About this file
This is a Mandatory Pre-Bid Conference Agenda for Eastern Oregon University's Ballfield Complex Phase 1 project, ITB #FP-2022-09B. The project encompasses right-of-way utility improvements along C Avenue and 6th Street, site grading and utility updates, new baseball and softball field construction with associated infrastructure, irrigation system installation, planting remediation, and site treatment following construction disturbance. The project is structured as an open bid consisting of three separate bid packages (A, B, and C), with bidders required to submit three separate bids accordingly. The mandatory pre-bid conference was held on March 13, 2026, at 10:00 AM at EOU Physical Plant. Bids are due on Tuesday, April 7, 2026, at 2:00 PM, with a Zoom meeting scheduled for the bid opening. Contractors must submit the 1st Tier Subcontractor Form by 4:00 PM on the same day. The Notice to Proceed is anticipated for on or before April 9, 2026, with work required to commence within 7 calendar days. The contract completion date is October 31, 2026. The deadline for clarifications, changes, or protests to bid documents is March 26, 2026, at 5:00 PM.
Contractors are responsible for coordinating water line relocations with the City of La Grande and obtaining all required local, state, and federal permits, including the Oregon DEQ 1200-CA stormwater pollution prevention permit. Work hours are Monday through Friday, 7:00 AM to 7:00 PM, excluding holidays, with owner approval required for work outside these hours. The project includes one additive alternate for a new transformer. Contractors must conduct field verification of all utility locations and coordinate with the owner regarding any conflicts. All work must comply with Oregon state mandated requirements and be approved by both Oregon DEQ and the City of La Grande. Contractors assume responsibility for over-excavation, stabilization of utility trenching, and synthetic turf surface preparation as anticipated conditions included in the bid schedule, plans, and specifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EOU Ballfield Project – Phase 1 ITB 2022-09B EOU Project Number FP-2022-09B MADATORY PRE-BID CONFERENCE March 13, 2026 Page 1 of 2
Eastern Oregon University Facilities & Planning Department
EASTERN OREGON UNIVERSITY
ITB #FP-2022-09B
EOU BALLFIELD COMPLEX PHASE 1
MANDATORY PRE-BID CONFERENCE
March 13, 2026, 10:00 EOU Physical Plant
A. INTRODUCTION
1. Sign attendance sheet – name, organization, title, and phone number.
2. Project Description: Right-of-way utility improvements along C Ave and 6th Street, site grading and utility updates, utilities for future baseball field and existing softball field with associate infrastructure materials, planting remediation, and site treatment from construction disturbance for all improvements, new site irrigation system, new baseball field improvements and associated infrastructure, softball field improvements and associated infrastructure, and site planting improvements.
B. GENERAL DISCUSSION ITEMS
1. The project is an Open, Bid project that has one additive alternate (New Transformer).
2. The Bid Due Date & Time is Tuesday April 7, 2026, at 2:00PM.
a. EOU will set up a zoom mtg to hold the bid opening to the approved bidders
b. By 4PM, Bidders shall submit the 1st Tier Subcontractor Form via the same email address
c. After the 4PM deadline, the responsive Bid amounts will be reviewed and publicly posted.
3. All questions, clarifications, and substitutions shall come through bidders only.
a. Substitution requests not submitted by a Bidder cannot be considered. All substitution requests must be submitted in accordance with the Contract Documents.
4. Phase 1 of this project consists of three bid packages: A, B, & C.
a. It is contractor’s responsibility to provide three separate bids for each bid package.
b. EOU reserves the right to flexibility in construction sequencing based on funding availability.
c. EOU reserves the right to some assumed scope adjustments based on selected construction sequencing.
5. It is Contractor’s responsibility to coordinate all work related to water line relocations including work scope, and schedules with the City of La Grande.
6. The Contractor shall be responsible for obtaining all local, state, and federal permits required for storm water pollution prevention as a result of the construction activities while meeting the contract time.
a. Contractor shall be responsible for obtaining Oregon DEQ 1200-CA permit. All plans must be reviewed and approved by ODEQ. Note the City of La Grande is not a 1200-CN local qualified Program.
b. On-site construction practices shall conform to the Oregon state mandated requirements. Work is considered incidental to the project.
EOU Ballfield Project – Phase 1 ITB 2022-09B EOU Project Number FP-2022-09B MADATORY PRE-BID CONFERENCE March 13, 2026 Page 2 of 2
Eastern Oregon University Facilities & Planning Department
i. Work hours are Monday – Friday 7am to 7pm, not including holidays. Approval is required from the Owner to work outside these hours.
c. All plans must be reviewed and approved by the City of La Grande.
7. The Bidder agrees to begin work within 7 calendar days after the date of the Notice to Proceed, being on or before April 9, 2026. The Contract Complete Date is October 31, 2026.
8. All work shall be completed in accordance with the contract documents.
a. The Contractor should disturb only those areas necessary to complete work and move within the work zone area and restore all surfaces to an in-kind condition.
b. Utility locations are approximate. Field verify all utilities and coordinate with owner if conflicts exist. Note the specific requirements to confirm critical utility crossing locations.
c. Soil conditions and assumptions are anticipated and included in the bid schedule, plans, and specifications.
i. Contractor shall consider over-excavation and stabilization of all utility trenching, and synthetic turf surfaces.
d. Last day to request clarifications, changes, or protests to Bid Docs is March 26, 2026 at 5:00
PM.
C. OPEN DISCUSSION
1. Open Questions and Comments
2. Site Walk Conducted
| EASTERN OREGON UNIVERSITY |
| ITB #FP-2022-09B |
| EOU BALLFIELD COMPLEX PHASE 1 |
| MANDATORY PRE-BID CONFERENCE |
| March 13, 2026, 10:00 |
| EOU Physical Plant |
File details come from the government source that posted it. Updated .