Industry_Questions_and_Answers Prior to Final FOPR.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
MC-130J Loadmaster Conformal Signal Lights
Solicitation number
FA8509-20-R-0023
Issued by

View the file

Other files

File Type Posted
FOPR_Amendment04_FA850920R0023_23Sep2020 signed.pdf PDF
Post FOPR Release_AddlQuestion_23Sept2020.xlsx XLSX spreadsheet
Attachment 8 -Free Space Catalog Excerpts MC-130J Loadmaster 14 Sept 2020.pdf PDF
Attachment 1 -20-32480 Order Description_Rev 02.pdf PDF
Attachment 9- FAR 52.204-24, -25 and -26.docx DOCX document
FOPR_Amendment02_FA850920R0023_14Sep2020 signed.pdf PDF
Post FOPR Release_AddlQuestion_14Sept2020.xlsx XLSX spreadsheet
FOPR_Amendment02_FA850920R0023_14Sep2020 signed.pdf PDF
20-32480 Order Description_Rev 02.pdf PDF
Free Space Catalog Excerpts MC-130J Loadmaster 14 Sept 2020.pdf PDF
Attachment 4_Exhibit A Not Separately Priced CDRLs.pdf PDF
Post-FOPR Release Questions_Govt Responses FA8509-20-R-0023.xlsx XLSX spreadsheet
Attachment 1_20-32480 Order Description_Rev01.pdf PDF
FOPR Amendment 01 FA8509-20-R-0023_26Aug2020 signed.pdf PDF
Attachment 5_Exhibit B Separately Priced CDRLs.pdf PDF
Attachment 4_Exhibit A Not-Separately Priced CDRLs.pdf PDF
Attachment 2_AFMC 158 Packaging.pdf PDF
Attachment 3_Transportation.pdf PDF
Attachment 7_MACC Cert Basis and Compliance Report Template 516C CN1-7_9 Jan 2020.xlsx XLSX spreadsheet
Attachment 1_20-32480 Order Description.pdf PDF
Final FOPR FA8509-20-R-0023_18Aug2020 signed.pdf PDF
Attachment 5_Exhibit B Separately Priced CDRL.pdf PDF
Attachment 6_Additional Provisions and Clauses.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

QuestionReferenceGov't Response
1Reference Paragraph states "The loadmaster lights shall not connect to aircraft systems." Does this mean the Government wants the system to provide self-contained power, or will the system be allowed to connect to aircraft power?Order Description Para 3.1.3Connection to aircraft power is expected. No MIL-STD-1553 data bus connections will be allowed. Language has been updated in Order Description Para 3.1.3.
2Will the Contractor be required to provide New Equipment Training to the units where installed?N/AGovernment expectation is that due to the simplicity of the operation of the system, no formal training will be required.
3Will the USG require First Article Test documentation for the Trial Kit?N/ANo true First Article is being required, therefore the associated First Article documentation is not required.
4Are there specific System and Component testing requirements?Order Description Para 3.9.9.2Contractor will provide an Acceptance Test Procedure (ATP) for post modification of each aircraft and will develop an operational check-out for the Government to put into the Technical Orders. Language has been added to the Order Description Para 3.9.9.2. Additionally, ATP CDRL B029 has been added.
5Are there specific environmental testing requirements?Order Description Para 3.9.9.2Contractor will provide a Systems Safety Hazard Analysis Report (SSHAR) that shows compliance with MIL-STD-810. Language has been added to the Order Description Para 3.9.9.2. Additionally, SSHAR CDRL A02L has been added.
6Is there a reason this is specific to Helicopters/Tilt Rotor aircraft?N/AMC-130J aircraft only cleared to refuel these aircraft.
7Is there an issue with the current similar setup currently being used on C-130H?N/AThe loadmaster signal light system on the MC-130H does not meet all of the MC-J loadmaster signal light system requirements. MC-J loadmaster signal light system requirements are identified in the Order Description.
8Is there a current position on the airframe chosen for the lights, or is that part of the design requirement?Order Description Para 3.1.3.7The lights shall be located just aft of the left and right air deflector doors, just forward of each paratroop door. Language has been added to Order Description Para 3.1.3.7.
9How do the lights get power? Aircraft power or battery power? Or, is that part of the design requirement?Order Description Para 3.1.3Connection to aircraft power is expected. No MIL-STD-1553 data bus connections will be allowed. Language has been updated in Order Description Para 3.1.3.
10Is this a new design or are we installing a current design?N/ANew design
11Are refueling pods on the MC-130J yet?N/AYes
12The draft FOPR pdf title is MC-130J Conformal Loadmaster Lights indicating the lights are to be conformal lights; however, the draft Word Document does not specify conformal lights anywhere in the requirements. Are the lights intended to be conformally mounted?FOPRLights are not intended to be conformal. "Conformal" has been removed from the title of the FOPR.
13Para 3.1.3 of the Word document states one stowage pouch. Paragraph 3.1.3.3 states each pouch……please confirm there are two stowage pouches.Order Description
Para 3.1.3Two stowage pouches are required per kit. Language has been corrected in Order Description Para 3.1.3.
14“Current signaling is easily and often misread” Will the current methods and procedures be provided so we know what to avoid?Order Description
Para 1.1Clarifying language has been added to Order Description Para 1.1.
15What level of modification to the airframe or WARP system will be required?N/AAny level of modification to aircraft will be determined by the individual technical approach.
16Is the information being transmitted to the refueling pilot strictly based on color (or pattern for NVIS operations), or are there other standard light patterns that need to be generated such as the flashing emergency disconnect signal?Order Description Para 3.1.3.4, 3.1.3.5 and 3.1.3.6.Refer to Order Description Para 3.1.3.4, 3.1.3.5 and 3.1.3.6
17The RFQ calls for both colored lights and NVIS operations. Is the intent for the system to be switchable from colored lights to NVIS only lights, or is the intent to use colored lights that will not overload NVIS optics?Order Description Para 3.1.3.4Design will be determined by the individual technical approach. However, refer to Order Description Para 3.1.3.4 for Day-Time and NVG and NVIS requirements.
18If the system is intended to operate in NVIS only conditions, are there specific patterns that we should plan on to allow pilots to correctly interpret the lights through monochromatic NVIS optics?Order Description Para 3.1.3.6Design will be determined by the individual technical approach. However, refer to Order Description Para 3.1.3.6 for redundancy requirement.
19What are the known systems requirements and/ or constraints available at this time (location, mounting, vibration, thermal, power, etc) for optimum System Requirements Review boundaries?N/AIAW MIL-STD-810
20Are the LED lights colored or the lenses?N/ADesign will be determined by the individual technical approach.
21How many function switches are required on the grip? Are they to be backlit vis/IR?N/ADesign will be determined by the individual technical approach.
22What is the operating altitude of the light pod?N/AFull range of MC-130J aircraft.
23Is the kit inclusive of POD, cables - 20’, IC box, cables to POD, all mounting hardware?Order Description Para 3.1.3Refer to Order Description Para 3.1.3 for what shall be included in a loadmaster signal light kit.
24Order Description (OD) Para 3.1.3 states each kit has one (1) stowage pouch while Para 3.1.3.3 implies two (2) pouches will be installed. Please reconcile or clarify these requirements.Order Description Paras 3.1.3Two stowage pouches are required per kit. Language has been corrected in Order Description Para 3.1.3.
25OD Para 3.1.3.3 states this modification will not conflict with the CR2 free space catalog and Appx G references the CR2 mod as well. Please provide the CR2 free space catalog. Please confirm that this mod should not rely on the CR2 mod.OD Para 3.1.3.3 and Appendix GThis mod does not rely on the CR2 mod. CR2 free space catalog shall be provided by the Government; however it will require the download of a SolidWorks viewer in order to view the CR2 free space catalog. Language has been updated in Order Description Para 3.1.3.3.
26OD Para 3.1.3 states each kit has spares of five (5) externally mounted loadmaster lights while Para 3.1.3.6 implies that each side of the aircraft will have four (4) installed lights/bulbs. Please reconcile or clarify if the spares requirement is for installed lights and how the spares should be supplied if they are not to be installed.OD Paras 3.1.3 and 3.1.3.6Order Description Para 1.1 refers to five (5) initial spares kits being purchased as part of this order. Order Description Para 3.1.3.6 refers to four (4) LED light colors (red, amber, white and green).

The five (5) initial spares kits will be shipped to Robins AFB. Language has been added to Order Description Para 3.3.2 & Appendix F.

27OD Para 3.1.3.5 and 3.1.3.6 state the left and right controller grips shall control both left and right aircraft lights. The requirement as written allows both grips to be connected at the same time and therefore allowing contradictory commands to the aircraft lights. Must the system allow for parallel and simultaneous operation of the lights by both grips?OD Paras 3.1.3.5 and 3.1.3.6Left and right grip shall be interchangeable with the intention that either grip can be installed and used on either side. Additionally, both the left and right loadmaster light grips shall control both the left and right red signal lights. Clarifying language has been updated in Order Description Para 3.1.3.5.
28CLIN 0017 for Production Kit Installation if FFP and per OD Para 3.9.8 only allows for “reasonable adjustments…to the installation schedule” if aircraft are not available for one aircraft after another. Is it intended that the CLIN 0038 is to be used to account for labor costs when aircraft are available one after another?OD Para 3.9.8
FOPR CLINs 0017 and 0038CLIN 0038 is to be used to correct deficiencies that result due to the installation of the modification. It is not to account for aircraft installation labor costs. The Government recognizes the uncertainty of the aircraft nose-to-tail installation schedule and has decided to change CLIN from 0017 FFP to 0018 to CPFF. CLIN change has been updated in FOPR.
29Sub-factor 1.1 includes the requirement for the proposal to include a consolidated bill of materials. Request the Gov't consider changing this requirement to a Notional Bill of Materials.FOPR Subfactor 1.1The consolidated BOM is considered to be notional and combines all the materials for each of the parts being proposed. Language was updated in FOPR Subfactor. 1.1
30At the end of Appendix G of the Order Description, MACM SOW 3.9.4 is stated as “not applicable”. Since this paragraph covers airworthiness, is the government indicating that airworthiness will be addressed by the government and not by the contractor?OD Para 5.3.1Airworthiness will be required to be addressed by the Contractor. Language has been updated in the Order Description Appendix G removing the statement that the "MACM SOW Para 3.9.4 Airworthiness is not applicable." Additionally, Airworthiness related CDRLs have been added to Order Description Para 5.3.1.
31At the end of Appendix G of the Order Description, MACM SOW 2.0 is stated as “not applicable”. Since this paragraph covers GFE, should the contractor assume the solution should be fully contractor-developed?OD Appendix GYes
32Does the Government intend to provide provisioning CDRL?Order Description Para 5.3.1Provisioning CDRLs have been added to Order Description Para 5.3.1
33States “The loadmaster signal lights shall not connect to aircraft systems.” Subsequent paragraphs mention plugging into the ICS. Can you please clarify what is meant by not connect to aircraft systems?Order Description Paragraph 3.1.3The cord connections will not plug into the ICS box. The cord connections will be located below the ICS box as stated in Order Description Para 3.1.3.2. Connection to aircraft power is expected. No MIL-STD-1553 data bus connections will be allowed. Lanuage has been updated in Order Description Para 3.1.3.
34mentions (2) (left and right) externally mounted loadmaster lights. Can you please clarify what is meant by externally mounted?Order Description Paragraph 3.1.3Design will be determined by the individual technical approach. However, the lights shall be located just aft of the left and right air deflector doors, just forward of each paratroop door. Language has been added to Order Description Para 3.1.3.7.
35Should there be a CDRL for provisioning?Order Description Paragraphs 1.1 and 3.26.5Provisioning CDRLs have been added to Order Description Para 5.3.1
36For production installations will the contractor have access to modify all aircraft at the given location (Mildenhall AFB, Kadena AFB, Kirtland AFB, Cannon AFB and Hurlburt Field AFB) in one trip? In other words will the contractor have access to modify all aircraft at Cannon AFB in one trip once the contractor field team arrives at Cannon AFB? Multiple trips would add costs.Order DescriptionThe Government recognizes the uncertainty of the aircraft nose-to-tail installation schedule and has decided to change CLIN from 0017 FFP to 0018 to CPFF. CLIN change has been updated in FOPR.
37Is there a current system available that fills the requirements of this order delivery? Is there any GFE or GFI for this effort?N/AThere is no current system available that meets the requirements. There is no GFE or GFI for this effort.
