ITB FP-2022-09 Addendum No. 2.pdf
PDF 7 MB Posted
- Attached to
- ITB FP-2022-09B EOU Ballfield Complex-Phase 1
- Solicitation number
- S-580100-00016144
- Issued by
- Umatilla County, Oregon
About this file
Addendum No. 2 Summary
This is an addendum to the Invitation to Bid (ITB) issued by Eastern Oregon University's Facilities & Planning Department for the EOU Ballfield Complex Phase 1 project (RFP #FP-2022-09B) located in La Grande, Oregon. Addendum No. 2, issued April 7, 2026, modifies the bid due date from Tuesday, April 14, 2026 to Thursday, April 16, 2026 at 2:00 PM, with bids to be submitted electronically in searchable PDF format to bids@eou.edu. The project scope includes right-of-way utility improvements along C Avenue and 6th Street, site grading and utility updates, irrigation system installation, baseball and softball field improvements with associated infrastructure, concrete paving and flatwork, asphalt paving, chain link fencing, electrical work, soil preparation, native seeding, and landscape planting. The mandatory pre-bid conference is scheduled for Friday, March 13, 2026 at 10:00 AM at the Physical Plant Administration Building. The addendum removes seven work items from the Package A bid form (items 8 through 12, 14, and 15), including masonry, metals, wood and composites, thermal and moisture protection, openings, specialties, and equipment. The base bid items list has been renumbered following these deletions. The addendum also provides clarifications regarding the irrigation system design (3-inch mainline connection downstream of existing backflow assembly), substitution allowances for Hunter I-90 irrigation heads, optional use of air spade equipment, and updates to the existing contours on civil grading plan sheet C-110 and landscape construction plan sheets.
The contract is subject to Eastern Oregon University Policy 3.15.01 for procurement and contracting, with all prospective bidders required to acknowledge receipt of this addendum in their transmittal letters or risk deemed non-responsiveness. Bidders must submit a First Tier Subcontractors Disclosure Form within two working hours after the bid opening, by 4:00 PM, to maintain responsiveness. The supplemental unit price list requirement for all bidders is waived during the bidding process but will be required for the awarded contractor. No specific pricing information, set-asides, or incumbent contractor details are addressed within this addendum, as it serves primarily as a technical clarification document modifying bid procedures and work scope items from the original ITB documents issued February 26, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EOU Ballfield Project – Phase 1 FP-2022-09B EOU Project Number FP-2022-09B Addendum No. 2 April 7, 2026 Page 1 of 3
Eastern Oregon University Facilities & Planning Department
A D D E N D U M N O . 2
Project: EOU Ballfield Complex
RFP #: #FP-2022-09B
Date: April 7, 2026 Subject: Bid Form & Existing Conditions Plan Addenda
This three (3) page addenda changes the contract documents as follows:
modifies the bid due date to Tuesday April 16, 2026, the package ‘A’ bid form, and the overall civil grading plan to answer bidder questions.
Attachments included as part of this addendum are as follows:
• Updated invitation to bids cover sheet
• Updated Invitation for bids Section 00 11 16
• Updated package ‘A’ bid form
• Updated package ‘A’ civil grading plan
• Updated package C landscape construction plans
Addendum No. 2 to the Request for Proposal (RFP) is hereby submitted for use in bid preparation and submittal.
All changes, additions, and/or deletions are hereby made as part of EOU Ballfield Complex Phase I Project, as fully and completely as if the same were entirely set forth in the RFP #FP- 2022-09B. Changes and additions are noted in underlined italics, deletions are noted in strikethrough.
BID DOCUMENTS
1. Bid Due Date & Time
a. Modify the invitation to bids cover sheet as follows:
i. Tuesday Thursday April 14 16, 2026 at 2:00pm via sealed bid submission to bids@eou.edu
2. Invitation for bids Section 00 11 16 (page 1 of 4)
a. Modify Invitation for bids as follows:
i. Bids must be delivered through email in a searchable PDF format to, bids@eou.eou and must be received by 2:00 PM, Tuesday Thursday April 14 16, 2026, at which time bids shall be immediately opened;
however, the amounts of the Bids will not be publicly provided at that time.
CONTRACT DOCUMENTS
mailto:bids@eou.edu
April 7, 2026 Page 2 of 3
3. Procurement Forms & Bid Forms Section 00 40 00
a. Modify Drawing Package A Bid Form to remove the following items:
i. 8. MASONRY | (includes labor, equipment, and material required for:
Concrete Masonry Units (CMU), mortar, grout, reinforcing, flashing, and moisture controls, and other work reasonably inferable to this section).
RE: specifications section 04 20 00; as well as drawing sheet(s) A2.10 – A9.00 and S0.1 – S6.1.
ii. 9. METALS | (includes labor, equipment, and material required for:
metal tube and bar-stock stair and ramp railings, fabrication, field verification, finishes, and other work reasonably inferable to this section). RE: specifications section(s) 05 5213; as well as drawing sheet(s) LC1.00 – LC1.02, LC2.01, and LC2.03.
iii. 10. WOOD, PLASTICS, AND COMPOSITES | (includes labor, equipment, and material required for: baseball dug-outs and storage areas to related to rough carpentry, framing, sheathing, architectural casework, cabinets, shelving, finishes, fasteners, and other work reasonably inferable to this section). RE: specifications section(s) 06 10 00, 06 20 00, and 06 41 00; as well as drawing sheet(s) A2.10 – A9.00 and S0.1 – S6.1.
iv. 11. THERMAL AND MOISTURE PROTECTION | (includes labor, equipment, and material required for: surface prep, liquid or asphalt-based dampproofing, application of water repellent(s), crack treatments, protections, metal roof panels, underlayment, fiber cement siding, fasteners, trim pieces, flashings, drip edge, roof accessories, joint sealants, and other work reasonably inferable to this section). RE:
specifications section(s) 07 11 13, 07 19 00, 07 41 13, 07 46 46, 07 62 00, 07 72 00, and 07 92 00; as well as drawing sheet(s) A2.10 – A9.00, S0.1 – S0.1-S6.1, LC2.01, and LC2.03.
v. 12. OPENINGS | (includes labor, equipment, and material required for:
hollow metal doors, frames, finishes, hardware, hinges, locks, latchsets, exit devices, stops, thresholds, and other work reasonably inferable to this section). RE: specifications section(s) 08 11 13 and 08 71 00; as well as drawing sheet(s) A2.10 – A9.00.
vi. 14. SPECIALTIES | (includes labor, equipment, and material required for: fire protection specialties, extinguishers, fire resistant coatings, and other work reasonably inferable to this section). RE: specifications section(s) 10 44 00; as well as drawing sheet(s) A2.10 – A9.00.
vii. 15. EQUIPMENT | (includes labor, equipment, and material required for:
bases, pitchers’ mounds, athletic field equipment, batting cages, backstop padding, fence toppers, home plate, foul poles, windscreens, backstop netting, and other work reasonably inferable to this section).
April 7, 2026 Page 3 of 3
RE: specifications section(s) 11 68 33; as well as drawing sheet(s) LC1.00 – LC1.02, LC2.02 – LC2.08, and A2.10 – A9.00.
viii. Base bid items list has been renumbered with items above removed.
b. Supplemental Unit Price list shall be waived during the bidding process for all bidders. This list will be a requirement for the awarded contractor/bidder.
