CDRLS table.pdf

PDF 107 KB Posted

Attached to
ARC FLASH STUDY
Solicitation number
ISO198-23
Issued by

About this file

This document contains a Contract Data Requirements List (CDRL) table outlining twelve deliverables required under a federal contract for production reporting, schedules, quality control plans, safety analyses and reports, personnel rosters, and environmental, safety, and occupational health plans. The contract is in support of an Arc Flash Study solicitation issued by the Department of Justice Bureau of Prisons Correctional Facilities. The CDRL includes the deliverable identification number, title, applicable statement of work paragraph, and delivery schedule for each required item. Delivery dates range from prior to notice to proceed, to post award kickoff, to as required based on incidents. This CDRL provides key details on the deliverables and reporting requirements for the federal contract to conduct an Arc Flash Study for the Bureau of Prisons.

View the file

Other files

File Type Posted
AMD07 ISO198-23 ARC FLASH.docx DOCX document
Arc Flash Building Answers to Questions.xlsx XLSX spreadsheet
arc flash site visit attendance.pdf PDF
Arc Flash SOW_20230920-1.pdf PDF
Arc Flash Building SqFt_20230919.pdf PDF
AMD06 ISO198-23 ARC FLASH.pdf PDF
AMD05 ISO198-23 ARC FLASH.pdf PDF
AMD04 ISO198-23 ARC FLASH SITE VISIT.pdf PDF
Arc Flash Contractor Questions.docx DOCX document
AMD03 ISO198-23 ARC FLASH SITE VISIT.pdf PDF
AMD02 ISO198-23 ARC FLASH.pdf PDF
AMD01 ISO198-23 ARC FLASH.pdf PDF
Building Square Footage.pdf PDF
Acronym Table.pdf PDF
Combine Submittals.pdf PDF
RFP16200000132 EX.pdf PDF
Applicable Documents.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CDRL DID Number DID Title Applicable

SOW

Paragraph

Deliverable Schedule

A001 DI-MISC-

80508B

Production Report 4.1 Daily

A002 DI-MISC-

80508B

Schedule 4.1 Post Award Kickoff

A003 ER 415-1-10 Submittal Register 4.1 As Required

A004 DI-MISC-

80508B

Quality Control Plan 4.3.1 Prior to NTP

A005 DI-SAFT-81841 Activity Hazard Analysis Report

4.4.1 NLT 10 working

days after the

PAK

A006 DI-MISC-

80508B

Accident Prevention Plan 4.4.2 NLT 10 working days after the

PAK

A007 DI-MISC-

80508B

Severe Hazard Exposure 6.3 As Required

A008 DI-MISC-

81489B

As-Built Drawings 4.1, 4.5 5 days prior to

BOD

A009 DI-SAFT-82188 Accident/Incident Report 6.5 As Required

A010 DI-SAFT-82188 Damage Reporting 6.7 As Required

A011 DI-MGMT-

81834

Contractor’s Personnel Roster

6.14 NLT 10 working

days after PAK

A012 DI-SAFT-82313 ENVIRONMENTAL, SAFETY,

AND OCCUPATIONAL

HEALTH (ESOH) PLAN

4.4 NLT 10 working

days after the

PAK

File details come from the government source that posted it. Updated .