ITB_ENG250564_Terminal_Apron_Rehabilitation_-_OCF_Ocala_International_Airport_-_Exhibit_C_-_Table_of_Contents.pdf

PDF 664 KB Posted

Attached to
Terminal Apron Rehabilitation - OCF Ocala International Airport
Solicitation number
ITB# ENG/250564
Issued by
Marion County, Orlando City, Florida

About this file

This document is a Table of Contents for Invitation to Bid (ITB) ENG/250564, issued by the City of Ocala for the Terminal Apron Rehabilitation project at Ocala International Airport (OCF) in Marion County, Florida. The table of contents details comprehensive documentation for an airport infrastructure improvement project, including FAA General Provisions, Contract Provision Guidelines, General Requirements, General Construction Items, and Technical Specifications. The document covers sections ranging from definition of terms and scope of work to specific technical details about pavement preparation, asphalt mixing, prime coating, and apron and taxilane marking. The documentation also includes a Construction Safety and Phasing Plan, and spans multiple sections covering everything from project coordination to warranties and bonds.

The project is grant-funded through the FAA Airport Improvement Program (AIP) and Florida Department of Transportation (FDOT), with a Disadvantaged Business Enterprise (DBE) goal of 15.31%. The technical specifications indicate a complex rehabilitation effort involving removal of pavement tie-downs, milling of existing apron areas, and application of multiple asphalt pavement layers, including a 6-inch Hot Mix Asphalt leveling course and a 2-inch Fuel Resistance Asphalt Mix Pavement overlay. The documentation suggests precise technical requirements for contractors, including specific qualifications such as being licensed General or Building Contractors in Florida with at least 5 years of commercial/industrial construction experience. The comprehensive nature of the documentation reflects the technical complexity of airport infrastructure improvement projects and the stringent standards required by federal aviation authorities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

Table of Contents ........................................................................................................................................ TOC-1 to TOC-1

FAA GENERAL PROVISIONS

Section 10 Definition of Terms ........................................................................................... GP 10-1 to GP 10-8 Section 40 Scope of Work..................................................................................................... GP 40-1 to GP 40-4 Section 50 Control of Work .................................................................................................. GP 50-1 to GP 50-9 Section 60 Control of Materials ............................................................................................ GP 60-1 to GP 60-3 Section 70 Legal Regulations and Responsibility to Public ................................................. GP 70-1 to GP 70-6 Section 80 Execution and Progress........................................................................................ GP 80-1 to GP 80-8 Section 90 Measurement and Payment.................................................................................. GP 90-1 to GP 90-9

CONTRACT PROVION GUIDELINES FOR OBLIGATED SPONSORS AND AIRPORT

IMPROVEMENT PROGRAM PROJECTS

Section 100 Required Federal Contract Provisions ........................................................................FP-1 to FP-87

GENERAL REQUIREMENTS

Section 01010 Summary of Work……………………........................................................ 01010-1 to 01010-4 Section 01030 Airport Project Procedures………………………………………………. 01030-1 to 01030-3 Section 01035 Nighttime Construction Operations Section 01040 Project Coordination……………………………………………………… 01040-1 to 01040-3 Section 01070 Abbreviations and Symbols………………………………………………. 01070-1 to 01070-4 Section 01090 Regulations and Definitions………………………………………………. 01090-1 to 01090-2 Section 01150 Measurement and Payment.......................................................................... 01150-1 to 01150-4 Section 01300 Submittals .................................................................................................... 01300-1 to 01300-5 Section 01600 Materials and Equipment ............................................................................ 01600-1 to 01600-3 Section 01700 Contract Closeout......................................................................................... 01700-1 to 01700-7 Section 01740 Warranties and Bonds .................................................................................. 01740-1 to 01740-2

GENERAL CONSTRUCTION ITEMS

Item C-100 Contractor Quality Control Program (CQCP)…………………………… C-100-1 to C-100-7 Item C-105 Mobilization.................................................................................................... C-105-1 to C-105-2 Item C-110 Method of Estimating Percentage of Material Within Specification Limits... C-110-1 to C-110-8

TECHNICAL SPECIFICATIONS

Item S-100 FDOT Standard Specificastions…………………………………………… S-100-1 to S-100-2 Item 02000 Construction Layout and Survey………………………………………….. 02000-1 to 02000-3 Item P-101 Preparation/ Removal of Existing Pavements.................................................... P-101-1 to P-101-5 Item S-140 Site Demolition ............................................................................................ S-140-1 to S-140-4 Item S-141 Pavement Milling.......................................................................................... S-141-1 to S-141-2 Item P-403 Asphalt Mix Pavement Leveling Course ..................................................... P-403-1 to P-403-21 Item P-404 Fuel Resistance Asphalt Mix Pavement ....................................................... P-404-1 to P-404-21

Exhibit C-Table of Contents CONTRACT# ENG/250564

C-1

Item P-602 Emulsified Asphalt Prime Coat .................................................................... P-602-1 to P-602-3 Item P-603 Emulsified Asphalt Prime Coat .................................................................... P-603-1 to P-603-3 Item P-620 Apron and Taxilane Marking ........................................................................ P-620-1 to P-620-13

Appendix

Construction Safety and Phasing Plan……………………………………………………… CSPP-1 to CSPP-8

Exhibit C-Table of Contents CONTRACT# ENG/250564

C-2

FAA GENERAL PROVISIONS
CONTRACT PROVION GUIDELINES FOR OBLIGATED SPONSORS AND AIRPORT IMPROVEMENT PROGRAM PROJECTS
GENERAL REQUIREMENTS
GENERAL CONSTRUCTION ITEMS
TECHNICAL SPECIFICATIONS