These answers supersede any discussions held prior to today, including discussions on-site, and shall be considered direction/intention of the documents.
1. Irrigation system has been designed to tie into the existing system downstream of existing double check backflow assembly and proposes the use and install of a 3” mainline.
2. Substitutions to the use of Hunter I-90 irrigation heads may be considered during the submittal process.
3. Given the open and accessible nature of the project, the necessity to use an air spade is not anticipated, but may be suggested at the contractor’s discretion.
Package A SHEET C-110
The existing contours have been updated to match other sheets. See area north of E Ave where EG was extended to include data at the football parking lot.
Package C SHEETS LC1.00, LC1.01, LC1.01.2, LC1.02
These sheets have been revised to indicate drawing scale and north arrow.
PLANS
CLARIFICATIONS
INVITATION TO BID PROPOSALS #FP-2022-09B
EOU BALLFIELD COMPLEX – PHASE 1
ISSUE DATE: FEBRUARY 26, 2026
MANDATORY MEETING & SITE VISIT: BID DUE DATE & TIME
Friday, March 13, 2026 at 10:00 AM Thursday, April 16, 2026 at 2:00 PM via sealed
Main Entrance of the Physical Plant Admin. Bldg. bid submission to bids@eou.edu One University Blvd, La Grande, OR 97850
Eastern Oregon University reserves the right to change the pre-proposal site visit requirements to non-mandatory should there be three (3) or fewer attendees.
REQUEST FOR CLARIFICATIONS OR CHANGE BID DOCUMENTS:
Must be received in writing by March 26, 2026 5:00 PM
Addenda to be issued on March 30, 2026
PROJECT NUMBER FP-2022-09B
Eastern Oregon University is seeking Bid Proposals for the Project described below pursuant to this INVITATION TO BID. By submitting a Bid, the Bidder represents that they have carefully read the terms and conditions of this Bid Proposal, including all attachments and addenda, and agrees to be bound by them.
Contract Administrator Bid Proposal Administrator John Garlitz, Director of Facilities & Planning Lowann Vanleuven, F&P Business Manager EOU Facilities & Planning Department EOU Facilities & Planning Department Phone: (541) 962-3181 Phone: (541) 962-3020 Email: jgarlitz@eou.edu Email: bids@eou.edu
It is the Bidders’ responsibility to continue to monitor the ORPU.org website for Addenda. Failure to acknowledge any Addenda in the Transmittal Letter may cause your Bid to be considered non-responsive.
EOU Policy 3.15.01 – Procurement and Contracting of Goods and Services govern this solicitation unless otherwise referenced in this or stated.
mailto:bids@eou.edu mailto:shollenbeck@eou.edu https://drive.google.com/file/d/1akshmjvmFFGfFLVbtJM0C60APpPeMdxr/view
EOU Ballfield Project – Phase 1 EOU Project Number FP-2022-09B February 26, 2026
Section 00 11 16
INVITATION FOR BIDS
INVITIATION FOR BIDS
Owner: Eastern Oregon University, La Grande, OR
Project: EOU Ballfield Complex – Phase 1
Bidders must submit Bids electronically. Hard copies will not be accepted. Bids must be delivered through email in a searchable PDF format to, bids@eou.eou and must be received by 2:00 PM, Thursday April 16, 2026, at which time bids shall be immediately opened; however, the amounts of the Bids will not be publicly provided at that time. The email subject line must include the title: “Bid Proposal: Ballfield Complex – Phase 1”. Within two working hours after the date and time designated for Bid opening, the Bidder shall submit to EOU the First Tier Subcontractors Disclosure Form through email in a searchable PDF format to bids@eou.edu. The email subject line must include the title “1st Tier Subcontractor Form: Ballfield Complex – Phase 1”. If a First Tier Subcontractors Disclosure Form is not received by 4:00 PM the Bid will be considered Non-Responsive. After the deadline for submitting the First Tier Subcontractors Disclosure Form, the responsive Bid amounts will be reviewed and publicly posted in a timely manner.
A Mandatory Pre-Bid Conference will be convened Tuesday, March 13, 2026 at 10:00 AM at the main Entrance of the Physical Plant Administration Building, One University Blvd, La Grande, OR 97850. The University reserves the right to adjust the requirements of the pre-bid conference from mandatory to non-mandatory should three (3) or fewer bidders attend the meeting.
Written requests for clarification or change of the Bid Documents (defined below), including but not limited to the form of contract, must be received by March 26, 2026 at 5:00 PM.
• Should a Bidder find discrepancies in, or omissions from the Bid Documents, or should the Bidder be in doubt as to their meaning or believe that any aspect of the Bid Documents is improvident or unlawful or which may unnecessarily restrict competition, the Bidder should at once notify EOU in the form of a request for clarification, change, or protest. Only responses issued by formal written Addenda will be binding.
• The purpose of this request for clarification, change or protest procedure is to permit EOU time to correct, prior to the submission of Bids, aspects of the Bid Documents that may be improvident or unlawful, or which may unnecessarily restrict competition. This requirement is intended to eliminate, by permitting corrections prior to the submission of Bids, the waste of resources and delay that may result from the untimely detection of errors in the Bid Documents, possible protests, and possible rejection of Bids.
• EOU will consider each request for clarification, change, or protest and amend the Bid Documents accordingly if warranted and notify by written Addenda each prospective Bidder of any change. No other explanation or interpretation will be considered official or binding. Oral and other interpretations or clarification will be without legal effect.
• Any prospective Bidder who contends that the terms and conditions of the Bid Documents, including but not limited to the Contract, or any aspect of the selection process: (i) will encourage favoritism in the award of the Contract; (ii) will substantially diminish competition; (iii) will violate any other statute, regulation, policy, or law of any kind, including but not limited to EOU Policy mailto:bids@eou.eou
February 26, 2026
Section 00 11 16
3.15.01 – Procurement and Contracting of Goods and Services; and/or (iv) are ambiguous, insufficient, or unfair for any reason must file a written protest.
• Protests must set forth the basis of the protest or request for clarification along with any proposed changes to the Bid Documents, including but not limited to the specifications or Contract terms.
Failure to file a protest by the time and date indicated above will be deemed a waiver of any claim by a Bidder that the selection process violates any of the items (i)-(iv) in Paragraph 6.5. Any protest that does not meet these requirements will not be considered.
• EOU will issue a written disposition of each such request for change or clarification and/or protest no less than three business days before Bids are due. If EOU agrees with the request or upholds the protest, in whole or in part, EOU may, in its sole discretion, issue an Addendum reflecting its disposition or take other appropriate action.
• Addenda may also be issued to modify the Bid Documents or Contract Documents as deemed advisable by EOU. EOU will post addenda, if any, on its website. It is each Bidder’s responsibility to check the website frequently for updates and addenda.
Work will generally include:
Right-of-way utility improvements along C Ave and 6th Street, site grading and utility updates, utilities for future baseball field and existing softball field with associate infrastructure materials, planting remediation, and site treatment from construction disturbance for all improvements, new site irrigation system, new baseball field improvements and associated infrastructure, softball field improvements and associated infrastructure, and site planting improvements.
Bid Procedures and Conditions, Bid Forms, Drawings, Specifications, and other Documents collectively referred to as the Bid Documents may be examined at the www.ORPU.org website. These are uncontrolled documents, and it is the sole responsibility of bidder to continue to monitor the www.ORPU.org website for Addenda. Failure to acknowledge any Addenda will be cause for being considered non-responsive.