38Does the government have a System Specification for this effort?Order DescriptionMACM SOW Para 3.9.10 is not applicable to this effort per the "Note" at the end of the Order Description that identifies MACM SOW paragraphs that are not applicable to this order.
39The paragraph states that "contractor shall be responsible for getting the contract field team, loadmaster signal light kits, and all necessary equipment, tools and materials" to the locations. Will any Government Furnished Equipment or Special Tooling for the aircraft be available for use by the contractor if needed?Order Description Paragraph 3.3.2During installation, the Government will allow the Contract Field Team to have access to and use an Aerospace Ground Equipment (AGE) power cart, an air compressor, aircraft stands, etc as needed. Language has been added to Order Description Para 3.3.2.
40Row 9 states a Quantity of 2 or 0 in column “Quantity” but under column “Location Installed” it says 5 total otherwise only 3. Which column is the correct quantity?Order Description, Appendix G, Row 9Correction made to quantity stated in row 9 of Appendix G in the Order Description.
41What is the Over and Above process to add funding and how quick is the anticipated response to an O&A request?Draft FOPRTo Be Negotiated as task arises and funding will be added at the time a task is identified and approved. Anticipated order modification within two weeks of approved task.
42Technical Orders" are listed as a requirement. In Paragraph 5.3.1 (CDRL Table), no TO's are listed (only Tech Manuals). Need to list TOs as a CDRL if they are indeed a requirement.Order Desription Paragraph 1.1The TMCR CDRL will be provided with the final FOPR release.
43Please verify that "Contractor Facilities are only needed for kit production" means that contractor facilities will be required for none (zero) of the aircraft installation activities.Order Description Paragraph 3.25Yes, installs will be at each base.
44titled "Proposed Production & Installation Schedule." Shouldn't the word "proposed" be reserved for offerors? Suggest using "Nominal" or "Projected" instead.Order Description
Appendix G titleThe Order Description's Appendix G title has been changed from "proposed" to "projected."
4560 Production Kits are listed in Appendix G, but these are associated with "57 acft." Please explain - are you purchasing 60 kits for 57 aircraft?Appendix GWe are purchasing kits for 57 aircraft (1 TKI, 1 KPI, 55 Production Kits) & 5 spare kits per Order Description Para 1.1 and Order Description Appendix G.
46The "*" (asterisk) in two of the "Quantity" columns in Appendix G is a bit confusing. Does it indicate that if 5 are done in one period, that 0 will be done in the next and conversely if 3 are done, then 2 will be done next?Appendix GYes, either all 5 can be installed in one trip or multiple trips will be required where the first trip will consist of 3 and the second trip will consist of 2. Quantity a Hurlburt Field AFB for a specific period will depend upon whether the loadmaster light installs can be performed at the same time the aircraft is available for the CR2 mod.
47The Note at the end lists MACM SOW paragraphs that are "not applicable." Please verify that nothing in any of those paragraphs applies as a requirement for this FOPR. "In particular, please verify that there will be no (MACM IDIQ SOW Para. 3.9.4) "Airworthiness Certification" tasks for the contractor in this FOPR. It would seem that anything added to the exterior of the aircraft (e.g. the lights) could result in the need to address and at least provide data in support of MC130J MACC impacts."OD Para 5.3.1Airworthiness will be required to be addressed by the Contractor. Language has been updated in the Order Description Appendix G removing the statement that the "MACM SOW Para 3.9.4 Airworthiness is not applicable." Additionally, Airworthiness related CDRLs have been added to Order Description Para 5.3.1.***may need to add something in the Section L&M as a criteria and how they plan to meet/address the MACC impacts
48The Product Drawing/Models and Lists CDRL is incorrectly ID'd as "Sequence #B02X" - should be "A02X."Paragraph 5.3.1 CDRL TableThe CDRL's in Order Description Para 5.3.1 are labeled correctly. Per the MACM SOW Para 5.3.1 the sequence number for each Not Separately Priced CDRL will begin with an "A." CDRLs that are separately priced will begin with a "B."
49Should MACM SOW 4.9 (EVMS) be on the list of MACM SOW paragraphs that are not applicable to this order. While the MACM SOW paragraph is somewhat clear that EVMS only applies to orders that list it as a requirement, it would be worthwhile and helpful to note when it does NOT apply to a FOPR as well.MACM SOW 4.9 (EVMS)Language was added to the "Note" at the end of the Order Description identifying MACM SOW Para 4.9 is not applicable to this order.
