ITB 25-041-PW Drawing Package.pdf

PDF 3 MB Posted

Attached to
ITB 25-041-PW Grant St and Pierce St Water Main Replacement
Solicitation number
S-P00140-00013065
Issued by
Lane County, Oregon

About this file

The document is a technical drawing package (ITB 25-041-PW) for a water main replacement project by the Eugene Water & Electric Board (EWEB) in Eugene, Oregon. The project involves replacing water distribution infrastructure along Pierce/Grant Street from W 18th Avenue to W 23rd/24th Avenue, with a total project length spanning approximately 36.75 linear stations. The drawing set includes multiple plan and profile sheets detailing the proposed water main replacement, with specific design drawings numbered B-41086-G1 through B-41086-C22, dated February 5, 2025.

The technical drawings include critical project specifications such as coordination requirements with the City of Eugene's concurrent paving project (900538), traffic control guidelines, and utility crossing protocols. Key construction requirements include daily trench backfilling or temporary fencing, maintaining safe pedestrian and vehicle passage, coordinating sequencing with city projects, and specific provisions for sewer lateral interactions, such as replacing sewer lines with less than 48 inches of cover. The project work order is identified as EWEB Work Order 2403421, and the drawings are digitally signed and include detailed northing references and station-specific plan and profile information.

View the file

Other files

File Type Posted
Addendum 2 - ITB 24-041-PW.pdf PDF
18th Ave and Pierce St Lane shift.xlsx XLSX spreadsheet
18th Ave and Pierce St Flagging.xlsx XLSX spreadsheet
ITB 25-041-PW Grant and Pierce St Water Main Replacement.pdf PDF
ITB 25-041-PW Bid Tab - filled~2.pdf PDF
Attachment N.zip ZIP file
ITB 25-041-PW Bid Tab - filled2.pdf PDF
Addendum 1 - ITB 25-041-PW~1.pdf PDF
22nd and Chambers St Lane shift.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DES

DWN

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED02/05/25

B-41086-G1

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO W 23RD AVE

COVER SHEET, LOCATION MAP &

INDEX OF DRAWINGS

EUGENE WATER & ELECTRIC BOARD

EUGENE, OREGON

PIERCE/GRANT ST - W 18TH AVE TO W 23RD AVE - WATER MAIN REPLACEMENT

NORTH

NORTH

EWEB WORK ORDER: 2403421

DIGITALLY SIGNED

Docusign Envelope ID: FEA7B42B-E2FB-45BB-B272-7055F53388A3

N O

R T H

DES

DWN

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED02/05/25

B-41086-G2

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLANCEMENT

PIERCE/GRANT ST - W 18TH AVE TO W 23RD AVE

SHEET INDEX

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

NTS02/05/25

B-41086-G3

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO W 23RD AVE

GENERAL NOTES, LEGEND & ABBREVIATIONS

₂

DIGITALLY SIGNED

2. At the end of each workday backfill trenches or protect with temporary fencing to keep work area safe. Safely direct vehicles, bicyclists and pedestrians through work zone to the maximum extent possible.

3. Coordinate all work with City of Eugene contractor under paving project 900538. Coordinate sequencing, traffic control, erosion control, trucking, pedestrian detours, flushing, etc. to the maximum extent possible to avoid impacts to city project during construction

4. Local streets may be closed during work hours but must be reopened to local traffic outside of work hours. Collectors and arterials must be flagged 2 way under a city approved traffic control plan with all traffic control devices removed between 3 pm and 9 am.

5. Where sewer laterals are encountered with less than 48" of cover, sewer line must be replaced 10 feet each side of the proposed water main with AWWA c900 and City of Eugene approved pipe couplings. Center a full water main pipe over sewer crossing. Encase sewer line in CLSM past couplings