EOU Policy 3.15.01 – Procurement and Contracting for Goods and Services govern this bid solicitation unless otherwise referenced or stated.
Each Bid must contain a statement as to whether the bidder is a resident bidder, as defined in ORS 279A.120. In determining the lowest qualified bidder, the Eastern Oregon University will, for the purpose of awarding the Contract, include a contractor proposed Bid Price, and add a percentage increase on the Bid of a nonresident bidder equal to the percentage, if any, of the preference given to that bidder in the state in which the bidder resides.
The successful Bidder will be required to furnish separate Performance and Payment Bonds submitted on the prescribed forms for faithful performance of the Contract in the full amount of the Contract price. The Surety issuing the bond must hold a certificate of authority to transact surety business in Oregon.
The Eastern Oregon University reserves the right to reject any or all Bids for good cause, or any or all Bids upon a finding of the Owner that it is in the public interest to do so, to postpone the award of the Contract for a period not to exceed thirty (30) days, and to accept that Bid which is to the best interests of the Eastern Oregon University http://www.orpu.org/ https://drive.google.com/file/d/1akshmjvmFFGfFLVbtJM0C60APpPeMdxr/view
February 26, 2026
Section 00 11 16
For information regarding this project, contact John Garlitz, Director of Facilities and Planning, Eastern Oregon University Facilities & Planning Department, phone (541) 962-3114, email jgarlitz@eou.edu .
END OF SECTION
mailto:jgarlitz@eou.edu
February 26, 2026
Section 00 11 16
THIS PAGE INTENTIONALLY LEFT BLANK
EOU Ballfield Project – Phase 1 Section 00 40 00 EOU Project Number FP-2022-09B DRAWING PACKAGE A | BID FORM February 26, 2026 Page 1 of 5
BID SCHEDULE | DRAWING PACKAGE A
Instructions to Bidders
1. Submit lump sum prices for each work scope item as listed below.
2. EOU will be determining what packages beyond A are advanced to construction based on an Institutional Determination based on Auxiliary budgets. EOU will award the bid based on the totals of packages advanced as determined by EOU.
3. Include all overhead, general conditions, and profit in each lump sum; prices must be reasonable and justifiable.
4. Bid each work scope item as financially independent, since the Owner may accept, modify, or omit one or more item(s) based on final budget availability.
5. Document, as necessary, assumptions used in calculating overhead and profit to support the lump sums.
6. Bids should allow the Owner flexibility to add or remove scope items without renegotiating overhead or profit allocation.
7. The Itemized Lump Sum Base Bid must include all labor, materials, equipment, supervision, services, overhead, profit, permits, fees, and all other costs necessary to provide a complete, fully functional, code-compliant project in strict accordance with the Contract Documents.
8. All work indicated, reasonably inferable, or required by the Contract Documents shall be included in the Base Bid, whether or not specifically itemized.
9. No additional compensation will be allowed for work required by the Contract Documents that is not separately listed in the Bid Schedule.
10. By submitting this Bid, the Bidder acknowledges they have reviewed the Contract Documents in their entirety and agree to complete all work in accordance therewith for the stated amount.
BASE BID ITEMS
ITEM ITEM DESCRIPTION QUANTITY BID PRICE
1. MOBILIZATION and BONDING 1 LS $__________
2. FEES & PERMITTING | (includes applicable fees, 1200C permit, and other work reasonably inferable to this section) 1 LS $__________
3. TRAFFIC CONTROL 1 LS $__________
4. EROSION CONTROL | (includes labor, equipment, and material required for: construction fencing, silt fencing, tree protection, and maintenance of existing erosion control BMP’s and other work reasonably inferable to this section). RE: drawing sheet(s) C-012 and C-002.
1 LS $_________
Section 00 40 00
DRAWING PACKAGE A | BID FORM
February 26, 2026 Page 2 of 5
5. DEMOLITION | (includes labor, equipment, and material required for: removal and proper disposal of existing pavements, curbs, utility abandonment fence removal, clearing and grubbing, temporary protections, hauling, cutting and patching and other work reasonably inferable to this section). RE: specifications section(s) 31 10 00 and 26 00 20; as well as drawing sheet(s) C-010, C-011, C-002, and E0.00. 1 LS $_________
6. EARTHWORK | (includes labor, equipment, and material required for: topsoil stripping and stockpile, export, import haul & place for all earthwork, trenching and backfilling, compactions, and other work reasonably inferable to this section). RE: specifications section(s) 31 00 00 and 31 23 00; as well as drawing sheet(s) C-110, C-111, C-112, and C-
113). 1 LS $_________
7. CAST IN PLACE CONCRETE | (includes labor, equipment, and material required for: curbs, walls (freestanding and retaining), footings and foundations, stairs, curb ramps, slab-on-grade, columns and associated reinforcing, joints, surface treatments, and other work reasonably inferable to this section). RE: specifications section(s) 03 30 00, 03 30 01, and per City of La Grande Public Works Department Standards and Development Code Ordinance(s); as well as drawing sheet(s) C-112, C-113, LC2.01, E1.00 and LI4.01.
