | Fresh water | 1 | |||
| Nkasi District Council | |||||||||||
| 20 | Namanyere - Majengo Village | Point B | 314337 | 9121143 | 127 | 184 | Fresh water | 1 | |||
| 21 | Namanyere - Lunyala Village | Point D | 289874 | 9174879 | 128 | 185 | Fresh water | 1 | |||
| 22 | Namanyere - Nkomolo Village | Point C | 282248 | 9171622 | 111 | 168 | Slight saline water | 1 | |||
| 23 | Mashete B Village | Point A | 295814 | 9181412 | 131 | 188 | Fresh water | 1 | |||
| 24 | Mashete A Village | Point F | 294786 | 9181275 | 103 | 160 | Fresh water | 1 | |||
| 25 | Miombo Village | Point B | 300606 | 9173241 | 127 | 184 | Slightly salty water | 1 | |||
| 26 | Londokazi Village Site 1 | Point A | 304441 | 9166079 | 116 | 187 | Fresh water | 1 | |||
| 27 | Londokazi Village Site 3 | Point D | 305029 | 9166671 | 116 | 187 | Fresh water | 1 | |||
| 28 | Milundikwa Village | Point A | 318373 | 9149284 | 116 | 173 | Slightly saline water | 1 | |||
| 29 | Malongwe Village Site 2 | Point E | 328275 | 9149686 | 111 | 168 | Slightly saline water | 1 | |||
| 30 | Malongwe Village Site 2 | Point A | 327249 | 9151084 | 111 | 168 | Slightly saline water | 1 | |||
| 31 | Katani Village | Point D | 311507 | 9148018 | 126 | 183 | Fresh water | 1 | |||
| 32 | Kanazi Village | Point B | 291029 | 9164998 | 131 | 188 | Slight saline water | 1 | |||
| 33 | Nkana Village | Point D | 314344 | 9121225 | 126 | 183 | Slight saline water | 1 | |||
| 34 | Nkomachindo Village | Point D | 309386 | 9125448 | 103 | 160 | Fresh water | 1 | |||
| 35 | Kizi Village Site 1 | Point E | 281048 | 9206087 | 123 | 180 | Fresh water | 1 | |||
| 36 | Kizi Village Site 2 | Point D | 282850 | 9205691 | 126 | 183 | Fresh water | 1 | |||
| Kalambo District Council | |||||||||||
| 37 | Ngoma Village | Point A | 338716 | 9049486 | 103 | 160 | Fresh water | 1 | |||
| 38 | Katazi Village | Point B | 362220 | 9055759 | 91 | 148 | Slight saline water | 1 |
Ulinji Village
| Borehole Drilling Cost Estimates | ||
| Actual Drilling depth will be determined by the drilling supervisor based on actual site geological formation. Actual work done will be verified using drilling logs. Payments will be per actual work done per site verified from signed drilling logs. | ||
| Maximum recommeded Depth (m) | 196 |
| Item | Description | Estimated Quantity | Units | Unit Price | Total Price |
| 1 | Test Holes | ||||
| Drill pilot boreholes with appropriate size (152mm) | |||||
| 1.1 | Alignment and Plumbness test | 1 | Each | - 0 | |
| 1.2 | _ Air | 137 | m | - 0 | |
| 1.3 | _ Rotary ( mud/) | 59 | m | - 0 | |
| 1.4 | Collection of drilling samples at 2m intervals | 98 | Each | - 0 |
| 2 | Aquifer Testing | |||
| 2.1 | Supply, installation and removal of testing equipment | 1 | Per Test | - 0 |
| 2.2 | Carry out testing | 1 | Per Test | - 0 |
| 3 | Well Construction | |||
| Drilling Production borehole – 203 mm diameter with | ||||
| 3.1 | _ air percussion | 137 | m | - 0 |
| 3.2 | _ rotary (mud/) | 59 | m | - 0 |
| 3.3 | Supply and use of Drilling Mud | 20 | kg | - 0 |
| 3.4 | Supply and use of drilling mud/fluid additives | 15 | kg | - 0 |
| 3.5 | Supply, install and subsequently remove temporary steel casing 254mm | 20 | m | - 0 |
| 3.6 | Supply and install – gravel packing (bags of 20 kg) | 353 | bags | - 0 |
| 4 | Well Installation | |||
| 4.1 | Supply and Install PVC casings 152 mm Inner Diameter | 118 | m | - 0 |
| 4.2 | Supply and Install PVC screens 152 mm Inner Diameter | 78 | m | - 0 |
| 4.3 | Supply and Install Grout Seals | 20 | kg | - 0 |
| 4.4 | Supply and Install Inert back-fill material | 10 | m | - 0 |
| 5 | Well Development | |||
| 5.1 | Well Development | 4 | Per Hr | - 0 |
| 5.2 | Chemicals | 1 | kg | - 0 |
| 6 | Pumping Tests | |||
| 6.1 | Supply, Installation and Removal of testing equipment | 1 | Per Test | - 0 |
| 6.2 | Carry out pumping testing (step test, constant discharge) | 28 | Per Hr | - 0 |
| 6.3 | Recovery standby time (step test, constant discharge) | 4 | Per Hr | - 0 |
| 7 | Well Disinfection | |||
| 7.1 | Well Disinfection | 1 | Per Well | - 0 |
| 7.2 | Chemicals | 1 | kg | - 0 |
| 8 | Well Completion | |||
| 8.1 | Construction of Surface Sanitary Seal – including supply of materials | 1 | Each | - 0 |
| 8.2 | Well head and capping (masonry) – including supply of materials | 1 | Each | - 0 |
| 8.3 | Restoration of drilling sites | 1 | Each | - 0 |
| 9 | Water quality testing | |||
| 9.1 | Water quality test report | 1 | Each | - 0 |
| 10 | Mobilization and demobilization | |||
| 10.1 | Mobilization and demobilization of all equipments, and personnel | 1 | LS | - 0 |
COST OF THE BOREHOLE USD - 0
TOTAL COST INCLUDING MOBILIZATION COSTS USD - 0
Laela Misheni Site 01
| Borehole Drilling Cost Estimates | ||
| Actual Drilling depth will be determined by the drilling supervisor based on actual site geological formation. Actual work done will be verified using drilling logs. Payments will be per actual work done per site verified from signed drilling logs. | ||
| Maximum recommeded Depth (m) | 188 |
| Item | Description | Estimated Quantity | Units | Unit Price | Total Price |
| 1 | Test Holes | ||||
| Drill pilot boreholes with appropriate size (152mm) | |||||
| 1.1 | Alignment and Plumbness test | 1 | Each | - 0 | |
| 1.2 | _ Air | 132 | m | - 0 | |
| 1.3 | _ Rotary ( mud/) | 56 | m | - 0 | |
| 1.4 | Collection of drilling samples at 2m intervals | 94 | Each | - 0 |
| 2 | Aquifer Testing | |||
| 2.1 | Supply, installation and removal of testing equipment | 1 | Per Test | - 0 |
| 2.2 | Carry out testing | 1 | Per Test | - 0 |
| 3 | Well Construction | |||
| Drilling Production borehole – 254 mm diameter with | ||||
| 3.1 | _ air percussion | 132 | m | - 0 |
| 3.2 | _ rotary (mud/) | 56 | m | - 0 |
| 3.3 | Supply and use of Drilling Mud | 20 | kg | - 0 |
| 3.4 | Supply and use of drilling mud/fluid additives | 15 | kg | - 0 |
| 3.5 | Supply, install and subsequently remove temporary steel casing 254mm | 20 | m | - 0 |
| 3.6 | Supply and install – gravel packing (bags of 20 kg) | 338 | bags | - 0 |
| 4 | Well Installation | |||
| 4.1 | Supply and Install PVC casings 203 mm Inner Diameter | 113 | m | - 0 |
| 4.2 | Supply and Install PVC screens 203 mm Inner Diameter | 75 | m | - 0 |
| 4.3 | Supply and Install Grout Seals | 20 | kg | - 0 |
| 4.4 | Supply and Install Inert back-fill material | 10 | m | - 0 |
| 5 | Well Development | |||
| 5.1 | Well Development | 4 | Per Hr | - 0 |
| 5.2 | Chemicals | 1 | kg | - 0 |
| 6 | Pumping Tests | |||
| 6.1 | Supply, Installation and Removal of testing equipment | 1 | Per Test | - 0 |
| 6.2 | Carry out pumping testing (step test, constant discharge) | 28 | Per Hr | - 0 |
| 6.3 | Recovery standby time (step test, constant discharge) | 4 | Per Hr | - 0 |
| 7 | Well Disinfection | |||
| 7.1 | Well Disinfection | 1 | Per Well | - 0 |
| 7.2 | Chemicals | 1 | kg | - 0 |
| 8 | Well Completion | |||
| 8.1 | Construction of Surface Sanitary Seal – including supply of materials | 1 | Each | - 0 |
| 8.2 | Well head and capping (masonry) – including supply of materials | 1 | Each | - 0 |
| 8.3 | Restoration of drilling sites | 1 | Each | - 0 |
| 9 | Water quality testing | |||
| 9.1 | Water quality test report | 1 | Each | - 0 |
| 10 | Mobilization and demobilization | |||
| 10.1 | Mobilization and demobilization of all equipments, and personnel | 1 | LS | - 0 |
