This document is a comprehensive bid set of engineering and design plans for the Terminal Apron Rehabilitation project at Ocala International Airport (OCF) in Ocala, Florida, prepared by Infrastructure Consulting & Engineering for the City of Ocala. The project involves a comprehensive rehabilitation of the airport's terminal apron, encompassing approximately 167,450 square feet of pavement. The scope includes removing 27 existing aircraft tie-downs, milling 8 inches of existing pavement, and installing new asphalt overlay in multiple layers using different asphalt mixes, including fuel-resistant and superpave varieties. The project is divided into two bid schedules, with phased construction approaches that maintain airport operational continuity, and includes associated electrical work such as installing underground conduits and new underground mini hatch pit systems.
The project is federally funded through FAA AIP Project No. 3-12-0055-034-2024 and FDOT FM No. 455217-1-94-01, with a planned construction timeline in March 2025. Bidder requirements include being a licensed General or Building Contractor in Florida with a minimum of 5 years' experience in commercial/industrial construction, and the ability to provide three verifiable professional references. The project will be awarded on a unit price basis to the lowest responsive bidder, with pricing to be honored for 120 days after award. Critical technical specifications include precise pavement elevation matching, specific asphalt mix types and thicknesses, electrical infrastructure installation, and comprehensive pavement markings, all designed to meet FAA standards and airport operational requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PREPARED BY:
TAMPA, FL 33634
5550 W. IDLEWILD AVENUE, SUITE 115
(813) 330-2704
CERTIFICATE OF AUTHORIZATION NO.: 30862
DRAWING INDEX
DWG. No. DESCRIPTION
C1.1
G0.0
LOCATION MAP
OCALA, FLORIDA
VICINITY MAP
TERMINAL APRON REHABILITATION
AT
BID DOCUMENTS
MARCH 2025
PROJECT
LOCATION
G2.1
EXISTING CONDITIONS
COVER SHEET
GENERAL NOTES
FAA AIP PROJECT No.: 3-12-0055-034-2024
FDOT FM NO. : 455217-1-94-01 (G3474)
G1.0 PROJECT LAYOUT PLAN
HAMED JAFARIAN, FL P.E. NO. 76516
G1.1-G1.5 CONSTRUCTION SAFETY & PHASING PLAN, NOTES AND DETAILS
F O
R B
ID
D
IN
G
O N
L Y
N
O T
F O
R C
O N
S T
R U
C T
IO
N
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR
THE ABOVE SHEETS IN ACCORDANCE WITH RULE 61615-23.004, F.A.C.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND
SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
C2.1 DEMOLITION & PAVEMENT REMOVAL PLAN
C3.1-C3.2 TYPICAL SECTIONS AND DETAILS
C4.1 PAVEMENT LAYOUT AND MARKING PLAN
C5.1 GRADING AND DRAINAGE PLAN
C6.1
C1.2 EXISTING CONDITIONS - PHOTOS
MARKING DETAILS
AutoCAD SHX Text Phone: 811
AutoCAD SHX Text Sunshine State One Call of Florida, Inc.
AutoCAD SHX Text It's the Law!
AutoCAD SHX Text Call 48 hours
AutoCAD SHX Text before you dig
AutoCAD SHX Text Jacksonville
AutoCAD SHX Text Daytona
AutoCAD SHX Text Gainesville
AutoCAD SHX Text Palm Beach
AutoCAD SHX Text Miami
AutoCAD SHX Text Lauderdale
AutoCAD SHX Text Titusville
AutoCAD SHX Text Tampa
AutoCAD SHX Text Key West
AutoCAD SHX Text Fort Myers
AutoCAD SHX Text Vero Beach
AutoCAD SHX Text Pensacola
AutoCAD SHX Text Tallahassee
AutoCAD SHX Text
APPROXIMATE SCALE IN MILES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Beach
AutoCAD SHX Text
NORTH
AutoCAD SHX Text Orlando
AutoCAD SHX Text West
AutoCAD SHX Text Fort
AutoCAD SHX Text 737-300
AutoCAD SHX Text
NORTH
AutoCAD SHX Text 1" = 1000'
AutoCAD SHX Text
OCALA INTERNATIONAL AIRPORT
AutoCAD SHX Text
OCALA INTERNATIONAL AIRPORT
AutoCAD SHX Text
STATE OF
AutoCAD SHX Text No.
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text 76516
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS
PROJECT AREA
±167,450 SF
CONTRACTOR
ACCESS THROUGH
GATE 2CONTRACTOR'S
STAGING
AREA (TYP.)
Fil e P ath : C:
\U se rs\ ha me d.j afa ria n\B ox
\IC
ET
PA
\AV
IAT
IO
N\ Oc ala \24
-22 7 T erm ina l A pro n R eh ab \C
AD
D-dw g\(
2)_
G1 .0-
PR
OJ
EC
T L
AY
OU
T P
LA
N.
dw g D ate : 3/
/20
3:
PM
REVISIONS
24-227
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
AM
AM HJ
MAR 2025
TERMINAL
APRON
REHABILITATION
455217-1-94-01 (G3474)
3-12-0055-034-2024
B
ID
D O
C U
M E
N T
S
N O
T F
O R
C O
N S
T R
U C
T
IO
N
G1.0
PROJECT LAYOUT PLAN
0 200 400 800
N
CONTRACTOR'S STAGING AREA
LEGEND
CONTRACTOR'S HAUL ROUTE
LIMIT OF CONSTRICTION
AutoCAD SHX Text
TAXIWAY 'A'
AutoCAD SHX Text A5
AutoCAD SHX Text A7
AutoCAD SHX Text A8
AutoCAD SHX Text A6
AutoCAD SHX Text A3
AutoCAD SHX Text A4
AutoCAD SHX Text
RUNWAY 18-36
AutoCAD SHX Text
TAXIWAY A
AutoCAD SHX Text
SW 60TH AVE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
AutoCAD SHX Text Sheet Number:
AutoCAD SHX Text
RUNWAY SAFETY AREA
AutoCAD SHX Text
RSA
AutoCAD SHX Text
TAXIWAY OBJECT FREE AREA
AutoCAD SHX Text
TOFA
AutoCAD SHX Text
TAXIWAY SAFETY AREA
AutoCAD SHX Text
TSA
TERMINAL
OE/AAA POINT 1 STAGE AREA
160.0' (PART 77 MSL) - 85.0' (GRND.EL.)
= 75.0' ALLOWABLE EQUIP. HEIGHT
N: 1758872.0907
E: 585514.9308
LAT: N029° 10' 25.47"
LONG: W82° 13' 11.02"
START OF 7-TO-1
TRANSITIONAL SURFACE
OE/AAA POINT 2 PROJECT APRON AREA
92.09' (PART 77 MSL) - 79.4' (GRND.EL.)
= 12.69' ALLOWABLE EQUIP. HEIGHT
N: 1758598.9471 E: 585573.6699
LAT: N029° 10' 16.21"
LONG: W82° 13' 16.34"
CONTRACTOR'S
STAGING
AREA (TYP.)
90.00
100.00
110.00
120.00
130.00
140.00
150.00
160.00
170.00
80.00
0'
T O
T R
AN
SI
TI
O
N
AL
S U
R
FA
C E
WEST TAXILANE
GATE "2"
C
C
CC CC CC
C C
Fil e P ath : C:
\U se rs\ ha me d.j afa ria n\B ox
\IC
ET
PA
\AV
IAT
IO
N\ Oc ala \24
-22 7 T erm ina l A pro n R eh ab \C
AD
D-dw g\(
3)-
G1 .1-
G1 .5-
CS
PS
PL
AN
.dw g
D ate
: 4/
/20
4:
PM
REVISIONS
24-227
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
AM
AM HJ
MAR 2025
TERMINAL
APRON
REHABILITATION
455217-1-94-01 (G3474)
3-12-0055-034-2024
B
ID
D O
C U
M E
N T
S
N O
T F
O R
C O
N S
T R
U C
T
IO
N
CONSTRUCTION SAFETY &
PHASING PLAN (OVERALL)
1. SEE SHEET G1.6 FOR BARRICADE
DETAILS.
2. SEE SHEET G1.6 FOR ADDITIONAL
SECURITY, SAFETY AND PHASING
NOTES.
3. CONTRACTOR TO KEEP A SWEEPER
TRUCK DURING CONSTRUCTION AT
ALL TIME.
4. CONTRACTOR TO KEEP A SWEEPER
TRUCK DURING CONSTRUCTION AT
ALL TIME.
TERMINAL APRON REHAB
AREA = ±167,450 SF
G1.1
0 1206030
N
TYPE II LOW PROFILE
BARRICADES
CONTRACTOR'S
STAGING AREA
14 CFR PART 77 IMAGINARY
SURFACE ELEVATION
80.00
PHASE 1 CONSTRUCTION
BID SCHEDULE 1
LEGEND
PHASE 2 CONSTRUCTION
BID SCHEDULE 2
CONTRACTOR'S ACCESS
HAUL ROUTE
C UNDER GROUND ELECTRICAL
CONDUITSCC
TERMINAL
AutoCAD SHX Text 30" R.C.P.
AutoCAD SHX Text 36" R.C.P.
AutoCAD SHX Text
CONC. HARDSTAND
AutoCAD SHX Text
RUNWAY 18-36
AutoCAD SHX Text
TAXIWAY A
AutoCAD SHX Text
TAXIWAY 'A'
AutoCAD SHX Text A5
AutoCAD SHX Text A7
AutoCAD SHX Text A6
AutoCAD SHX Text A4
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
AutoCAD SHX Text Sheet Number:
AutoCAD SHX Text
RUNWAY SAFETY AREA
AutoCAD SHX Text
RUNWAY OBJECT FREE AREA
AutoCAD SHX Text
OBJECT FREE ZONE
AutoCAD SHX Text
ROFA
AutoCAD SHX Text
RSA
AutoCAD SHX Text
OFZ
AutoCAD SHX Text
TAXIWAY OBJECT FREE AREA
TOFA
START OF 7-TO-1
TRANSITIONAL SURFACE
90.00
100.00
110.00
120.00
130.00
140.00
80.00
0'
T O
T R
AN
SI
TI
O
N
AL
S U
R
FA
C E
WEST TAXILANE
C
C
Fil e P ath : C:
\U se rs\ ha me d.j afa ria n\B ox
\IC
ET
PA
\AV
IAT
IO
N\ Oc ala \24
-22 7 T erm ina l A pro n R eh ab \C
AD
D-dw g\(
3)-
G1 .1-
G1 .5-
CS
PS
PL
AN
.dw g
D ate
: 3/
/20
3:
PM
REVISIONS
24-227
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
AM
AM HJ
MAR 2025
TERMINAL
APRON
REHABILITATION
455217-1-94-01 (G3474)
3-12-0055-034-2024
B
ID
D O
C U
M E
N T
S
N O
T F
O R
C O
N S
T R
U C
T
IO
N
CONSTRUCTION SAFETY &
PHASING PLAN (PHASE 1)
1. SEE SHEET G1.1 FOR STAGE AREA
2. SEE SHEET G1.4 FOR BARRICADE
DETAILS.
3. SEE SHEET G2.1 FOR ADDITIONAL
SECURITY, SAFETY AND PHASING
NOTES.
4. CONTRACTOR TO KEEP A SWEEPER
TRUCK DURING CONSTRUCTION AT
ALL TIME.
G1.2
PHASING SCHEDULE
PHASE DESCRIPTION OF WORKLIQUIDATED IMPACT
PER CONTRACT
DURATION
21 CALENDAR
DAYS
DAMAGES
PLACE PHASE 1 BARRICADES, CLEAN APRON, REMOVE EXIST. ASPHALT, REMOVE EXIST.
TIE-DOWNS, REMOVE EXIST. CONC. PAD, REMOVE 1"-2" OF EXIST BASE, GROUT FILL TIE-DOWN
REMOVALS, COMPLETE ELECTRICAL WORK, COMPACT/ ROLL EXISTING BASE, PLACE PRIME
COAT, PLACE FIRST LIFT OF P- 403 OVERLAY, PLACE TACK COAT, PLACE SECOND LIFT OF P- 403 OVERLAY, PLACE TACK COAT, PLACE FINAL LIFT OF P- 404 OVERLAY, APPLY TEMPORARY PAINT, APPLY PERMANENT PAINT PER SPECS.
CONSTRUCTION PHASING NOTES:
1. PROJECT DURATION IS CONTINUOUS THROUGH ALL PROJECT PHASES. THERE WILL
BE NO LAPS IN TIME BETWEEN PHASES.
2. CONTRACTOR IS REQUIRED TO ENSURE CONTINUOUS ACCESS TO THE TERMINAL
BUILDING THROUGHOUT THIS PHASE OF THE PROJECT.
3. CONTRACTOR TO KEEP A SWEEPER TRUCK DURING CONSTRUCTION AT ALL TIME.
4. OWNER MAY REQUIRE OCCASIONAL USE OF WEST TAXILANE. CONTRACTOR SHALL
COORDINATE MILLING AND PAVING OPERATIONS IN THE AREA IMMEDIATELY
ADJACENT TO THE TAXILANE WITH THE OWNER. ALL OTHER ACTIVITIES SHALL PULL
BACK AND YIELD TO AIRCRAFT.
TYPE II LOW PROFILE
BARRICADES
14 CFR PART 77 IMAGINARY
SURFACE ELEVATION
PHASE 1 CONSTRUCTION
BID SCHEDULE 1
LEGEND
0 1206030
N
AIRPORT WILL BE OPEN TO ALL TAKEOFF AND LANDING
OPERATIONS ON RUNWAY "18-36" FOR PHASE 1. TAXIWAYS "A",
"A5", AND "A7" SHALL REMAIN OPERATIONAL DURING THIS
PHASE. CONTRACTOR MAY ONLY PERFORM WORK DURING THE
HOURS OF 7:00 AM TO 5:00 PM MONDAY-FRIDAY AND 8:00 AM TO
5:00 PM ON SATURDAY, EXCLUDING, SUNDAYS, AND HOLIDAYS.
ANY DEVIATION FROM THIS SCHEDULE REQUIRES
PRE-APPROVAL FROM AIRPORT MANAGER.
80.00
AIRCRAFT MANEUVER
DURING PHASE 1 (TYP.)
.5
AD
G
-II
TS
A
8'
C PHASE 1 ELECTRICAL WORK
PHASE 1 BARRICADES
AutoCAD SHX Text
CONC. HARDSTAND
AutoCAD SHX Text
RUNWAY 18-36
AutoCAD SHX Text
TAXIWAY A
AutoCAD SHX Text
TAXIWAY 'A'
AutoCAD SHX Text A5
AutoCAD SHX Text A7
AutoCAD SHX Text A6
AutoCAD SHX Text A4
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
AutoCAD SHX Text Sheet Number:
AutoCAD SHX Text
RUNWAY SAFETY AREA
AutoCAD SHX Text
RUNWAY OBJECT FREE AREA
AutoCAD SHX Text
OBJECT FREE ZONE
AutoCAD SHX Text
TAXIWAY OBJECT FREE AREA
AutoCAD SHX Text
ROFA
AutoCAD SHX Text
RSA
AutoCAD SHX Text
OFZ
START OF 7-TO-1
TRANSITIONAL SURFACE
90.00
100.00
110.00
120.00
130.00
140.00
80.00
0'
T O
T R
AN
SI
TI
O
N
AL
S U
R
FA
C E
WEST TAXILANE
C
C
CC CC CC
C C
Fil e P ath : C:
\U se rs\ ha me d.j afa ria n\B ox
\IC
ET
PA
\AV
IAT
IO
N\ Oc ala \24
-22 7 T erm ina l A pro n R eh ab \C
AD
D-dw g\(
3)-
G1 .1-
G1 .5-
CS
PS
PL
AN
.dw g
D ate
: 3/
/20
3:
PM
REVISIONS
24-227
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
AM
AM HJ
MAR 2025
TERMINAL
APRON
REHABILITATION
455217-1-94-01 (G3474)
3-12-0055-034-2024
B
ID
D O
C U
M E
N T
S
N O
T F
O R
C O
N S
T R
U C
T
IO
N
1. SEE SHEET G1.1 FOR STAGE AREA
2. SEE SHEET G1.4 FOR BARRICADE
DETAILS.
3. SEE SHEET G2.1 FOR ADDITIONAL
SECURITY, SAFETY AND PHASING
NOTES.
4. CONTRACTOR TO KEEP A SWEEPER
TRUCK DURING CONSTRUCTION AT
ALL TIME.
G1.3
PHASING SCHEDULE
PHASE DESCRIPTION OF WORKLIQUIDATED IMPACT
PER CONTRACT
DURATION
1 CALENDAR
DAY
(NIGHT WORK)
DAMAGES
TYPE II LOW PROFILE
BARRICADES
14 CFR PART 77 IMAGINARY
SURFACE ELEVATION
LEGEND
PHASE 2 CONSTRUCTION
BID SCHEDULE 2
0 1206030
N
PHASE 2 BARRICADES (TYP.)
MIN. 24'
ACCESS
REMOVE PHASE 1 BARRICADES, PLACE PHASE 2 BARRICADES, CLEAN APRON, REMOVE 2" OF
EXIST. ASPHALT, COMPLETE ELECTRICAL WORK, FILL & COMPACT OPEN TRENCHES, PLACE
TACK COAT, PLACE 2" OF SP- 12.5 OVERLAY, APPLY TEMPORARY PAINT, APPLY PERMANENT
PAINT PER SPECS.
CONSTRUCTION PHASING NOTES:
1. PROJECT DURATION IS CONTINUOUS THROUGH ALL PROJECT
PHASES. THERE WILL BE NO LAPS IN TIME BETWEEN PHASES.
2. NO MEN OR EQUIPMENT PERMITTED IN THE RSA OR TOFA
WITHOUT CLOSURES.
3. CONTRACTOR TO KEEP A SWEEPER TRUCK DURING
CONSTRUCTION AT ALL TIME.
4. PLACEMENT OF CONDUIT IN PHASE 2 AREA MAY BE
ACCOMPLISHED IN PHASE 1 PROVIDING ACCESS TO TERMINAL
FOR VEHICLES, GOLF CARTS, AND PEDESTRIANS.
AIRPORT WILL BE OPEN TO ALL TAKEOFF AND LANDING
OPERATIONS ON RUNWAY "18-36" FOR PHASE 2. TAXIWAYS "A",
"A5", AND "A7" SHALL REMAIN OPERATIONAL DURING THIS
PHASE. WORK HOURS 9:00 PM TO 5:00 AM. ANY DEVIATION
FROM THIS SCHEDULE REQUIRES PRE-APPROVAL FROM
AIRPORT MANAGER.
CONSTRUCTION SAFETY &
PHASING PLAN (PHASE 2)
COMPLETED CONSTRUCTION
FROM PHASE 1
80.00
AIRCRAFT MANEUVER
DURING PHASE 2 (TYP.)
35.52'
.0
0'
C PHASE 1 ELECTRICAL WORK
C PHASE 2 ELECTRICAL WORKC
AutoCAD SHX Text 30" R.C.P.
AutoCAD SHX Text 36" R.C.P.
AutoCAD SHX Text
RUNWAY 18-36
AutoCAD SHX Text
TAXIWAY A
AutoCAD SHX Text
TAXIWAY 'A'
AutoCAD SHX Text A5
AutoCAD SHX Text A7
AutoCAD SHX Text A6
AutoCAD SHX Text A4
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
AutoCAD SHX Text Sheet Number:
AutoCAD SHX Text
RUNWAY SAFETY AREA
AutoCAD SHX Text
RUNWAY OBJECT FREE AREA
AutoCAD SHX Text
OBJECT FREE ZONE
AutoCAD SHX Text
TAXIWAY OBJECT FREE AREA
AutoCAD SHX Text
ROFA
AutoCAD SHX Text
RSA
AutoCAD SHX Text
OFZ
Fil e P ath : C:
\U se rs\ ha me d.j afa ria n\B ox
\IC
ET
PA
\AV
IAT
IO
N\ Oc ala \24
-22 7 T erm ina l A pro n R eh ab \C
AD
D-dw g\(
3)-
G1 .1-
G1 .5-
CS
PS
PL
AN
.dw g
D ate
: 3/
/20
3:
PM
REVISIONS
24-227
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
AM
AM HJ
MAR 2025
TERMINAL
APRON
REHABILITATION
455217-1-94-01 (G3474)
3-12-0055-034-2024
B
ID
D O
C U
M E
N T
S
N O
T F
O R
C O
N S
T R
U C
T
IO
N
G1.4
CAUTION LIGHTS
LOW PROFILE BARRICADE DETAIL
N.T.S.
NOTES:
1) ALL BARRICADES SHALL BE LINKED END TO END IN ALL LOCATIONS.
2) FRANGIBLE, LOW PROFILE BARRICADES SHALL BE USED WHERE
WORK IS ADJACENT TO ACTIVE AIRCRAFT OR INSIDE OF AN ACTIVE
TAXIWAY'S SAFETY AREA. CAUTION LIGHTS TO BE RED IN COLOR AND
FLASHING DURING HOURS OF DARKNESS.
3) SECURE EACH BARRICADES WITH TWO SAND BAGS OR USE WATER
FILLED.
3'
MIN.
3'
MIN.
NOTE:
SAFETY FLAG SHALL BE PROMINENTLY DISPLAYED ON ALL
CONSTRUCTION EQUIPMENT. AN AMBER FLASHING LIGHT IS
REQUIRED FOR NIGHT WORK AND MAY BE SUBSTITUTED FOR
THE FLAG DURING THE DAY.
CONSTRUCTION SAFETY FLAG
TRAFFIC CONE
N.T.S.
AVIATION ORANGE
AVIATION WHITE
1. THE CONTRACTOR SHALL OBTAIN, HAVE KNOWLEDGE OF, AND INCORPORATE THE FOLLOWING SAFETY
PROVISIONS INTO THE CONSTRUCTION PROJECT:
A. OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION - AC 150/5370-2, LATEST EDITION.
B. AIRPORT SAFETY SELF-INSPECTION - AC 150/5200-18, LATEST EDITION.
C. PAINTING, MARKING AND LIGHTING OF VEHICLES USED ON AIRPORTS - AC 150/5210-5, LATEST EDITION.
D. CODE OF FEDERAL REGULATIONS (CFR) PART 139
2. NOTICE TO AIRMEN (NOTAM) - THE AIRPORT WILL ISSUE ALL NOTAMS TO THE FAA FLIGHT SERVICE STATION
RELATED TO THIS PROJECT IN ACCORDANCE WITH ESTABLISHED CRITERIA.
3. FOR OTHER CONDITIONS RELATED TO SAFETY, SEE SPECIFICATIONS.
4. PRIOR TO THE CLOSURE OF ANY AIRFIELD PAVEMENT, THE CONTRACTOR SHALL PROVIDE A MINIMUM OF 3
DAYS NOTICE SO A NOTAM CAN BE ISSUED.
5. AIRCRAFT TRAFFIC SHALL HAVE THE RIGHT-OF-WAY AT ALL TIMES.
6. THE CONTRACTOR WILL NOT BE ALLOWED TO USE ANY OF THE EXISTING RUNWAYS, TAXIWAYS, OR VEHICLE PARKING AREAS AS PART OF THE HAUL ROAD UNLESS SPECIFICALLY AUTHORIZED BY THE OWNER.
7. THE CONTRACTOR SHALL CONDUCT HIS CONSTRUCTION OPERATIONS AS SHOWN ON THE PLANS. THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE OWNER TO MINIMIZE
INTERFERENCE TO AIRCRAFT OPERATIONS DURING CONSTRUCTION.
8. NO CONTRACTOR VEHICLES, EQUIPMENT, OR PERSONNEL SHALL CROSS OR BE WITHIN ANY RUNWAY, TAXIWAY, OR TAXILANE OBJECT FREE AREA UNLESS SPECIFICALLY AUTHORIZED BY THE OWNER.
9. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER IN SCHEDULING ALL AIRFIELD PAVEMENT OPENINGS/CLOSINGS TO BE CONSISTENT WITH AIRFIELD OPERATIONS. WHEN THE CONTRACTOR'S OPERATIONS CROSS ACTIVE TAXIWAYS OR RUNWAYS HE SHALL BE REQUIRED TO PROVIDE A FLAGMAN ON EACH SIDE OF ACTIVE CROSSING TO DIRECT VEHICULAR TRAFFIC AND PROTECT AIRCRAFT TRAFFIC. THE CONTRACTOR SHALL ALSO HAVE SUITABLE EQUIPMENT APPROVED BY THE ENGINEER AT EACH CROSSING TO
KEEP THE CROSSING CLEAN OF ALL DIRT AND DEBRIS AND SAFE FOR AIRCRAFT TRAFFIC.
10. ALL AIRFIELD PAVEMENTS SHALL BE KEPT FREE OF DIRT AND ALL OTHER DEBRIS AT ALL TIMES. ANY SPILLAGE OF EXCAVATION OF OTHER MATERIAL SHALL BE CLEANED UP IMMEDIATELY BY THE CONTRACTOR USING A VACUUM OR MOTOR-DRIVEN SWEEPER. A PROGRAM OF REGULAR INSPECTION OF AIRFIELD PAVEMENTS SHALL
BE IMPLEMENTED AS PART OF THE CONTRACTOR'S SAFETY PLAN COMPLIANCE DOCUMENT.
11. ANY UNPLANNED, UNAPPROVED, OR ACCIDENTAL SHUTDOWN OR INTERRUPTION OF SERVICE TO ANY LIGHTING CIRCUIT OR NAVIGATIONAL AID REQUIRES IMMEDIATE NOTIFICATION OF THE AIRPORT MANAGER AND ENGINEER BY THE CONTRACTOR. THE COST OF MATERIALS AND LABOR REQUIRED TO REPAIR THE LIGHTING
CIRCUIT SHALL BE BORNE BY THE CONTRACTOR.
12. THE CONTRACTOR SHALL PROTECT ALL NAVIGATIONAL AIDS (NAVAIDS) DURING CONSTRUCTION. CONTRACTOR WILL BE HELD RESPONSIBLE FOR ANY DAMAGE TO EXISTING NAVAIDS. ANY DAMAGE TO NAVAIDS MAY REQUIRE SUBMITTALS FOR REPAIR OF THE DAMAGED FACILITY TO BE APPROVED BY THE ENGINEER. THE ENGINEER SHALL BE NOTIFIED OF ANY DAMAGE AND IMMEDIATE REPAIR AT THE CONTRACTOR'S EXPENSE WILL BE
REQUIRED.
13. CONTRACTOR SHALL MAINTAIN ALL AIRFIELD SAFETY DEVICES SUCH AS STAKED LIMIT LINES, FOR THE DURATION OF THE PROJECT AS REQUIRED. DAMAGED STAKES OR FLAGGING SHALL BE REPLACED IMMEDIATELY. CONTRACTOR TO SUBMIT PLAN SHOWING LOCATION OF LIMIT LINES FOR EACH PHASE AND FOR
PROJECT DURATION TO THE ENGINEER FOR APPROVAL.
14. ALL ACTIVE AIRPORT OPERATIONAL AREAS WHICH ARE ADJACENT TO A CONSTRUCTION WORK AREA SHALL BE SEPARATED BY LOW PROFILE BARRICADES WITH RED FLASHING LIGHTS. THE CONTRACTOR SHALL PROVIDE, MAINTAIN, AND INSTALL THE BARRICADES.
15. BARRICADES USED TO CLOSE NON-AIRFIELD AREAS SUCH AS ROADS OR PARKING LOTS SHALL CONFORM TO FDOT INDEX 600. ACCEPTABLE OPTIONS INCLUDE PLASTIC DRUMS, TYPE I BARRICADE, TYPE II BARRICADE, OR
TYPE III BARRICADE.
16. THE CONTRACTOR SHALL PROVIDE TEMPORARY R11-2, 48 x 30 "ROAD CLOSED" SIGNS TO BE USED IN CONJUNCTION WITH TRAFFIC BARRELS AT ALL LOCATIONS TO BE CLOSED TO VEHICULAR TRAFFIC.
17. CONTRACTOR MAY AT HIS OPTION PROVIDE TEMPORARY CHAIN LINK FENCE AROUND THE CONTRACTOR'S STAGING AREA. THE CITY ASSUMES NO RESPONSIBILITY FOR THE SECURITY OF EQUIPMENT, MATERIAL, OR ANY
OTHER ELEMENTS RELATED TO THE CONTRACTOR'S OPERATIONS.
18. THE CONTRACTOR SHALL PROMINENTLY DISPLAY AVIATION SAFETY FLAGS ON ALL CONSTRUCTION EQUIPMENT
AT THE HIGHEST POINT ON EACH PIECE OF EQUIPMENT. SEE DETAIL THIS SHEET.
19. FOR OTHER CONDITIONS RELATING TO SAFETY, SEE CONSTRUCTION SAFETY AND PHASING DOCUMENT (CSPP).
FLAG
(SEE DETAIL
THIS SHEET)
NOTES & DETAILS (1 OF 2)
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
Sheet Number:
ath : C:
\U se rs\ ha me d.j afa ria n\B ox
\IC
ET
PA
\AV
IAT
IO
N\ Oc ala \24
-22 7 T erm ina l A pro n R eh ab \C
AD
D-dw g\(
3)-
G1 .1-
G1 .5-
CS
PS
PL
AN
.dw g
D ate
: 3/
/20
3:
PM
REVISIONS
24-227
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
AM
AM HJ
MAR 2025
TERMINAL
APRON
REHABILITATION
455217-1-94-01 (G3474)
3-12-0055-034-2024
B
ID
D O
C U
M E
N T
S
N O
T F
O R
C O
N S
T R
U C
T
IO
N
1. SEE SHEET G1.6 FOR BARRICADE
DETAILS.
2. SEE SHEET G1.6 FOR ADDITIONAL
SECURITY, SAFETY AND PHASING
NOTES.
G1.5
14 CFR PART 77 SURFACES
(SEE SAFETY AND PHASING PLAN THIS
SHEET FOR ELEVATION)
EQUIPMENT HEIGHT RESTRICTION DETAIL
N.T.S.
1. THE CONTRACTOR SHALL ADHERE TO THE MAXIMUM ALLOWABLE HEIGHT
REQUIREMENTS SHOWN IN THE PLANS. THE CONTRACTOR SHALL COORDINATE ALL
EQUIPMENT LOCATIONS WITH THE ENGINEER PRIOR TO CONSTRUCTION.
2. IF THE CONTRACTOR'S OPERATIONS WILL RESULT IN ADDITIONAL AIRSPACE IMPACTS,
THE CONTRACTOR SHALL OBTAIN FAA APPROVAL BY SUBMITTING FORM 7460-1.
3. THE CONTRACTOR SHALL SUPPLY ALL INFORMATION REQUESTED BY THE ENGINEER TO
PROPERLY EVALUATE WHETHER ADDITIONAL AIRSPACE IMPACTS ARE LIKELY AND
WARRANT THE CONTRACTOR TO FILE A FORM 7460-1. THE ENGINEER'S DECISION SHALL
BE FINAL.
EQUIPMENT HEIGHT NOTESEQUIPMENT HEIGHT RESTRICTION
OE/AAA POINT NO.
(SEE SAFETY AND
PHASING PLAN)
MAXIMUM ALLOWABLE
EQUIPMENT HEIGHT
AT POINT
POINT 1 75.0 (FT)
SEE SHEET G1.1 FOR POINT LOCATIONS
C
RUNWAY 18-36
L
200' ROFZ
7:1 TRANSITIONAL SURFACE
TERMINAL APRON590'
POINT 2 12.69 (FT)
500' PRIMARY SURFACE
400' ROFA
C
TAXIWAY ALPHA
L
Mack
NOTES & DETAILS (2 OF 2)
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
AutoCAD SHX Text Sheet Number:
AutoCAD SHX Text
GROUND EL.= ±79.40
GROUND EL.= ±79.40
ath : C:
\U se rs\ ha me d.j afa ria n\B ox
\IC
ET
PA
\AV
IAT
IO
N\ Oc ala \24
-22 7 T erm ina l A pro n R eh ab \C
AD
D-dw g\(
4)-
G2 .1
-G
EN
ER
AL
N
OT
ES
.dw g D ate : 3/
/20
3:
PM
REVISIONS
24-227
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
AM
AM HJ
MAR 2025
TERMINAL
APRON
REHABILITATION
455217-1-94-01 (G3474)
3-12-0055-034-2024
B
ID
D O
C U
M E
N T
S
N O
T F
O R
C O
N S
T R
U C
T
IO
N
GENERAL NOTES
GENERAL NOTES
1. CONSTRUCTION STAKE-OUT SHALL BE PERFORMED BY CONTRACTOR IN ACCORDANCE
WITH ARTICLE 50-06 OF THE GENERAL PROVISIONS OF THE CONTRACT DOCUMENTS. IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL MEASUREMENTS
THAT MAY BE REQUIRED TO LAY OUT THE CONSTRUCTION. THE COST OF STAKING WILL
NOT BE PAID FOR DIRECTLY AND SHALL BE INCLUDED IN THE UNIT PRICES FOR THE
VARIOUS ITEMS OF WORK.
2. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE CLEANUP AND DISPOSAL OF ALL TRASH
AND DEBRIS CREATED BY HIS WORK OR PERSONNEL. NO BURNING IS ALLOWED ON SITE.
ALL TRASH AND DEBRIS MUST BE DISPOSED OF OFFSITE.
3. THE CONTRACTOR SHALL MAKE HIS OWN ARRANGEMENTS FOR ASPHALT AND OR
CONCRETE BATCH PLANT LOCATIONS WHICH MUST BE LOCATED OFF AIRPORT PROPERTY.
4. THE CONTRACTOR SHALL VISIT SITE TO DETERMINE EXISTING CONDITIONS PRIOR TO
SUBMITTING BID. THE CONTRACTOR SHALL REPORT TO THE ENGINEER ANY VARIATIONS
FROM THE INFORMATION SHOWN ON THE CONSTRUCTION PLANS.
5. APPROVED CUTS IN PAVEMENT OR CONCRETE SHALL BE MADE USING A PAVEMENT SAW,
AND SHALL BE PATCHED TO MATCH THE EXISTING SURFACE IN A MANNER APPROVED BY
THE ENGINEER.
6. EXISTING EASEMENTS TO OTHER PROPERTIES SHALL BE MAINTAINED AT ALL TIMES.
7. AIRFIELD PAVEMENTS SHALL BE KEPT FREE OF ALL DEBRIS, DIRT, ETC., AT ALL TIMES. ANY
SPILLAGE OF EXCAVATION OR OTHER MATERIAL SHALL BE CLEANED UP IMMEDIATELY BY
THE CONTRACTOR WITH A MOTOR DRIVEN SWEEPER OR VACUUM AS REQUIRED BY THE
ENGINEER. A PROGRAM OF REGULAR AIRFIELD PAVEMENT INSPECTION WILL BE PLANNED
BY THE CONTRACTOR, AIRPORT OPERATIONS AND THE OWNER'S REPRESENTATIVE.
SWEEPERS ARE TO BE EQUIPPED WITH NON-METALIC BROOMS.
8. ALL NON-PAVED AREAS OUTSIDE THE LIMITS OF CONSTRUCTION WHICH ARE DISTURBED
BY THE CONTRACTOR'S OPERATIONS, SUCH AS THE CONTRACTOR'S ACCESS ROAD,
STAGING AREA, HAUL ROUTES, ETC., SHALL BE RESTORED TO THEIR ORIGINAL CONDITION
AND GRASSED PER ITEM T-901 UPON COMPLETION OF THE PROJECT.
9. ANY DAMAGES DONE TO AIRPORT PROPERTY OR UTILITIES (SUCH AS RUNWAY, TAXIWAYS,
APRONS, FENCING, EXISTING CABLES) WILL BE REPAIRED BY THE CONTRACTOR TO THE
APPROVAL OF THE OWNER OF THE FACILITY IN A SATISFACTORY MANNER. THE
CONTRACTOR WILL BEAR ALL COSTS FOR REPAIRS USING INDUSTRY STANDARD
PRACTICES AND MATERIALS.
10. THE CONTRACTOR SHALL MAINTAIN SECURITY WITHIN THE PROJECT SITE AT ALL TIMES.
NO UNAUTHORIZED PERSONNEL SHALL BE ALLOWED ON THE SITE.
11. CONTRACTOR SHALL MAINTAIN ALL AIRFIELD SAFETY DEVICES SUCH AS STAKED LIMIT
LINES, FOR THE DURATION OF THE PROJECT AS REQUIRED. DAMAGED STAKES OR
FLAGGING SHALL BE REPLACED IMMEDIATELY. CONTRACTOR TO SUBMIT PLAN SHOWING
LOCATION OF LIMIT LINES FOR EACH PHASE AND FOR PROJECT DURATION TO THE
ENGINEER FOR APPROVAL.
12. THE CONTRACTOR SHALL OBTAIN ALL PERMITS NECESSARY FOR THE COMPLETION OF
THIS PROJECT.
13. THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL ENVIRONMENTAL RULES
AND REGULATIONS OF THE CITY, COUNTY, STATE, ARMY CORPS OF ENGINEERS, AND ANY
OTHER JURISDICTIONAL AGENCIES, AND ALL CONDITIONS SET FORTH IN ENVIRONMENTAL
PERMITS.
14. AIRCRAFT OPERATING ON THE AIRFIELD MAKE THE CONSTRUCTION AREA A ZONE OF HIGH
LEVEL NOISE. THE CONTRACTOR IS ADVISED TO TAKE THE NECESSARY PRECAUTIONS,
SUCH AS THE USE OF EAR PLUGS AND EAR MUFFS TO PREVENT EAR INJURY TO ANY
PERSONNEL WORKING IN THE AREA.
15. ALL DISPUTES ARISING FROM THE CONTRACTOR SHALL BE DECIDED BY THE ENGINEER,
WHOSE DECISION SHALL BE FINAL.
16. BURNING OF DEBRIS WILL NOT BE ALLOWED ON AIRPORT PROPERTY.
17. ALL DEMOLISHED MATERIALS BECOME THE PROPERTY OF THE CONTRACTOR UNLESS
OTHERWISE SHOWN IN THE CONTRACT DOCUMENTS. CONSTRUCTION AND DEMOLITION
DEBRIS SHALL BE LEGALLY DISPOSED OF OFF AIRPORT PROPERTY.
18. THE CONTRACTOR SHALL KEEP A WATER TRUCK ONSITE AT ALL TIMES FOR THE PURPOSE
OF CONTROLLING DUST AS REQUIRED BY THE CONTRACT DOCUMENTS.