1 LS $_________
8. FINISHES | (includes labor, equipment, and material required for: exterior painting, staining, finishes, high performance coatings, graffiti resistant coatings, CMU or masonry coatings, and other work reasonably inferable to this section). RE: specifications section(s) 09 91 13, 09 93 00, 09 96 23 and 09 97 23; as well as drawing sheet(s) A2.10 – A9.00 and LC2.01 –
LC2.03. 1 LS $_________
9. ELECTRICAL | (includes labor, equipment, and material required for: general provisions, medium voltage cable, building wires and cables, grounding, support devices, raceways and fittings, outlets, junction and pull boxes, overcurrent protective devices, wire connections, oil filled transformers, panelboards, (SPD) equipment, lamps, lighting fixtures, and other work reasonably inferable to this section). RE: specifications section(s)26 00 01, 26 00 20, 26 00 26, 26 00 05 13, 26 05 19, 26 05 26, 26 05 29, 26 05 33, 26 05 33.16, 26 05 53, 26 05 60, 26 05 83, 26 12 00, 26 24 17, 26 24 18, 26 27 26, 26 51 13.10, and 26 51 13.20; as well as drawing sheet(s) E0.00 – E1.00. 1 LS $_________
10. CONCRETE PAVING & FLATWORK | (includes labor, equipment, and material required for:
concrete flatwork, reinforcing, joints and sealants, expansion assemblies, base course aggregates, and other work reasonably inferable to this section). RE: specifications section(s) 32 13 13 and 32 13 73, and City of La Grande Public Works Department Standards and Development Code Ordinance(s); as well as drawing sheet(s) C-112, C-113, LC1.00, & LC2.01. 1 LS $_________
11. ASPHALT PAVING & MARKINGS | (includes labor, equipment, and material required for:
Parking and pavement markings and striping, ADA Symbols, lane and crosswalk striping, curb painting, directional arrows, hot-mix asphalt paving, aggregate base materials and compaction, leveling and surface coats, patching, and other work reasonably inferable to this section). RE: specifications section(s) 32 17 23, City of La Grande Public Works Department Standards and Development Code Ordinance(s); as well as drawing sheet(s) C-112, C-113, LC1.00, LC2.01. 1 LS $_________
Section 00 40 00
February 26, 2026 Page 3 of 5
12. CHAIN LINK FENCING AND GATES | (includes labor, equipment, and material required for:
posts, horizontal rails, mesh infill, pedestrian and vehicular gates, vinyl-coatings, finishes, fasteners, hardware, tension bars and bands, drop rods, latches, locks, slats, windscreens, field measurements, and other work reasonably inferable to this section). RE: specifications section(s) 32 31 13; as well as drawing sheet(s) LC1.00, LC2.01 1 LS $_________
13. PLANTING IRRIGATION | (includes labor, equipment, and material required for: connection to water supply, controllers, flow sensors, double-check valves, ball valves, control valves, quick-couplers, boxes, equipment components, mainline, lateral lines, heads and emitters, joints, fittings, trenching, wires, tape, sleeving, testing, as-builts, maintenance period establishment and operations, and other work reasonably inferable to this section). RE:
specifications section(s) 32 84 00 and 32 01 90; as well as drawing sheet(s) LI3.00 – LI4.01, E.00, and E1.00. 1 LS $_________
14. SOIL PREPARATION | (includes labor, equipment, and material required for: topsoil, soils testing, scarifying, amendments, tilling, fine grading, conditioning, soil depth verifications, and other work reasonably inferable to this section). RE: specifications section(s) 32 91 13; as well as drawing sheet(s) LP5.00 – LP6.01. 1 LS $_________
15. NATIVE SEEDING | (includes labor, equipment, and material required for: removal of rocks or debris, drill seeding, hydroseeding, tackifier, starter fertilizer application, maintenance period establishment, reseeding, weed control & removal, and other work reasonably inferable to this section). RE: specifications section(s) 32 01 90 and 32 92 20; as well as drawing sheet(s) LP5.00 – LP5.01 1 LS $_________
16. PLANTS | (includes labor, equipment, and material required for: supply and planting of trees, shrubs, ornamental grasses, groundcovers, perennials, tree stakes and ties, fertilizers, pit amendments, mulching, establishment period maintenance, and other work reasonably inferable to this section). RE: specifications section(s) 32 01 90 and 32 93 00; as well as drawing sheet(s) LP5.00 – LP6.01 1 LS $_________
17. UTILITY STRUCTURES | (includes labor, equipment, and material required for: placement of utility boxes, vaults, catch basins and inlets, precast structures, temporary shoring, dry wells, and other work reasonably inferable to this section). RE: specifications section(s) 33 05 16;
as well as drawing sheet(s) C-002, C-110 – C-501 1 LS $_________
18. SANITARY UTILITY SEWERAGE PIPING | (includes labor, equipment, and material required for: gravity and force mains, PVC and HDPE pipe, fittings, gaskets and joint material, bedding material, inspections, testing, and other work reasonably inferable to this section). RE: specifications section(s) 33 31 00 and La Grande Public Works Department Standards and Development Code Ordinance; as well as drawing sheet(s) C-002, C-110 – C-
501. 1 LS $_________
19. STORMWATER UTILITY DRAINAGE PIPING | (includes labor, equipment, and material required for: PVC, RCP, and/or HDPE underground rainwater piping, fittings, bedding material, connections catch basins and other structures, testing, and other work reasonably inferable to this section). RE: specifications section(s) 33 42 00; as well as drawing sheet(s)
C-002, C-110 – C-501. 1 LS $_________
20. TRENCHING OVER EXCAVATION AND STABILIZATION | (includes labor, equipment, and material required for: over excavation and stabilization of utility trenching and backfilling, compactions, trench soil stabilization, and other work reasonably inferable to this section).
Assumed to be 15% of total project trenching. 1 LS $_________
Section 00 40 00
February 26, 2026 Page 4 of 5
TOTAL BASE BID AMOUNT FOR ALL ITEMS 1-20 COMBINED (IN NUMBERS):
TOTAL BASE BID AMOUNT FOR ALL ITEMS 1-20 COMBINED (IN WORDS):
NOTE: It is the intent of the University to award the bid to the lowest responsive bidder who submits the lowest dollar bid for all the Base Bid bid-items 1-27 combined. In the event that the University determines that it will award any of the Bid Alternate Bid Items from this bid, then the lowest responsive bidder shall be considered that bidder who has submitted the lowest dollar bid for all the Base Bid Items and for any of the selected Bid Alternate Items combined. Award of all and/or any of the Alternate Bid Items is at the sole option of the City as deemed in its best interest. All of the listed Base Bid and Bid Alternates are ADD alternates.
BID ALTERNATES
ITEM ITEM DESCRIPTION QUANTITY BID PRICE
A1 New Oil Filled Transformer 1 LS $__________
Base Bid- Readily available Oil-Filled Transformer meeting Specification Section 26 12 00 (additional pre-approved manufacturers/suppliers/etc.). Requires added testing, and demonstration period. See Alternates Specification Section 01 63 00. Indicate lead-time______*
Alternate Bid- New Oil-Filled Transformer per fewer listed new manufacturers (or approved) in Specification Section 26 12 00. See Alternates Specification Section 01 63 00. Indicate lead-time_____*
*Lead-time is not part of Contractor Award selection, will be used to determine if Owner elects to extend Substantial Completion and/or selection of Alternate; however, Owner may select Alternate at bid time leading to a difference in apparent low bidder.
For Specification Section 01 63 00 Alternate Description (Bid Package A). Base Bid to include readily available Oil-Filled Transformer. For the purposes of this Alternate readily available means furnished and installed prior to bid Substantial Completion. Base Bid allows for used, tested, in-stock unit, not exceeding 15 years in age (from install date) with warranty not less than specified. Base Bid allows for refurbished Oil Filled Transformer with warranty not less than specified. Requires performance demonstration period, and after on-site operational 3rd party oil testing. Refer to Specification Section 26 12 00 for approved base bid Oil-Filled Transformer suppliers/re-manufacturers, and additional requirements. Oil-Filled Transformer (used in-stock, and/or refurbished) shall meet requirements of Section 26 12 00.
Alternate Bid to include newly manufactured Oil-Filled Transformer (not used, not refurbished) as described in Specification Section 26 12 00. Alternate deletes performance demonstration period, and after operation on-site 3rd Party oil testing (factory testing still required). Base Bid and Alternate bids include same Warranty requirements.
Section 00 40 00
February 26, 2026 Page 5 of 5
NOTE: The above Lump Sum (LS) amount for the Bid Alternate A1 must be inclusive of all labor, materials, equipment, permits, transportation and everything else that is necessary to complete the project as specified in the Invitation for Bid documents.
Section 00 40 00
LIMIT OF W
ORK
LIMIT OF WORK
LIMIT OF WORK
EXISTING GRAVEL
ACCESS ROAD TO REMAIN
T
POWER
PANEL
28202821
302831
28332834
283028312832
302831
STUB PKG A TO B BB MID
N: 610189.29 E: 8821431.78
FG:2819.66
INV: 2818.93 8" (NE)
28272828
28332834
1.5%
1.5
STUB PKG A TO C
N: 610373.39 E: 8821158.56
FG:2821.01
INV: 2820.11 10" (NE)
EG 2826.35
98 LF 8" PVC @ 1.00%
81 LF 8" PVC @ 1.00%
113 LF 8" PVC @ 0.55%
299 LF 8" PVC @ 2.26%
27 LF 6" PVC @ 1.20%
35 LF 8" PVC @ 0.50%
20 LF 6" PVC @ 2.00%
180 LF 8" PVC @ 0.75%
65 LF 10" PVC @ 3.00%
7 LF 8" PVC @ 1.00%
SD3
SD11
SD9
SD5 SD4
SD4
SD4
SD4
SD4
SD1
MATCH EXISTING
PATH EOP/EG
SD10
SD12
SD1
SD4
SD4
SD4
SD4
SD4SD1
SD1
G3
G3
G3
SD4
SD2 SD1
SEE SHEET
C-112
10'
G4G4
G4
6:
SD13
1.
5%
154 LF 15" PVC @ 2.51%
FG 2829.46
FG 2829.21
FG 2829.03
FG 2827.95
FG 2828.07
FG 2826.83
FG 2826.54
FG 2825.26
FG 2825.16
FG 2826.28
FG 2829.30
FG 2832.63
FG 2832.90
FG 2833.91
FG 2833.91
FG 2834.80 FG 2834.30
BASEBALL INFIELD
2825.00
FG 2826.55
FG 2825.14 FG 2824.86 FG 2824.16
FG 2828.00
FG 2829.60
FG 2829.42
FG 2830.85
FG 2828.28 FG 2825.00
FG 2824.38
FG 2823.46
FG 2825.00
FG 2828.14
FG 2827.84
FG 2828.03
FG 2828.00
FG 2827.91
FG 2827.99
FG 2827.92
FG 2828.70
FG 2824.98
FG 2824.94
EG 2821.06±
EG 2822.40±
FG 2825.43
FG 2827.79
FG 2827.98
FG 2826.24
FG 2826.51
FG 2827.73
FG 2827.96
FG 2826.78
FG 2825.55
FG 2825.00
FG 2826.51
FG 2825.00
FG 2828.70
FG 2828.00
FG 2826.03
FG 2826.38
FG 2827.10
FG 2825.25
FG 2824.86
FG 2823.36FG 2823.38
FG 2822.65
FG 2822.59
FG 2828.05
FG 2832.64
FG 2828.00
35 LF 8" PVC @ 0.50%
37 LF 8" PVC @ 0.50%
36 LF 8" PVC @ 0.50%
37 LF 8" PVC @ 0.50%
FG 2828.00
FG 2831.37
FG 2831.19
FG 2832.37
FG 2830.98
FUTURE FFE
FG: 2832.00
FG 2831.48
FG 2831.35
FG 2831.55
FG 2831.68
FG 2830.52
FG 2830.09
FG 2828.35
FG 2827.91
FG 2828.00
FG 2829.00
FG 2831.42
FG 2830.90
FG 2830.49
FG 2830.99
FG 2828.00 BASEBALL INFIELD
2825.00
FG 2831.37FG 2832.37
FG 2827.91
FG 2828.00
FG 2827.91
FG 2827.71
FG 2831.33
FG 2828.00
FG 2827.92
FG 2828.00
FG 2828.00
FG 2828.00
FG 2830.80
FG 2831.68
FG 2832.33
FG 2832.30
SD6
SD8
SD4
SD4
SD4
SD4
SD7
G3
G3 sheet number consultant engineer's seal sheet description agency project number sla project number date project phase project revision schedule
E AVENUE
LA GRANDE, OR
2308.02
EOU BALLFIELD COMPLEX
PHASE 1 - BID PACKAGE A
no. date description
BID SET
2026.02.26
1000 NW WALL ST., STE 205 | BEND, OR 97703
541.382.2059 | WWW.SZABO-LA.COM
keymap
Kennewick, WA 99337 3611 S. Zintel Way
J-U-B ENGINEERS, INC.
www.jub.com Phone: 509.783.2144
J-U-B ENGINEERS, INC.
N
0 30 60
SCALE IN FEET
C-110
MATCH EXISTING
PATH EOP
EXISTING GROUND
CONTOURS, TYP.
PROPOSED
FINISHED
GROUND
CONTOURS, TYP.
GRADING AND DRAINAGE
PLAN - A WEST
GRADING
MATCH EXISTING
GRADE BREAK
CONSTRUCT TEMPORARY 4:1 SLOPE AT FUTURE
STAIRS, STRUCTURES, AND RETAINING WALLS
(PACKAGE B IMPROVEMENTS), IF NOT
CONSTRUCTED CONCURRENTLY
EXISTING 12" WATER MAINS TO BE RELOCATED BY
CITY OF LA GRANDE PUBLIC WORKS (SEE DEMO
PLAN). RETAIN AND PROTECT IN PLACE
(INCLUDING ANY VALVES, FITTINGS, THRUST
BLOCKS, ETC.) UNTIL RELOCATED. LOCATION
SHOWN IS APPROXIMATE. MAY EXIST DURING
GRADING. STOP STORM DRAIN 10' FROM ACTUAL
LOCATION, TYP.
STORM DRAIN
CAP STUB AND MARK FOR FUTURE CONNECTION
IN PACKAGES B AND C IF NOT CONSTRUCTED
CONCURRENTLY.
SD MANHOLE WITH SOLID LID
N: 610252.45 E: 8821218.21
RIM:2825.63
INV IN: 2820.86 8" (S)
INV IN: 2820.86 8" (E)
INV OUT: 2820.66 8" (N)
SD MANHOLE WITH SOLID LID
N: 610427.64 E: 8821194.29
RIM: 2824.77
INV IN: (S) 2818.67 8"
INV IN: (SW) 2818.16 10"
INV OUT: (NE) 2817.96 10"
PVC STORM DRAIN PIPE. DIAMETER, LENGTH,
SLOPE PER PLAN
18" NYLOPLAST DRAIN BASIN
WITH PEDESTRIAN GRATE
N: 610048.22 E: 8821211.44
RIM: 2827.88
INV OUT: (S) 2825.38 8"
18" NYLOPLAST DRAIN BASIN
WITH PEDESTRIAN GRATE
N: 610013.48 E: 8821204.18
RIM: 2827.88
INV IN: (N) 2825.20 8"
INV OUT: (SE) 2825.10 8"
18" NYLOPLAST DRAIN BASIN
WITH PEDESTRIAN GRATE
N: 609987.58 E: 8821230.08
RIM:2827.88
INV IN: (NW) 2824.92 8"
INV OUT: (SE) 2824.82 8"
18" NYLOPLAST DRAIN BASIN
WITH PEDESTRIAN GRATE
N: 609961.69 E: 8821255.97
RIM: 2827.88
INV IN: (NW) 2824.64 8"
INV OUT: (E) 2824.54 8"
SD CATCH BASIN
N: 610141.21 E: 8821200.06
RIM: 2827.00
INV IN: (SE) 2821.68 6"
INV OUT: (N) 2821.48 8"
SD MANHOLE WITH SOLID LID
N: 609946.29 E: 8821317.13
RIM: 2827.63
INV IN: (NW) 2822.21 8"
INV IN: (N) 2822.11 6"
INV OUT: (E) 2822.01 8"
SD CATCH BASIN
N: 610333.18 E: 8821221.97
RIM: 2823.00
INV IN: (S) 2819.85 8"
INV OUT: (N) 2819.65 8"
18" NYLOPLAST DRAIN BASIN
WITH PEDESTRIAN GRATE
N: 609969.12 E: 8821291.50
RIM: 2827.88
INV IN: (W) 2824.36 8"
INV OUT: (SE) 2824.26 8"
SD MANHOLE WITH GRATED LID
N: 610429.36 E: 8821412.36
RIM: 2819.88
INV IN: (W) 2811.63 15"
INV OUT: (E) 2811.43 15"
G1
G2
G3
G4
SD1
SD2
SD3
SD4
SD5
SD6
SD7
SD8
SD9
SD10
SD11
SD12
SD13
SCALE:A BASEBALL DETAIL
1" = 10'
NOTES:
1. SEE LANDSCAPE CONSTRUCTION PLANS (LC
SHEETS) FOR SITE LAYOUT, PAVING
SECTIONS, AND DIMENSIONS, TYP.
