The document is a lane shift notification spreadsheet for a water main installation project by Eugene Water & Electric Board (EWEB) at 22nd and Chambers Street in Eugene, Oregon. The work is scheduled for 3 shifts, with work times from 8:15am to 4:00pm, requiring 48-hour advance notifications to various city departments including Fire/EMS, Eugene Police Department, and City Signal Operations. Key project details include maintaining work zone safety with flaggers, ensuring minimum 10-foot travel lanes, placing appropriate signage for lane shifts, bike lane and crosswalk modifications, and managing traffic flow and pedestrian access.
The project involves detailed traffic management protocols, including lane shifts (left and right), utility work ahead signs, road closure indicators, and bike merge and crosswalk closure signage. Contact persons for the project include Nate Wahto (541-579-9359), Nolan Melendrez (541-914-8109), and Tyler Kennedy (541-520-5141). While this document appears to be a supplementary notification for a specific work segment, it is related to a broader water main replacement project (ITB 25-041-PW) on Pierce Street and Grant Street, which involves installing approximately 2,690 feet of 12-inch water main, 1,425 feet of 8-inch water main, and 30 feet of 6-inch water main, along with associated valves, fittings, water services, and fire hydrants.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 2 - ITB 24-041-PW.pdf | ||
| 18th Ave and Pierce St Lane shift.xlsx | XLSX spreadsheet | |
| 18th Ave and Pierce St Flagging.xlsx | XLSX spreadsheet | |
| ITB 25-041-PW Grant and Pierce St Water Main Replacement.pdf | ||
| ITB 25-041-PW Bid Tab - filled~2.pdf | ||
| Attachment N.zip | ZIP file | |
| ITB 25-041-PW Bid Tab - filled2.pdf | ||
| Addendum 1 - ITB 25-041-PW~1.pdf | ||
| ITB 25-041-PW Drawing Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
Notifications : 48 hours before work is to begin
FIRE/EMS; EPD 541-682-5111
LTD 541-682-6199
City of Eugene Signal OPs 541-954-8382 N Duration : 3 shifts Work times : 8:15am - 4:00pm
EWEB
Location: 22nd and Chambers Contact : Nate Wahto 541-579-9359 *Nolan Melendrez 541-914-8109 Tyler Kennedy 541-520-5141
RCA
Nature of Work : EWEB will be installing a new water main.
See ROW permit application project description for more information.
A worker to be available to maintain the work zone. Flaggers to maintain visual or radio contact at all times.
Crew to maintain a 10' minimum per travel lane.
If crosswalks are affected crosswalk closed-closed ahead signs will be placed.
If Bike lanes are affected Bikes Merge signs will be placed.
Cones to be spaced to allow for driveway access.
Lanes to be re-opened and signs to be turned or removed at the end of the work day.
Contact buisinesses or residents if access is to be affected
Pedestrians will be escorted through the work zone as needed.
UWA = Utility Work Ahead = 6 LSL = Lane Shifts Left = 1 LSR = Lane Shifts Right = 1 RCA = Road Closed Ahead = 5 RC = Road Closed = 2 BM = Bikes Merge = 2 CC = Crosswalk Closed = 2 CWCA = Crosswalk Closed Ahead = 4 Sign Spacing = 100' Taper = 75' No Parking 48 hours in advance
LSL
UWA
UWA
UWA
BM
BM
LSR
UWA
UWA
UWA
RCA
RCA
RC
CC
CC
CWCA
CWCA
CWCA
CWCA
RCA
RCA