ITB 24-42TM Addendum 6 Attachment 5 DE Trenching Requirements.pdf

PDF 166 KB Posted

Attached to
ITB 24-42TM Coliseum Lake Weir Replacement
Solicitation number
60190
Issued by
Hampton City, Virginia

About this file

The document is an Addendum to the Invitation to Bid (ITB) 24-42TM for the Coliseum Lake Weir Replacement project in Hampton, Virginia. The scope of work includes the reconstruction of the existing weir located at the outfall of Coliseum Lake, which will be replaced with an automated slide gate. The project also involves the removal and replacement of the existing concrete bed, riprap, road curb, and dog waste station at Waterside Drive. The bid submission deadline is April 23, 2024, with a mandatory pre-bid meeting scheduled for March 12, 2024. The City of Hampton has established Minority Business Enterprise (MBE) and Women's Business Enterprise (WBE) subcontracting goals of 4.34% and 3.82%, respectively, for this contract. The successful bidder will be required to provide performance and payment bonds. The document also provides guidance on the trenching requirements for the project, including ensuring the site is at final grade, removing any obstructions, marking private utilities, and managing tree roots.

View the file

Other files

File Type Posted
ITB 23-42TM Addendum 4.docx.pdf PDF
ITB 24- 42TM Addendum 6 Attachment 3 DE Marking Private Utilities Customer Information (002).pdf PDF
ITB 24-42TM Addendum 3 Attachment 6 NAO-2013-02345 NWP.pdf PDF
ITB 24-42TM Coliseum Lake Slide Gate 100pc Construction Plans_signed.pdf PDF
ITB 24-42TM Addendum 3 Attachment 5 Coliseum Lake Weir Structural Design.pdf PDF
ITB 24-42TM Addendum 3 Attachment 7 WM19-126G Coliseum Lake Weir Repairs Part II.pdf PDF
ITB 24-42TM Addendum 3_Responses.pdf PDF
ITB 24-42TM Addendum 6 Attachment 2 DE Coliseum Lake Gate Project Dominion WO Sketch (002).pdf PDF
ITB 24-42TM Coliseum Lake Slide Gate Bid Tab.pdf PDF
ITB 24-42TM Lake Weir Replacement.pdf PDF
ITB 23-42TM Addendum 5 Responses.pdf PDF
ITB 24-42TM Addendum 1.pdf PDF
ITB 24-42TM Addendum 2.pdf PDF
ITB 24-42TM Addendum 3 Attachment 4 Coliseum Lake Weir HH Analysis.pdf PDF
ITB 24-42TM Addendum 5 Attachment 1 Coliseum Slide Gate Site Plan (1).pdf PDF
ITB 24-42TM Addendum 6 Attachment 4.pdf PDF
ITB 24-42TM Addendum 6.pdf PDF
ITB 24-42TM Approved Site Plan.pdf PDF
ITB 24-42TM Bid Tab —
ITB 24-42TM Lake Slide Gate - Construction Specs.pdf PDF
ITB 24-42TM Mandatory Pre-bid Sign In Sheet.pdf PDF
ITB 24-42TM Addendum 3 Attachment 1 f Coliseum Lake Slide Gate Bid Tab_Rev1.xlsx XLSX spreadsheet
ITB 24-42TM Addendum 3 Attachment 2 Overall Report Coliseum Weir Flow Data.xlsx XLSX spreadsheet
ITB 24-42TM Addendum 6 Attachment 1.jpg JPG image
ITB 24-42TM Addendum 3 Attachment 2 Overall Report Coliseum Weir Flow Data.xlsx XLSX spreadsheet
ITB 24-42TM Addendum 3 Attachment 7 WM19-126G Coliseum Lake Weir Repairs Part II.pdf PDF
ITB 24-42TM Addendum 3_Responses.pdf PDF
ITB 24-42TM Coliseum Lake Slide Gate Bid Tab.pdf PDF
ITB 24-42TM Lake Weir Replacement.pdf PDF
ITB 24-42TM Addendum 3 Attachment 1 f Coliseum Lake Slide Gate Bid Tab_Rev1.xlsx XLSX spreadsheet
ITB 24-42TM Addendum 3 Attachment 6 NAO-2013-02345 NWP.pdf PDF
ITB 24-42TM Coliseum Lake Slide Gate 100pc Construction Plans_signed.pdf PDF
ITB 23-42TM Addendum 4.docx.pdf PDF
ITB 24-42TM Addendum 2.pdf PDF
ITB 24-42TM Addendum 3 Attachment 4 Coliseum Lake Weir HH Analysis.pdf PDF
ITB 24-42TM Addendum 3 Attachment 5 Coliseum Lake Weir Structural Design.pdf PDF
ITB 24-42TM Mandatory Pre-bid Sign In Sheet.pdf PDF
ITB 24-42TM Addendum 1.pdf PDF
ITB 24-42TM Approved Site Plan.pdf PDF
ITB 24-42TM Lake Slide Gate - Construction Specs.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRENCHING

Providing a Clear Trench Path

In order for our contractors to be able to trench the path where underground power lines shall be buried, the following items need to be completed:

� Ensure site is to final grade.

� Make sure there are no obstructions in path (i.e. building material, pavers, blocks, dumpsters, portable toilets, etc).

� Remove temporary erosion control fence in conflict with trenching path.

� Mark private utilities (see attached document: ‘Marking Private Utilities’).

Also, the Project Designer will stake and flag the trenching path prior to releasing the project to construction. ***These flags and/or stakes shall not be removed, relocated or tampered with under any circumstance.***

Trenching Established/Landscaped Yards

The figure below illustrates an example of a trenched yard. Please be advised that results may vary significantly for different yards.

� Dominion does not guarantee any specific results after trenching a yard.

� The trench is backfilled and mounded with the same soil removed from the trench path.

� The trenching path will not be leveled, reseeded, resodded, or landscaped in any way.

Trees

Any trench work done near tree roots may cause damage to the tree, which can result in the tree’s eventual death. Dominion will not be held responsible for tree damage.

Guide drilling near tree roots is available at an additional cost to the customer.

File details come from the government source that posted it. Updated .