ITB_ENG260740_CONSTRUCT_AND_INSTALL_Bus_Stop_Shelters__Exhibit_D_Bench_Install6736.pdf
PDF 872 KB Posted
- Attached to
- CONSTRUCT AND INSTALL- Bus Stop Shelters
- Solicitation number
- ITB# ENG/260740
- Issued by
- Marion County, Orlando City, Florida
About this file
This document is installation instructions for a 5' performance bench surface-mounted product manufactured by Tolar Manufacturing Company Inc., which serves as a supporting exhibit for the City of Ocala's ITB#ENG/260740 for the construction and installation of fifteen (15) bus stop shelters located throughout Ocala and Marion County, Florida. The project requires a licensed general or building contractor to provide all materials, labor, and equipment necessary to construct and install the shelters, which will include city-provided shelter structures, lighting packages, and benches. This is a lump sum bid project, and all bids must be submitted electronically through www.bidocala.com or www.prorfx.com by the specified deadline. The contractor must be certified and licensed as a general or building contractor in the State of Florida, possess a minimum of five years' experience in commercial and industrial building construction, and provide three verifiable professional references along with documentation of three previously completed projects.
The bid security requirement is five percent (5%) of the total bid amount in the form of a bid bond, with the successful bidder required to furnish a performance bond. The installation instructions specify that benches must be positioned inside shelters at locations indicated on elevation drawings, with concrete marking required at each mounting pad before anchoring, utilizing either SUP-R-STUD anchors or Hilti TZ anchors as specified in the anchoring specification sheets. Funding and contract term details, including any performance bond amounts and project completion timelines, are contained in the primary scope of work document referenced within this contract opportunity.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTALLATION INSTRUCTIONS PERF BENCH Page 1
INSTALLATION
INSTRUCTIONS
FOR
5' PERF BENCH
SURFACE MOUNTED
TOLAR MANUFACTURING COMPANY INC.
TRANSIT SHELTERS | STREET FURNITURE | DISPLAYS & DIRECTORIES | TRANSIT SOLAR LIGHTING 258 Mariah Circle, Corona, CA USA 92879-1751 | 800-339-6165 | 951-808-0081 | www.tolarmfg.com http://www.tolarmfg.com/
INSTALLATION INSTRUCTIONS PERF BENCH Page 2
IF BENCH REQUIRES SUP-R-STUD ANCHORS
INSTALLATION INSTRUCTIONS PERF BENCH Page 3
IF BENCH REQUIRES HILTI TZ ANCHORS
GENERAL BENCH INSTALLATION
1. PLACE THE BENCH INSIDE THE SHELTER AT THE LOCATION INDICATED ON THE ELEVATION
DRAWING.
2. MARK THE CONCRETE AT EACH OF THE MOUNTING PADS. REFER TO THE ANCHORING SPEC.
SHEET FOR ANCHORING INSTRUCTIONS.
File details come from the government source that posted it. Updated .