About this file

The document is an Invitation to Bid (ITB) for the Coliseum Lake Weir Replacement project (ITB 24-42TM) issued by the City of Hampton, Virginia. The project involves the reconstruction of the existing weir located at the outfall of Coliseum Lake, which will be replaced with an automated slide gate. The scope of work includes the removal and replacement of the existing concrete bed, riprap, road curb, and dog waste station at Waterside Drive, with the aim of improving the drainage and water management capabilities of Coliseum Lake. Bidders must have experience in waterway construction and dredging operations, and a mandatory pre-bid meeting is scheduled for March 12, 2024. The bid submission deadline is April 23, 2024, and the City of Hampton has established Minority Business Enterprise (MBE) and Women's Business Enterprise (WBE) subcontracting goals of 4.34% and 3.82%, respectively, for this contract. The successful bidder will be required to provide performance and payment bonds.

Pricing for the project shall be all-inclusive, with no additional charges allowed. The City of Hampton reserves the right to accept or reject any and all bids and to award one or more contracts deemed to be in its best interest. No specific budget range or incumbent contractor information is provided in the documents.

View the file

Other files

File Type Posted
ITB 24-42TM Addendum 3 Attachment 5 Coliseum Lake Weir Structural Design.pdf PDF
ITB 24-42TM Addendum 3 Attachment 7 WM19-126G Coliseum Lake Weir Repairs Part II.pdf PDF
ITB 24-42TM Addendum 3_Responses.pdf PDF
ITB 24-42TM Addendum 6 Attachment 2 DE Coliseum Lake Gate Project Dominion WO Sketch (002).pdf PDF
ITB 24-42TM Addendum 6 Attachment 5 DE Trenching Requirements.pdf PDF
ITB 24-42TM Lake Weir Replacement.pdf PDF
ITB 23-42TM Addendum 5 Responses.pdf PDF
ITB 24-42TM Addendum 1.pdf PDF
ITB 24-42TM Addendum 2.pdf PDF
ITB 24-42TM Addendum 3 Attachment 4 Coliseum Lake Weir HH Analysis.pdf PDF
ITB 24-42TM Addendum 5 Attachment 1 Coliseum Slide Gate Site Plan (1).pdf PDF
ITB 24-42TM Addendum 6 Attachment 4.pdf PDF
ITB 24-42TM Addendum 6.pdf PDF
ITB 24-42TM Approved Site Plan.pdf PDF
ITB 24-42TM Bid Tab —
ITB 24-42TM Lake Slide Gate - Construction Specs.pdf PDF
ITB 24-42TM Mandatory Pre-bid Sign In Sheet.pdf PDF
ITB 24-42TM Addendum 3 Attachment 1 f Coliseum Lake Slide Gate Bid Tab_Rev1.xlsx XLSX spreadsheet
ITB 24-42TM Addendum 3 Attachment 2 Overall Report Coliseum Weir Flow Data.xlsx XLSX spreadsheet
ITB 24-42TM Addendum 6 Attachment 1.jpg JPG image
ITB 23-42TM Addendum 4.docx.pdf PDF
ITB 24- 42TM Addendum 6 Attachment 3 DE Marking Private Utilities Customer Information (002).pdf PDF
ITB 24-42TM Addendum 3 Attachment 6 NAO-2013-02345 NWP.pdf PDF
ITB 24-42TM Coliseum Lake Slide Gate 100pc Construction Plans_signed.pdf PDF
ITB 24-42TM Addendum 3 Attachment 1 f Coliseum Lake Slide Gate Bid Tab_Rev1.xlsx XLSX spreadsheet
ITB 24-42TM Addendum 3 Attachment 6 NAO-2013-02345 NWP.pdf PDF
ITB 24-42TM Coliseum Lake Slide Gate 100pc Construction Plans_signed.pdf PDF
ITB 23-42TM Addendum 4.docx.pdf PDF
ITB 24-42TM Addendum 2.pdf PDF
ITB 24-42TM Addendum 3 Attachment 4 Coliseum Lake Weir HH Analysis.pdf PDF
ITB 24-42TM Addendum 3 Attachment 5 Coliseum Lake Weir Structural Design.pdf PDF
ITB 24-42TM Mandatory Pre-bid Sign In Sheet.pdf PDF
ITB 24-42TM Addendum 1.pdf PDF
ITB 24-42TM Approved Site Plan.pdf PDF
ITB 24-42TM Lake Slide Gate - Construction Specs.pdf PDF
ITB 24-42TM Addendum 3 Attachment 2 Overall Report Coliseum Weir Flow Data.xlsx XLSX spreadsheet
ITB 24-42TM Addendum 3 Attachment 7 WM19-126G Coliseum Lake Weir Repairs Part II.pdf PDF
ITB 24-42TM Addendum 3_Responses.pdf PDF
ITB 24-42TM Coliseum Lake Slide Gate Bid Tab.pdf PDF
ITB 24-42TM Lake Weir Replacement.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE:

ITEM NO.