HAUL ROUTE / STAGING
19. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE STORAGE AND SECURITY OF HIS
MATERIAL AND EQUIPMENT AND SHALL ERECT STORAGE FACILITIES AND FENCING AS
NECESSARY. THE CONTRACTOR'S STORAGE AND STAGING AREA SHALL BE IN THE
LOCATION SHOWN ON DRAWING G-1.1 & G1.2.
20. THE CONTRACTOR'S STAGING AREA(S) AND HAUL ROUTES SHOWN ON THE PLANS ARE
GENERAL AND FOR INFORMATIONAL PURPOSES ONLY. THE ACTUAL SIZE AND LOCATION
OF STAGING AREAS AND HAUL ROUTES WILL BE APPROVED BY THE OWNER PRIOR TO
CONSTRUCTION.
21. CONTRACTOR WILL NOT BE ALLOWED TO USE ANY OF THE EXISTING RUNWAYS OR
TAXIWAYS AS PART OF THE HAUL ROAD UNLESS SPECIFICALLY AUTHORIZED BY THE
OWNER'S REPRESENTATIVE. UNDER NO CIRCUMSTANCE SHALL THE CONTRACTOR CROSS
ANY RUNWAY AT ANY TIME WITH CONSTRUCTION VEHICLES OR EQUIPMENT.
22. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE PROJECT AREA THROUGH THE
PROJECT ACCESS ROUTES APPROVED BY THE ENGINEER ONLY. THE CONTRACTOR SHALL
BE RESPONSIBLE FOR THE SECURITY OF ALL GATES HE USES FOR ACCESS ONTO AIRPORT
PROPERTY. THE CONTRACTOR SHALL POST A GUARD AT ANY ACCESS GATE THAT IS NOT
LOCKED.
23. THE EXISTING AIRPORT PAVEMENTS ACCESS ROADS AND HAUL ROUTES MAY NOT BE
CAPABLE OF SUPPORTING CERTAIN TYPES OF CONSTRUCTION EQUIPMENT. PRIOR TO
BIDDING, THE CONTRACTOR SHALL FULLY SATISFY HIMSELF AS TO THE ABILITY OF THE
EXISTING AIRPORT PAVEMENTS TO SATISFACTORILY SUSTAIN THE TYPE OF EQUIPMENT HE
PLANS TO USE. CONTRACTOR SHALL SIZE THE EQUIPMENT USED FOR CONSTRUCTION
ACCORDINGLY. ANY DAMAGE CAUSED BY HAULING OR ANY OTHER CONSTRUCTION
ACTIVITY TO EXISTING PAVEMENT SHALL BE REPAIRED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE OWNER.
24. THE OWNER'S REPRESENATIVE SHALL DESIGNATE AREAS TO BE USED BY THE
CONTRACTOR FOR THE PARKING OF CONSTRUCTION EQUIPMENT AND VEHICLES WHEN
NOT ENGAGED IN THE CONSTRUCTION DURING NON-WORKING DAYS AND NIGHTS AS WELL
AS AREAS FOR CONTRACTOR'S EMPLOYEES AUTO PARKING.
25. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PROVIDING ALL PERMANENT
AND TEMPORARY UTILITY CONNECTIONS TO THE STAGING AREA.
MOVEMENT ON AIRFIELD
26. AREAS OUTSIDE THE PROJECT LIMITS ARE DESIGNATED AS RESTRICTED AREAS. THE
CONTRACTOR'S FORCES ARE PROHIBITED FROM ENTERING RESTRICTED AREAS AT ANY
TIME, UNLESS SPECIFICALLY AUTHORIZED BY THE OWNER'S REPRESENTATIVE OR
AIRPORT OPERATIONS.
27. THE CONTRACTOR SHALL CONDUCT HIS CONSTRUCTION OPERATIONS AS SHOWN ON THE
CONSTRUCTION SAFETY & PHASING PLAN, AND HIS APPROVED PHASING PLAN. THE
CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES WITH THE OWNER'S
REPRESENTATIVE TO MINIMIZE INTERFERENCE TO AIRCRAFT OPERATIONS DURING
CONSTRUCTION.
28. NO CONTRACTOR VEHICLES, EQUIPMENT, OR PERSONNEL SHALL CROSS OR BE WITHIN
ANY RUNWAY SAFETY AREA OR WITHIN ANY TAXIWAY OBJECT FREE AREA AS DELINEATED
IN THE PLANS. THE CONTRACTOR SHALL NOT PARK OR LEAVE UNATTENDED ANY
EQUIPMENT WITHIN THE RUNWAY OBJECT FREE AREA (ROFA) OR THE RUNWAY
PROTECTION ZONE (RPZ). EQUIPMENT NOT MANNED AND BEING USED SHALL NOT BE
ALLOWED WITHIN THE ROFA OR RPZ.
29. ALL VEHICLES USED ON THE AIRFIELD SHALL MEET FAA REQUIREMENTS FOR MARKINGS
AND LIGHTING. (SEE AC 150/5210-5D).
30. ALL ACTIVE AIRPORT OPERATIONAL AREAS WHICH ARE ADJACENT TO A CONSTRUCTION
WORK AREA SHALL BE SEPARATED BY TYPE II LOW PROFILE BARRICADES OR OTHER
BARRIER APPROVED BY THE ENGINEER. NO CONSTRUCTION TRAFFIC WILL CROSS ACTIVE
AIRPORT OPERATIONAL AREAS. THE CONTRACTOR SHALL PROVIDE AND INSTALL THE
BARRIERS AS SHOWN ON THE DRAWINGS AND WHERE DIRECTED BY THE ENGINEER. SEE
SPECIFICATION 01030 AND 01530 FOR ADDITIONAL INFORMATION.
31. THE CONTRACTOR SHALL WORK WITH THE ENGINEER IN SCHEDULING ALL TAXIWAY
OPENINGS/CLOSINGS TO BE CONSISTENT WITH AIRFIELD OPERATIONS. WHEN THE
CONTRACTOR'S OPERATIONS CROSS ACTIVE TAXIWAYS, HE SHALL BE REQUIRED TO
PROVIDE A FLAGMAN ON EACH SIDE OF THE ACTIVE CROSSING TO DIRECT VEHICULAR
TRAFFIC AND PROTECT AIRCRAFT TRAFFIC. THE CONTRACTOR SHALL ALSO HAVE
SUITABLE EQUIPMENT APPROVED BY THE ENGINEER AT EACH CROSSING TO KEEP THE
CROSSING CLEAN OF ALL DIRT AND DEBRIS AND SAFE FOR AIRCRAFT TRAFFIC.
BURIED UTILITIES
32. PRIOR TO DIGGING ANY TRENCHES, THE CONTRACTOR SHALL NOTIFY AIRPORT FOR ALL
UTILITIES (ELECTRIC, GAS, TELEPHONE, WATER, FIBER, AND ETC.) AND OBTAIN LOCATIONS
OF UNDERGROUND UTILITIES.
33. CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND IDENTIFICATION OF ALL
EXISTING UTILITIES AND UNDERGROUND PIPELINES IN CONSTRUCTION AREA. ANY
DAMAGES TO EXISTING UTILITIES OR UNDERGROUND PIPELINES ON OR OFF AIRPORT
PROPERTY SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL REPAIR WORK
SHALL MEET THE APPROVAL OF THE OWNER OF THE DAMAGED UTILITY. NO
REIMBURSEMENT WILL BE ALLOWED FOR UTILITY/PIPE REPAIR OR REPLACEMENT.
34. THE CONTRACTOR SHALL PROTECT EXISTING UTILITIES, AIRFIELD LIGHTING AND NAVAIDS
NOT CALLED OUT TO BE REMOVED OR ABANDONED. ANY DAMAGES DONE TO AIRPORT
PROPERTY OR UTILITIES (INCLUDING, BUT NOT LIMITED T0 RUNWAYS, TAXIWAYS, APRONS,
FENCING, EXISTING CABLES, LIGHTING, SIGNS, NAVAIDS) WILL BE REPAIRED BY THE
CONTRACTOR TO THE APPROVAL OF THE OWNER OF THE FACILITY IN A SATISFACTORY
MANNER. THE CONTRACTOR WILL BEAR ALL COSTS FOR REPAIRS.
35. ANY UNPLANNED, UNAPPROVED, OR ACCIDENTAL SHUTDOWN OR INTERRUPTION OF
SERVICE TO ANY LIGHTING CIRCUIT OR NAVIGATIONAL AID REQUIRES IMMEDIATE
NOTIFICATION OF AIRPORT OPERATIONS AND THE OWNER'S REPRESENTATIVE BY THE
CONTRACTOR. THE COST OF MATERIALS AND LABOR REQUIRED TO REPAIR THE LIGHTING
CIRCUIT SHALL BE BORNE BY THE CONTRACTOR.
G2.1
LIQUIDATED DAMAGES
LIQUIDATED DAMAGES AS PRESCRIBED IN SECTION 01010 - SUMMARY OF WORK, OF THE CONTRACT DOCUMENTS SHALL BE
ASSESSED FOR:
1. EACH DAY BEYOND THE SPECIFIED CONTRACT TIME THE ENTIRE PROJECT IS NOT SUBSTANTIALLY COMPLETE AND
READY FOR USE BY THE OWNER.
