ITB_ENG250564_Terminal_Apron_Rehabilitation_-_OCF_Ocala_International_Airport_-_Exhibit_C_-_Table_of_Contents.pdf
PDF 664 KB Posted
- Solicitation number
- ITB# ENG/250564
- Issued by
- Marion County, Orlando City, Florida
About this file
This document is a Table of Contents for Invitation to Bid (ITB) #ENG/250564 for the Terminal Apron Rehabilitation project at Ocala International Airport (OCF) in Florida, prepared by the City of Ocala. The project involves comprehensive airport infrastructure improvements, including the removal of 27 pavement tie-downs, 8-inch milling of 16,364 square yards of existing apron area, and overlay with Hot Mix Asphalt (HMA) Pavement and Fuel Resistance Asphalt Mix Pavement. The scope also includes installing two underground mini hatch pit systems, electrical work with underground conduits, and pavement markings. Additional work involves milling 2 inches of asphalt in front of the terminal building and overlaying with Superpave asphalt concrete.
The contract is grant-funded and requires bidders to be licensed General or Building Contractors in Florida with a minimum of 5 years' experience in commercial/industrial construction. Bidders must submit three completed work projects and provide three professional references. Bids will be received on a unit price basis, with award going to the lowest bidder whose total project cost is lowest. Pricing will be honored for 120 days after award, and contractors must remain current on all obligations to the City. The project involves multiple construction elements including tie-down removal, trench excavation, asphalt milling and overlay, underground conduit work, pavement marking, and installation of underground systems. Badging will be required for supervisory personnel, with a two-hour processing time at no cost.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE OF CONTENTS
Table of Contents ........................................................................................................................................ TOC-1 to TOC-1
FAA GENERAL PROVISIONS
Section 10 Definition of Terms ........................................................................................... GP 10-1 to GP 10-8 Section 40 Scope of Work..................................................................................................... GP 40-1 to GP 40-4 Section 50 Control of Work .................................................................................................. GP 50-1 to GP 50-9 Section 60 Control of Materials ............................................................................................ GP 60-1 to GP 60-3 Section 70 Legal Regulations and Responsibility to Public ................................................. GP 70-1 to GP 70-6 Section 80 Execution and Progress........................................................................................ GP 80-1 to GP 80-8 Section 90 Measurement and Payment.................................................................................. GP 90-1 to GP 90-9
CONTRACT PROVION GUIDELINES FOR OBLIGATED SPONSORS AND AIRPORT
IMPROVEMENT PROGRAM PROJECTS
Section 100 Required Federal Contract Provisions ........................................................................FP-1 to FP-87
GENERAL REQUIREMENTS
Section 01010 Summary of Work……………………........................................................ 01010-1 to 01010-4 Section 01030 Airport Project Procedures………………………………………………. 01030-1 to 01030-3 Section 01035 Nighttime Construction Operations Section 01040 Project Coordination……………………………………………………… 01040-1 to 01040-3 Section 01070 Abbreviations and Symbols………………………………………………. 01070-1 to 01070-4 Section 01090 Regulations and Definitions………………………………………………. 01090-1 to 01090-2 Section 01150 Measurement and Payment.......................................................................... 01150-1 to 01150-4 Section 01300 Submittals .................................................................................................... 01300-1 to 01300-5 Section 01600 Materials and Equipment ............................................................................ 01600-1 to 01600-3 Section 01700 Contract Closeout......................................................................................... 01700-1 to 01700-7 Section 01740 Warranties and Bonds .................................................................................. 01740-1 to 01740-2
GENERAL CONSTRUCTION ITEMS
Item C-100 Contractor Quality Control Program (CQCP)…………………………… C-100-1 to C-100-7 Item C-105 Mobilization.................................................................................................... C-105-1 to C-105-2 Item C-110 Method of Estimating Percentage of Material Within Specification Limits... C-110-1 to C-110-8
TECHNICAL SPECIFICATIONS
Item S-100 FDOT Standard Specificastions…………………………………………… S-100-1 to S-100-2 Item 02000 Construction Layout and Survey………………………………………….. 02000-1 to 02000-3 Item P-101 Preparation/ Removal of Existing Pavements.................................................... P-101-1 to P-101-5 Item S-140 Site Demolition ............................................................................................ S-140-1 to S-140-4 Item S-141 Pavement Milling.......................................................................................... S-141-1 to S-141-2 Item P-403 Asphalt Mix Pavement Leveling Course ..................................................... P-403-1 to P-403-21 Item P-404 Fuel Resistance Asphalt Mix Pavement ....................................................... P-404-1 to P-404-21
Exhibit C-Table of Contents CONTRACT# ENG/250564
C-1
Item P-602 Emulsified Asphalt Prime Coat .................................................................... P-602-1 to P-602-3 Item P-603 Emulsified Asphalt Prime Coat .................................................................... P-603-1 to P-603-3 Item P-620 Apron and Taxilane Marking ........................................................................ P-620-1 to P-620-13
Appendix
Construction Safety and Phasing Plan……………………………………………………… CSPP-1 to CSPP-8
Exhibit C-Table of Contents CONTRACT# ENG/250564
C-2
| FAA GENERAL PROVISIONS |
| CONTRACT PROVION GUIDELINES FOR OBLIGATED SPONSORS AND AIRPORT IMPROVEMENT PROGRAM PROJECTS |
| GENERAL REQUIREMENTS |
| GENERAL CONSTRUCTION ITEMS |
| TECHNICAL SPECIFICATIONS |
File details come from the government source that posted it. Updated .