ITB_ENG250564_Terminal_Apron_Rehabilitation_-_OCF_Ocala_International_Airport_-_Exhibit_C_-_Table_of_Contents.pdf
PDF 664 KB Posted
- Solicitation number
- ITB# ENG/250564
- Issued by
- Marion County, Orlando City, Florida
About this file
The document is a Table of Contents for Contract #ENG/250564, involving the City of Ocala and Ocala International Airport (OCF) in Marion County, Florida, with involvement from the Federal Aviation Administration (FAA) and Florida Department of Transportation (FDOT). The comprehensive project involves Terminal Apron Rehabilitation, covering multiple technical specifications and construction items including pavement preparation, removal, milling, asphalt mix overlay, prime coating, and taxilane marking. The document outlines detailed sections spanning FAA General Provisions, Contract Provision Guidelines, General Requirements, General Construction Items, and Technical Specifications, with page ranges for each section covering topics from project coordination and quality control to materials and equipment management.
The contract is funded through the FAA Airport Improvement Program (AIP) and FDOT, with a Disadvantaged Business Enterprise (DBE) goal of 15.31%. The project requires bidders to be licensed General or Building Contractors in Florida with at least 5 years of commercial/industrial construction experience. Insurance requirements include Commercial General Liability ($1,000,000 per occurrence), Commercial Automotive Liability ($1,000,000 combined limit), and Workers' Compensation. The solicitation was posted on May 1, 2025, with proposals due by June 2, 2025, and a total project duration of 22 calendar days. The project involves sophisticated infrastructure improvements, including removing 27 pavement tie-downs, milling 16,364 square yards of apron area, installing underground mini hatch pit systems, and performing electrical work with underground conduits.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE OF CONTENTS
Table of Contents ........................................................................................................................................ TOC-1 to TOC-1
FAA GENERAL PROVISIONS
Section 10 Definition of Terms ........................................................................................... GP 10-1 to GP 10-8 Section 40 Scope of Work..................................................................................................... GP 40-1 to GP 40-4 Section 50 Control of Work .................................................................................................. GP 50-1 to GP 50-9 Section 60 Control of Materials ............................................................................................ GP 60-1 to GP 60-3 Section 70 Legal Regulations and Responsibility to Public ................................................. GP 70-1 to GP 70-6 Section 80 Execution and Progress........................................................................................ GP 80-1 to GP 80-8 Section 90 Measurement and Payment.................................................................................. GP 90-1 to GP 90-9
CONTRACT PROVION GUIDELINES FOR OBLIGATED SPONSORS AND AIRPORT
IMPROVEMENT PROGRAM PROJECTS
Section 100 Required Federal Contract Provisions ........................................................................FP-1 to FP-87
GENERAL REQUIREMENTS
Section 01010 Summary of Work……………………........................................................ 01010-1 to 01010-4 Section 01030 Airport Project Procedures………………………………………………. 01030-1 to 01030-3 Section 01035 Nighttime Construction Operations Section 01040 Project Coordination……………………………………………………… 01040-1 to 01040-3 Section 01070 Abbreviations and Symbols………………………………………………. 01070-1 to 01070-4 Section 01090 Regulations and Definitions………………………………………………. 01090-1 to 01090-2 Section 01150 Measurement and Payment.......................................................................... 01150-1 to 01150-4 Section 01300 Submittals .................................................................................................... 01300-1 to 01300-5 Section 01600 Materials and Equipment ............................................................................ 01600-1 to 01600-3 Section 01700 Contract Closeout......................................................................................... 01700-1 to 01700-7 Section 01740 Warranties and Bonds .................................................................................. 01740-1 to 01740-2
GENERAL CONSTRUCTION ITEMS
Item C-100 Contractor Quality Control Program (CQCP)…………………………… C-100-1 to C-100-7 Item C-105 Mobilization.................................................................................................... C-105-1 to C-105-2 Item C-110 Method of Estimating Percentage of Material Within Specification Limits... C-110-1 to C-110-8
TECHNICAL SPECIFICATIONS
Item S-100 FDOT Standard Specificastions…………………………………………… S-100-1 to S-100-2 Item 02000 Construction Layout and Survey………………………………………….. 02000-1 to 02000-3 Item P-101 Preparation/ Removal of Existing Pavements.................................................... P-101-1 to P-101-5 Item S-140 Site Demolition ............................................................................................ S-140-1 to S-140-4 Item S-141 Pavement Milling.......................................................................................... S-141-1 to S-141-2 Item P-403 Asphalt Mix Pavement Leveling Course ..................................................... P-403-1 to P-403-21 Item P-404 Fuel Resistance Asphalt Mix Pavement ....................................................... P-404-1 to P-404-21
Exhibit C-Table of Contents CONTRACT# ENG/250564
C-1
Item P-602 Emulsified Asphalt Prime Coat .................................................................... P-602-1 to P-602-3 Item P-603 Emulsified Asphalt Prime Coat .................................................................... P-603-1 to P-603-3 Item P-620 Apron and Taxilane Marking ........................................................................ P-620-1 to P-620-13
Appendix
Construction Safety and Phasing Plan……………………………………………………… CSPP-1 to CSPP-8
Exhibit C-Table of Contents CONTRACT# ENG/250564
C-2
| FAA GENERAL PROVISIONS |
| CONTRACT PROVION GUIDELINES FOR OBLIGATED SPONSORS AND AIRPORT IMPROVEMENT PROGRAM PROJECTS |
| GENERAL REQUIREMENTS |
| GENERAL CONSTRUCTION ITEMS |
| TECHNICAL SPECIFICATIONS |
File details come from the government source that posted it. Updated .