ITB 24-42TM Addendum 6 Attachment 5 DE Trenching Requirements.pdf
PDF 166 KB Posted
- Attached to
- ITB 24-42TM Coliseum Lake Weir Replacement
- Solicitation number
- 60190
- Issued by
- Hampton City, Virginia
About this file
The document is an Addendum to the Invitation to Bid (ITB) 24-42TM for the Coliseum Lake Weir Replacement project in Hampton, Virginia. The scope of work includes the reconstruction of the existing weir located at the outfall of Coliseum Lake, which will be replaced with an automated slide gate. The project also involves the removal and replacement of the existing concrete bed, riprap, road curb, and dog waste station at Waterside Drive. The bid submission deadline is April 23, 2024, with a mandatory pre-bid meeting scheduled for March 12, 2024. The City of Hampton has established Minority Business Enterprise (MBE) and Women's Business Enterprise (WBE) subcontracting goals of 4.34% and 3.82%, respectively, for this contract. The successful bidder will be required to provide performance and payment bonds. The document also provides guidance on the trenching requirements for the project, including ensuring the site is at final grade, removing any obstructions, marking private utilities, and managing tree roots.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRENCHING
Providing a Clear Trench Path
In order for our contractors to be able to trench the path where underground power lines shall be buried, the following items need to be completed:
� Ensure site is to final grade.
� Make sure there are no obstructions in path (i.e. building material, pavers, blocks, dumpsters, portable toilets, etc).
� Remove temporary erosion control fence in conflict with trenching path.
� Mark private utilities (see attached document: ‘Marking Private Utilities’).
Also, the Project Designer will stake and flag the trenching path prior to releasing the project to construction. ***These flags and/or stakes shall not be removed, relocated or tampered with under any circumstance.***
Trenching Established/Landscaped Yards
The figure below illustrates an example of a trenched yard. Please be advised that results may vary significantly for different yards.
� Dominion does not guarantee any specific results after trenching a yard.
� The trench is backfilled and mounded with the same soil removed from the trench path.
� The trenching path will not be leveled, reseeded, resodded, or landscaped in any way.
Trees
Any trench work done near tree roots may cause damage to the tree, which can result in the tree’s eventual death. Dominion will not be held responsible for tree damage.
Guide drilling near tree roots is available at an additional cost to the customer.