This is a Historical Maintenance Data document detailing preventive and corrective maintenance requirements for spill boom equipment located at Building 569 – MCAS Fuel Pier. The spill boom is identified as a critical component of the fuel transfer process when a fuel barge is at the fuel pier, with all cleaning and maintenance activities to be coordinated with Station Fuels and NREAO to prevent conflicts with the fuel delivery schedule.

The maintenance program consists of four distinct tasks executed at varying frequencies. Quarterly maintenance of the spill boom reel (on dock) occurs four times per year and includes servicing 12 grease points across multiple components (guide rollers, guide arm, boom reel, pillow block bearings, and brake handle tube), freshwater cleaning, rust removal and corrosion inhibitor application, paint touch-ups, and inspections of the electric motor, hydraulic system (pump, tank, lines, strainer, and filter), block bearing gearbox, control panel, hand brake, and hydraulic ram. Annual maintenance of the spill boom reel requires performing all quarterly maintenance tasks plus hydraulic oil changes and removal of the spill boom from the reel for scraping of marine growth, inspection of all hardware and anchoring components, repair or replacement of damaged or missing components, and submission of before/after photos and detailed condition reports to NREAO. Quarterly cleaning of permanent spill boom end connections (located in water) occurs four times per year. Annual maintenance of the permanent spill boom (located in water) includes removal from water, pressure washing and scraping to remove marine growth, inspection of hardware and anchoring components, repair or replacement of damaged items, and submission of comprehensive condition reports with before/after photos to NREAO documenting all work performed.

View the file

Other files

File Type Posted
Solicitation N4008526R0033 Amendment 0009.pdf PDF
J-0200000-11 ELIN Amd 0009.xlsx XLSX spreadsheet
Solicitation N4008526R0033 Amendment 0008.pdf PDF
J-0200000-11 ELIN Amd 0008.xlsx XLSX spreadsheet
J-0200000-11 ELIN Amd 0007.xlsx XLSX spreadsheet
0200000 J Management and Administration Amd 0007.pdf PDF
N4008526R0033 Section C Annexes Amd 0007.pdf PDF
Solicitation N4008526R0033 Amendment 0007.pdf PDF
1502000 J Facility Investment Amd 0007.pdf PDF
J-1502000-04 - J-1502000-40 Facilities Investment Inventory Amd 0007.xlsx XLSX spreadsheet
1700000 J BSVE Inventory Amd 0007.xlsx XLSX spreadsheet
N4008526R0033 PPIs for Amendment 0006.pdf PDF
N4008526R0033 PPIs for Amendment 0005.pdf PDF
J-0200000-06-01 - J-0200000-06-05 Amd 0005.xlsx XLSX spreadsheet
Solicitation N4008526R0033 Amendment 0005.pdf PDF
J-1502000-04 - J-1502000-40 Facilities Investment Inventory Amd 0005.xlsx XLSX spreadsheet
N4008526R0033 Section C Annexes Amd 0004.pdf PDF
0200000 J Management and Administration.pdf PDF
Solicitation N4008526R0033 Amendment 0003.pdf PDF
RFP N4008526R0033 Site Visit Sign-in Sheet.pdf PDF
Solicitation Amendment N4008526R00330002 SF 30.pdf PDF
Solicitation Amendment N4008526R00330001 SF 30.pdf PDF
J-0200000-04 INVOICE FORM.pdf PDF
1700000 J BSVE Inventory.xlsx XLSX spreadsheet
1503020 J Pest Control.pdf PDF
1602000 J Electrical.pdf PDF
J-1502000-21-03 Air Quality Inspections.pdf PDF
J-0200000-13 - SERVICE PROVIDER INFORMATION.xlsx XLSX spreadsheet
J-1502000-17-01 Tank Farm A Inventory.pdf PDF
J-0200000-22 CBA-2026-360.pdf PDF
J-0200000-21 PIEE Solicitation Vendor Access Instructions.pdf PDF
J-1502000-41 HERO System.pdf PDF
J-0200000-14 - ASSET INFORMATION.xlsx XLSX spreadsheet
0200000 J Management and Administration.pdf PDF
J-0200000-12 FRCS Cybersecurity Program.pdf PDF
1700000 J Base Support Vehicle Equipment.pdf PDF
J-0200000-06-01 - J-0200000-06-05 Furnished Inventory.xlsx XLSX spreadsheet
J-1502000-04- J-1502000-40 Facilities Investment Inventory.xlsx XLSX spreadsheet
J-1502000-16 Lightning Arrestors and Grounding Devices Inventory.xlsx XLSX spreadsheet
J-1502000-21-04 Daily HVAC Report.xlsx XLSX spreadsheet
J-0200000-18 - CHARACTERISTIC METER READING INFORMATION.xlsx XLSX spreadsheet
J-0200000-12-01 FRCS Roles and Responsiblities.xlsx XLSX spreadsheet
N4008526R0033 SECTION F ANNEX.pdf PDF
Solicitation - N4008526R0033.pdf PDF
1502000 J Facility Investment.pdf PDF
J-0200000-03-01 Destructive Weather Operations.pdf PDF
J-0200000-11 ELINs.xlsx XLSX spreadsheet
1602000 J Electrical Inventory.xlsx XLSX spreadsheet
J-0200000-15 - ASSET SPECIFICATION.xlsx XLSX spreadsheet
N4008526R0033 Section C Annexes.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Historical maintenance data J-1502000-15-02

Spill Boom Equipment

LOCATION Building 569 – MCAS Fuel Pier

The spill boom is a critical component of the fuel transfer process when a fuel barge is at the fuel pier

Cleaning the spill boom will be coordinated with Station Fuels and NREAO to de-conflict with the fuel delivery schedule

1. Spill boom 2. Spill boom reel

(4 times per year) Quarterly – Spill Boom Reel (On Dock)

1. Service multiple grease points:

o Guide Roller – 2 points o Guide Arm – 1 point o Boom Reel – 6 points o Pillow Block Bearings – 2 points o Break Handle Tube – 1 point

2. Clean with fresh water

3. Remove rust and spray corrosion inhibitor on any bare metallic parts

4. Touch up any scratches that may occur on the painted surfaces

5. Check electric motor for proper operation and cleanliness

6. Check hydraulic pump, tank, lines, strainer, and filter for proper operation, cleanliness, serviceability

(hydraulic oil and filter) and free of leaks

7. Check block bearing gearbox for proper operation, cleanliness, serviceability, fluid level, and free of leaks

8. Check control panel for proper operation, cleanliness, and free of leaks

9. Check hand brake for operation, cleanliness, and serviceability

10. Check hydraulic ram for leaks, serviceability, and proper operation

(1 time per year) Annually- Spill Boom Reel (On Dock)

1. Perform quarterly maintenance requirements

2. Change hydraulic oil annually

2. Remove the spill boom from the reel:

o Scrape/ remove all marine growth from the entire length of the boom o Inspect all hardware, attachments, and anchoring components o Repair/ replace and components that are loose, damaged, or missing o Put spill boom back on the reel o Provide before cleaning and after cleaning photos and a detailed report to NREAO to indicate overall condition of the boom and its components, what was replaced or repaired, etc

(4 times per year) Quarterly – Permanent Spill Boom End Connections (Located in water around fuel pier)

Clean end point connections where the deployable spill boom connects to the permanent spill boom in the water

(1 time per year) Annually – Permanent Spill Boom (Located in water around fuel pier)

1. Remove the spill boom from the water

2. Pressure wash and scrape/remove all marine growth from the entire length of the boom.

3. Inspect all hardware, attachments, and anchoring components

4. Repair/replace any components that are loose, damaged or missing

5. Provide a report to the Natural Resources and Environmental Affairs Office (NREAO) including before/after photos. The report will provide details on what was replaced or repaired and the overall condition of the boom and its components