Arc Flash Building Answers to Questions.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
ARC FLASH STUDY
Solicitation number
ISO198-23
Issued by

About this file

This document contains answers to contractor questions from a site visit related to Solicitation Number ISO198-23 for an arc flash study. The scope of the study involves performing arc flash calculations on all three-phase electrical services in buildings at 50 amps and higher back to the transformer feeding each building. Coordination for data collection will be handled through the designated point of contact, Ryan Metzger. Multiple teams may concurrently collect data from different buildings once scheduled. Awarded contractors will be responsible for providing any needed equipment such as ladders. The period of performance ends on September 30, 2024 and award decisions are expected in December.

View the file

Other files

File Type Posted
AMD07 ISO198-23 ARC FLASH.docx DOCX document
arc flash site visit attendance.pdf PDF
Arc Flash SOW_20230920-1.pdf PDF
Arc Flash Building SqFt_20230919.pdf PDF
AMD06 ISO198-23 ARC FLASH.pdf PDF
AMD05 ISO198-23 ARC FLASH.pdf PDF
AMD04 ISO198-23 ARC FLASH SITE VISIT.pdf PDF
Arc Flash Contractor Questions.docx DOCX document
AMD03 ISO198-23 ARC FLASH SITE VISIT.pdf PDF
AMD02 ISO198-23 ARC FLASH.pdf PDF
AMD01 ISO198-23 ARC FLASH.pdf PDF
CDRLS table.pdf PDF
Building Square Footage.pdf PDF
Acronym Table.pdf PDF
Combine Submittals.pdf PDF
RFP16200000132 EX.pdf PDF
Applicable Documents.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7 NOV

Arc Flash Building POC's
7-Nov
Building #SqFtPOC NameEmail SentResponse ReceivedCalendar Invite SentPhone Number
34618,264Rob McBride0830 - 0900
2547799Toby Evans0930 - 1000Cody Walton - In Contacts
322711,122Shile Anderson1000 - 1030In Contacts
14323,471Kevin Newlin1030 - 1100x8679 (Roger), x3937 (Mike)
14220,614Chris Pierce1100 - 1130x5837 (Chris)
36310,294Nathan Skinner1200 - 1230x2660 (Daniel Yokem)
280523,281Nathan Skinner1230 - 1300x2660 (Daniel Yokem)
328526,195Michael E. Jones1300 - 1330x3434 (Ask for a process supervisor)
32862,232Michael E. Jones1330 - 1400x3434 (Ask for a process supervisor)
Total SqFt106,087

8 NOV

8-Nov
Building #SqFtPOC NameEmail SentResponse ReceivedCalendar Invite SentPhone Number
3330276,904Matt Tafflinger0830 - 0900In Contacts
3334105,964Bruce Edwards0930 - 1000In Contacts
12226,348Jackie Jean1000 - 1030In Contacts
328793,655Gary Harding1030 - 1100In Contacts
3006 (Option 3)7,050Jason Howard1100 - 1130In Contacts
3168 (Option 2)144,938Jason Howard1200 - 1230In Contacts
323447,222Wade McIntosh1230 - 1300Eric Bass - In Contacts
329124,399Neil Embree1300 - 1330or Paul Edwards
29876,284Wes Gouty1330 - 1400In Contacts
Total SqFt732,764

Contractors

Contractors attending NOV 7-8 Site Visit
NameCompanyPhone NumberVisitors pass submitted
Thomas HamstreetCardinal Compliance Consultants LLC419-377-5590
Jose ConcepcionCardinal Compliance Consultants LLC248-854-4222
Robert ArnoNorth Point Defense315-269-1178Has active CAC
Christopher BunalNorth Point Defense315-709-7300Has active CAC
Kris StrawmyerPremier Power Maintenance317-752-4988
Thomas AkinsWin Engineering, LLC229-300-5947
Lori WaltersWin Engineering, LLC615-400-8371
Jesse YoungPowerTech Engineering314-825-9985
Dan McDonoughHP Engineering Inc.501-627-5594
Scott HenwoodHenron Electrical724-991-0099
Troy VarebergVareberg Engineering LTD701-361-0403
Bryant ColinoESM Engineers281-726-0731
Noah HawkinsElectrical Safety Specialist913-837-0997
Jeremy HatfieldMavenHas active CAC
Nathan GabehartMavenHas active CAC
Chris Fleming186 Engineering404-465-3346Escorted

Questions From Site Visit

Contractor NameCompanyQuestionAnswer
Chris Fleming186 Engineering, LLC1. Some transformers and possibly some relevant high voltage switches are locked and have no info displayed. Please confirm how the awarded contractor will obtain the equipment ratings and/or configuration in a timely manner.Access to the transformers will be thru Department of public works medium voltage supervisor. Coordination with him will happen thru Ryan Metzger and access will be granted timely.
2. The bid options represent additional scope. Request that 1 month be added to the period of performance if all bid options are awarded.The end of the period of performance is 9/30/24.
3. Is there a site wide Facilities Branch and/or Maintenance Branch with electrical systems related personnel?Access to NAVFAC DPW and facilities electrical will be available as needed. Coordination with these personnel must be initiated via Ryan Metzger.
4. Please break down building 3330 areas (West, North, South, Central) with regard to square footage.B3330 is a total of 3 levels. First level - 66,523 sqft, Second level - 99,455 sqft, Third level - 110,926 sqft.
Robert ArnoNorth Point Defense1. Will DPW/Utility be able to open pad mounted utility transformers to access the name plate data?Yes, with coordination
2. Will DPW/Utility be able to get the name plate data off the pole mounted transformers?Yes, with coordination
3. For equipment not reachable from the floor, will ladders be avialble for the contractor to use?Contractor should plan to bring their own equipment to get to the heights needed to perform the study.
Rich BarcumCardinal Compliance1. In the previous Questions and Answers, the government indicated that the study's limits are “down to every 3 phase 50-amp circuit and higher back to the transformer feeding the building.” Can you please verify that this is what the government wants as it will not result in a fully compliant arc flash study? If so, what is the rationale behind setting these limits?In the requirements posted on sam.gov, three phase is the lowest to evaluate in this study.
2. Will site personnel be available to concurrently assist multiple data collections teams?All coordination will happen via Ryan Metzger. Once a building has been scheduled, then the building POC can escort the awarded contractor in their respective building allowing for multiple building access simultaneously.
3. If the bid options are awarded, will additional time be added to the period of performance to allow for their completion?The end of the period of performance is 9/30/24.
4. When does the government anticipate making a final award decision?December timeframe
William J. NewbyBold New Solutions Inc.We are expected to perform the Arc Flash study in accordance with IEEE 1584-2018 and NFPA 70E 2024 Edition. SInce neither of these standards require Arc Flash calculations beyond three-phase services are you expecting the drawings we provide to include all electrical services in each building including single phase?In the requirements posted on sam.gov, three phase is the lowest to evaluate in this study.
Are the electrical drawings you are requesting to be one-line drawings only?Yes
What are the number of drops for each bus ducts, how high are the bus ducts, and do we need to include lift rental?The number of drops per bus duct, if not noted during the site visit, will need to be determined during on site data collection. The heigth of the bus ducts varies from building to building. The estimated range would be between 8' and 16'. Ladders and/or lift rental will be the responsibility of the awarded contractor.
Will we be getting information for building 8000?This building has been removed from the scope. Please reference the latest posting on sam.gov for accurate building list.