50Will you provide the TMCR or provide more specific Technical Manual requirements? We will need the TM-86-01 (TMCR) to determine what the tech manual requirements are:Para 5.3.1The TMCR CDRL will be provided with the final FOPR release.
51A bit confusing. Shouldn't the fact that companies have already qualified for Pool A, FOPRs count for something? Shouldn’t this paragraph give Pool A company’s credit for the fact they've already been awarded IDIQ contracts? The paragraph seems to bring us back to "square 1" in terms of demonstrating qualifications for FOPRs.FOPR Paragraph 1.DThe IDIQ awards were based on a sample task, whereas order requirements could not be defined at the time of the IDIQ award. The sample task proposal and evaluation for the IDIQ contract limits the competition for the orders, rather than having full and open competition among any Small Businesses. The technical acceptability for the IDIQ award that was based on the sample task will not be able to serve as a technical factor for the evaluation of order requirements; therefore, the Government will base this order's evaluation on the informatoin presented in the offeror's proposal.
52Talks about separate Tech and Cost volumes, however in the December 2019 Kickoff Meeting, you specified all FOPR proposals were to be prepared and delivered as a single volume with a very specific outline provided at the Kickoff. All teams have been preparing for this specific format. Why has this changed for this FOPR? We recommend continuing with the format you provided at the Kickoff 2019 meeting.FOPR Paragraph HFOPR only requires one written volume (Volume I). Pricing information (Volume II) shall be submitted in MS Excel format.
53(Basis for Award) subparagraph B provides the government's approach to selection and it seems very unfair to give the lowest price offeror a chance to make corrections even before ever considering the other technically acceptable offers. If the lowest price proposal has corrections or even deficiencies, shouldn't the other offeror proposals at least be evaluated before you offer the lowest price the opportunity to make improvements? This approach does not seem fair and would likely be subject to protest.FOPR Paragraph 2 (Basis for Award)The proposal must conform to the FOPRs requirements (to include all stated terms, conditions, representations, certifications, and all other information required by the FOPR instructions). FOPR Paragraph 2 has been revised.
54Completely contradicts what was stated in subparagraph B. This paragraph states you "intend to award without discussions." This would imply NOT giving the lower price offeror a chance to make corrections. This approach is much fairer.FOPR Paragraph 2.CThe proposal must conform to the FOPRs requirements (to include all stated terms, conditions, representations, certifications, and all other information required by the FOPR instructions).
55The required 15 page, page count for the technical volume may not be sufficient. We request the USAF to consider adding page count to at least 25 pages.FOPRGovernment has determined 20 pages for Volume I is sufficient and has updated language in FOPR Para H.
56There are no detailed requirements for grips. (other than redundancy) Is it up to the contractor to design a style and function for the grips?Para 3.1.3.5Yes
57No specific aircraft light mounting locations are provided. Is it up to the contractor to determine mounting location?Para 3.1.3.5The lights shall be located just aft of the left and right air deflector doors, just forward of each paratroop door. Language has been added to Order Description Para 3.1.3.7.
58After the red signal lights have flashed for 10 seconds, what state do they go to? Do they continue to stay red or do they extinguish?Para 3.1.3.6The red signal lights shall flash until turned off by the loadmaster. Language has been updated in Order Description Para 3.1.3.6.
59On the Production installations, we assume that at a given location the aircraft will be provided nose-to-tail for mod install to preclude any Contractor Field Team (CFT) down time between installations.N/AThis is a correct assumption so as aircraft availability allows.
60We understand the Government’s intent to complete Trial Kit Installation (TKI) and Verification (Kit Proof) Installation within the first year. Although the Signal Light system may be predominately COTS so that the design phase will be short, we’ve often found that the long pole in the tent, schedule-wise, has been the development and reviews of the Technical Manuals. Per the TMCR, 30 days before each review the TO package has to be provided to the Gov’t. With a 40% IPR (usually in conjunction with CDR), pre-TKI, 80% IPR following TKI, Verification, and then Final TO review following Verification; the multiple 30-day review cycles extends out the program schedule. So technically the TKI and Verification could be accomplished within 1 year, there may be some NRE items (final TDP and TO development, final provisioning, etc.) that may have to extend beyond the 1-year basic.N/AYes, if needed it will be addressed at that time
61Based on the Installation Schedule, the Initial Spares aren’t provided until the end of Option 2. We would recommend procuring the spares early in Option 1 as a risk mitigation factor.Order Description Appendix GThe proposed schedule for the production of the five (5) initial spares kits has been updated to Option 1. Language has been updated in the Order Description Appendix G.
62On the installation Schedule, would the Gov’t be open to an alternate plan of using 2 CFTs (1 CONUS/1 OCONUS) to accelerate the overall installations?N/AInstallations may be determined by the individual technical approach. However, installations must be based on the delivery of future MC-130J aircraft as well as aircraft availability at the CONUS and OCONUS locations. Delivery of final MC-130J is projected to be in 2024. Language has been updated in Order Description Appendix G.
63Request clarification on the statement in Order Description paragraph 3.1.3, “… loadmaster signal lights shall not connect to aircraft systems.” Please confirm this excludes connection to aircraft 28 VDC power for the signal light system.Order Description 3.1.3Connection to aircraft power is expected. No MIL-STD-1553 data bus connections will be allowed. Language has been updated in Order Description Para 3.1.3.
64Will the Government provide adequate storage space for Group A/B kits, CFT tools, and other miscellaneous equipment at the various CONUS/OCONUS kit installation locations?Order Description Para 3.3.3Yes, this will be coordinated with each location. Language updated in Order Description Para 3.3.3.
65Will applicable MC-130J engineering drawings and associated electrical schematics be provided to the successful Offeror after award, or will the Offeror be required to separately obtain this technical data directly from Lockheed Martin?N/ADue to the proprietary nature of the TO's and drawings, the contractor will have to separately obtain permission from Lockheed Martin.
66Are there any design/size restrictions for light mounting to the aircraft?Order Description Para 3.1.3.7Design shall be determined by the individual technical approach. However, the lights shall be located just aft of the left and right air deflector doors, just forward of each paratroop door. Language has been added to Order Description Para 3.1.3.7.
67For kit installs, including trial kit & kit proof with disturbed systems checks followed by ATP after the kit is installed, typically the aircraft are GFP to the contractor. Request clarification on this since GFP is not mentioned in the Ordering Description, and SOF MACM SOW para 2.0 (Government Property) is not applicable to this order.Order Description Para 3.1.2 and 3.25The aircraft will not be GFP'd to the contractor. Refer to Order Description Para 3.1.2 for place of performance and Para 3.25 for facilities requirement.
68Request clarification on how SOF MACM SOW 3.9.4 (Airworthiness) is not applicable to this order (Reference: *** Note: statement in Order Description document). Is the Government waiving the requirement to obtain airworthiness certification for this mod to include performing respective OSS&E analyses (stress/strength, electrical load analysis, weight & balance, etc.)?OD Para 5.3.1Airworthiness will be required to be addressed by the Contractor. Language has been updated in the Order Description Appendix G removing the statement that the "MACM SOW Para 3.9.4 Airworthiness is not applicable." Additionally, Airworthiness related CDRLs have been added to Order Description Para 5.3.1.
69Request clarification on TMCR since it is listed as CDRL A03A but also listed as not applicable (SOF MACM SOW 5.5). Can the TMCR CDRL be provided in advance of final FOPR release? Will editable copies of the MC-130J Technical Orders be provided to enable change page updates?Order Description Para 5.3.1Clarifying language has been added in the "Note" at the end of the Order Description identifying MACM SOW paragraphs that are not applicable to this order. There is no Paragraph 5.5: Appendix E in this order; instead the TMCR is included as a CDRL in Para 5.3.1. The TMCR CDRL will be provided with the final FOPR release.
70Reference FOPR paragraph 1.H.8.(3). Request clarification on submittal of additional pricing information “with the exception of the cost CLINs” Please confirm this statement is referring to the CRNF CLINs, and not CPFF CLINs. Will the Government provide “plug” dollar amounts for CRNF CLINs, or are they to be estimated by the Offeror?FOPRLanguage was corrected in FOPR Para 1.H.8.3 to remove "with the exception of the cost CLINs."

