ITB 25-041-PW Bid Tab - filled2.pdf
PDF 103 KB Posted
- Solicitation number
- S-P00140-00013065
- Issued by
- Lane County, Oregon
About this file
This tab sheet is a bid tabulation document for the Eugene Water & Electric Board (EWEB) ITB 25-041-PW Grant St and Pierce St Water Main Replacement project. The procurement involves bids from six construction companies: Wildish Const. Co., Trech Line Excav. Inc., Riverbend Materials, H & J Const. Inc., Pacific Excavation, and Turney Excavating Inc. The bid closing date is March 20, 2025, at 2:00 PM PT, with bidders required to submit Section 00400 Bid Form, Section 00450 Minimum Qualifications Form, Section 00610 Bid Bond, Section 00430 First Tier Subcontractor Form, and acknowledge signed addenda.
The bid totals range from $1,298,347.00 to $1,524,985.00, with H & J Const. Inc. submitting the lowest bid at $1,298,347.00. All bidders submitted the required documentation, including minimum qualifications forms and bid bonds. The project involves water main replacement on Pierce Street and Grant Street in Eugene, Oregon, with specific infrastructure installation requirements. While the tab sheet does not detail funding sources, the accompanying project summary indicates the project is funded through the 2022 Street Repair Bond, with a projected Notice to Proceed date of April 8, 2025, and substantial completion anticipated by August 1, 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 2 - ITB 24-041-PW.pdf | ||
| 18th Ave and Pierce St Lane shift.xlsx | XLSX spreadsheet | |
| 18th Ave and Pierce St Flagging.xlsx | XLSX spreadsheet | |
| ITB 25-041-PW Grant and Pierce St Water Main Replacement.pdf | ||
| ITB 25-041-PW Bid Tab - filled~2.pdf | ||
| Attachment N.zip | ZIP file | |
| Addendum 1 - ITB 25-041-PW~1.pdf | ||
| 22nd and Chambers St Lane shift.xlsx | XLSX spreadsheet | |
| ITB 25-041-PW Drawing Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Closing Date: 3/20/25 Closing Time: 2:00 PM PT
DESCRIPTION
Wildish Const. Co. Trech Line Excav. Inc. Riverbend Materials H & J Const. Inc. Pacific Excavation Turney Excavating Inc.
Section 00400 Bid Form yes yes yes yes yes yes
Section 00450 Minimum Qualifications Form yes yes yes yes yes yes
Section 00610 Bid Bond yes yes yes yes yes yes
Section 00430 First Tier Subcontractor Form yes yes yes yes yes
Signed Addenda (or acknowledged on bid form) yes yes yes yes yes yes
Bid Total $1,340,875.00 $1,338,597.14 $1,433,620.00 $1,298,347.00 $1,152,951.00 $1,524,985.00
Opened by: Wendy Lopez
Witnessed by: Pam Ward
TAB SHEET
ITB # 25‐041‐PW
Grant St and Pierce St Water Main Replacement
COMPANY NAMES
File details come from the government source that posted it. Updated .