ITB_WRS260536_Water_Reclamation_Facility_WRF_2_Rotary_Press_-_Exhibit_D_-_WRF_2_Dewatering_Building_As_Builts.pdf

PDF 2 MB Posted

Attached to
Water Reclamation Facility (WRF) #2 Rotary Press
Solicitation number
ITB# WRS/260536
Issued by
Marion County, Orlando City, Florida

About this file

This file is Exhibit D, a set of as-built architectural and engineering drawings for the Dewatering Building at Water Reclamation Facility #2 (WRF #2), prepared for the City of Ocala Water Resources Department in Marion County, Florida, as part of Invitation to Bid WRS/260536. The exhibit comprises five pages of technical drawings documenting the existing facility infrastructure and building configuration where the new rotary press dewatering system will be installed. The mandatory pre-bid meeting is scheduled for Thursday, March 19, 2026, at 11:00 AM at WRF #2 located at 4200 SE 24th Street, Ocala, Florida 34471; attendance is required for bid eligibility. The bid submission deadline is April 8, 2026, with award anticipated to be made to the lowest qualified bidder. The contract includes a three-year warranty on materials and labor, covering both initial installation and renewal terms, with a maximum acceptable equipment delivery lead time of 26 weeks from contract award.

Pricing is structured as a lump-sum bid covering all labor, materials, equipment, shipping, permits, travel, and installation costs, with no contract value or budget range disclosed in available documentation. Bidders must provide a bid bond equal to five percent of the total bid amount, a performance and payment bond for the full bid amount, and a three-year maintenance and guarantee bond. Insurance requirements include commercial general liability of $1,000,000 per occurrence with $2,000,000 aggregate, commercial automotive liability of $1,000,000, and workers' compensation per Florida statutory requirements. Vendors must demonstrate a minimum of ten years of documented experience designing and installing domestic wastewater rotary presses with evidence of at least three similar completed projects, possess relevant OSHA 10/30 safety certifications, perform a minimum of 80 percent of work with their own forces, and assume responsibility for all required permits and site compliance. No set-aside designations, disadvantaged enterprise preferences, incumbent vendors, or organizational type restrictions are identified in available documentation.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit D - WRF #2 Dewatering Building As Builts

WRS/260536

D-1

D-2

D-3

D-4

D-5

File details come from the government source that posted it. Updated .