The Government will not provide "plug" dollar amounts for CRNF CLINS. Clarifying language was added to the FOPR Basis of Award section.

71Reference FOPR paragraph 1.H.8.(3). Request clarification on the phrase, “for each major functional element specified in the SOW/OD”. The SOW/OD makes no reference to functional elements.FOPR"Functional" was changed to "technical" in the FOPR Para 1.H.8.(3).
72Regarding additional pricing information, please confirm this information is limited to CPFF CLINs and does not include additional pricing information for FFP CLINs.FOPRLanguage was corrected in FOPR Para 1.H.8.3 to remove "with the exception of the cost CLINs."
73Will the Government provide a pricing template in MS Excel?FOPRThe format of the MS Excel price volume is expected to match the Work Breakdown Structure format as noted in FOPR Para 3.A. Pricing volume must include CLIN prices as well as total price as noted in para 1.H.
74Request clarification on the term “phase-in period” cited in FOPR paragraph 2.B.FOPRLanguage was corrected in FOPR para 2.B to remove "phased-in."
75Program Management CLIN X030 (Ref SOF MACM contract) was omitted from the CLIN table in the draft FOPR document. Request clarification if Program Management costs should be included in CLIN 0002 (NRE).FOPRProgram Management CLIN 0030 to be added to FOPR.
76Order Description paragraph 3.1.3.3 references “CR2 free space catalog” and Appendix G references a “CR2 mod”. In relation to the stowage pouch, can the Government describe and/or quantify what the free space catalog is, as well as provide any additional information on the CR2 mod itself?Order Description Para 3.1.3.3This mod does not rely on the CR2 mod. CR2 free space catalog shall be provided by the Government; however it will require the download of a SolidWorks viewer in order to view the CR2 free space catalog. Language has been updated in Order Description Para 3.1.3.3.
77Ordering Description paragraph 3.28.1 cites “CDRL A02X”. Should this be corrected to “CDRL A0XX” to reflect the CDRLs listed in paragraph 5.3.1.Order Description Para 3.26.5CDRL listed in Order Description Para 3.26.5 was corrected to B02X. Per the MACM SOW Para 5.3.1 the sequence number for each Not Separately Priced CDRL will begin with an "A." CDRLs that are separately priced will begin with a "B."
78Is a font size no smaller than 10 pt Arial permitted for tables and figures?FOPRFont size for tables and figures are to be no small than 10 pt Arial. Language has been updated in FOPR Para 1.H.2.
79Please confirm “one-inch margin all around” does not include header/footer text.FOPROne-inch margin is required. Government has determined 20 pages for Volume I is sufficient and therefore has increased Volume I page limit from 15 to 20. Language has been updated in FOPR Para 1.H.1.
80Are there any additional details on where the proposed exterior lights are to be mounted? Are there any preferred viewing angle requirements, etc.?Paragraph 3.1.3.5The lights shall be located just aft of the left and right air deflector doors, just forward of each paratroop door. Language has been added to Order Description Para 3.1.3.7.
81Would it also be acceptable to provide the redundancy by using multiple individual LED bulbs of the appropriate colors?Paragraph 3.1.3.6Design will be determined by the individual technical approach.
82There is no corresponding CLIN in the FOPR for this CDRL. Per the MACM contract, separately priced CDRLs should be captured as CLIN 0040.Paragraph 5.3.1The data CDRL is Not Separately Priced, therefore it should be CLIN 0039 according to the MACM contract.
83MACM SOW paragraph 5.5 states that the TMCR will be provided at the Order level. As this order includes Technical Manuals (CDRL A03A) governed by the TMCR, this SOW paragraph should be applicable. Further, the TMCR should be provided with the Order per the SOW paragraphParagraph 5.3.1Clarifying language has been added in the "Note" at the end of the Order Description identifying MACM SOW paragraphs that are not applicable to this order. There is no Paragraph 5.5: Appendix E in this order; instead the TMCR is included as a CDRL in Para 5.3.1. The TMCR CDRL will be provided with the final FOPR release.
84Paragraph 3.1.3.3 refers to two pouches, one each for the left and right side. Should this be “….two (2) stowage pouches.”?Paragraph 3.1.3Two stowage pouches are required per kit. Language has been corrected in Order Description Para 3.1.3.