COST OF THE BOREHOLE USD - 0
TOTAL COST INCLUDING MOBILIZATION COSTS USD - 0
Laela Misheni Site 04
| Borehole Drilling Cost Estimates | ||
| Actual Drilling depth will be determined by the drilling supervisor based on actual site geological formation. Actual work done will be verified using drilling logs. Payments will be per actual work done per site verified from signed drilling logs. | ||
| Maximum recommeded Depth (m) | 208 |
| Item | Description | Estimated Quantity | Units | Unit Price | Total Price |
| 1 | Test Holes | ||||
| Drill pilot boreholes with appropriate size (152mm) | |||||
| 1.1 | Alignment and Plumbness test | 1 | Each | - 0 | |
| 1.2 | _ Air | 146 | m | - 0 | |
| 1.3 | _ Rotary ( mud/) | 62 | m | - 0 | |
| 1.4 | Collection of drilling samples at 2m intervals | 104 | Each | - 0 |
| 2 | Aquifer Testing | |||
| 2.1 | Supply, installation and removal of testing equipment | 1 | Per Test | - 0 |
| 2.2 | Carry out testing | 1 | Per Test | - 0 |
| 3 | Well Construction | |||
| Drilling Production borehole – 254 mm diameter with | ||||
| 3.1 | _ air percussion | 146 | m | - 0 |
| 3.2 | _ rotary (mud/) | 62 | m | - 0 |
| 3.3 | Supply and use of Drilling Mud | 20 | kg | - 0 |
| 3.4 | Supply and use of drilling mud/fluid additives | 15 | kg | - 0 |
| 3.5 | Supply, install and subsequently remove temporary steel casing 254mm | 20 | m | - 0 |
| 3.6 | Supply and install – gravel packing (bags of 20 kg) | 374 | bags | - 0 |
| 4 | Well Installation | |||
| 4.1 | Supply and Install PVC casings 203 mm Inner Diameter | 125 | m | - 0 |
| 4.2 | Supply and Install PVC screens 203 mm Inner Diameter | 83 | m | - 0 |
| 4.3 | Supply and Install Grout Seals | 20 | kg | - 0 |
| 4.4 | Supply and Install Inert back-fill material | 10 | m | - 0 |
| 5 | Well Development | |||
| 5.1 | Well Development | 4 | Per Hr | - 0 |
| 5.2 | Chemicals | 1 | kg | - 0 |
| 6 | Pumping Tests | |||
| 6.1 | Supply, Installation and Removal of testing equipment | 1 | Per Test | - 0 |
| 6.2 | Carry out pumping testing (step test, constant discharge) | 28 | Per Hr | - 0 |
| 6.3 | Recovery standby time (step test, constant discharge) | 4 | Per Hr | - 0 |
| 7 | Well Disinfection | |||
| 7.1 | Well Disinfection | 1 | Per Well | - 0 |
| 7.2 | Chemicals | 1 | kg | - 0 |
| 8 | Well Completion | |||
| 8.1 | Construction of Surface Sanitary Seal – including supply of materials | 1 | Each | - 0 |
| 8.2 | Well head and capping (masonry) – including supply of materials | 1 | Each | - 0 |
| 8.3 | Restoration of drilling sites | 1 | Each | - 0 |
| 9 | Water quality testing | |||
| 9.1 | Water quality test report | 1 | Each | - 0 |
| 10 | Mobilization and demobilization | |||
| 10.1 | Mobilization and demobilization of all equipments, and personnel | 1 | LS | - 0 |
COST OF THE BOREHOLE USD - 0
TOTAL COST INCLUDING MOBILIZATION COSTS USD - 0
Laela Misheni Site 05
| Borehole Drilling Cost Estimates | ||
| Actual Drilling depth will be determined by the drilling supervisor based on actual site geological formation. Actual work done will be verified using drilling logs. Payments will be per actual work done per site verified from signed drilling logs. | ||
| Maximum recommeded Depth (m) | 199 |
| Item | Description | Estimated Quantity | Units | Unit Price | Total Price |
| 1 | Test Holes | ||||
| Drill pilot boreholes with appropriate size (152mm) | |||||
| 1.1 | Alignment and Plumbness test | 1 | Each | - 0 | |
| 1.2 | _ Air | 139 | m | - 0 | |
| 1.3 | _ Rotary ( mud/) | 60 | m | - 0 | |
| 1.4 | Collection of drilling samples at 2m intervals | 100 | Each | - 0 |
| 2 | Aquifer Testing | |||
| 2.1 | Supply, installation and removal of testing equipment | 1 | Per Test | - 0 |
| 2.2 | Carry out testing | 1 | Per Test | - 0 |
| 3 | Well Construction | |||
| Drilling Production borehole – 254 mm diameter with | ||||
| 3.1 | _ air percussion | 139 | m | - 0 |
| 3.2 | _ rotary (mud/) | 60 | m | - 0 |
| 3.3 | Supply and use of Drilling Mud | 20 | kg | - 0 |
| 3.4 | Supply and use of drilling mud/fluid additives | 15 | kg | - 0 |
| 3.5 | Supply, install and subsequently remove temporary steel casing 254mm | 20 | m | - 0 |
| 3.6 | Supply and install – gravel packing (bags of 20 kg) | 358 | bags | - 0 |
| 4 | Well Installation | |||
| 4.1 | Supply and Install PVC casings 203 mm Inner Diameter | 119 | m | - 0 |
| 4.2 | Supply and Install PVC screens 203 mm Inner Diameter | 80 | m | - 0 |
| 4.3 | Supply and Install Grout Seals | 20 | kg | - 0 |
| 4.4 | Supply and Install Inert back-fill material | 10 | m | - 0 |
| 5 | Well Development | |||
| 5.1 | Well Development | 4 | Per Hr | - 0 |
| 5.2 | Chemicals | 1 | kg | - 0 |
| 6 | Pumping Tests | |||
| 6.1 | Supply, Installation and Removal of testing equipment | 1 | Per Test | - 0 |
| 6.2 | Carry out pumping testing (step test, constant discharge) | 28 | Per Hr | - 0 |
| 6.3 | Recovery standby time (step test, constant discharge) | 4 | Per Hr | - 0 |
| 7 | Well Disinfection | |||
| 7.1 | Well Disinfection | 1 | Per Well | - 0 |
| 7.2 | Chemicals | 1 | kg | - 0 |
| 8 | Well Completion | |||
| 8.1 | Construction of Surface Sanitary Seal – including supply of materials | 1 | Each | - 0 |
| 8.2 | Well head and capping (masonry) – including supply of materials | 1 | Each | - 0 |
| 8.3 | Restoration of drilling sites | 1 | Each | - 0 |
| 9 | Water quality testing | |||
| 9.1 | Water quality test report | 1 | Each | - 0 |
| 10 | Mobilization and demobilization | |||
| 10.1 | Mobilization and demobilization of all equipments, and personnel | 1 | LS | - 0 |
COST OF THE BOREHOLE USD - 0
TOTAL COST INCLUDING MOBILIZATION COSTS USD - 0
Tunko Village
| Borehole Drilling Cost Estimates | ||
| Actual Drilling depth will be determined by the drilling supervisor based on actual site geological formation. Actual work done will be verified using drilling logs. Payments will be per actual work done per site verified from signed drilling logs. | ||
| Maximum recommeded Depth (m) | 198 |
| Item | Description | Estimated Quantity | Units | Unit Price | Total Price |
| 1 | Test Holes | ||||
| Drill pilot boreholes with appropriate size (152mm) | |||||
| 1.1 | Alignment and Plumbness test | 1 | Each | - 0 | |
| 1.2 | _ Air | 139 | m | - 0 | |
| 1.3 | _ Rotary ( mud/) | 59 | m | - 0 | |
| 1.4 | Collection of drilling samples at 2m intervals | 99 | Each | - 0 |
| 2 | Aquifer Testing | |||
| 2.1 | Supply, installation and removal of testing equipment | 1 | Per Test | - 0 |
| 2.2 | Carry out testing | 1 | Per Test | - 0 |
| 3 | Well Construction | |||
| Drilling Production borehole – 203 mm diameter with | ||||
| 3.1 | _ air percussion | 139 | m | - 0 |
| 3.2 | _ rotary (mud/) | 59 | m | - 0 |
| 3.3 | Supply and use of Drilling Mud | 20 | kg | - 0 |
| 3.4 | Supply and use of drilling mud/fluid additives | 15 | kg | - 0 |
| 3.5 | Supply, install and subsequently remove temporary steel casing 254mm | 20 | m | - 0 |
| 3.6 | Supply and install – gravel packing (bags of 20 kg) | 356 | bags | - 0 |
| 4 | Well Installation | |||
| 4.1 | Supply and Install PVC casings 152 mm Inner Diameter | 119 | m | - 0 |
| 4.2 | Supply and Install PVC screens 152 mm Inner Diameter | 79 | m | - 0 |
| 4.3 | Supply and Install Grout Seals | 20 | kg | - 0 |
| 4.4 | Supply and Install Inert back-fill material | 10 | m | - 0 |
| 5 | Well Development | |||
| 5.1 | Well Development | 4 | Per Hr | - 0 |