SPEC

SECTION1

ESTIMATED

QUANTITY UNIT UNIT COST TOTAL COST

1 513 MOBILIZATION/DEMOBILIZATION 1 LS

2 VDOT 514 FIELD OFFICE (TYPE III - VDOT 514) 12 MONTH

3 105 SITE SURVEYS 1 LS

4 301 CLEARING AND GRUBBING 1 LS

5 110-10 DREDGE UNCONTROLLED FILL 340 CY

6 303 EARTHWORK (CUT & FILL) 230 CY

7 303 HAUL REGULAR EXCAVATION 340 CY

8 VDOT 237 BEDDING - STRUCTURAL FILL 180 CY

9 303 CONSTRUCTION ACCESS ROAD (VDOT #1) 60 TN

10 303 GEOTEXTILE UNDER PERMANENT SITE ACCESS ROAD 670 SY

11 110-12 VIBRATION MONITORING 1 LS

12 VDOT 413 DEMO EXISTING CONCRETE BASE 110 CY

13 VDOT 402 SHEETPILE CUTOFF WALLS, PZ27 1,760 SF

14 414 RIPRAP FOR STABILIZATION 160 TN

15 303 REMOVAL OF CURB & GUTTER 55 LF

16 502 CURB/GUTTER REPLACEMENT 55 LF

17 VDOT 403 TIMBER PILES, 12" (x34) 1,805 LF

18 VDOT 402 DYNAMIC PILE TEST 2 EA

19 110-9 GATE (STAINLESS STEEL #316) 2 EA

20 502 CONCRETE CLASS A4 (GATE STRUCTURE) 130 CY

21 406 CORROSION RESISTANT REINFORCING STEEL, CLASS 1 20,750 LB

22 502 CONCRETE FOR APPROACH RAMPS 15 CY

23 502 CONCRETE FOR DOWNSTREAM APRON 120 CY

24 110-6 STOP LOGS, FRAME, LIFTING BEAM 1 LS

25 VDOT 409 PEDESTRIAN GRATED WALKWAY (INCL. REINFORCEMENTS) 1 LS

26 VDOT 410 RAILING FOR DECK 90 LF

27 110-7 ACTUATOR (INDIVIDUAL FOR EACH GATE) 2 EA

28 110-13 BATTERY BACKUP INCL. SOLAR PANEL + CONTROLS 1 LS

29 110-13 SENSORS 6 EA

30 110-14 SCADA SYSTEM WITH FLOODPROOFING 1 LS

31 - DOMINION ENERGY TIE-IN 1 LS

32 110-8 DEWATERING/PUMP AROUND OPERATION 135 DY

33 VDOT 402 COFFER DAM INSTALLATION & TIE-IN, SHEETPILES 2,300 SF

34 602 TOPSOIL (CLASS B, 6" DEPTH) 20 CY

35 603 REGULAR SEED - UPLAND & RIPARIAN 230 LB

36 603 LIME 2 TN

37 603 FERTILIZER 380 LB

38 303 TEMPORARY SILT FENCE (TYPE A) 700 LF

39 507 SAFETY FENCE 1,000 LF

40 507 TREE PROTECTION FENCE 600 LF

41 303 CONSTRUCTION ENTRANCE - VDOT #1 AGGREGATE 24 EA

42 303 TURBIDITY CURTAIN 150 LF

43 603 TEMPORARY SEED 120 LB

44 603 HYDRAULIC EROSION CONTROL PRODUCT (TYPE 1) 130 SY

LANDSCAPING

BID TAB

COLISEUM LAKE SLIDE GATE

CITY OF HAMPTON

GENERAL

GATE STRUCTURE & CONTROLS

CONSTRUCTION DEWATERING

EROSION AND SEDIMENT CONTROL

TOTAL PRICE