2. CONTRACTOR SHALL RETURN AFTER 30 DAYS FOR MARKING APPLICATION.
SURVEY NOTES
1. DATE OF FIELD SURVEY: JANUARY 14, 2025
2. SUBJECT TO RIGHTS OF WAY, RESTRICTIONS, EASEMENTS AND RESERVATIONS OF RECORD.
3. UNLESS OTHERWISE SHOWN, UNDERGROUND IMPROVEMENTS NOT LOCATED.
4. PUBLIC RECORDS NOT SEARCHED BY R.M. BARRINEAU & ASSOCIATES, INC.
5. BEARINGS AND STATE PLANE COORDINATES DEPICTED HEREON ARE GRID, WEST FLORIDA ZONE, NAD-83 (CORS96) EPOCH:2002.0000), BASED ON TRIMBLE VIRTUAL REFERENCE STATION NETWORK AND REFERENCED TO CITY OF OCALA
ENGINEERING DEPARTMENT CONTROL POINTS 0011 AND 0012.
6. VERTICAL DATUM BASED ON CITY OF OCALA ENGINEERING DEPARTMENT CONTROL POINTS 0011 WITH AN ELEVATION OF
85.20', NAVD-88.
7. ORIENTATION FOR THE IMPROVEMENTS SHOWN HEREON SHOULD NOT BE USED TO RECONSTRUCT BOUNDARY LINES.
8. ADDITIONS OR DELETIONS TO SURVEY MAPS BY OTHER THAN THE SIGNING PARTY OR PARTIES IS PROHIBITED WITHOUT
WRITTEN CONSENT OF THE SIGNING PARTY OR PARTIES.
9. THIS SURVEY DEPICTS THE PROPERTY AS IT EXISTED ON THE SURVEY DATE, NOT NECESSARILY THE SIGNATURE DATE.
10. THIS SURVEY HAS BEEN PREPARED FOR THE EXCLUSIVE BENEFIT OF THE PARTY(IES) NAMED HEREON, AND SHALL NOT BE DUPLICATED OR RELIED UPON BY ANY OTHER INDIVIDUAL OR ENTITY WITHOUT AUTHORIZATION FROM R.M.
BARRINEAU & ASSOCIATES, INC.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
CONTROL POINT
SET IRON ROD & CAP (58" LB 5091 WITNESS)
N.= 1759220.1820 E.= 585860.9300
ELEVATION =82.48'
CONTROL POINT
SET IRON ROD & CAP (5
8" LB 5091
WITNESS)
N.= 1759207.3060 E.= 585494.1430
ELEVATION =79.03'
CONTROL POINT
SET IRON ROD & CAP (5
8" LB 5091 WITNESS)
N.= 1758554.4730
E.= 585492.7370
ELEVATION =79.00'
CONTROL POINT
SET IRON ROD & CAP (5
8" WIT LB5091)
N.= 1758689.1200 E.= 585886.5200
ELEVATION =83.31'
Fil e P ath : C:
\U se rs\ ha me d.j afa ria n\B ox
\IC
ET
PA
\AV
IAT
IO
N\ Oc ala \24
-22 7 T erm ina l A pro n R eh ab \C
AD
D-dw g\(
5)_
C1 .1
EX
IST
. C
ON
D.
.dw g D ate : 3/
/20
3:
PM
REVISIONS
24-227
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
AM
AM HJ
MAR 2025
TERMINAL
APRON
REHABILITATION
455217-1-94-01 (G3474)
3-12-0055-034-2024
B
ID
D O
C U
M E
N T
S
N O
T F
O R
C O
N S
T R
U C
T
IO
N
C1.1
EXISTING CONDITIONS
LEGEND
N
0 1005025
CONTROL POINTS
(US SURVEY FEET)
AutoCAD SHX Text A5
AutoCAD SHX Text A7
AutoCAD SHX Text A6
AutoCAD SHX Text 30" R.C.P.
AutoCAD SHX Text 36" R.C.P.
AutoCAD SHX Text
CONC. HARDSTAND
AutoCAD SHX Text
EXIST. CONC. HEADWAL INV.= 70.88'
AutoCAD SHX Text
EXIST. CONC. HEADWAL INV.= 71.15'
AutoCAD SHX Text
EXIST. SIGN
AutoCAD SHX Text
TERMINAL BUILDING
AutoCAD SHX Text
EXIST. CONC. HEADWAL INV.= 71.38'
AutoCAD SHX Text
EXIST. CONC. HEADWAL INV.= 70.99'
AutoCAD SHX Text
EXIST. SIGN
AutoCAD SHX Text
EXIST. AIRCRAFT TIEDOWNS
AutoCAD SHX Text
EXIST. SERVICE ROAD MARKINGS
AutoCAD SHX Text
EXIST. MARKINGS (SHELTAIR)
AutoCAD SHX Text
EXISTING PAVEMENT JOINT
AutoCAD SHX Text
EXISTING PAVEMENT JOINT
AutoCAD SHX Text
EXISTING PAVEMENT JOINT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
AutoCAD SHX Text Sheet Number:
AutoCAD SHX Text
TSA
AutoCAD SHX Text
EXIST. TAXIWAY SAFETY AREA
AutoCAD SHX Text
TOFA
AutoCAD SHX Text
EXIST. TAXILANE OBJECT FREE AREA
AutoCAD SHX Text 82.00
AutoCAD SHX Text
EXISTING CONTOUR
AutoCAD SHX Text
TW "A"
AutoCAD SHX Text
EXIST. ASPHALT APRON
AutoCAD SHX Text
EXIST. T/W EOP
AutoCAD SHX Text
EOP
AutoCAD SHX Text
TOS
AutoCAD SHX Text
TOE OF SLOPE
AutoCAD SHX Text
TOB
AutoCAD SHX Text
TOP OF BANK
AutoCAD SHX Text
RW "18-36"
AutoCAD SHX Text
RW "18-36" EOP
AutoCAD SHX Text
EXIST. T/W EOP
AutoCAD SHX Text
TLSA
AutoCAD SHX Text
EXISTING TAXILANE SAFETY AREA
AutoCAD SHX Text
TLOFA
AutoCAD SHX Text
EXISTING TAXILANE OBJECT FREE AREA
AutoCAD SHX Text
EXISTING TW LIGHTS
EXISTING MITERED END SECTION
C1.2
EXIST. CONDITIONS -
PHOTOS
Fil e P ath : C:
\U se rs\ ha me d.j afa ria n\B ox
\IC
ET
PA
\AV
IAT
IO
N\ Oc ala \24
-22 7 T erm ina l A pro n R eh ab \C
AD
D-dw g\(
6)-
C1 .2-
EX
IST
IN
G
CO
ND
ITI
ON
S P
HO
TO
S.d wg D ate : 3/
/20
3:
PM
REVISIONS
24-227
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
AM
AM HJ
MAR 2025
TERMINAL
APRON
REHABILITATION
455217-1-94-01 (G3474)
3-12-0055-034-2024
B
ID
D O
C U
M E
N T
S
N O
T F
O R
C O
N S
T R
U C
T
IO
N
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
REMOVE EXIST. AIRCRAFT
TIE-DOWNS (TYP, FOR 27)
REMOVE 93 S.Y. OF EXIST.
CONC. PAD
50.0
35.7
BID SCHEDULE 1
BID SCHEDULE 2
BID SCHEDULE 1
BID SCHEDULE 2
4' PAVEMENT TIE-IN
SEE DETAIL SHEET C3.2
4' PAVEMENT TIE-IN
SEE DETAIL SHEET C3.2
2' PAVEMENT TIE-IN
SEE DETAIL SHEET C3.2
2' PAVEMENT TIE-IN
SEE DETAIL SHEET C3.2
4' PAVEMENT TIE-IN
SEE DETAIL SHEET C3.2
C2.1
DEMOLITION & PAVEMENT
REMOVAL PLAN
Fil e P ath : C:
\U se rs\ ha me d.j afa ria n\B ox
\IC
ET
PA
\AV
IAT
IO
N\ Oc ala \24
-22 7 T erm ina l A pro n R eh ab \C
AD
D-dw g\(
7)-
C2 .1
DE
MO
LIT
IO
N
PL
AN
.dw g D ate : 3/
/20
3:
PM
REVISIONS
24-227
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
AM
AM HJ
MAR 2025
TERMINAL
APRON
REHABILITATION
455217-1-94-01 (G3474)
3-12-0055-034-2024
B
ID
D O
C U
M E
N T
S
N O
T F
O R
C O
N S
T R
U C
T
IO
N
0 1206030
N
8" ASPHALT SURFACE AND
PARTIAL BASE REMOVAL
(BID SCHEDULE 1)
LEGEND
(2" ASPHALT PAVEMENT
REMOVAL)
(BID SCHEDULE 2)
4' PAVEMENT TIE-IN (BID SCH. 1)
2' PAVEMENT TIE-IN (BID SCH. 2)
AutoCAD SHX Text A5
AutoCAD SHX Text A7
AutoCAD SHX Text A8
AutoCAD SHX Text A6
AutoCAD SHX Text A4
AutoCAD SHX Text
EXIST. PAVING JOINT
AutoCAD SHX Text
EXIST. PAVING JOINT
AutoCAD SHX Text
EXIST. PAVING JOINT
AutoCAD SHX Text 30" R.C.P.
AutoCAD SHX Text 36" R.C.P.
AutoCAD SHX Text
CONC. HARDSTAND
AutoCAD SHX Text
EXIST. AIRCRAFT TIEDOWNS
AutoCAD SHX Text
EXIST. MARKINGS (SHELTAIR)
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
AutoCAD SHX Text Sheet Number:
AutoCAD SHX Text
RUNWAY SAFETY AREA
AutoCAD SHX Text
RUNWAY OBJECT FREE AREA
AutoCAD SHX Text
OBJECT FREE ZONE
AutoCAD SHX Text
ROFA
AutoCAD SHX Text
RSA
AutoCAD SHX Text
OFZ
AutoCAD SHX Text
TAXIWAY OBJECT FREE AREA
AutoCAD SHX Text
TOFA
AutoCAD SHX Text
TAXIWAY SAFETY AREA
TSA
N.T.S.
EXISTING TYPICAL SECTION
36'263'
±1.00%
N.T.S.