| 5.2 | Chemicals | 1 | kg | - 0 |
| 6 | Pumping Tests | |||
| 6.1 | Supply, Installation and Removal of testing equipment | 1 | Per Test | - 0 |
| 6.2 | Carry out pumping testing (step test, constant discharge) | 28 | Per Hr | - 0 |
| 6.3 | Recovery standby time (step test, constant discharge) | 4 | Per Hr | - 0 |
| 7 | Well Disinfection | |||
| 7.1 | Well Disinfection | 1 | Per Well | - 0 |
| 7.2 | Chemicals | 1 | kg | - 0 |
| 8 | Well Completion | |||
| 8.1 | Construction of Surface Sanitary Seal – including supply of materials | 1 | Each | - 0 |
| 8.2 | Well head and capping (masonry) – including supply of materials | 1 | Each | - 0 |
| 8.3 | Restoration of drilling sites | 1 | Each | - 0 |
| 9 | Water quality testing | |||
| 9.1 | Water quality test report | 1 | Each | - 0 |
| 10 | Mobilization and demobilization | |||
| 10.1 | Mobilization and demobilization of all equipments, and personnel | 1 | LS | - 0 |
COST OF THE BOREHOLE USD - 0
TOTAL COST INCLUDING MOBILIZATION COSTS USD - 0
Kamsamba Village
| Borehole Drilling Cost Estimates | ||
| Actual Drilling depth will be determined by the drilling supervisor based on actual site geological formation. Actual work done will be verified using drilling logs. Payments will be per actual work done per site verified from signed drilling logs. | ||
| Maximum recommeded Depth (m) | 168 |
| Item | Description | Estimated Quantity | Units | Unit Price | Total Price |
| 1 | Test Holes | ||||
| Drill pilot boreholes with appropriate size (152mm) | |||||
| 1.1 | Alignment and Plumbness test | 1 | Each | - 0 | |
| 1.2 | _ Air | 118 | m | - 0 | |
| 1.3 | _ Rotary ( mud/) | 50 | m | - 0 | |
| 1.4 | Collection of drilling samples at 2m intervals | 84 | Each | - 0 |
| 2 | Aquifer Testing | |||
| 2.1 | Supply, installation and removal of testing equipment | 1 | Per Test | - 0 |
| 2.2 | Carry out testing | 1 | Per Test | - 0 |
| 3 | Well Construction | |||
| Drilling Production borehole – 203 mm diameter with | ||||
| 3.1 | _ air percussion | 118 | m | - 0 |
| 3.2 | _ rotary (mud/) | 50 | m | - 0 |
| 3.3 | Supply and use of Drilling Mud | 20 | kg | - 0 |
| 3.4 | Supply and use of drilling mud/fluid additives | 15 | kg | - 0 |
| 3.5 | Supply, install and subsequently remove temporary steel casing 254mm | 20 | m | - 0 |
| 3.6 | Supply and install – gravel packing (bags of 20 kg) | 302 | bags | - 0 |
| 4 | Well Installation | |||
| 4.1 | Supply and Install PVC casings 152 mm Inner Diameter | 101 | m | - 0 |
| 4.2 | Supply and Install PVC screens 152 mm Inner Diameter | 67 | m | - 0 |
| 4.3 | Supply and Install Grout Seals | 20 | kg | - 0 |
| 4.4 | Supply and Install Inert back-fill material | 10 | m | - 0 |
| 5 | Well Development | |||
| 5.1 | Well Development | 4 | Per Hr | - 0 |
| 5.2 | Chemicals | 1 | kg | - 0 |
| 6 | Pumping Tests | |||
| 6.1 | Supply, Installation and Removal of testing equipment | 1 | Per Test | - 0 |
| 6.2 | Carry out pumping testing (step test, constant discharge) | 28 | Per Hr | - 0 |
| 6.3 | Recovery standby time (step test, constant discharge) | 4 | Per Hr | - 0 |
| 7 | Well Disinfection | |||
| 7.1 | Well Disinfection | 1 | Per Well | - 0 |
| 7.2 | Chemicals | 1 | kg | - 0 |
| 8 | Well Completion | |||
| 8.1 | Construction of Surface Sanitary Seal – including supply of materials | 1 | Each | - 0 |
| 8.2 | Well head and capping (masonry) – including supply of materials | 1 | Each | - 0 |
| 8.3 | Restoration of drilling sites | 1 | Each | - 0 |
| 9 | Water quality testing | |||
| 9.1 | Water quality test report | 1 | Each | - 0 |
| 10 | Mobilization and demobilization | |||
| 10.1 | Mobilization and demobilization of all equipments, and personnel | 1 | LS | - 0 |
COST OF THE BOREHOLE USD - 0
TOTAL COST INCLUDING MOBILIZATION COSTS USD - 0
Chombe Village
| Borehole Drilling Cost Estimates | ||
| Actual Drilling depth will be determined by the drilling supervisor based on actual site geological formation. Actual work done will be verified using drilling logs. Payments will be per actual work done per site verified from signed drilling logs. | ||
| Maximum recommeded Depth (m) | 186 |
| Item | Description | Estimated Quantity | Units | Unit Price | Total Price |
| 1 | Test Holes | ||||
| Drill pilot boreholes with appropriate size (152mm) | |||||
| 1.1 | Alignment and Plumbness test | 1 | Each | - 0 | |
| 1.2 | _ Air | 130 | m | - 0 | |
| 1.3 | _ Rotary ( mud/) | 56 | m | - 0 | |
| 1.4 | Collection of drilling samples at 2m intervals | 93 | Each | - 0 |
| 2 | Aquifer Testing | |||
| 2.1 | Supply, installation and removal of testing equipment | 1 | Per Test | - 0 |
| 2.2 | Carry out testing | 1 | Per Test | - 0 |
| 3 | Well Construction | |||
| Drilling Production borehole – 203 mm diameter with | ||||
| 3.1 | _ air percussion | 130 | m | - 0 |
| 3.2 | _ rotary (mud/) | 56 | m | - 0 |
| 3.3 | Supply and use of Drilling Mud | 20 | kg | - 0 |
| 3.4 | Supply and use of drilling mud/fluid additives | 15 | kg | - 0 |
| 3.5 | Supply, install and subsequently remove temporary steel casing 254mm | 20 | m | - 0 |
| 3.6 | Supply and install – gravel packing (bags of 20 kg) | 335 | bags | - 0 |
| 4 | Well Installation | |||
| 4.1 | Supply and Install PVC casings 152 mm Inner Diameter | 112 | m | - 0 |
| 4.2 | Supply and Install PVC screens 152 mm Inner Diameter | 74 | m | - 0 |
| 4.3 | Supply and Install Grout Seals | 20 | kg | - 0 |
| 4.4 | Supply and Install Inert back-fill material | 10 | m | - 0 |
| 5 | Well Development | |||
| 5.1 | Well Development | 4 | Per Hr | - 0 |
| 5.2 | Chemicals | 1 | kg | - 0 |
| 6 | Pumping Tests | |||
| 6.1 | Supply, Installation and Removal of testing equipment | 1 | Per Test | - 0 |
| 6.2 | Carry out pumping testing (step test, constant discharge) | 28 | Per Hr | - 0 |
| 6.3 | Recovery standby time (step test, constant discharge) | 4 | Per Hr | - 0 |
| 7 | Well Disinfection | |||
| 7.1 | Well Disinfection | 1 | Per Well | - 0 |
| 7.2 | Chemicals | 1 | kg | - 0 |
| 8 | Well Completion | |||
| 8.1 | Construction of Surface Sanitary Seal – including supply of materials | 1 | Each | - 0 |
| 8.2 | Well head and capping (masonry) – including supply of materials | 1 | Each | - 0 |
| 8.3 | Restoration of drilling sites | 1 | Each | - 0 |
| 9 | Water quality testing | |||
| 9.1 | Water quality test report | 1 | Each | - 0 |
| 10 | Mobilization and demobilization | |||
| 10.1 | Mobilization and demobilization of all equipments, and personnel | 1 | LS | - 0 |
COST OF THE BOREHOLE USD - 0
TOTAL COST INCLUDING MOBILIZATION COSTS USD - 0
Tululu Village
| Borehole Drilling Cost Estimates | ||
| Actual Drilling depth will be determined by the drilling supervisor based on actual site geological formation. Actual work done will be verified using drilling logs. Payments will be per actual work done per site verified from signed drilling logs. | ||
| Maximum recommeded Depth (m) | 180 |
| Item | Description | Estimated Quantity | Units | Unit Price | Total Price |
| 1 | Test Holes | ||||
| Drill pilot boreholes with appropriate size (152mm) | |||||
| 1.1 | Alignment and Plumbness test | 1 | Each | - 0 | |
| 1.2 | _ Air | 126 | m | - 0 | |
| 1.3 | _ Rotary ( mud/) | 54 | m | - 0 | |
| 1.4 | Collection of drilling samples at 2m intervals | 90 | Each | - 0 |
| 2 | Aquifer Testing | |||
| 2.1 | Supply, installation and removal of testing equipment | 1 | Per Test | - 0 |
