Question11-Price Evaluation-Estimated Hours.pdf

PDF 46 KB Posted

Attached to
Roof Maintenance and Repair Services IDIQ
Solicitation number
ISD_384529_DA
Issued by

About this file

This document is a labor category staffing table for a service contract covering roofing and sheet metal work across multiple contract periods. The contract spans from October 1, 2026, through December 31, 2031, consisting of a base term and three one-year option periods.

The staffing requirements are organized by labor category and contract period, with hours specified in standard time (ST), overtime (OT), and double-time (DT) columns. For the base term (October 1, 2026 – December 31, 2028), the contract requires 632 ST hours each for Roofer Foreman and Roofer Journeyman positions, and 70 ST hours each for Sheet Metal Foreman and Sheet Metal Journeyman positions, with no overtime or double-time hours required. Roofer and Sheet Metal Apprentice positions are not staffed. Option Period 1 (January 1, 2029 – December 31, 2029) reduces roofing requirements to 337 ST hours each for Foreman and Journeyman roles, and sheet metal work to 35 ST hours each. Option Period 2 (January 1, 2030 – December 31, 2030) specifies 348 ST hours for roofing positions and 39 ST hours for sheet metal positions. Option Period 3 (January 1, 2031 – December 31, 2031) increases roofing hours slightly to 362 ST hours and sheet metal hours to 40 ST hours. All periods maintain zero overtime and double-time hours across all labor categories.

View the file

Other files

File Type Posted
Amend 02 to RFP ISD_384529_DA.pdf PDF
QandA_Roof Maint and Repair IDIQ_Final.pdf PDF
Ppt_Roof Maint and Repair IDIQ-PreProposal Mtg.pdf PDF
Pre-Proposal Mtg_List_Roof Repair IDIQ.pdf PDF
Amend 01 to RFP ISD_384529_DA.pdf PDF
Exhibit E 013100_5 Year Roof IDIQ.pdf PDF
Exhibit H Payment Bond FL-42_FFDG.pdf PDF
Exhibit K SF1413_printed.pdf PDF
Exhibit Q Inventory_2027 Roof CM IDIQ(1).xlsx XLSX spreadsheet
Exhibit U FL-61 (Rev. 1-07).pdf PDF
Exhibit B 2025 Construction Insurance Requirements.pdf PDF
Exhibit I Performance Bond FL-40_FFDG.pdf PDF
Exhibit L PUR-466_Proposal Certifications_r5_10.14.25.pdf PDF
RFP ISD_384529_DA-Roof Maint and Repair IDIQ.pdf PDF
Exhibit A FFDG TandCs for Construction (08.2025).pdf PDF
Exhibit C Roof_Maintenance_SOW_Final.pdf PDF
Exhibit D 010010_5 Year Roofing IDIQ.pdf PDF
Exhibit F 013300_5 Year Roof IDIQ.pdf PDF
Exhibit G 014100 _ 5 Year Roof IDIQ.pdf PDF
Exhibit J Fermilab Subcontractor Safety Information Questionnaire.pdf PDF
Exhibit O SAMPLE-IDIQ Subcontract (Construction).pdf PDF
Exhibit P Price Proposal Form_fill_ins.pdf PDF
Exhibit S Consumable List.pdf PDF
Exhibit T Summary of Required Solicitation Documents.pdf PDF
Exhibit M SARC_Subcontractor Annual RepsCerts Rev 8.pdf PDF
Exhibit N General Decision No IL20260008 Mod2_2026_0518.pdf PDF
Exhibit R Tool List.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Labor Category Base Term (Oct. 1, 2026 – Dec. 31, 2028)

ST OT DT

Roofer, Foreman 632 0 0

Roofer, Journeyman 632 0 0

Roofer, Apprentice 0 0 0

Sheet Metal, Foreman 70 0 0

Sheet Metal, Journeyman 70 0 0

Sheet Metal, Apprentice 0 0 0

Option Period 1 (Jan. 1, 2029 – Dec. 31, 2029)

ST OT DT

Roofer, Foreman 337 0 0

Roofer, Journeyman 337 0 0

Roofer, Apprentice 0 0 0

Sheet Metal, Foreman 35 0 0

Sheet Metal, Journeyman 35 0 0

Option Period 2 (Jan. 1, 2030 – Dec. 31, 2030)

ST OT DT

Roofer, Foreman 348 0 0

Roofer, Journeyman 348 0 0

Roofer, Apprentice 0 0 0

Sheet Metal, Foreman 39 0 0

Sheet Metal, Journeyman 39 0 0

Option Period 3 (Jan. 1, 2031 – Dec. 31, 2031)

ST OT DT

Roofer, Foreman 362 0 0

Roofer, Journeyman 362 0 0

Roofer, Apprentice 0 0 0

Sheet Metal, Foreman 40 0 0

Sheet Metal, Journeyman 40 0 0