PROPOSED TYPICAL SECTION
2" FUEL RESISTANT ASPHALT MIX PAVEMENT
(P-404 w/ PG 88-22FR ASPHALT BINDER)
6" ASPHALT MIX PAVEMENT
PLACED IN 2 EQUAL LIFTS (P-403 w/ PG 76-22 ASPHALT BINDER)
2" SUPERPAVE ASPHALT CONC. (SP 12.5 w/ PG 67-22 ASPHT. BINDER)
(FDOT STD. SPECS 334, 2025-26)
TERMINAL BUILDING
TERMINAL BUILDING
MILL EXIST. PAVEMENT TO A DEPTH OF 8"
(±7.75" OF EXIST. ASPHALT AND ±0.25" OF EXIST. BASE)
MILL 2" OF EXIST. ASPHALT PAVEMENT.
(TO REMAIN)
(TO BE REMOVED -TYP. FOR 27 )
(TO REMAIN)
COMPACT/ ROLL EXIST. LIMEROCK BASE (LBR -100)
(COMPACT AT 98% MODIFIED PROCTOR PER AASHTO T180) (TO REMAIN)
PLACE TACK COAT
(FDOT STD. SPECS 300, 2025-26)
EMULSIFIED ASPHALT TACK COAT
BETWEEN THE LIFTS AND
VERTICAL FACES TYP. (P-603)
EMULSIFIED ASPHALT
PRIME COAT (P-602)
BID SCH. 1 BID
SCH. 2
BID SCH. 1
PHASE 1
BID SCH. 2
PHASE 2MATCH EXIST. GRADE
LIMITS OF PROJECT
LIMITS OF PROJECT
(TO REMAIN)
FILL WITH GROUT
50'
50'
SEE PAVEMENT TIE-IN
DETAIL SHEET C3.2
C3.1
TYPICAL SECTIONS
AND DETAILS
Fil e P ath : C:
\U se rs\ ha me d.j afa ria n\B ox
\IC
ET
PA
\AV
IAT
IO
N\ Oc ala \24
-22 7 T erm ina l A pro n R eh ab \C
AD
D-dw g\(
8)-
C3 .1-
TY
PIC
AL
SE
CT
IO
NS
AN
D
DE
TA
ILS
.dw g
D ate
: 3/
/20
2:
PM
REVISIONS
24-227
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
AM
AM HJ
MAR 2025
TERMINAL
APRON
REHABILITATION
455217-1-94-01 (G3474)
3-12-0055-034-2024
B
ID
D O
C U
M E
N T
S
N O
T F
O R
C O
N S
T R
U C
T
IO
N
AutoCAD SHX Text ±1.00%
AutoCAD SHX Text ±1.30%
AutoCAD SHX Text ±14.0%
AutoCAD SHX Text ±20.0%
AutoCAD SHX Text ±1.30%
AutoCAD SHX Text ±14.0%
AutoCAD SHX Text ±20.0%
AutoCAD SHX Text
EXIST. TAXILANE
AutoCAD SHX Text
EXIST. TIE-DOWNS
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text
TAXILANE
AutoCAD SHX Text
EXIST. PAVING JOINTS
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
TACK COAT (P-603) ON
SAWCUT SURFACES
2' ASPHALT SURFACE REMOVAL
VERTICAL SAWCUT AT
EDGE OF REMOVAL
SEE NOTE 1
PLACE TACK COAT
(FDOT STD. SPECS 300, 2025-26)
3" ASPHALT MIX PAVEMENT (P-403 w/ PG 76-22 ASPHALT BINDER)
3" ASPHALT MIX PAVEMENT (P-403 w/ PG 76-22 ASPHALT BINDER)
EMULSIFIED ASPHALT PRIME COAT (P-602)
EMULSIFIED ASPHALT TACK COAT BETWEEN THE LIFTS AND
VERTICAL FACES TYP. (P-603)
COMPACT/ ROLL EXIST. LIMEROCK BASE (LBR -100)
(COMPACT AT 98% MODIFIED PROCTOR PER AASHTO T180)
TACK COAT (P-603) ON
SAWCUT SURFACES (TYP.)
2' ASPHALT SURFACE REMOVAL
VERTICAL SAWCUT AT
EDGE OF REMOVAL
SEE NOTE 1
2' ASPHALT SURFACE/ BASE REMOVAL
TYPICAL 4' TIE-IN TO EXIST PAVEMENT
TYPICAL 2' TIE-IN TO EXIST PAVEMENT
NOTES:
1. SAWCUT EXISTING ASPHALT TO NEAT STRAIGHT (OR CURVED WHERE INDICATED)
VERTICAL LINES IN SOUND PAVEMENT. REMOVE EXISTING BASE COURSE TO NEAT
VERTICAL LINES. MAINTAIN EDGE OF PAVEMENT TO NEAT SQUARE LINES. RAVELING OR
DAMAGE AT EDGES THAT ARE UNACCEPTABLE TO THE ENGINEER SHALL BE RE-SAWCUT
FOR ENTIRE LENGTH OF THE JUNCTURE AS DIRECTED BY THE ENGINEER AT THE
CONTRACTOR'S EXPENSE BEFORE PLACEMENT OF THE NEW BASE OR SURFACE COURSE.
2" SUPERPAVE ASPHALT CONC. (SP 12.5 w/ PG 67-22 ASPHT. BINDER)
(FDOT STD. SPECS 334, 2025-26)
2" FUEL RESISTANT ASPHALT MIX PAVEMENT
(P-404 w/ PG 88-22FR ASPHALT BINDER)
LIMITS OF 8" MILLING AND OVERLAY
8"VERTICAL SAWCUT AT
EDGE OF REMOVAL
SEE NOTE 1
3"
3"
±1.00%
(TO REMAIN)
LIMITS OF 2" MILLING AND OVERLAY
Fil e P ath : C:
\U se rs\ ha me d.j afa ria n\B ox
\IC
ET
PA
\AV
IAT
IO
N\ Oc ala \24
-22 7 T erm ina l A pro n R eh ab \C
AD
D-dw g\(
8)-
C3 .2-
TY
PIC
AL
SE
CT
IO
NS
AN
D
DE
TA
ILS
.dw g
D ate
: 3/
/20
3:
PM
REVISIONS
24-227
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
AM
AM HJ
MAR 2025
TERMINAL
APRON
REHABILITATION
455217-1-94-01 (G3474)
3-12-0055-034-2024
B
ID
D O
C U
M E
N T
S
N O
T F
O R
C O
N S
T R
U C
T
IO
N
C3.2
TYPICAL SECTIONS
AutoCAD SHX Text
EXIST. 3" TO 6" ASPHALT
AutoCAD SHX Text
EXIST. SUBGRADE
AutoCAD SHX Text
EXIST. 3" TO 6" ASPHALT
AutoCAD SHX Text
EXIST. 7" TO 9" LIMEROCK BASE
AutoCAD SHX Text
EXIST. SUBGRADE
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
BID SCHEDULE 2
AutoCAD SHX Text
BID SCHEDULE 1
AutoCAD SHX Text
EXIST. 7" TO 9" LIMEROCK BASE
AutoCAD SHX Text
EXIST. SUBGRADE
AutoCAD SHX Text
EXIST. LIMEROCK BASE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
CONTROL POINT
SET IRON ROD & CAP (58" LB 5091 WITNESS)
N.= 1759220.1820 E.= 585860.9300
ELEVATION =82.48'
CONTROL POINT
SET IRON ROD & CAP (5
8" LB 5091
WITNESS)
N.= 1759207.3060 E.= 585494.1430
ELEVATION =79.03'
CONTROL POINT
SET IRON ROD & CAP (58" WIT LB5091)
N.= 1758689.1200 E.= 585886.5200
ELEVATION =83.31'
263.00'
39.50'
NEW REFLECTIVE
WHITE STRIPING
(SEE DETAIL 2 ON
SHEET C6.1) TYP.
FOR THREE
±50.00'
NEW IN-GROUND
UTILITY/POWER PIT BOX.
(TYP. FOR TWO) SEE
DETAIL SHEET C7.1
NEW 6" WIDE REF. YELLOW CL STRIPE SEE
DETAIL 3 SHEET C6.1 (TYP.)
TIE TO EXISTING CL
STRIPES
NEW SERVICE ROAD STRIPING
(SEE DETAIL 1 ON SHEET C6.1)
TIE TO EXISTING SERVICE
ROAD MARKINGS
70.00'
UE UE
U E
UE UE
32.93'
36.00'
INSTALL ±244 L.F. OF
2-WAY, 4" INCASED
CONCRETE DUCT BANK
INSTALL ±220 L.F. OF 2-WAY,
4" DUCT BANK IN TURF (SEE
ELECTRICAL DETAILS)
R60.00'
R60.00'
TIE TO EXISTING CL STRIPE
TIE TO EXISTING CL
STRIPES
TIE TO EXISTING CL STRIPE
±560.00'
TIE TO EXISTING CL
STRIPES
TIE TO EXISTING CL STRIPE
C4.1
PAVEMENT LAYOUT AND
MARKING PLAN
Fil e P ath : C:
\U se rs\ ha me d.j afa ria n\B ox
\IC
ET
PA
\AV
IAT
IO
N\ Oc ala \24
-22 7 T erm ina l A pro n R eh ab \C
AD
D-dw g\(
0)-
C4 .1-
PA
VE
ME
NT
LA
YO
UT
AN
D
MA
RK
IN
G
PL
AN
S.d wg D ate : 3/
/20
3:
PM
REVISIONS
24-227
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
AM
AM HJ
MAR 2025
TERMINAL
APRON
REHABILITATION
455217-1-94-01 (G3474)
3-12-0055-034-2024
B
ID
D O
C U
M E
N T
S
N O
T F
O R
C O
N S
T R
U C
T
IO
N
N
2" ASPHALT MIX PAVEMENT (P-404)
6" ASPHALT MIX PAVEMENT (P-403)
IN 2 EQUAL LIFTS - BID SCHEDULE 1
LEGEND
4' PAVEMENT TIE-IN BID SCH. 1
2" SP 12.5 SUPERPAVE ASPHALT
(FDOT -334) -BID SCHEDULE 2
0 603015
2' PAVEMENT TIE-IN BID SCH. 2
AutoCAD SHX Text
CONC. HARDSTAND
AutoCAD SHX Text
EXIST. SIGN
AutoCAD SHX Text
TERMINAL BUILDING
AutoCAD SHX Text
EXIST. SIGN
AutoCAD SHX Text
EXIST. SERVICE ROAD MARKINGS
AutoCAD SHX Text
EXIST. GRASS
AutoCAD SHX Text
EXIST. GATE NO.20
AutoCAD SHX Text
TERMINAL BUILDING
AutoCAD SHX Text
EXIST. TOWER
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
AutoCAD SHX Text Sheet Number:
AutoCAD SHX Text
RUNWAY SAFETY AREA
AutoCAD SHX Text
RUNWAY OBJECT FREE AREA
AutoCAD SHX Text
OBJECT FREE ZONE
AutoCAD SHX Text
ROFA
AutoCAD SHX Text
RSA
AutoCAD SHX Text
OFZ
AutoCAD SHX Text
TAXILANE OBJECT FREE AREA
AutoCAD SHX Text
TLOFA
AutoCAD SHX Text
TAXILANE SAFETY AREA
TLSA
4' PAVEMENT TIE-IN
TYP. SEE DETAIL
SHEET C3.2
MATCH EXIST.