| 2.2 | Carry out testing | 1 | Per Test | - 0 |
| 3 | Well Construction | |||
| Drilling Production borehole – 203 mm diameter with | ||||
| 3.1 | _ air percussion | 126 | m | - 0 |
| 3.2 | _ rotary (mud/) | 54 | m | - 0 |
| 3.3 | Supply and use of Drilling Mud | 20 | kg | - 0 |
| 3.4 | Supply and use of drilling mud/fluid additives | 15 | kg | - 0 |
| 3.5 | Supply, install and subsequently remove temporary steel casing 254mm | 20 | m | - 0 |
| 3.6 | Supply and install – gravel packing (bags of 20 kg) | 324 | bags | - 0 |
| 4 | Well Installation | |||
| 4.1 | Supply and Install PVC casings 152 mm Inner Diameter | 108 | m | - 0 |
| 4.2 | Supply and Install PVC screens 152 mm Inner Diameter | 72 | m | - 0 |
| 4.3 | Supply and Install Grout Seals | 20 | kg | - 0 |
| 4.4 | Supply and Install Inert back-fill material | 10 | m | - 0 |
| 5 | Well Development | |||
| 5.1 | Well Development | 4 | Per Hr | - 0 |
| 5.2 | Chemicals | 1 | kg | - 0 |
| 6 | Pumping Tests | |||
| 6.1 | Supply, Installation and Removal of testing equipment | 1 | Per Test | - 0 |
| 6.2 | Carry out pumping testing (step test, constant discharge) | 28 | Per Hr | - 0 |
| 6.3 | Recovery standby time (step test, constant discharge) | 4 | Per Hr | - 0 |
| 7 | Well Disinfection | |||
| 7.1 | Well Disinfection | 1 | Per Well | - 0 |
| 7.2 | Chemicals | 1 | kg | - 0 |
| 8 | Well Completion | |||
| 8.1 | Construction of Surface Sanitary Seal – including supply of materials | 1 | Each | - 0 |
| 8.2 | Well head and capping (masonry) – including supply of materials | 1 | Each | - 0 |
| 8.3 | Restoration of drilling sites | 1 | Each | - 0 |
| 9 | Water quality testing | |||
| 9.1 | Water quality test report | 1 | Each | - 0 |
| 10 | Mobilization and demobilization | |||
| 10.1 | Mobilization and demobilization of all equipments, and personnel | 1 | LS | - 0 |
COST OF THE BOREHOLE USD - 0
TOTAL COST INCLUDING MOBILIZATION COSTS USD - 0
Ilambo Village
| Borehole Drilling Cost Estimates | ||
| Actual Drilling depth will be determined by the drilling supervisor based on actual site geological formation. Actual work done will be verified using drilling logs. Payments will be per actual work done per site verified from signed drilling logs. | ||
| Maximum recommeded Depth (m) | 200 |
| Item | Description | Estimated Quantity | Units | Unit Price | Total Price |
| 1 | Test Holes | ||||
| Drill pilot boreholes with appropriate size (152mm) | |||||
| 1.1 | Alignment and Plumbness test | 1 | Each | - 0 | |
| 1.2 | _ Air | 140 | m | - 0 | |
| 1.3 | _ Rotary ( mud/) | 60 | m | - 0 | |
| 1.4 | Collection of drilling samples at 2m intervals | 100 | Each | - 0 |
| 2 | Aquifer Testing | |||
| 2.1 | Supply, installation and removal of testing equipment | 1 | Per Test | - 0 |
| 2.2 | Carry out testing | 1 | Per Test | - 0 |
| 3 | Well Construction | |||
| Drilling Production borehole – 203 mm diameter with | ||||
| 3.1 | _ air percussion | 140 | m | - 0 |
| 3.2 | _ rotary (mud/) | 60 | m | - 0 |
| 3.3 | Supply and use of Drilling Mud | 20 | kg | - 0 |
| 3.4 | Supply and use of drilling mud/fluid additives | 15 | kg | - 0 |
| 3.5 | Supply, install and subsequently remove temporary steel casing 254mm | 20 | m | - 0 |
| 3.6 | Supply and install – gravel packing (bags of 20 kg) | 360 | bags | - 0 |
| 4 | Well Installation | |||
| 4.1 | Supply and Install PVC casings 152 mm Inner Diameter | 120 | m | - 0 |
| 4.2 | Supply and Install PVC screens 152 mm Inner Diameter | 80 | m | - 0 |
| 4.3 | Supply and Install Grout Seals | 20 | kg | - 0 |
| 4.4 | Supply and Install Inert back-fill material | 10 | m | - 0 |
| 5 | Well Development | |||
| 5.1 | Well Development | 4 | Per Hr | - 0 |
| 5.2 | Chemicals | 1 | kg | - 0 |
| 6 | Pumping Tests | |||
| 6.1 | Supply, Installation and Removal of testing equipment | 1 | Per Test | - 0 |
| 6.2 | Carry out pumping testing (step test, constant discharge) | 28 | Per Hr | - 0 |
| 6.3 | Recovery standby time (step test, constant discharge) | 4 | Per Hr | - 0 |
| 7 | Well Disinfection | |||
| 7.1 | Well Disinfection | 1 | Per Well | - 0 |
| 7.2 | Chemicals | 1 | kg | - 0 |
| 8 | Well Completion | |||
| 8.1 | Construction of Surface Sanitary Seal – including supply of materials | 1 | Each | - 0 |
| 8.2 | Well head and capping (masonry) – including supply of materials | 1 | Each | - 0 |
| 8.3 | Restoration of drilling sites | 1 | Each | - 0 |
| 9 | Water quality testing | |||
| 9.1 | Water quality test report | 1 | Each | - 0 |
| 10 | Mobilization and demobilization | |||
| 10.1 | Mobilization and demobilization of all equipments, and personnel | 1 | LS | - 0 |
COST OF THE BOREHOLE USD - 0
TOTAL COST INCLUDING MOBILIZATION COSTS USD - 0
Mpande Village
| Borehole Drilling Cost Estimates | ||
| Actual Drilling depth will be determined by the drilling supervisor based on actual site geological formation. Actual work done will be verified using drilling logs. Payments will be per actual work done per site verified from signed drilling logs. | ||
| Maximum recommeded Depth (m) | 217 |
| Item | Description | Estimated Quantity | Units | Unit Price | Total Price |
| 1 | Test Holes | ||||
| Drill pilot boreholes with appropriate size (152mm) | |||||
| 1.1 | Alignment and Plumbness test | 1 | Each | - 0 | |
| 1.2 | _ Air | 152 | m | - 0 | |
| 1.3 | _ Rotary ( mud/) | 65 | m | - 0 | |
| 1.4 | Collection of drilling samples at 2m intervals | 109 | Each | - 0 |
| 2 | Aquifer Testing | |||
| 2.1 | Supply, installation and removal of testing equipment | 1 | Per Test | - 0 |
| 2.2 | Carry out testing | 1 | Per Test | - 0 |
| 3 | Well Construction | |||
| Drilling Production borehole – 203 mm diameter with | ||||
| 3.1 | _ air percussion | 152 | m | - 0 |
| 3.2 | _ rotary (mud/) | 65 | m | - 0 |
| 3.3 | Supply and use of Drilling Mud | 20 | kg | - 0 |
| 3.4 | Supply and use of drilling mud/fluid additives | 15 | kg | - 0 |
| 3.5 | Supply, install and subsequently remove temporary steel casing 254mm | 20 | m | - 0 |
| 3.6 | Supply and install – gravel packing (bags of 20 kg) | 391 | bags | - 0 |
| 4 | Well Installation | |||
| 4.1 | Supply and Install PVC casings 152 mm Inner Diameter | 130 | m | - 0 |
| 4.2 | Supply and Install PVC screens 152 mm Inner Diameter | 87 | m | - 0 |
| 4.3 | Supply and Install Grout Seals | 20 | kg | - 0 |
| 4.4 | Supply and Install Inert back-fill material | 10 | m | - 0 |
| 5 | Well Development | |||
| 5.1 | Well Development | 4 | Per Hr | - 0 |
| 5.2 | Chemicals | 1 | kg | - 0 |
| 6 | Pumping Tests | |||
| 6.1 | Supply, Installation and Removal of testing equipment | 1 | Per Test | - 0 |
| 6.2 | Carry out pumping testing (step test, constant discharge) | 28 | Per Hr | - 0 |
| 6.3 | Recovery standby time (step test, constant discharge) | 4 | Per Hr | - 0 |
| 7 | Well Disinfection | |||
| 7.1 | Well Disinfection | 1 | Per Well | - 0 |
| 7.2 | Chemicals | 1 | kg | - 0 |
| 8 | Well Completion | |||
| 8.1 | Construction of Surface Sanitary Seal – including supply of materials | 1 | Each | - 0 |
| 8.2 | Well head and capping (masonry) – including supply of materials | 1 | Each | - 0 |
| 8.3 | Restoration of drilling sites | 1 | Each | - 0 |
| 9 | Water quality testing | |||
| 9.1 | Water quality test report | 1 | Each | - 0 |
| 10 | Mobilization and demobilization | |||
| 10.1 | Mobilization and demobilization of all equipments, and personnel | 1 | LS | - 0 |
