ITB 24-42TM Bid Tab
49 KB Posted
- Attached to
- ITB 24-42TM Coliseum Lake Weir Replacement
- Solicitation number
- 60190
- Issued by
- Hampton City, Virginia
About this file
This document is an Invitation to Bid (ITB) for the Coliseum Lake Weir Replacement project (ITB 24-42TM) issued by the City of Hampton, Virginia. The project involves the reconstruction of the existing weir located at the outfall of Coliseum Lake, which will be replaced with an automated slide gate. The scope of work includes the removal and replacement of the existing concrete bed, riprap, road curb, and dog waste station at Waterside Drive. The City is seeking bids from qualified bidders with experience in waterway construction and dredging operations. The bid submission deadline is April 23, 2024, with a mandatory pre-bid meeting scheduled for March 12, 2024.
The pricing for this contract shall be all-inclusive, with no additional charges allowed. The City of Hampton has established Minority Business Enterprise (MBE) and Women's Business Enterprise (WBE) subcontracting goals of 4.34% and 3.82%, respectively, for this contract. The successful bidder will be required to provide performance and payment bonds. No specific budget range or incumbent contractor information is provided in the documents.
Text of this file
ITEM NO. DWG/SPEC
SECTION
ESTIMATED
QUANTITY
UNIT UNIT COST TOTAL COST Negotiated
Contract
1 513 MOBILIZATION/DEMOBILIZATION 1 LS $240,500.00 $240,500.00
2 VDOT 514 FIELD OFFICE (TYPE III - VDOT 514) 12 MONTH $2,883.00 $34,596.00
3 105 SITE SURVEYS 1 LS $39,988.50 $39,988.50
4 301 CLEARING AND GRUBBING 1 LS $58,806.50 $58,806.50
5 110-10 DREDGE UNCONTROLLED FILL
6 303 EARTHWORK (CUT & FILL)
7 303 HAUL REGULAR EXCAVATION
8 VDOT 237 BEDDING - STRUCTURAL FILL 180 CY $105.75 $19,035.00
9 303 CONSTRUCTION ACCESS ROAD (VDOT #1) 1 LS $2,611.00 $102,611.00
10 303 GEOTEXTILE UNDER PERMANENT SITE ACCESS ROAD 670
INCIDENTAL TO
ACCESS ROAD
11 110-12 VIBRATION MONITORING 1 LS $6,586.00 $6,586.00
12 VDOT 413 DEMO EXISTING CONCRETE BASE 1 LS $41,960.00 $41,960.00
13 VDOT 402 SHEETPILE CUTOFF WALLS, PZ27 1,760 SF $105.10 $184,976.00
14 414 RIPRAP FOR STABILIZATION 160 TN $241.65 $38,664.00
15 303 REMOVAL OF CURB & GUTTER 55 LF $64.25 $3,533.75
16 502 CURB/GUTTER REPLACEMENT 55 LF $119.50 $6,572.50
17 - PROJECT SIGN 1 LS $3,528.00 $3,528.00
SITE PLAN/S-
TRAFFIC CONTROL 1 LS $71,163.00 $71,163.00
SITE PLAN/S-
LIGHT POLE AND BENCH REPLACE & REINSTALL 1 LS $13,096.00 $13,096.00
SITE PLAN/S
FENCE 1 EA $15,304.00 $15,304.00
CNSTRCT
PLN E-1
ELECTRICAL CONDUIT 100 LF $1,962.75 $196,275.00
22 VDOT 403 TIMBER PILES, 12" (x34) 1,805 LF $156.40 $282,302.00
23 VDOT 402 DYNAMIC PILE TEST 2 EA $11,865.50 $23,731.00
24 110-9 GATE (STAINLESS STEEL #316) 2 EA $59,301.00 $118,602.00
25 502 CONCRETE CLASS A4 (GATE STRUCTURE) 130 CY $1,153.00 $149,890.00
26 406 CORROSION RESISTANT REINFORCING STEEL, CLASS 1 20,750 LB $3.99 $82,792.50
27 502 CONCRETE FOR APPROACH RAMPS 15 CY $2,623.00 $39,345.00
28 502 CONCRETE FOR DOWNSTREAM APRON 120 CY $931.00 $87,720.00
29 110-6 STOP LOGS, FRAME, LIFTING BEAM 1 LS $179,833.00 $179,833.00
30 VDOT 409 PEDESTRIAN GRATED WALKWAY (INCL. REINFORCEMENTS) 1 LS $45,180.52 $45,180.50
31 VDOT 410 RAILING FOR DECK 90 LF $721.00 $64,890.00
32 110-7 ACTUATOR (INDIVIDUAL FOR EACH GATE) 2 EA $37,844.50 $75,769.00
33 110-13 BATTERY BACKUP INCL. SOLAR PANEL + CONTROLS 1 LS $175,232.00 $175,232.00
34 110-13 SENSORS 6 EA $22,102.00 $132,612.00
35 110-14 SCADA SYSTEM WITH FLOODPROOFING 1 LS $22,061.75 $22,061.75
36 - DOMINION ENERGY TIE-IN 1 LS $75,000.00 $75,000.00
37 110-8 DEWATERING/PUMP AROUND OPERATION 1 LS $108,923.00 $108,923.00
38 VDOT 402 COFFER DAM INSTALLATION & TIE-IN, SHEETPILES 1 LS $294,390.00 $294,390.00
39 602 TOPSOIL (CLASS B, 6" DEPTH) 20 CY $359.65 $7,193.00
40 603 REGULAR SEED - UPLAND & RIPARIAN 230 LB $166.35 $38,260.50
41 603 LIME 2 TN $956.50 $1,913.00
42 603 FERTILIZER 380 LB $9.95 $3,781.00
43 303 TEMPORARY SILT FENCE (TYPE A) 700 LF $5.74 $4,018.00
44 507 SAFETY FENCE 1,000 LF $5.74 $5,740.00
45 507 TREE PROTECTION FENCE 600 LF $5.74 $3,444.00
46 303 CONSTRUCTION ENTRANCE - VDOT #1 AGGREGATE 1 LS $82,119.25 $62,119.25
47 303 TURBIDITY CURTAIN 375 LF $139.67 $52,376.25
48 603 TEMPORARY SEED 120 LB $34.45 $4,134.00
GATE STRUCTURE & CONTROLS
CONSTRUCTION DEWATERING
LANDSCAPING
5.75
GENERAL
1 LS
$184,987.50 $184,987.50
ITB 24-42TM Coliseum Lake Weir Replacement
Closing Date: April 23, 2024 at 2:00 P.m.
Buyer: Tammy Martin
Vendor:
Ballard Construction
49 603 HYDRAULIC EROSION CONTROL PRODUCT (TYPE 1) 130 SY $28.70 $3,731.00
$3,407,166.50 3,177,166.50TOTAL PRICE
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .