ITB_25-49_Addendum_4.pdf
PDF 151 KB Posted
- Attached to
- Town and Country Rd Undermined Culvert
- Solicitation number
- 25-49
- Issued by
- Seminole County, Florida
About this file
This document is an Addendum No. 4 for Invitation to Bid (ITB) 25-49 issued by the City of Oviedo, Florida, concerning the Town and Country Road Undermined Culvert project. The addendum was released on August 19, 2025, and addresses a clarification from a prospective bidder regarding the project scope. Bidders are required to acknowledge receipt of this addendum on page 24 of the original ITB packet, with failure to do so potentially resulting in disqualification.
The addendum provides a specific clarification in response to a bidder's question about the absence of a line item for an existing Bleeder structure removal, connecting pipe, and pond pump down. The city's response indicates that these items are already included within Item 0110 1 1 – Clearing and grubbing. All other aspects of the ITB 25-49 remain unchanged, and the addendum serves to provide additional guidance to potential bidders without altering the fundamental requirements of the original bid document.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Oviedo, Florida
ITB 25-49: Town and Country Rd Undermined Culvert
Addendum No. 4
August 19, 2025
To Prospective Bidders and Others Concerned:
This Addendum is in response to questions from interested bidders and forms a part of the ITB documents dated July 27, 2025, for the above referenced ITB. Please note, questions are recorded as they are received, including grammar and spelling errors.
Receipt of this addendum must be acknowledged on page 24 of the original ITB packet. Failure to do so will subject the Bidder to disqualification.
CLARIFICATION:
1. Question: I do not see a line item for the Exist. Bleeder structure ( to be removed) along with the connecting pipe and pond pump down.
Response: These items are included in Item 0110 1 1 – Clearing and grubbing.
All other areas of ITB 25-49 remain unchanged.
END OF ADDENDUM NO. 4
File details come from the government source that posted it. Updated .