COST OF THE BOREHOLE USD - 0
TOTAL COST INCLUDING MOBILIZATION COSTS USD - 0
Kilangawana Village
| Borehole Drilling Cost Estimates | ||
| Actual Drilling depth will be determined by the drilling supervisor based on actual site geological formation. Actual work done will be verified using drilling logs. Payments will be per actual work done per site verified from signed drilling logs. | ||
| Maximum recommeded Depth (m) | 182 |
| Item | Description | Estimated Quantity | Units | Unit Price | Total Price |
| 1 | Test Holes | ||||
| Drill pilot boreholes with appropriate size (152mm) | |||||
| 1.1 | Alignment and Plumbness test | 1 | Each | - 0 | |
| 1.2 | _ Air | 127 | m | - 0 | |
| 1.3 | _ Rotary ( mud/) | 55 | m | - 0 | |
| 1.4 | Collection of drilling samples at 2m intervals | 91 | Each | - 0 |
| 2 | Aquifer Testing | |||
| 2.1 | Supply, installation and removal of testing equipment | 1 | Per Test | - 0 |
| 2.2 | Carry out testing | 1 | Per Test | - 0 |
| 3 | Well Construction | |||
| Drilling Production borehole – 203 mm diameter with | ||||
| 3.1 | _ air percussion | 127 | m | - 0 |
| 3.2 | _ rotary (mud/) | 55 | m | - 0 |
| 3.3 | Supply and use of Drilling Mud | 20 | kg | - 0 |
| 3.4 | Supply and use of drilling mud/fluid additives | 15 | kg | - 0 |
| 3.5 | Supply, install and subsequently remove temporary steel casing 254mm | 20 | m | - 0 |
| 3.6 | Supply and install – gravel packing (bags of 20 kg) | 328 | bags | - 0 |
| 4 | Well Installation | |||
| 4.1 | Supply and Install PVC casings 152 mm Inner Diameter | 109 | m | - 0 |
| 4.2 | Supply and Install PVC screens 152 mm Inner Diameter | 73 | m | - 0 |
| 4.3 | Supply and Install Grout Seals | 20 | kg | - 0 |
| 4.4 | Supply and Install Inert back-fill material | 10 | m | - 0 |
| 5 | Well Development | |||
| 5.1 | Well Development | 4 | Per Hr | - 0 |
| 5.2 | Chemicals | 1 | kg | - 0 |
| 6 | Pumping Tests | |||
| 6.1 | Supply, Installation and Removal of testing equipment | 1 | Per Test | - 0 |
| 6.2 | Carry out pumping testing (step test, constant discharge) | 28 | Per Hr | - 0 |
| 6.3 | Recovery standby time (step test, constant discharge) | 4 | Per Hr | - 0 |
| 7 | Well Disinfection | |||
| 7.1 | Well Disinfection | 1 | Per Well | - 0 |
| 7.2 | Chemicals | 1 | kg | - 0 |
| 8 | Well Completion | |||
| 8.1 | Construction of Surface Sanitary Seal – including supply of materials | 1 | Each | - 0 |
| 8.2 | Well head and capping (masonry) – including supply of materials | 1 | Each | - 0 |
| 8.3 | Restoration of drilling sites | 1 | Each | - 0 |
| 9 | Water quality testing | |||
| 9.1 | Water quality test report | 1 | Each | - 0 |
| 10 | Mobilization and demobilization | |||
| 10.1 | Mobilization and demobilization of all equipments, and personnel | 1 | LS | - 0 |
COST OF THE BOREHOLE USD - 0
TOTAL COST INCLUDING MOBILIZATION COSTS USD - 0
Maleza Village
| Borehole Drilling Cost Estimates | ||
| Actual Drilling depth will be determined by the drilling supervisor based on actual site geological formation. Actual work done will be verified using drilling logs. Payments will be per actual work done per site verified from signed drilling logs. | ||
| Maximum recommeded Depth (m) | 160 |
| Item | Description | Estimated Quantity | Units | Unit Price | Total Price |
| 1 | Test Holes | ||||
| Drill pilot boreholes with appropriate size (152mm) | |||||
| 1.1 | Alignment and Plumbness test | 1 | Each | - 0 | |
| 1.2 | _ Air | 112 | m | - 0 | |
| 1.3 | _ Rotary ( mud/) | 48 | m | - 0 | |
| 1.4 | Collection of drilling samples at 2m intervals | 80 | Each | - 0 |
| 2 | Aquifer Testing | |||
| 2.1 | Supply, installation and removal of testing equipment | 1 | Per Test | - 0 |
| 2.2 | Carry out testing | 1 | Per Test | - 0 |
| 3 | Well Construction | |||
| Drilling Production borehole – 203 mm diameter with | ||||
| 3.1 | _ air percussion | 112 | m | - 0 |
| 3.2 | _ rotary (mud/) | 48 | m | - 0 |
| 3.3 | Supply and use of Drilling Mud | 20 | kg | - 0 |
| 3.4 | Supply and use of drilling mud/fluid additives | 15 | kg | - 0 |
| 3.5 | Supply, install and subsequently remove temporary steel casing 254mm | 20 | m | - 0 |
| 3.6 | Supply and install – gravel packing (bags of 20 kg) | 288 | bags | - 0 |
| 4 | Well Installation | |||
| 4.1 | Supply and Install PVC casings 152 mm Inner Diameter | 96 | m | - 0 |
| 4.2 | Supply and Install PVC screens 152 mm Inner Diameter | 64 | m | - 0 |
| 4.3 | Supply and Install Grout Seals | 20 | kg | - 0 |
| 4.4 | Supply and Install Inert back-fill material | 10 | m | - 0 |
| 5 | Well Development | |||
| 5.1 | Well Development | 4 | Per Hr | - 0 |
| 5.2 | Chemicals | 1 | kg | - 0 |
| 6 | Pumping Tests | |||
| 6.1 | Supply, Installation and Removal of testing equipment | 1 | Per Test | - 0 |
| 6.2 | Carry out pumping testing (step test, constant discharge) | 28 | Per Hr | - 0 |
| 6.3 | Recovery standby time (step test, constant discharge) | 4 | Per Hr | - 0 |
| 7 | Well Disinfection | |||
| 7.1 | Well Disinfection | 1 | Per Well | - 0 |
| 7.2 | Chemicals | 1 | kg | - 0 |
| 8 | Well Completion | |||
| 8.1 | Construction of Surface Sanitary Seal – including supply of materials | 1 | Each | - 0 |
| 8.2 | Well head and capping (masonry) – including supply of materials | 1 | Each | - 0 |
| 8.3 | Restoration of drilling sites | 1 | Each | - 0 |
| 9 | Water quality testing | |||
| 9.1 | Water quality test report | 1 | Each | - 0 |
| 10 | Mobilization and demobilization | |||
| 10.1 | Mobilization and demobilization of all equipments, and personnel | 1 | LS | - 0 |
COST OF THE BOREHOLE USD - 0
TOTAL COST INCLUDING MOBILIZATION COSTS USD - 0
Kiandaigonda Village
| Borehole Drilling Cost Estimates | ||
| Actual Drilling depth will be determined by the drilling supervisor based on actual site geological formation. Actual work done will be verified using drilling logs. Payments will be per actual work done per site verified from signed drilling logs. | ||
| Maximum recommeded Depth (m) | 214 |
| Item | Description | Estimated Quantity | Units | Unit Price | Total Price |
| 1 | Test Holes | ||||
| Drill pilot boreholes with appropriate size (152mm) | |||||
| 1.1 | Alignment and Plumbness test | 1 | Each | - 0 | |
| 1.2 | _ Air | 150 | m | - 0 | |
| 1.3 | _ Rotary ( mud/) | 64 | m | - 0 | |
| 1.4 | Collection of drilling samples at 2m intervals | 107 | Each | - 0 |
| 2 | Aquifer Testing | |||
| 2.1 | Supply, installation and removal of testing equipment | 1 | Per Test | - 0 |
| 2.2 | Carry out testing | 1 | Per Test | - 0 |
| 3 | Well Construction | |||
| Drilling Production borehole – 203 mm diameter with | ||||
| 3.1 | _ air percussion | 150 | m | - 0 |
| 3.2 | _ rotary (mud/) | 64 | m | - 0 |
| 3.3 | Supply and use of Drilling Mud | 20 | kg | - 0 |
| 3.4 | Supply and use of drilling mud/fluid additives | 15 | kg | - 0 |
| 3.5 | Supply, install and subsequently remove temporary steel casing 254mm | 20 | m | - 0 |
| 3.6 | Supply and install – gravel packing (bags of 20 kg) | 385 | bags | - 0 |
| 4 | Well Installation | |||
| 4.1 | Supply and Install PVC casings 152 mm Inner Diameter | 128 | m | - 0 |
| 4.2 | Supply and Install PVC screens 152 mm Inner Diameter | 86 | m | - 0 |
| 4.3 | Supply and Install Grout Seals | 20 | kg | - 0 |
| 4.4 | Supply and Install Inert back-fill material | 10 | m | - 0 |
| 5 | Well Development | |||
| 5.1 | Well Development | 4 | Per Hr | - 0 |
| 5.2 | Chemicals | 1 | kg | - 0 |
| 6 | Pumping Tests | |||
| 6.1 | Supply, Installation and Removal of testing equipment | 1 | Per Test | - 0 |
| 6.2 | Carry out pumping testing (step test, constant discharge) | 28 | Per Hr | - 0 |
| 6.3 | Recovery standby time (step test, constant discharge) | 4 | Per Hr | - 0 |
| 7 | Well Disinfection | |||
| 7.1 | Well Disinfection | 1 | Per Well | - 0 |
| 7.2 | Chemicals | 1 | kg | - 0 |
| 8 | Well Completion | |||
| 8.1 | Construction of Surface Sanitary Seal – including supply of materials | 1 | Each | - 0 |
| 8.2 | Well head and capping (masonry) – including supply of materials | 1 | Each | - 0 |
| 8.3 | Restoration of drilling sites | 1 | Each | - 0 |
| 9 | Water quality testing | |||
| 9.1 | Water quality test report | 1 | Each | - 0 |
| 10 | Mobilization and demobilization | |||
| 10.1 | Mobilization and demobilization of all equipments, and personnel | 1 | LS | - 0 |
COST OF THE BOREHOLE USD - 0
TOTAL COST INCLUDING MOBILIZATION COSTS USD - 0
Kilando Village
| Borehole Drilling Cost Estimates | ||
| Actual Drilling depth will be determined by the drilling supervisor based on actual site geological formation. Actual work done will be verified using drilling logs. Payments will be per actual work done per site verified from signed drilling logs. | ||
| Maximum recommeded Depth (m) | 188 |
| Item | Description | Estimated Quantity | Units | Unit Price | Total Price |
| 1 | Test Holes | ||||
| Drill pilot boreholes with appropriate size (152mm) | |||||
| 1.1 | Alignment and Plumbness test | 1 | Each | - 0 | |
| 1.2 | _ Air | 132 | m | - 0 | |
| 1.3 | _ Rotary ( mud/) | 56 | m | - 0 | |
| 1.4 | Collection of drilling samples at 2m intervals | 94 | Each | - 0 |
| 2 | Aquifer Testing | |||
| 2.1 | Supply, installation and removal of testing equipment | 1 | Per Test | - 0 |
| 2.2 | Carry out testing | 1 | Per Test | - 0 |
| 3 | Well Construction | |||
| Drilling Production borehole – 203 mm diameter with | ||||
| 3.1 | _ air percussion | 132 | m | - 0 |
| 3.2 | _ rotary (mud/) | 56 | m | - 0 |
| 3.3 | Supply and use of Drilling Mud | 20 | kg | - 0 |
| 3.4 | Supply and use of drilling mud/fluid additives | 15 | kg | - 0 |
| 3.5 | Supply, install and subsequently remove temporary steel casing 254mm | 20 | m | - 0 |
| 3.6 | Supply and install – gravel packing (bags of 20 kg) | 338 | bags | - 0 |
| 4 | Well Installation | |||
| 4.1 | Supply and Install PVC casings 152 mm Inner Diameter | 113 | m | - 0 |
| 4.2 | Supply and Install PVC screens 152 mm Inner Diameter | 75 | m | - 0 |
| 4.3 | Supply and Install Grout Seals | 20 | kg | - 0 |
| 4.4 | Supply and Install Inert back-fill material | 10 | m | - 0 |
| 5 | Well Development | |||
| 5.1 | Well Development | 4 | Per Hr | - 0 |
| 5.2 | Chemicals | 1 | kg | - 0 |
| 6 | Pumping Tests | |||
| 6.1 | Supply, Installation and Removal of testing equipment | 1 | Per Test | - 0 |
| 6.2 | Carry out pumping testing (step test, constant discharge) | 28 | Per Hr | - 0 |
| 6.3 | Recovery standby time (step test, constant discharge) | 4 | Per Hr | - 0 |
| 7 | Well Disinfection | |||
| 7.1 | Well Disinfection | 1 | Per Well | - 0 |
| 7.2 | Chemicals | 1 | kg | - 0 |
| 8 | Well Completion | |||
| 8.1 | Construction of Surface Sanitary Seal – including supply of materials | 1 | Each | - 0 |
| 8.2 | Well head and capping (masonry) – including supply of materials | 1 | Each | - 0 |
| 8.3 | Restoration of drilling sites | 1 | Each | - 0 |
| 9 | Water quality testing | |||
| 9.1 | Water quality test report | 1 | Each | - 0 |
| 10 | Mobilization and demobilization | |||
| 10.1 | Mobilization and demobilization of all equipments, and personnel | 1 | LS | - 0 |
COST OF THE BOREHOLE USD - 0
TOTAL COST INCLUDING MOBILIZATION COSTS USD - 0
Mpona village
| Borehole Drilling Cost Estimates | ||
| Actual Drilling depth will be determined by the drilling supervisor based on actual site geological formation. Actual work done will be verified using drilling logs. Payments will be per actual work done per site verified from signed drilling logs. | ||
| Maximum recommeded Depth (m) | 217 |
| Item | Description | Estimated Quantity | Units | Unit Price | Total Price |
| 1 | Test Holes | ||||
| Drill pilot boreholes with appropriate size (152mm) | |||||
| 1.1 | Alignment and Plumbness test | 1 | Each | - 0 | |
| 1.2 | _ Air | 152 | m | - 0 | |
| 1.3 | _ Rotary ( mud/) | 65 | m | - 0 | |
| 1.4 | Collection of drilling samples at 2m intervals | 109 | Each | - 0 |
| 2 | Aquifer Testing | |||
| 2.1 | Supply, installation and removal of testing equipment | 1 | Per Test | - 0 |
| 2.2 | Carry out testing | 1 | Per Test | - 0 |
| 3 | Well Construction | |||
| Drilling Production borehole – 203 mm diameter with | ||||
| 3.1 | _ air percussion | 152 | m | - 0 |
| 3.2 | _ rotary (mud/) | 65 | m | - 0 |
| 3.3 | Supply and use of Drilling Mud | 20 | kg | - 0 |
| 3.4 | Supply and use of drilling mud/fluid additives | 15 | kg | - 0 |
| 3.5 | Supply, install and subsequently remove temporary steel casing 254mm | 20 | m | - 0 |
| 3.6 | Supply and install – gravel packing (bags of 20 kg) | 391 | bags | - 0 |
| 4 | Well Installation | |||
| 4.1 | Supply and Install PVC casings 152 mm Inner Diameter | 130 | m | - 0 |
| 4.2 | Supply and Install PVC screens 152 mm Inner Diameter | 87 | m | - 0 |
| 4.3 | Supply and Install Grout Seals | 20 | kg | - 0 |
| 4.4 | Supply and Install Inert back-fill material | 10 | m | - 0 |
| 5 | Well Development | |||
| 5.1 | Well Development | 4 | Per Hr | - 0 |
| 5.2 | Chemicals | 1 | kg | - 0 |
| 6 | Pumping Tests | |||
| 6.1 | Supply, Installation and Removal of testing equipment | 1 | Per Test | - 0 |
| 6.2 | Carry out pumping testing (step test, constant discharge) | 28 | Per Hr | - 0 |
| 6.3 | Recovery standby time (step test, constant discharge) | 4 | Per Hr | - 0 |
| 7 | Well Disinfection | |||
| 7.1 | Well Disinfection | 1 | Per Well | - 0 |
| 7.2 | Chemicals | 1 | kg | - 0 |
| 8 | Well Completion | |||
| 8.1 | Construction of Surface Sanitary Seal – including supply of materials | 1 | Each | - 0 |
| 8.2 | Well head and capping (masonry) – including supply of materials | 1 | Each | - 0 |
| 8.3 | Restoration of drilling sites | 1 | Each | - 0 |
| 9 | Water quality testing | |||
| 9.1 | Water quality test report | 1 | Each | - 0 |
| 10 | Mobilization and demobilization | |||
| 10.1 | Mobilization and demobilization of all equipments, and personnel | 1 | LS | - 0 |
COST OF THE BOREHOLE USD - 0
TOTAL COST INCLUDING MOBILIZATION COSTS USD - 0
Kituku Village
| Borehole Drilling Cost Estimates | ||
| Actual Drilling depth will be determined by the drilling supervisor based on actual site geological formation. Actual work done will be verified using drilling logs. Payments will be per actual work done per site verified from signed drilling logs. | ||
| Maximum recommeded Depth (m) | 223 |
| Item | Description | Estimated Quantity | Units | Unit Price | Total Price |
| 1 | Test Holes | ||||
| Drill pilot boreholes with appropriate size (152mm) | |||||
| 1.1 | Alignment and Plumbness test | 1 | Each | - 0 | |
| 1.2 | _ Air | 156 | m | - 0 | |
| 1.3 | _ Rotary ( mud/) | 67 | m | - 0 | |
| 1.4 | Collection of drilling samples at 2m intervals | 112 | Each | - 0 |
| 2 | Aquifer Testing | |||
| 2.1 | Supply, installation and removal of testing equipment | 1 | Per Test | - 0 |