C-500
C-500
C-500
C-500
M
AT
C H
LI
N
E
SE
E
SH
EE
T
C -1
C-500
C-500
C-500
C-500
C-500
A
PACKAGE A EARTHWORK QUANTITIES
NEAT-LINE (NO SHRINK/SWELL FACTORS OR STRIPPING APPLIED)
VOLUMES CALCULATED FROM EXISTING GRADE TO FINISHED GRADE.
FOR PERMITTING PURPOSES ONLY. CONTRACTOR TO INDEPENDENTLY
CALCULATE FOR BIDDING AND CONSTRUCTION PURPOSES.
CUT 20,776 CY
FILL 21,702 CY
NET 926 CY IMPORT
FROM PACKAGE B & C TO MT. WELCH GRADING
C-500
C-500
SEE SHEET
C-112
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE
YOU DIG, GRADE, OR EXCAVATE FOR THE
MARKING OF UNDERGROUND MEMBER
UTILITIES
Call before you dig.
Know what's below.
R
1 4/6/26 EG CONTOURS01 2026.04.07 ADDENDA
NO. 2
DEC
CON
DEC
CON
DEC
CON
CON
CON
CON
CON
CON
CON
CON
CON
CONCON
CON
CON
CON
CON
DECDEC
DEC
DEC
DEC
DEC
DEC
DEC
CON
DEC DEC DEC DEC DEC DEC DEC DEC
DEC
DEC
DEC
DEC
CON
CON
CON
DEC
DEC
DEC
DEC DEC
DEC
DECCON
CL
T
DEC
F
CL
LIM
IT
O F
W
OR
K
LIMIT OF WORK
TRACK
FOOTBALL FIELD
MOUNT WELCH
THROWING CIRCLE
JAVELIN RUNWAY
T
EXISTING TRACK
SHED TO REMAIN
EXISTING GRAVEL
ACCESS ROAD TO REMAIN
F
6TH
S
TR
E
E T
C A V E N U E
E A V E N U E
REFER TO BID PACKAGE 'B' FOR
BASEBALL FIELD IMPROVEMENTS
PA
PA
PA
PA
PA
PA
PA
1. EXPANSION JOINTS TO BE INSTALLED WHERE PAVING MEETS ALL VERTICAL SURFACES
INCLUDING BUILDING WALLS, SEATWALLS, AND RETAINING WALLS. THESE JOINTS ARE
NOT SHOWN GRAPHICALLY ON CONSTRUCTION PLANS ONLY DUE TO NEED FOR
CLARITY.
2. REFER TO IRRIGATION PLAN FOR SLEEVE LOCATIONS.
3. MOCK-UPS ARE REQUIRED FOR ALL FLATWORK AND SITEWALLS.
4. CONTRACTOR SHALL COORDINATE SITE GRADING AND DRAINAGE WITH CIVIL
DRAWINGS.
5. CONTRACTOR SHALL COORDINATE SITE DEMO, CLEARING AND GRUBBING WITH CIVIL
DRAWINGS.
6. CONTRACTOR SHALL COORDINATE RIGHT-OF-WAY DEMO AND IMPROVEMENTS WITH
CIVIL DRAWINGS.
7. UTILITIES SHOWN ARE FOR INFORMATION ONLY. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO LOCATE AND PROTECT EXISTING UTILITIES. POT-HOLING IN ADDITION
TO FIELD LOCATES MAY BE REQUIRED.
8. CONTRACTOR SHALL PROTECT ALL EXISTING TREES TO REMAIN AS INDICATED ON
PLANS AND SPECIFICATIONS.
9. LANDSCAPE ARCHITECT SHALL PROVIDE CAD FILES FOR CONTRACTOR TO USE FOR
ALIGNMENT AND HORIZONTAL CONTROLS. CONTRACTOR IS STILL RESPONSIBLE TO
VERIFY APPROPRIATE LIMITS TO PERFORM ALL REQUIRED WORK.
10. CONTRACTOR SHALL RECEIVE LANDSCAPE ARCHITECTURAL APPROVAL OF ALL
CONCRETE FLATWORK FORMWORK PRIOR TO POURING.
11. ALL CONTROL JOINTS, DECORATIVE JOINTS, AND EXPANSION JOINTS SHALL BE SPACED
AS INDICATED ON THE DRAWINGS. CONTRACTOR SHALL COORDINATE CONCRETE
PRECON MEETING WITH LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION.
