This document is a Rehabilitation Specification Work Write-Up for the City of Ocala, Marion County, Florida, specifically for an emergency HVAC residential rehabilitation project at 117 NW 16th Terrace (Parcel #2261-005-003). The work is part of Contract #CDS/250787 and involves comprehensive HVAC system servicing and renovation, with a project completion timeline of 30 days. The scope includes detailed requirements such as servicing the entire HVAC system, installing a UV light, cleaning and sealing ductwork, replacing flex ducts and registers, installing fresh air returns, and ensuring all work complies with the current Florida Building Code.

The project has an estimated permit cost allowance of $200.00 and requires the contractor to submit a comprehensive 3-ring binder at project closeout containing warranty information, sub-contractor details, registered warranties for roof, water heater, and HVAC, owner manuals, and a detailed list of all coatings used. The contractor must obtain all necessary permits, coordinate with the City of Ocala Building Department and inspectors, and ensure all work passes required inspections. The rehabilitation is for an owner-occupied residence, with provisions for the owner potentially moving out during construction, and emphasizes following best practices when dealing with potential asbestos or lead hazards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit B – WORK WRITE-UP CONTRACT# CDS/250787

C - 1

Rehabilitation Specification[Grant #]

Applicant: Shanta Norton

Address: 117 NW 16th Terr

Parcel #: 2261-005-003

Work must comply with the current Florida Building Code.

TYPES OF PERMITS REQUIRED:

Building Roofing Plumbing Electrical Mechanical Gas

CONTRACTORS REQUIRED:

General/Builder/Residential Roofing Plumbing Electrical HVAC Gas Specialty

Project must be fully completed in 30 days.

GENERAL CONDITIONS

1. It is the responsibility of the contractor and/or sub-contractors to obtain all required permits necessary to perform the work described above and to properly post/display them clearly at the job site.

2. It is also the responsibility of the contractors and sub-contractors to ensure all required inspections are requested and passed, up to and including the final inspections from the City of Ocala Building Department and the Community Development Services Department.

3. Due to this being an owner-occupied residence, the contractor MUST coordinate with the Owner and City of Ocala Building Department/Inspectors when requesting the necessary inspections for this project. (Owner may move out during construction.)

4. All references to equivalent imply the substituted goods/materials must meet or exceed the specifications of the brand requested.

Exhibit B – WORK WRITE-UP CONTRACT# CDS/250787

C - 2

Contractor shall follow best practices when working with asbestos and/or lead on Rehab projects

Item 1 – HVAC

1. Service HVAC system completely, which shall include but not be limited to: refrigerant charge, visual signs of refrigerant leaks, electrical connections, voltage and amperage, electrical wiring, contactors and relays, thermostat operation, blower assembly cleaning, lubricating motors and bearings if required, checking filters, temperature differences across the coils, condenser cleaning, condensate drain line cleaning and priming, electric heating elements, heat exchanger, pilot and thermocouple, limit controls, gas valves, sequencers and relays, burners and runners, adjust safety controls, install new filter MERV-5 (or better).

2. Install UV Light in manufactures suggested location. Ensure proper sized transformer. Train owner on use and operation.

3. Clean, line and seal return air box with duct board.

4. Drywall walls/ceiling in furnace closet as needed. Install new bifold door on closet.

5. Install fresh air and return air as required by code.

6. Install return air filter grille.

7. Ensure that condensate line empties a minimum of 12” away from the side walls of the home and is secured per code.

8. Replace all flex ducts and register boxes/supply registers. All joint connections to be sealed with mastic (fiber reinforced, water-based, high-velocity duct sealant).

9. Check clean and sanitize existing metal ductwork. All joint connections to be sealed with mastic (fiber reinforced, water-based, high-velocity duct sealant).

10. Provide and install a Secondary “wet” switch as a safety backup to the gravity condensate.

11. If existing Plenum Base is damaged, rotted or in any way deteriorated, provide and install ALL necessary materials to properly repair or rebuild the plenum with duct board or (if metal, then replace with metal).

12. Provide and install new standard filter box (if needed) and install new filter(s), minimum of MERV-5 Rating or better, in a readily accessible manner. Filter size should be common and readily available at any chain retail store such as Walmart.

13. Install new properly sized registers and returns as needed, throughout home and make all necessary repairs to home in all locations a component is removed or replaced.

14. If required by code or for permit, obtain and provide Energy Calculations and Manual D & J and AHRI Reports.

15. Copies of all documents, including Signed Energy Calculations, Manual D & J and AHRI Reports, Warranty Information and ALL Paperwork required for any Energy Rebates that the owner may be eligible for must be made and provided to Owner and Rehab Inspector at Rehab Final Inspection.

16. Contractor shall repair/paint any areas damaged due to replacement.

Exhibit B – WORK WRITE-UP CONTRACT# CDS/250787

C - 3

General:

Remove all trash, rubbish, tools, Item P – Permits

This amount of __200.00________ is the estimated permit cost/allowance for this project.

At project closeout and before final payment, Contractor shall submit to homeowner, a 3-ring binder to include:

Prime Contractors information w/warranty

Sub-contractor information

Registered roof warranty and claim information

Registered water heater warranty claim information

Registered HVAC warranty claim information

All owner manuals/instructions

Provide a list of the manufacturer, type, sheen/finish and color of all coatings used and the respective locations where they were applied, to the owner

Color choices (all color/product choices and/or changes to previously agreed upon choices shall be done in writing)

Also to project manager:

Final Payment Affidavit

Owner final acceptance of the work

Material and/or contractor lien releases