PAVEMENT ELEV.
TYP.
±50.00'
MATCH EXIST. PAVEMENT ELEV.
TYP.
MATCH EXIST. PAVEMENT ELEV.
TYP.
80.00
81.00
82.00
80.20
80.40
80.60
80.80
81.20
81.40
81.60
81.80
82.20
82.40
82.60
1%
1%
1%
1%
2' PAVEMENT TIE-IN
TYP. SEE DETAIL
SHEET C3.2 (BID
SCH. 2)
2' PAVEMENT TIE-IN
TYP. SEE DETAIL
SHEET C3.2 (BID
SCH. 2)
4' PAVEMENT TIE-IN
TYP. SEE DETAIL
SHEET C3.2
4' PAVEMENT TIE-IN
TYP. SEE DETAIL
SHEET C3.2
C5.1Fil e P ath : C:
\U se rs\ ha me d.j afa ria n\B ox
\IC
ET
PA
\AV
IAT
IO
N\ Oc ala \24
-22 7 T erm ina l A pro n R eh ab \C
AD
D-dw g\(
1)_
C5 .1-
GR
AD
IN
G
& D
RA
IN
AG
E P
LA
NS
.dw g D ate : 3/
/20
3:
PM
REVISIONS
24-227
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
AM
AM HJ
MAR 2025
TERMINAL
APRON
REHABILITATION
455217-1-94-01 (G3474)
3-12-0055-034-2024
B
ID
D O
C U
M E
N T
S
N O
T F
O R
C O
N S
T R
U C
T
IO
N
0 603015
N
ASPHALT PAVEMENT (P-404)
BID SCHEDULE 1
LEGEND
2' PAVEMENT TIE-IN BID SCH. 2
ASPHALT PAVEMENT
BID SCHEDULE 2
GRADING &
DRAINAGE PLAN
PROPOSED CONTOURS82.20
LIMITS OF CONSTRUCTION
STORM WATER FLOW ARROW
4' PAVEMENT TIE-IN BID SCH. 1
AutoCAD SHX Text 30" R.C.P.
AutoCAD SHX Text 36" R.C.P.
AutoCAD SHX Text
EXIST. GRASS
AutoCAD SHX Text
EXIST. GATE NO.20
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
AutoCAD SHX Text Sheet Number:
AutoCAD SHX Text
RUNWAY SAFETY AREA
AutoCAD SHX Text
RUNWAY OBJECT FREE AREA
AutoCAD SHX Text
OBJECT FREE ZONE
AutoCAD SHX Text
ROFA
AutoCAD SHX Text
RSA
AutoCAD SHX Text
OFZ
AutoCAD SHX Text
TAXILANE OBJECT FREE AREA
AutoCAD SHX Text
TLOFA
AutoCAD SHX Text
TAXILANE SAFETY AREA
AutoCAD SHX Text
TLSA
AutoCAD SHX Text
TSA
AutoCAD SHX Text
EXIST. TAXIWAY SAFETY AREA
AutoCAD SHX Text
TOFA
AutoCAD SHX Text
EXIST. TAXIWAY OBJECT FREE AREA
AutoCAD SHX Text 79.00
EXISTING CONTOURS
12" WIDE REFLECTIVE WHITE PAINTED
MARKING W/ TYPE III GLASS BEADS (TYP.)
1'
4'
12" WIDE NON-REFLECTIVE
BLACK PAINTED MARKING (TYP.)
C6.1
MARKING DETAILS
Fil e P ath : C:
\U se rs\ ha me d.j afa ria n\B ox
\IC
ET
PA
\AV
IAT
IO
N\ Oc ala \24
-22 7 T erm ina l A pro n R eh ab \C
AD
D-dw g\(
2)-
C6 .1-
MA
RK
IN
G
DE
TA
ILS
.dw g D ate : 3/
/20
2:
PM
REVISIONS
24-227
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
AM
AM HJ
MAR 2025
TERMINAL
APRON
REHABILITATION
455217-1-94-01 (G3474)
3-12-0055-034-2024
B
ID
D O
C U
M E
N T
S
N O
T F
O R
C O
N S
T R
U C
T
IO
N
SERVICE ROAD STRIPING DETAIL
N.T.S
6" REFLECTIVE YELLOW SOLID
TAXILANE CENTER LINE MARKING
(USE TYPE III BEADS ONLY)
W/ 6" BLACK BORDER.
TAXILANE CENTERLINE MARKING
N.T.S
SHELTAIR AIRCRAFT CONFINEMENT AREA MARKING
N.T.S
12'
2'
2'
4" REFLECTIVE WHITE SKIP (2'-12')
MARKING (W/ TYPE III BEADS)
AutoCAD SHX Text
DATE
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text Project Name:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text Designer:
AutoCAD SHX Text Checked By:
AutoCAD SHX Text Technician:
AutoCAD SHX Text ICE Project Name:
AutoCAD SHX Text Engineer of Record:
AutoCAD SHX Text Drawing Name:
AutoCAD SHX Text FAA A.I.P. Project No.:
AutoCAD SHX Text FDOT Project No.:
AutoCAD SHX Text Date:
C7.1
ELECTRICAL DETAILS
Fil e P ath : C:
\U se rs\ ha me d.j afa ria n\B ox
\IC
ET
PA
\AV
IAT
IO
N\ Oc ala \24
-22 7 T erm ina l A pro n R eh ab \C
AD
D-dw g\(
3)-
C7 .1-
EL
EC
TT
IC
AL
D
ET
AIL
S.d wg
D ate
: 3/
/20
3:
PM
REVISIONS
24-227
5550 WEST IDLEWILD AVE. SUITE 115
TAMPA, FLORIDA 33634 (813) 330-2701
CERTIFICATE OF AUTHORIZATION NO.: 30862
AM
AM HJ
MAR 2025
TERMINAL
APRON
REHABILITATION
455217-1-94-01 (G3474)
3-12-0055-034-2024
B
ID
D O
C U
M E
N T
S
N O
T F
O R
C O
N S
T R
U C
T
IO
N
4" SCHED. 80 PVC
CONDUIT
SPACER
#6 AWG BARE
COPPER
COUNTERPOISE WIRE
NEW 2" P-404 ASPHALT
SURFACE COURSE
P-610 CONCRETE
ENCASEMENT
4000 PSI
4" SHED. 80 PVC
CONDUIT
#6 AWG BARE COPPER
COUNTERPOISE WIRE
SAND BACKFILL *
BACKFILL WITH SUITABLE
COMPACTED MATERIAL
REMOVED FROM THE
TRENCH
DETECTABLE
UNDERGROUND ELEC.
TAPE (L-110 SPEC.)
2-WAY, 4" DUCT BANK IN FULL-STRENGTH PAVEMENT 2-WAY, 4" DUCT BANK IN TURF
NEW 6" P-403 ASPHALT
SURFACE COURSE
NOTES:
1. REQUIRED 50 HZ AC POWER NEW AIRCRAFT SOCKETS ARE FITTED TO UPPER PART OF THE HATCH FOR EASE OF
OPERATION. REQUIRED TO HAVE ONLY ONE A MAIN POWER DISCONNECT/ BREAKER.
2. WATERPROOF CORRUGATED HATCH LOAD CAPACITY: F900 (90T/M²).
3. THE HATCH MUST BE PROTECTED FROM SPARK FORMATION CAUSED BY COLLISIONS WITH METAL OBJECTS.
4. REQUIRED TO HAVE WATER/ SUMP PUMP WATER LEVEL DETECTOR.
5. ALL COMPONENTS SHALL BE EXPLOSION PROOF.
6. EXPLOSION PROOF CABLES WILL BE PROVIDED AND INSTALL BY OTHERS.
7. ALL COMPONENTS SHALL BE ATEX/ UL CERTIFIED AND MEET NFPA 70 (NEC), NFPA 415, AND FAA REQUIREMENTS.
NEW UNDERGROUND HATCH MINI PIT SYSTEM FULL ASSEMBLY
BACKFILL WITH SUITABLE
COMPACTED MATERIAL
REMOVED FROM THE
TRENCH (LBR - 40)
BACKFILL WITH P-211 LIME ROCK
(LBR 100)
M
IN
. 2 4"
8…