CONSTRUCTION NOTES
S
ZA
BO
L an d sc ap e
A rc hi te ct ur e, a ll r ig ht s r es er ve d
A ny u se w ith ou t p er m iss io n is ex pr es sly p ro hi bi te d
Pl ot te d
/1
0/
:3 6:
P
M sheet number consultant landscape architect's seal sheet description agency project number sla project number date project phase project revision schedule
E AVENUE
LA GRANDE, OR
2308.04
EOU BALLFIELD COMPLEX
PHASE 1 - BID PACKAGE C
no. date description
BID SET
2026.02.26
1000 NW WALL ST., STE 205 | BEND, OR 97703
541.382.2059 | WWW.SZABO-LA.COM
R
E G I S T E R E
D
L A
N D
S
C A P E A R C H
I T E
C T
LC1.01
25' 50' 100'0
SCALE:1"=50'-0"
OVERALL LANDSCAPE
CONSTRUCTION PLAN
LC1.0001
01 2026.04.07 ADDENDA
NO. 2
AutoCAD SHX Text J
AutoCAD SHX Text James M. Szabo
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
AutoCAD SHX Text 02.24.2014
AutoCAD SHX Text
EXPIRES 02.28.2026
CONSTRUCTION KEYTAGS
SYMBOL DESCRIPTION DETAIL SPEC. SECTION
10 / LC2.01 11 68 331
2 & 3 / LC2.03 -
SYNTHETIC COACH'S BOX
1 / LC2.02PERIMETER FENCING (RE: LC1.02)
EOU LOGO PER EOU STANDARDS GUIDE
ON-DECK CIRCLE
32 31 13
- 11 68 333
SOFTBALL PITCHER'S CIRCLE
SOFTBALL BATTER'S AND CATCHER'S BOX 9 / LC2.01 11 68 332
INFIELD BASE
EXISTING FENCING TO REMAIN
CONCRETE STAIRS
SOFTBALL LED SCOREBOARD (NIC: FUTURE PHASE)
BENCH (NIC: FUTURE PHASE)
TRASH / RECYCLING RECEPTACLE (NIC: FUTURE PHASE)
INFIELD PEDESTRIAN ACCESS GATE
SITE UTILITIES
1 / LC2.03
2 / LC2.02 32 31 13SOFTBALL BULLPEN & FENCING (RE: LC1.02)
6, 7 / LC2.01 03 30 01
9 / LC2.02 05 52 13
8 / LC2.02
PER CIVIL -
EXISTING SOFTBALL DUGOUT TO REMAIN - -
EXISTING SOFTBALL FIELD FENCING TO REMAIN
(RE:LC1.02)
OUTFIELD FENCING (RE: LC1.02) 3 / LC2.02 32 31 13
PRESS BOX FACILITY (NIC: FUTURE PHASE) - -
STEEL STAIR HANDRAIL
RESTROOM BUILDING (NIC: FUTURE PHASE) --
METAL EDGING -5 / LC2.03
EXISTING SOFTBALL BATTING CAGE TO REMAIN --
SYNTHETIC TURF MANHOLE ACCESS COVER -4 / LC2.03
SALVAGED SOFTBALL FOUL BALL POLE --
SHOVEL CUT LAWN EDGE
27 CONCRETE MOWCURB 03 30 0111 / LC2.01
28 FLAGPOLE -6 / LC2.03
32 31 13
DETAIL
PEDESTRIAN CONCRETE PAVING
COLOR: NATURAL GRAY
FINISH: LT. BROOM
SEALER: PROSOCO SALTGUARD
PAVING LEGEND
SPEC. SECTIONSYMBOL DESCRIPTION
1 / LC2.01 32 13 13
A
VEHICULAR CONCRETE PAVING
COLOR: NATURAL GRAY
FINISH: LT. BROOM
SEALER: PROSOCO SALTGUARD
2 / LC2.01 32 13 13
E
8 / LC2.01 -
B
CRUSHED GRAVEL PAVING
COLOR: GRAY
SIZE: 1/4" CLEAN
SYNTHETIC FIELD TURF - TYPE A 'INFIELD SURFACE'
MANUF: SHAW SPORTS TURF #1 (512)627-2220
MODEL: LEGION 2.0
COLOR: TAN FAMILY
SYNTHETIC FIELD TURF - TYPE B 'FIELD SURFACE' W/
ALTERNATE PANELS
MANUF: SHAW SPORTS TURF #1 (512)627-2220
MODEL: LEGION 2.0
COLOR: GREEN FAMILY
4 / LC2.02 32 18 13
4 / LC2.02 32 18 13
C
D
DEC
CON
DEC
CON
DEC
CON
CON
CON
CON
CON
CON
CON
CON
CON
CONCON
CON
CON
CON
CON
DECDEC
DEC
DEC
DEC
DEC
DEC
DEC
CON
DEC DEC DEC
DEC DEC DEC DEC DEC
DEC
DEC
DEC
DEC
CON
CON
CON
DEC
DEC
DEC
DEC DEC
DEC
DEC
CON
CL
T
DEC
F
T
T
T
T
T
CL
T
T
F
DEC
CON
DEC
CON
CON
CON
CON
CON
CON
CON
CON
CON
CONCON
CON
CON
CON
CON
DECDEC
DEC
DEC
DEC
DEC
DEC
DEC
DEC
T
T
T
T
T
T
LIMIT OF WORK
LIM
IT
O F
W
OR
K
LIMIT OF WORK
LIM
IT
O F
W
OR
K
T
F
D
PA
PA
PA
PA
PA
D
A
C
E
B
D
PA
PA
PA
PA
PA
PA
EX. BLEACHERS TO REMAIN
EX. CONCRETE TO REMAIN
A
EXISTING
FENCEOUTFIELD
FENCE
OUTFIELD
FENCE
EX
IS
TI
NG
FE
NC
E
STRIPING PER LC1.01.2
TYP. OF (3)
TYP. OF (2)
TYP. OF (2)
6TH
S
TR
E
E T
PA
A
1523 23
D
D
JOINT LEGEND
SYMBOL
5 / LC2.01
DESCRIPTION
TOOLED CONTROL JOINT
DETAIL SPEC. SECTION
32 13 13
SYMBOL
EXPANSION JOINT
DESCRIPTION
PLANTING AREA
SIM.
ALIGN
STANDARD CONSTRUCTION SYMBOLS & ABBREVIATIONS
PA
SIMILAR
SYMBOL DESCRIPTION
POINT OF ORIGIN
PAVINGPAV.
JOINTSJTS.
TYPICALTYP. EQUALEQ.
3 & 4 / LC2.01 32 13 13
S
ZA
BO
L an d sc ap e
A rc hi te ct ur e, a ll r ig ht s r es er ve d
A ny u se w ith ou t p er m iss io n is ex pr es sly p ro hi bi te d
Pl ot te d
/1
0/
:3 6:
P
M sheet number consultant landscape architect's seal sheet description agency project number sla project number date project phase project revision schedule
E AVENUE
LA GRANDE, OR
2308.04
EOU BALLFIELD COMPLEX
PHASE 1 - BID PACKAGE C
no. date description
BID SET
2026.02.26
1000 NW WALL ST., STE 205 | BEND, OR 97703
541.382.2059 | WWW.SZABO-LA.COM
keymap
R
E G I S T E R E
D
L A
N D
S
C A P E A R C H
I T E
C T
10' 20' 40'0
SCALE:1"=20'-0"
SOFTBALL FIELD
LANDSCAPE
CONSTRUCTION PLAN
LC1.01
LC1.01
01 2026.04.07 ADDENDA
NO. 2
AutoCAD SHX Text J
AutoCAD SHX Text
LEASE LINE PER ROS 001-1999
AutoCAD SHX Text J
AutoCAD SHX Text James M. Szabo
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
AutoCAD SHX Text 02.24.2014
T
T
CL
F
D
3'-0" 5'-0" 15'-0"
3'-0"
15'-0"
3'-0"
30'-0"
43' -0"
60'-0"
60'-0"
60'-0"
60'-0"
R2'-6"
R2'-6"
'-0"
PA
PA
D
E
D
TYP. OF (2)
TYP. OF (3)
60'-0" R.