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

AS NOTED02/05/25

B-41086-C1

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO W 23RD AVE

PLAN & PROFILE

STA: 9+75 TO 12+00

N O

R T H

N O

R T H

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED2-5-25

B-41086-C2

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO E 24TH AVE

PLAN & PROFILE

STA: 12+00 TO 14+00

N O

R T H

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED2-5-25

B-41086-C3

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO E 24TH AVE

PLAN & PROFILE

STA: 14+00 TO 16+00

N O

R T H

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED2-5-25

B-41086-C4

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO E 24TH AVE

PLAN & PROFILE

STA: 16+00 TO 18+00

N O

R T H

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED2-5-25

B-41086-C5

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO E 24TH AVE

PLAN & PROFILE

STA: 18+00 TO 20+00

N O

R T H

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED2-5-25

B-41086-C6

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO E 24TH AVE

PLAN & PROFILE

STA: 20+00 TO 22+00

N O

R T H

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED2-5-25

B-41086-C7

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO E 24TH AVE

PLAN & PROFILE

STA: 22+00 TO 24+00

N O

R T H

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED2-5-25

B-41086-C8

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO E 24TH AVE

PLAN & PROFILE

STA: 24+00 TO 26+00

N O

R T H

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED2-5-25

B-41086-C9

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO E 24TH AVE

PLAN & PROFILE

STA: 26+00 TO 28+00

N O

R T H

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED2-5-25

B-41086-C10

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO E 24TH AVE

PLAN & PROFILE

STA: 28+00 TO 30+00

N O

R T H

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED2-5-25

B-41086-C11

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO E 24TH AVE

PLAN & PROFILE

STA: 30+00 TO 32+00

N O

R T H

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED2-5-25

B-41086-C12

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO E 24TH AVE

PLAN & PROFILE

STA: 32+00 TO 34+00

N O

R T H

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED2-5-25

B-41086-C13

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO E 24TH AVE

PLAN & PROFILE

STA: 34+00 TO 36+00

NORTH

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED2-5-25

B-41086-C14

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO E 24TH AVE

PLAN & PROFILE

STA: 36+00 TO 36+75

NORTH

NORTH

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED2-5-25

B-41086-C15

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO E 24TH AVE

PLAN & PROFILE

STA: 9+75 TO 12+00

N O

R T H

N O

R T H

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED2-5-25

B-41086-C16

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO E 24TH AVE

PLAN & PROFILE

STA: 12+00 TO 14+00

NORTH

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED2-5-25

B-41086-C17

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO E 24TH AVE

PLAN & PROFILE

STA: 14+00 TO 16+00

NORTH

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED2-5-25

B-41086-C18

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO E 24TH AVE

PLAN & PROFILE

STA: 16+00 TO 18+00

NORTH

NORTH

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED2-5-25

B-41086-C19

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO E 24TH AVE

PLAN & PROFILE

STA: 22+00 TO 24+00

N O

R T H

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED2-5-25

B-41086-C20

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO E 24TH AVE

PLAN & PROFILE

STA: 24+00 TO 26+00

NORTH

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED2-5-25

B-41086-C21

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO E 24TH AVE

PLAN & PROFILE

STA: 26+00 TO 28+00

NORTH

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

STD

STANDARDS CHECKEWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 1 INCH

AT FULL SIZE

(IF NOT 1" - SCALE ACCORDINGLY)

REV NO.

3/ 6/

2:

P

M A

N D

ER

S

LO

VE

N D

AH

L

FUNC BY CHK APP EWEB WORK

ORDER NO.

2403421

AS NOTED2-5-25

B-41086-C22

CB/CCI

ESR

WATER DISTRIBUTION

WATER MAIN REPLACEMENT

PIERCE/GRANT ST - W 18TH AVE TO E 24TH AVE

PLAN & PROFILE

STA: 28+00 TO 28+75

NORTH

NORTH

Sheets and Views
41086-G1-B-41086-G1
41086-G1-B-41086-G2
41086-G3-B-41086-G3
41086-C1-B-41086-C1
41086-C1-B-41086-C2
41086-C1-B-41086-C3
41086-C1-B-41086-C4
41086-C1-B-41086-C5
41086-C1-B-41086-C6
41086-C1-B-41086-C7
41086-C1-B-41086-C8
41086-C1-B-41086-C9
41086-C1-B-41086-C10
41086-C1-B-41086-C11
41086-C1-B-41086-C12
41086-C1-B-41086-C13
41086-C1-B-41086-C14
41086-C1-B-41086-C15
41086-C1-B-41086-C16
41086-C1-B-41086-C17
41086-C1-B-41086-C18
41086-C1-B-41086-C19
41086-C1-B-41086-C20
41086-C1-B-41086-C21
41086-C1-B-41086-C22
2025-03-06T13:22:11-0800
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .