About this file

The document is an Invitation to Bid (ITB# ENG/250564) from the City of Ocala for a Terminal Apron Rehabilitation project at Ocala International Airport (OCF) in Marion County, Florida. The project involves comprehensive airport infrastructure improvements, including removing 27 pavement tie-downs, milling 16,364 square yards of existing apron area to an 8-inch depth, and applying multiple layers of asphalt pavement. Specific deliverables include a 6-inch Hot Mix Asphalt (HMA) Pavement leveling course of 3,685 tons, a 2-inch Fuel Resistance Asphalt Mix Pavement overlay of 1,845 tons, installation of two underground mini hatch pit systems, electrical work with underground conduits, and comprehensive pavement markings. The solicitation was posted on May 1, 2025, with proposals due by June 2, 2025, and the total project duration is 22 calendar days.

The project is grant-funded through the FAA Airport Improvement Program (AIP) and Florida Department of Transportation (FDOT), with a Disadvantaged Business Enterprise (DBE) goal of 15.31%. Bidders must be licensed General or Building Contractors in Florida with minimum 5 years of commercial/industrial construction experience and must submit three completed work projects with professional references. The bid will be awarded on a unit price basis to the lowest responsive bidder, with pricing valid for 120 days after award. Insurance requirements include Commercial General Liability ($1,000,000 per occurrence), Commercial Automotive Liability ($1,000,000 combined limit), and Workers' Compensation per Florida statutory requirements. Additional requirements include Builder's Risk Insurance covering the full project value and mandatory badging for supervisory personnel. While no specific budget is stated, the project involves approximately 167,450 square feet of pavement rehabilitation, indicating a significant infrastructure investment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Exhibit B - PRICE PROPOSALCONTRACT# AIR/250564
Bidder nameBidder Location
ENTER COMPANY NAME HEREENTER OFFICE LOCATION HERE
PHASE 1-BID SCHEDULE
ITEM #ITEM DESCRIPTIONUnitEstimated QuantityUnit CostExtended Cost
1530SAFETY, SECURITY AND BARRICADESLS1$ - 0
1720PROJECT RECORD DOCUMENTSLS1$ - 0
2000CONSTRUCTION LAYOUT AND TOPOGRAPHIC AS-BUILT SURVEYLS1$ - 0
C-100CONTRACTOR QUALITY CONTROL PROGRAM (CQCP)LS1$ - 0
C-105MOBILIZATIONLS1$ - 0
P-101REMOVE EXIST. CONCRETE HARDSTANDSY93$ - 0
S-140CONCRETE TIE-DOWN REMOVALEA27$ - 0
S-1418" BITUMINOUS PAVEMENT MILLINGSY16,610$ - 0
P-4036" HOT MIX ASPHALT (HMA) PAVEMENT, LEVELING COURSE, GYRATORY, PG 76-22TON5,525$ - 0
P-4042" FUEL RESISTANCE ASPHALT MIX PAVEMENT, GYRATORY, PG 88-22 FRTON1,855$ - 0
P-602EMULSIFIED ASPHALT PRIME COATGAL2,460$ - 0
P-603EMULSIFIED ASPHALT TACK COATGAL3,275$ - 0
P-610GROUT FILL TIE-DOWN REMOVALCY15$ - 0
P-620-1NON-REFLECTIVE PAVEMENT MARKINGS (BLACK)SF500$ - 0
P-620-2REFLECTIVE PAVEMENT MARKINGS (WHITE)SF270$ - 0
P-620-3REFLECTIVE PAVEMENT MARKINGS (YELLOW)SF325$ - 0
P-620-4TEMPORARY PAVEMENT MARKINGSSF595$ - 0
L-108INSTALL #6 AWG, SOLID BARE, GROUND COUNTERPOISE INSTALLED IN TRENCHLF244$ - 0
L-1102 WAY, 4" SCHEDULE 80 PVC CONDUIT, CONCRETE ENCASEDLF244$ - 0
L-115-5IN-GROUND UTILITY/POWER MINI HATCH PIT BOX/ ELEC. HANDHOLE 4'X4'X4' FULL ASSEMBLY, (AIRCRAFT RATED, EXPLOSION PROOF COMPONENT)EA2$ - 0
Subtotal Bid Schedule 1$ - 0
Phase 2-BID SCHEDULE
Item #ITEM DESCRIPTIONUnitQtyUnit CostExtended Cost
1530SAFETY, SECURITY AND BARRICADESLS1$ - 0
1720PROJECT RECORD DOCUMENTSEACH1$ - 0
2000CONSTRUCTION LAYOUT AND TOPOGRAPHIC AS-BUILT SURVEYEACH1$ - 0
FDOT-101MOBILIZATIONLS1$ - 0
FDOT-300TACK COATGAL340$ - 0
FDOT-3272" BITUMINOUS PAVEMENT MILLINGSY2,260$ - 0
FDOT-3342" SUPERPAVE ASPHALT CONCRETE (SP 12.5) PG 67-22TON255$ - 0
P-620-1NON-REFLECTIVE PAVEMENT MARKINGSSF400$ - 0
P-620-2REFLECTIVE PAVEMENT MARKINGS (WHITE)SF400$ - 0
L-108INSTALL #6 AWG, SOLID BARE, GROUND COUNTERPOISE INSTALLED IN TRENCHLF220$ - 0
L-1102 WAY, 4" SCHEDULE 80 PVC CONDUIT, IN TURFLF220$ - 0
Subtotal Bid Schedule 2$ - 0

Total Bid Schedule 1 & 2 Amount $ - 0 image1.png