15'-0" 7'-9"
9'-3" 15'-0"
13'-10"
14'-6"
15' -0"
DEC
CON
DEC
CON
DEC
CON
CON
CON
CON
CON
CON
CON
CON
CON
CONCON
CON
CON
CON
CON
DECDEC
DEC
DEC
DEC
DEC
DEC
DEC
CON
DEC DEC DEC
DEC DEC DEC DEC DEC
DEC
DEC
DEC
DEC
CON
CON
CON
DEC
DEC
DEC
DEC DEC
DEC
DEC
CON
CL
T
DEC
F
T
T
T
T
T
CL
T
T
F
CONSTRUCTION KEYTAGS
SYMBOL DESCRIPTION DETAIL SPEC. SECTION
10 / LC2.01 11 68 331
2 & 3 / LC2.03 -
SYNTHETIC COACH'S BOX
1 / LC2.02PERIMETER FENCING (RE: LC1.02)
EOU LOGO PER EOU STANDARDS GUIDE
ON-DECK CIRCLE
32 31 13
- 11 68 333
SOFTBALL PITCHER'S CIRCLE
SOFTBALL BATTER'S AND CATCHER'S BOX 9 / LC2.01 11 68 332
INFIELD BASE
EXISTING FENCING TO REMAIN
CONCRETE STAIRS
SOFTBALL LED SCOREBOARD (NIC: FUTURE PHASE)
BENCH (NIC: FUTURE PHASE)
TRASH / RECYCLING RECEPTACLE (NIC: FUTURE PHASE)
INFIELD PEDESTRIAN ACCESS GATE
SITE UTILITIES
1 / LC2.03
2 / LC2.02 32 31 13SOFTBALL BULLPEN & FENCING (RE: LC1.02)
6, 7 / LC2.01 03 30 01
9 / LC2.02 05 52 13
8 / LC2.02
PER CIVIL -
EXISTING SOFTBALL DUGOUT TO REMAIN - -
EXISTING SOFTBALL FIELD FENCING TO REMAIN
(RE:LC1.02)
OUTFIELD FENCING (RE: LC1.02) 3 / LC2.02 32 31 13
PRESS BOX FACILITY (NIC: FUTURE PHASE) - -
STEEL STAIR HANDRAIL
RESTROOM BUILDING (NIC: FUTURE PHASE) --
METAL EDGING -5 / LC2.03
EXISTING SOFTBALL BATTING CAGE TO REMAIN --
SYNTHETIC TURF MANHOLE ACCESS COVER -4 / LC2.03
SALVAGED SOFTBALL FOUL BALL POLE --
SHOVEL CUT LAWN EDGE
27 CONCRETE MOWCURB 03 30 0111 / LC2.01
28 FLAGPOLE -6 / LC2.03
32 31 13
DETAIL
PEDESTRIAN CONCRETE PAVING
COLOR: NATURAL GRAY
FINISH: LT. BROOM
SEALER: PROSOCO SALTGUARD
PAVING LEGEND
SPEC. SECTIONSYMBOL DESCRIPTION
1 / LC2.01 32 13 13
A
VEHICULAR CONCRETE PAVING
COLOR: NATURAL GRAY
FINISH: LT. BROOM
SEALER: PROSOCO SALTGUARD
2 / LC2.01 32 13 13
E
8 / LC2.01 -
B
CRUSHED GRAVEL PAVING
COLOR: GRAY
SIZE: 1/4" CLEAN
SYNTHETIC FIELD TURF - TYPE A 'INFIELD SURFACE'
MANUF: SHAW SPORTS TURF #1 (512)627-2220
MODEL: LEGION 2.0
COLOR: TAN FAMILY
SYNTHETIC FIELD TURF - TYPE B 'FIELD SURFACE' W/
ALTERNATE PANELS
MANUF: SHAW SPORTS TURF #1 (512)627-2220
MODEL: LEGION 2.0
COLOR: GREEN FAMILY
4 / LC2.02 32 18 13
4 / LC2.02 32 18 13
C
D
JOINT LEGEND
SYMBOL
5 / LC2.01
DESCRIPTION
TOOLED CONTROL JOINT
DETAIL SPEC. SECTION
32 13 13
SYMBOL
EXPANSION JOINT
DESCRIPTION
PLANTING AREA
SIM.
ALIGN
STANDARD CONSTRUCTION SYMBOLS & ABBREVIATIONS
PA
SIMILAR
SYMBOL DESCRIPTION
POINT OF ORIGIN
PAVINGPAV.
JOINTSJTS.
TYPICALTYP. EQUALEQ.
3 & 4 / LC2.01 32 13 13
S
ZA
BO
L an d sc ap e
A rc hi te ct ur e, a ll r ig ht s r es er ve d
A ny u se w ith ou t p er m iss io n is ex pr es sly p ro hi bi te d
Pl ot te d
/1
0/
:3 6:
P
M sheet number consultant landscape architect's seal sheet description agency project number sla project number date project phase project revision schedule
E AVENUE
LA GRANDE, OR
2308.04
EOU BALLFIELD COMPLEX
PHASE 1 - BID PACKAGE C
no. date description
BID SET
2026.02.26
1000 NW WALL ST., STE 205 | BEND, OR 97703
541.382.2059 | WWW.SZABO-LA.COM
keymap
R
E G I S T E R E
D
L A
N D
S
C A P E A R C H
I T E
C T
5' 10' 20'0
SCALE:1"=10'-0"
SOFTBALL FIELD
LANDSCAPE STRIPING
ENLARGEMENT PLAN
LC1.01.2
LC1.01.2
01 2026.04.07 ADDENDA
NO. 2
AutoCAD SHX Text J
AutoCAD SHX Text
LEASE LINE PER ROS 001-1999
AutoCAD SHX Text James M. Szabo
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
AutoCAD SHX Text 02.24.2014
DEC
CON
DEC
CON
DEC
CON
CON
CON
CON
CON
CON
CON
CON
CON
CONCON
CON
CON
CON
CON
DECDEC
DEC
DEC
DEC
DEC
DEC
DEC
DEC DEC DEC
DEC
DEC
F
30'-0"
62'-6"
30'-0"
62'-6" 30'-0"
30'-0"
83'-1"
82'-0"
BULLPEN FENCING
BULLPEN FENCING
OUTFIELD FENCING
37'-6"
285'-4"
PERIMETER FENCING
PERIMETER FENCING
35'-5"
PERIMETER FENCING1
234'-7"
PERIMETER FENCING1
10'-2"
279'-11"
6TH
S
TR
E
E T
PED. ACCESS GATE
LC2.02 PED. ACCESS GATE
LC2.02
LINE DESCRIPTION DETAIL
1 / LC2.02PERIMETER FENCING
OUTFIELD FENCING 3 / LC2.02
BULLPEN FENCING 2 / LC2.02
SYMBOL
FENCING LEGEND
EXISTING FENCING TO REMAIN
FENCING NOTES
1. ACTUAL DIMENSIONS OF PROPOSED FENCING MAY VARY. ALL DIMENSIONS SHALL BE VERIFIED IN FIELD
PRIOR TO INSTALLATION. CONSULT LANDSCAPE ARCHITECT SHOULD THERE BE A SIGNIFICANT
DISCREPANCY IN DIMENSIONS.
2. PROPOSED FENCING SHALL TIE IN TO PRESERVED EXISTING FENCING WHERE APPLICABLE.
S
ZA
BO
L an d sc ap e
A rc hi te ct ur e, a ll r ig ht s r es er ve d
A ny u se w ith ou t p er m iss io n is ex pr es sly p ro hi bi te d
Pl ot te d
/1
0/
:3 6:
P
M sheet number consultant landscape architect's seal sheet description agency project number sla project number date project phase project revision schedule
E AVENUE
LA GRANDE, OR
2308.04
EOU BALLFIELD COMPLEX
PHASE 1 - BID PACKAGE C
no. date description
BID SET
2026.02.26
1000 NW WALL ST., STE 205 | BEND, OR 97703
541.382.2059 | WWW.SZABO-LA.COM
R
E G I S T E R E
D
L A
N D
S
C A P E A R C H
I T E
C T
15' 30' 60'0
SCALE:1"=30'-0"
SOFTBALL FIELD
LANDSCAPE FENCING
PLAN
LC1.0201
01 2026.04.07 ADDENDA
NO. 2
AutoCAD SHX Text J
AutoCAD SHX Text James M. Szabo
AutoCAD SHX Text
OREGON
AutoCAD SHX Text
AutoCAD SHX Text 02.24.2014
Project: EOU Ballfield Complex
File details come from the government source that posted it. Updated .