| 2.2 | Carry out testing | 1 | Per Test | - 0 |
| 3 | Well Construction | |||
| Drilling Production borehole – 203 mm diameter with | ||||
| 3.1 | _ air percussion | 156 | m | - 0 |
| 3.2 | _ rotary (mud/) | 67 | m | - 0 |
| 3.3 | Supply and use of Drilling Mud | 20 | kg | - 0 |
| 3.4 | Supply and use of drilling mud/fluid additives | 15 | kg | - 0 |
| 3.5 | Supply, install and subsequently remove temporary steel casing 254mm | 20 | m | - 0 |
| 3.6 | Supply and install – gravel packing (bags of 20 kg) | 401 | bags | - 0 |
| 4 | Well Installation | |||
| 4.1 | Supply and Install PVC casings 152 mm Inner Diameter | 134 | m | - 0 |
| 4.2 | Supply and Install PVC screens 152 mm Inner Diameter | 89 | m | - 0 |
| 4.3 | Supply and Install Grout Seals | 20 | kg | - 0 |
| 4.4 | Supply and Install Inert back-fill material | 10 | m | - 0 |
| 5 | Well Development | |||
| 5.1 | Well Development | 4 | Per Hr | - 0 |
| 5.2 | Chemicals | 1 | kg | - 0 |
| 6 | Pumping Tests | |||
| 6.1 | Supply, Installation and Removal of testing equipment | 1 | Per Test | - 0 |
| 6.2 | Carry out pumping testing (step test, constant discharge) | 28 | Per Hr | - 0 |
| 6.3 | Recovery standby time (step test, constant discharge) | 4 | Per Hr | - 0 |
| 7 | Well Disinfection | |||
| 7.1 | Well Disinfection | 1 | Per Well | - 0 |
| 7.2 | Chemicals | 1 | kg | - 0 |
| 8 | Well Completion | |||
| 8.1 | Construction of Surface Sanitary Seal – including supply of materials | 1 | Each | - 0 |
| 8.2 | Well head and capping (masonry) – including supply of materials | 1 | Each | - 0 |
| 8.3 | Restoration of drilling sites | 1 | Each | - 0 |
| 9 | Water quality testing | |||
| 9.1 | Water quality test report | 1 | Each | - 0 |
| 10 | Mobilization and demobilization | |||
| 10.1 | Mobilization and demobilization of all equipments, and personnel | 1 | LS | - 0 |
COST OF THE BOREHOLE USD - 0
TOTAL COST INCLUDING MOBILIZATION COSTS USD - 0
Liwelyamvula Village
| Borehole Drilling Cost Estimates | ||
| Actual Drilling depth will be determined by the drilling supervisor based on actual site geological formation. Actual work done will be verified using drilling logs. Payments will be per actual work done per site verified from signed drilling logs. | ||
| Maximum recommeded Depth (m) | 185 |
| Item | Description | Estimated Quantity | Units | Unit Price | Total Price |
| 1 | Test Holes | ||||
| Drill pilot boreholes with appropriate size (152mm) | |||||
| 1.1 | Alignment and Plumbness test | 1 | Each | - 0 | |
| 1.2 | _ Air | 130 | m | - 0 | |
| 1.3 | _ Rotary ( mud/) | 56 | m | - 0 | |
| 1.4 | Collection of drilling samples at 2m intervals | 93 | Each | - 0 |
| 2 | Aquifer Testing | |||
| 2.1 | Supply, installation and removal of testing equipment | 1 | Per Test | - 0 |
| 2.2 | Carry out testing | 1 | Per Test | - 0 |
| 3 | Well Construction | |||
| Drilling Production borehole – 203 mm diameter with | ||||
| 3.1 | _ air percussion | 130 | m | - 0 |
| 3.2 | _ rotary (mud/) | 56 | m | - 0 |
| 3.3 | Supply and use of Drilling Mud | 20 | kg | - 0 |
| 3.4 | Supply and use of drilling mud/fluid additives | 15 | kg | - 0 |
| 3.5 | Supply, install and subsequently remove temporary steel casing 254mm | 20 | m | - 0 |
| 3.6 | Supply and install – gravel packing (bags of 20 kg) | 333 | bags | - 0 |
| 4 | Well Installation | |||
| 4.1 | Supply and Install PVC casings 152 mm Inner Diameter | 111 | m | - 0 |
| 4.2 | Supply and Install PVC screens 152 mm Inner Diameter | 74 | m | - 0 |
| 4.3 | Supply and Install Grout Seals | 20 | kg | - 0 |
| 4.4 | Supply and Install Inert back-fill material | 10 | m | - 0 |
| 5 | Well Development | |||
| 5.1 | Well Development | 4 | Per Hr | - 0 |
| 5.2 | Chemicals | 1 | kg | - 0 |
| 6 | Pumping Tests | |||
| 6.1 | Supply, Installation and Removal of testing equipment | 1 | Per Test | - 0 |
| 6.2 | Carry out pumping testing (step test, constant discharge) | 28 | Per Hr | - 0 |
| 6.3 | Recovery standby time (step test, constant discharge) | 4 | Per Hr | - 0 |
| 7 | Well Disinfection | |||
| 7.1 | Well Disinfection | 1 | Per Well | - 0 |
| 7.2 | Chemicals | 1 | kg | - 0 |
| 8 | Well Completion | |||
| 8.1 | Construction of Surface Sanitary Seal – including supply of materials | 1 | Each | - 0 |
| 8.2 | Well head and capping (masonry) – including supply of materials | 1 | Each | - 0 |
| 8.3 | Restoration of drilling sites | 1 | Each | - 0 |
| 9 | Water quality testing | |||
| 9.1 | Water quality test report | 1 | Each | - 0 |
| 10 | Mobilization and demobilization | |||
| 10.1 | Mobilization and demobilization of all equipments, and personnel | 1 | LS | - 0 |
COST OF THE BOREHOLE USD - 0
TOTAL COST INCLUDING MOBILIZATION COSTS USD - 0
Kipeta Village
| Borehole Drilling Cost Estimates | ||
| Actual Drilling depth will be determined by the drilling supervisor based on actual site geological formation. Actual work done will be verified using drilling logs. Payments will be per actual work done per site verified from signed drilling logs. | ||
| Maximum recommeded Depth (m) | 183 |
| Item | Description | Estimated Quantity | Units | Unit Price | Total Price |
| 1 | Test Holes | ||||
| Drill pilot boreholes with appropriate size (152mm) | |||||
| 1.1 | Alignment and Plumbness test | 1 | Each | - 0 | |
| 1.2 | _ Air | 128 | m | - 0 | |
| 1.3 | _ Rotary ( mud/) | 55 | m | - 0 | |
| 1.4 | Collection of drilling samples at 2m intervals | 92 | Each | - 0 |
| 2 | Aquifer Testing | |||
| 2.1 | Supply, installation and removal of testing equipment | 1 | Per Test | - 0 |
| 2.2 | Carry out testing | 1 | Per Test | - 0 |
| 3 | Well Construction | |||
| Drilling Production borehole – 203 mm diameter with | ||||
| 3.1 | _ air percussion | 128 | m | - 0 |
| 3.2 | _ rotary (mud/) | 55 | m | - 0 |
| 3.3 | Supply and use of Drilling Mud | 20 | kg | - 0 |
| 3.4 | Supply and use of drilling mud/fluid additives | 15 | kg | - 0 |
| 3.5 | Supply, install and subsequently remove temporary steel casing 254mm | 20 | m | - 0 |
| 3.6 | Supply and install – gravel packing (bags of 20 kg) | 329 | bags | - 0 |
| 4 | Well Installation | |||
| 4.1 | Supply and Install PVC casings 152 mm Inner Diameter | 110 | m | - 0 |
| 4.2 | Supply and Install PVC screens 152 mm Inner Diameter | 73 | m | - 0 |
| 4.3 | Supply and Install Grout Seals | 20 | kg | - 0 |
| 4.4 | Supply and Install Inert back-fill material | 10 | m | - 0 |
| 5 | Well Development | |||
| 5.1 | Well Development | 4 | Per Hr | - 0 |
| 5.2 | Chemicals | 1 | kg | - 0 |
| 6 | Pumping Tests | |||
| 6.1 | Supply, Installation and Removal of testing equipment | 1 | Per Test | - 0 |
| 6.2 | Carry out pumping testing (step test, constant discharge) | 28 | Per Hr | - 0 |
| 6.3 | Recovery standby time (step test, constant discharge) | 4 | Per Hr | - 0 |
| 7 | Well Disinfection | |||
| 7.1 | Well Disinfection | 1 | Per Well | - 0 |
| 7.2 | Chemicals | 1 | kg | - 0 |
| 8 | Well Completion | |||
| 8.1 | Construction of Surface Sanitary Seal – including supply of materials | 1 | Each | - 0 |
| 8.2 | Well head and capping (masonry) – including supply of materials | 1 | Each | - 0 |
| 8.3 | Restoration of drilling sites | 1 | Each | - 0 |
| 9 | Water quality testing | |||
| 9.1 | Water quality test report | 1 | Each | - 0 |
| 10 | Mobilization and demobilization | |||
| 10.1 | Mobilization and demobilization of all equipments, and personnel | 1 | LS | - 0 |
COST OF THE BOREHOLE USD - 0
TOTAL COST INCLUDING MOBILIZATION COSTS USD - 0
Kilyamatundu Village
| Borehole Drilling Cost Estimates | ||
| Actual Drilling depth will be determined by the drilling supervisor based on actual site geological formation. Actual work done will be verified using drilling logs. Payments will be per actual work done per site verified from signed drilling logs. | ||
| Maximum recommeded Depth (m) | 185 |
| Item | Description | Estimated Quantity | Units | Unit Price | Total Price |
| 1 | Test Holes | ||||
| Drill pilot boreholes with appropriate size (152mm) | |||||
| 1.1 | Alignment and Plumbness test | 1 | Each | - 0 | |
| 1.2 | _ Air | 130 | m | - 0 | |
| 1.3 | _ Rotary ( mud/) | 56 | m | - 0 | |
| 1.4 | Collection of drilling samples at 2m intervals | 93 | Each | - 0 |
| 2 | Aquifer Testing | |||
| 2.1 | Supply, installation and removal of testing equipment | 1 | Per Test | - 0 |
| 2.2 | Carry out testing | 1 | Per Test | - 0 |
| 3 | Well Construction | |||
| Drilling Production borehole – 203 mm diameter with | ||||
| 3.1 | _ air percussion | 130 | m | - 0 |
| 3.2 | _ rotary (mud/) | 56 | m | - 0 |
| 3.3 | Supply and use of Drilling Mud | 20 | kg | - 0 |
| 3.4 | Supply and use of drilling mud/fluid additives | 15 | kg | - 0 |
| 3.5 | Supply, install and subsequently remove temporary steel casing 254mm | 20 | m | - 0 |
| 3.6 | Supply and install – gravel packing (bags of 20 kg) | 333 | bags | - 0 |
| 4 | Well Installation | |||
| 4.1 | Supply and Install PVC casings 152 mm Inner Diameter | 111 | m | - 0 |
| 4.2 | Supply and Install PVC screens 152 mm Inner Diameter | 74 | m | - 0 |
| 4.3 | Supply and Install Grout Seals | 20 | kg | - 0 |
| 4.4 | Supply and Install Inert back-fill material | 10 | m | - 0 |
| 5 | Well Development | |||
| 5.1 | Well Development | 4 | Per Hr | - 0 |
| 5.2 | Chemicals | 1 | kg | - 0 |
| 6 | Pumping Tests | |||
| 6.1 | Supply, Installation and Removal of testing equipment | 1 | Per Test | - 0 |
| 6.2 | Carry out pumping testing (step test, constant discharge) | 28 | Per Hr | - 0 |
| 6.3 | Recovery standby time (step test, constant discharge) | 4 | Per Hr | - 0 |
| 7 | Well Disinfection | |||
| 7.1 | Well Disinfection | 1 | Per Well | - 0 |
| 7.2 | Chemicals | 1 | kg | - 0 |
| 8 | Well Completion | |||
| 8.1 | Construction of Surface Sanitary Seal – including supply of materials | 1 | Each | - 0 |
| 8.2 | Well head and capping (masonry) – including supply of materials | 1 | Each | - 0 |
| 8.3 | Restoration of drilling sites | 1 | Each | - 0 |
| 9 | Water quality testing | |||
| 9.1 | Water quality test report | 1 | Each | - 0 |
| 10 | Mobilization and demobilization | |||
| 10.1 | Mobilization and demobilization of all equipments, and personnel | 1 | LS | - 0 |
COST OF THE BOREHOLE USD - 0
TOTAL COST INCLUDING MOBILIZATION COSTS USD - 0
Namanyere - Majengo Village
| Borehole Drilling Cost Estimates | ||
| Actual Drilling depth will be determined by the drilling supervisor based on actual site geological formation. Actual work done will be verified using drilling logs. Payments will be per actual work done per site verified from signed drilling logs. | ||
| Maximum recommeded Depth (m) | 196 |
| Item | Description | Estimated Quantity | Units | Unit Price | Total Price |
| 1 | Test Holes | ||||
| Drill pilot boreholes with appropriate size (152mm) | |||||
| 1.1 | Alignment and Plumbness test | 1 | Each | - 0 | |
| 1.2 | _ Air | 137 | m | - 0 | |
| 1.3 | _ Rotary ( mud/) | 59 | m | - 0 | |
| 1.4 | Collection of drilling samples at 2m intervals | 98 | Each | - 0 |
| 2 | Aquifer Testing | |||
| 2.1 | Supply, installation and removal of testing equipment | 1 | Per Test | - 0 |
| 2.2 | Carry out testing | 1 | Per Test | - 0 |
| 3 | Well Construction | |||
| Drilling Production borehole – 254 mm diameter with | ||||
| 3.1 | _ air percussion | 137 | m | - 0 |
| 3.2 | _ rotary (mud/) | 59 | m | - 0 |
| 3.3 | Supply and use of Drilling Mud | 20 | kg | - 0 |
| 3.4 | Supply and use of drilling mud/fluid additives | 15 | kg | - 0 |
| 3.5 | Supply, install and subsequently remove temporary steel casing 254mm | 20 | m | - 0 |
| 3.6 | Supply and install – gravel packing (bags of 20 kg) | 353 | bags | - 0 |
| 4 | Well Installation | |||
| 4.1 | Supply and Install PVC casings 203 mm Inner Diameter | 118 | m | - 0 |
| 4.2 | Supply and Install PVC screens 203 mm Inner Diameter | 78 | m | - 0 |
| 4.3 | Supply and Install Grout Seals | 20 | kg | - 0 |
| 4.4 | Supply and Install Inert back-fill material | 10 | m | - 0 |
| 5 | Well Development | |||
| 5.1 | Well Development | 4 | Per Hr | - 0 |
| 5.2 | Chemicals | 1 | kg | - 0 |
| 6 | Pumping Tests | |||
| 6.1 | Supply, Installation and Removal of testing equipment | 1 | Per Test | - 0 |
| 6.2 | Carry out pumping testing (step test, constant discharge) | 28 | Per Hr | - 0 |
| 6.3 | Recovery standby time (step test, constant discharge) | 4 | Per Hr | - 0 |
| 7 | Well Disinfection | |||
| 7.1 | Well Disinfection | 1 | Per Well | - 0 |
| 7.2 | Chemicals | 1 | kg | - 0 |
| 8 | Well Completion | |||
| 8.1 | Construction of Surface Sanitary Seal – including supply of materials | 1 | Each | - 0 |
| 8.2 | Well head and capping (masonry) – including supply of materials | 1 | Each | - 0 |
| 8.3 | Restoration of drilling sites | 1 | Each | - 0 |
| 9 | Water quality testing | |||
| 9.1 | Water quality test report | 1 | Each | - 0 |
| 10 | Mobilization and demobilization | |||
| 10.1 | Mobilization and demobilization of all equipments, and personnel | 1 | LS | - 0 |
COST OF THE BOREHOLE USD - 0
TOTAL COST INCLUDING MOBILIZATION COSTS USD - 0
Namanyere - Lunyala Village
| Borehole Drilling Cost Estimates | ||
| Actual Drilling depth will be determined by the drilling supervisor based on actual site geological formation. Actual work done will be verified using drilling logs. Payments will be per actual work done per site verified from signed drilling logs. | ||
| Maximum recommeded Depth (m) | 196 |
| Item | Description | Estimated Quantity | Units | Unit Price | Total Price |
| 1 | Test Holes | ||||
| Drill pilot boreholes with appropriate size (152mm) | |||||
| 1.1 | Alignment and Plumbness test | 1 | Each | - 0 | |
| 1.2 | _ Air | 137 | m | - 0 | |
| 1.3 | _ Rotary ( mud/) | 59 | m | - 0 | |
| 1.4 | Collection of drilling samples at 2m intervals | 98 | Each | - 0 |
| 2 | Aquifer Testing | |||
| 2.1 | Supply, installation and removal of testing equipment | 1 | Per Test | - 0 |
| 2.2 | Carry out testing | 1 | Per Test | - 0 |
| 3 | Well Construction | |||
| Drilling Production borehole – 254 mm diameter with | ||||
| 3.1 | _ air percussion | 137 | m | - 0 |
| 3.2 | _ rotary (mud/) | 59 | m | - 0 |
| 3.3 | Supply and use of Drilling Mud | 20 | kg | - 0 |
| 3.4 | Supply and use of drilling mud/fluid additives | 15 | kg | - 0 |
| 3.5 | Supply, install and subsequently remove temporary steel casing 254mm | 20 | m | - 0 |
| 3.6 | Supply and install – gravel packing (bags of 20 kg) | 353 | bags | - 0 |
| 4 | Well Installation | |||
| 4.1 | Supply and Install PVC casings 203 mm Inner Diameter | 118 | m | - 0 |
| 4.2 | Supply and Install PVC screens 203 mm Inner Diameter | 78 | m | - 0 |
| 4.3 | Supply and Install Grout Seals | 20 | kg | - 0 |
| 4.4 | Supply and Install Inert back-fill material | 10 | m | - 0 |
| 5 | Well Development |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .