IFC 04AUG2023 Drawings Revision 2.pdf
PDF 19 MB Posted
- Attached to
- Y1DA--558-21-106 | Correct Atrium Fire Protection Issues Federal contract opportunity
- Solicitation number
- 36C24624B0007_1
About this file
This document provides details for a federal contract opportunity to correct fire protection issues at an atrium. The solicitation seeks a contractor to install a new smoke exhaust system, supply system, and roof replacement at a Durham VA facility to meet design requirements. The contractor must coordinate installation with the facility, with roof replacement anticipated to occur on weekends to minimize disruptions. The contractor will be responsible for supervision, materials, labor, equipment, transportation, testing, and storage. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24624B0007 0004.pdf | ||
| 36C24624B0007 0003.pdf | ||
| 36C24624B0007 0002.docx | DOCX document | |
| Attachment A - Base Bid Cost Breakdown Worksheet.xlsx | XLSX spreadsheet | |
| 558-21-106 IFC Specs 23AUG23.pdf | ||
| 36C24624B0007 0001.docx | DOCX document | |
| IFC 04AUG2023 Specs Revision 2.pdf | ||
| 36C24624B0007_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOOTH
A
D C
B
E
F
MRI
I.C.U.
F U
L T
O N
S T
R E
E T
ERWIN ROAD
DURHAM VA MEDICAL CENTER
ATRIUM
NORTH
NORTH
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
/2
/2
:3
:0
P M
C U s e rs
\o m a n ts c h \D o c u m e n ts
\R e v it L o c a l\ A
-0
-D u rh a m
-A tr iu m
-N C o m a n ts c h
.r v t
G-001
COVER
1 4OKM
CORRECT ATRIUM FIRE
PROTECTION ISSUES
DURHAM VA MEDICAL CENTER
508 FULTON ST.
DURHAM, NC 27705 JULY 28, 2023
CONSTRUCTION DRAWINGS
558-21-10621-045
CORRECT ATRIUM FIRE PROTECTION ISSUES
DURHAM VA MEDICAL CENTER
508 FULTON ST.
DURHAM, NC 27705
VA PROJECT #: 558-21-106
WVS
DRAWING LIST
GENERAL
G-001 COVER 1 4
G-002 CONSTRUCTION SITE PLAN 2 4
G-003 GROUND FLOOR LIFE SAFETY PLAN 3 4
G-004 ICRA INFORMATION AND DETAILS 4 4
STRUCTURAL
S-001 GENERAL NOTES 1 4
S-101 ATRIUM PLAN 2 4
S-102 ROOF PLAN 3 4
S-201 DETAILS 4 4
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 15
A-101 GROUND FLOOR PLAN 2 15
AD105 ROOF EXISTING CONDITIONS PLAN & PHOTOS 3 15
AD105A ROOF DEMOLITION PLAN - REROOF WHOLE ROOF AREA 4 15
AD105B ROOF DEMOLITION PLAN - PARTIAL ROOF AREA RE-ROOF 5 15
A-105A ROOF PLAN - REROOF WHOLE ROOF AREA 6 15
A-105B ROOF PLAN - PARTIAL ROOF AREA RE-ROOF 7 15
A-201 INTERIOR ELEVATIONS 8 15
A-202 INTERIOR ELEVATIONS 9 15
A-203 WINDOW ELEVATIONS 10 15
A-204 WINDOW ELEVATIONS 11 15
A-205 WINDOW DETAILS 12 15
A-401 OFFICE & CONFERENCE ROOM ENLARGED PLANS 13 15
A-402 PARTIAL GROUND FLOOR PLANS 14 15
A-501 DETAILS AND RAILING ELEVATIONS 15 15
FIRE SUPPRESSION
FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 2
FX101 GROUND FLOOR FIRE SUPPRESSION PLAN 2 2
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 10
MH101 GROUND FLOOR HVAC PLAN 2 10
MH102 FIRST FLOOR HVAC PLAN 3 10
MH103 SECOND FLOOR HVAC PLAN 4 10
MH104 THIRD FLOOR HVAC PLAN 5 10
MH105 ROOF MECHANICAL PLAN 6 10
M-300 MECHANICAL SECTIONS 7 10
M-301 MECHANICAL SECTIONS 8 10
M-501 MECHANICAL CONTROLS SCHEMATIC 9 10
M-601 MECHANICAL SCHEDULES 10 10
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 6
E-101 PARTIAL SITE ELECTRICAL PLAN 2 6
E-102 GROUND FLOOR ELECTRICAL PLAN 3 6
E-105 ROOF ELECTRICAL PLAN 4 6
E-601 ELECTRICAL SCHEDULES AND DETAILS 5 6
E-602 ELECTRICAL DETAILS AND SINGLE LINE DIAGRAMS 6 6
FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 6
FA101 GROUND FLOOR FIRE ALARM PLAN 2 6
FA102 FIRST FLOOR FIRE ALARM PLAN 3 6
FA103 SECOND FLOOR FIRE ALARM PLAN 4 6
FA104 THIRD FLOOR FIRE ALARM PLAN 5 6
FA105 ROOF FIRE ALARM PLAN 6 6
DocuSign Envelope ID: AA532F77-8364-4B52-91C1-84680DC67BFA
8/3/2023
BOOTH
A
D C
B
E
F
MRI
I.C.U.
F U
L T
O N
S T
R E
E T
ERWIN ROAD
'-0
BUILDING LEGEND
1. MAIN BUILDING
5. MIRECC
6. ENGINEERING SERVICES
7. BOILER PLANT
8. MENTAL HEALTH
9. A.C. PLANT
10. RESEARCH
11. FLAG POLE
12. OXYGEN TANK
13. STORAGE
14. RESEARCH
16. RESEARCH & EDUCATION
18. GENERATORS
19. GENERATOR
20. SUBSTATION
21. TRANSFORMER
23. E.C.R.C.
24. GROUNDS SHOP
25. SUBSTATION
26. PARKING DECK
27. TRANSFORMER
33. PARKING DECK
PROPOSED
CRANE LOCATION
CONTRACTOR
ACCESS TO ROOF
LOCATION OF WORK TO
BE PERFORMED AT ROOF
CONSTRUCTION LEGEND
OVERHEAD CRANE SWING PROHIBITED
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:3
:0
P M
C U s e rs
\o m a n ts c h \D o c u m e n ts
\R e v it L o c a l\ A
-0
-D u rh a m
-A tr iu m
-N C o m a n ts c h
.r v t
G-002
CONSTRUCTION SITE PLAN
2 4OKM
CORRECT ATRIUM FIRE
PROTECTION ISSUES
DURHAM VA MEDICAL CENTER
508 FULTON ST.
DURHAM, NC 27705 JULY 28, 2023
CONSTRUCTION DRAWINGS
558-21-10621-045
WVS
Scale: 1" = 60'-0"
CONSTRUCTION SITE PLAN
Scale: No Scale
EXISTING ROOF PHOTO
A. WINDOWS TO BE STORED AT GC PROPERTY AND
BROUGHT TO SITE AS NEEDED.
B. EMERGENCY DEPARTMENT ENTRANCE MUST
REMAIN IN OPERATION AT ALL TIMES. CRANE
LOCATION CANNOT IMPEDE ENTRANCE AND
CRANE MAY NOT SWING OVER EMERGENCY
DEPARTMENT AT ANY TIME.
1 CRANE LOCATION CANNOT IMPACT EMERGENCY
DEPARTMENT ENTRANCE. CANNOT IMPEDE
AMBULANCES.
2 CRANE - TO BE SET UP DURING WEEKEND HOURS.
3 TREE AREA.
4 EMERGENCY ENTRANCE.
SD
UP
UP
DN
UP
EGRESS PATH
EGRESS IDENTIFICATION
FIRE EXTINGUISHER CABINET
EMERGENCY RESPONSE REFERENCE
CONTROLLED ACCESS - ALWAYS
UNLOCKED IN DIRECTION OF EGRESS
CA
FEC
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS CAPACITY
PROJECT NAME: CORRECT ATRIUM FIRE PROTECTION
PROJECT ADDRESS: DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
PROPOSED USE: HEALTHCARE
OWNED BY: FEDERAL GOVERNMENT
AUTHORITY HAVING JURISDICTION: US DEPARTMENT OF VETERAN AFFAIRS
PROJECT DESCRIPTION: MODIFICATION OF LARGE VOLUME SPACE TO CORRECT FIRE
PROTECTION/SEPARATION MEASURES AND PROVIDE SMOKE EXHAUST SYSTEM
APPLICABLE CODES:
2021 NFPA 101 LIFE SAFETY CODE
2021 NFPA 220 STANDARDS ON TYPES OF BUILDING CONSTRUCTION
2021 INTERNATIONAL BUILDING CODE
2010 AMERICANS WITH DISABILITIES ACT (ADA) STANDARDS
2017 PG-18-13 VA BARRIER FREE DESIGN STANDARD
GENERAL CODE INFORMATION:
CONSTRUCTION TYPE: I (332) PER NFPA 220
PRIMARY OCCUPANCY: HEALTHCARE
CONSTRUCTION SCOPE: MODIFICATION
SPRINKLERS: FULLY SPRINKLERED
ALLOWABLE STORIES ABOVE GRADE: UNLIMITED (2021 IBC, T504.4)
ACTUAL STORIES: 9
ALLOWABLE AREA: UNLIMITED (2021 IBC, T506.2)
LIFE SAFETY SYSTEMS:
EMERGENCY LIGHTING: YES
EXIT SIGNS: YES
FIRE ALARM: YES
SMOKE DETECTION: YES
LARGE VOLUME SPACE 4,653 S.F.
OCCUPANT LOAD 311 PERSONS
PLUMBING FIXTURES: EXISTING TO REMAIN
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND
STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION,
ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE
CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER
SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS
PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD
APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY
(TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• INTERNATIONAL BUILDING CODE (IBC) 2021 (ONLY WHEN SPECIFICALLY REFERENCED IN VA
DESIGN DOCUMENTS, SEE NOTES BELOW)
• NFPA 101 LIFE SAFETY CODE 2021 (SEE NOTES BELOW)
• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• NATIONAL ELECTRICAL CODE (NEC)
• INTERNATIONAL PLUMBING CODE (IPC) 2021
• SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL
ENGINEERS (ASME) A 17.1.
• ASME BOILER AND PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA
SUPPLEMENT, BARRIER FREE DESIGN STANDARD (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE
INSTITUTE AND COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN
SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL
CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL,
COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE
RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS:
MEMORANDUM OF UNDERSTANDING (MOU)
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL
REQUIREMENTS SECTION 01 00 00 OF THE CONSTRUCTION SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2019.
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2019.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE
THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED
TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND
VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE
REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO
COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. DESIGN
FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL
COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE
ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE
ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY
NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101
SHALL SUPERCEDE.
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA
REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA
ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE
BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE
BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM
WIDE.
106'-1'' TRAVEL DISTANCE
99'-10'' TRAVEL DISTANCE
37'-3'' TRAVEL DISTANCE
T R
A V
E L D
IS
T
A N
C E
ACCESSIBLE ROUTE
CAFETERIA
AG002
21201917A
R
S
T
F.9 F.1
AHU
EG003
OFFICE
EG005A
OFFICE
EG005
CORRIDOR
OFFICE
EG007
OFFICE
EG009
OFFICE
EG011
STORAGE
EG013
STAIR
CONFERENCE
ROOM
STORAGE
CANTEEN
FG150
KITCHEN
EG010
MECH
ROOM
BG001A
CAFETERIA
AG002
D-1000
CANTEEN
DINING
AG000A
CANTEEN
DINING
AG000A
D -1
A
UP
LOW WALL
PLANTER
HIGH WALL
EXAM
ROOM
F1269
EXAM
ROOM
F1271
STAIR
RECORD
ROOM
F1262
CORRIDOR
1FW26
OFFICE
E1266
TOILET
F1261
TOILET
F1259
WAITING
F1255
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:3
:0
P M
C U s e rs
\o m a n ts c h \D o c u m e n ts
\R e v it L o c a l\ A
-0
-D u rh a m
-A tr iu m
-N C o m a n ts c h
.r v t
G-003
GROUND FLOOR LIFE SAFETY PLAN
3 4OKM
CORRECT ATRIUM FIRE
PROTECTION ISSUES
DURHAM VA MEDICAL CENTER
508 FULTON ST.
DURHAM, NC 27705 JULY 28, 2023
CONSTRUCTION DRAWINGS
558-21-10621-045
WVS
NORTH
0 4 8 16
LIFE SAFETY LEGEND
N
KEY PLAN
SCALE: NO SCALE
ATRIUM
CONFERENCE
ROOM
CODE SUMMARY
CODE STANDARDS AND EXECUTIVE ORDERS
(PG-18-3 TOPIC 1)
Scale: 1/8" = 1'-0"
OVERALL LIFE SAFETY PLAN
CAPACITYCLR
EXIT
32" 160
CAPACITYCLR
EXIT
32" 160
CONF. ROOM
1,098 SF
OCCUPANTS 74
CANTEEN
DINING
4,227 SF
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS
FOR CONSTRUCTION AND RENOVATION
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE
DESIGNATION FOR THIS PROJECT IS LEVEL IV FOR THE CLASS OF
PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES. HARD
SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA
INDICATED ON THE PHASING PLAN WITH PLASTIC BARRIERS
(MINIMUM 4MIL) TO SEAL AREA FROM NON-WORK AREA AS LONG AS
THE SPRINKLER SYSTEM IS INTACT AND ACTIVE.
AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 6A.
2. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER
ENTRANCE SPACES AND CHANGE DAILY OR MORE OFTEN AS
NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS INTO
ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND
DEBRIS CONTROL
3. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.
3A. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES
SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;
DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED
TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED
TO ENTER THE CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT
PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREA AND
MATERIALS.
4. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER
CONSTRUCTION MATERIAL IN AND OUT OF THE PROJECT - A CLEAN
CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED
BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION
STAGING/PREP AREA.
4A. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH
TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES.
EFFORTS SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH
AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF
ACTIVITY. DEBRIS SHALL BE REMOVED DAILY AND AT TIMES
SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS
OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED
NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE
OPENING SHALL BE SEALED WHEN NOT IN USE. FILTERS SHALL BE
BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE
CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF
THE COR.
VENTILATION AND ENVIRONMENTAL CONTROLS
5. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE
CONTRACTOR WHETHER THE CONSTRUCTION AREA USES
FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED
OR RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL
OR PLASTIC. AIR MUST FLOW FROM CLEAN TO DIRTY AREAS.
5A. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION
AREA SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING
AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT
AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE
ENCLOSURE TO REMOVE DUST SHALL PASS AIR THROUGH AN
INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF
FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN),
OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY
VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR
SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE
EXHAUST TO PREVENT CONTAMINATION OF THE DUCTS.
5B. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND
INTACT CEILING SHALL BE VERIFIED DAILY.
5C. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND
CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN
CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR
IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE
CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR PRESSURE
TESTING THROUGHOUT THE PROJECT IN THE FREQUENCY AS
IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND
RELATED AREAS
6. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL
BE FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE
CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORN
(E.G., COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED
VACUUM SHALL BE USED TO REMOVE DUST FROM CLOTHING
BEFORE LEAVING THE BARRICADE. IF PROTECTIVE APPAREL IS
UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR
ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT
(DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND
MATERIALS TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE
MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET
WIPING BEFORE THEIR REMOVAL FROM THE CONSTRUCTION ZONE
OR WORK AREA.
6A. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL
HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED
CONSTRUCTION SITE, VA EMS STAFF HAS DONE A TERMINAL
CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS INSPECTED
AND APPROVED THE CLEANING.
ICRA NOTES
NOTE:
CONSTRUCTION ACTIVITY - TYPE C
RISK GROUP - GROUP 3 HIGH RISK
ICRA MEASURES - CLASS III
APPLICABLE TO ALL INTERIOR WORK
ICRA MEASURES IN CANTEEN FOR WINDOW
REPLACEMENT AND DUCT INSTALLATION TO BE
COORDINATED WITH COR. WINDOW REPLACEMENT
TO OCCUR FROM THE CANTEEN SIDE. COORDINATE
SEQUENCE OF WORK. ALL INTERIOR CORRIDORS TO
BE SEALED OFF WITH 6 MIL PLASTIC BARRIER WHILE
WINDOWS ARE BEING REMOVED AND NEW WINDOWS
INSTALLED. ALL INTERIOR TRIM WORK TO THE
CORRIDOR SIDE TO BE DONE OFF HOURS.
III/IVLOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
II
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 IV
IV
IV
III/IV
III/IV
III
III/IV
I
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete ceiling system
- new construction
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet
- painting (but not sanding), wall covering
- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
- Physical Occupational Therapy
- Outpatient Clinics
- WAITING ROOMS
- Sleep Lab
- Mental Health (Outpatient Only)
- Prosthetics
- Orthotics
- Domiciliary
- Other
- Office Areas
- Outdoors
- Electrical Rooms
- Mechanical Rooms
- Stairwells
- Conference Rooms
- Other
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
- Emergency Room
- Kitchen
- Food Preparation
- Dining
- Canteen
- Echocardiography
- Radiology/MRI
- Respiratory Therapy
- Nuclear Medicine
- Senior Mental Health
- Community Living Center
Clean Suppy
- Other
- Cardiac Cath
- EP Lab or Cardiology
- Sterile Processing Service
- All Inpatient Medical or Surgical Units
- Care Units
- PACU
- MICU
- SICU
- TCU
- Spinal Cord Injury
- Negative Pressure Isoloation Rooms
- Outpatient Chemotherapy
- Oncology Areas
- Operating Rooms
- Endoscopy
- Dialysis
- Bronchoscopy
- Pharmacy
- Clinical Laboratories
- Other
III
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
C
LA
S S
IV
C
LA
S
S
II
During Construction Project
C L-
I C
LA
S
S
II
I
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant after barriers are removed.
6. Remove or isolate HVAC system in areas where work was being performed.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work with HEPA-filtered vacuums.
5. Wet mop with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
1. Wipe surfaces to remove dust.
Upon Completion of Project
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
4. Complete all critical barriers before construction begins or implement control cube method.
5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.
6. Contain construction waste before transport in tightly covered containers.
7. Cover transport receptacles or carts. Tape covers.
8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.
9. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
1. Includes all activities required by Class I
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Seal holes, pipes, conduits, and punctures appropriately.
7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
9. Place adhesive walk-off mats at entrance to work area within anteroom.
10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.
11. Cover transport receptacles or carts. Tape covering
12. Vacuum work area with HEPA filtered vacuums.
13. Wet mop with disinfectant after barriers are removed.
14. Remove isolation of HVAC system in areas where work is being performed.
CONFERENCE
ROOM
STORAGE
CANTEEN
FG150
ISO
OFFICE
FG148
OFFICE
FG147A
DECEDENT
AFFAIRS
FG147
AFGE
FG146
AFGE
FG146A
OFFICE,
PRIVACY
FG145
INSTALL PLASTIC
BARRIER WITH
ZIPPER ACCESS.
TAPE AND SEAL
TIGHT
6'-0"
F.9 F.1
INSTALL PLASTIC
BARRIER WITH
ZIPPER ACCESS.
TAPE AND SEAL
TIGHT
A-401
WALL RATING LEGEND
1 HR - FIRE SEPARATION
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:3
:1
P M
C U s e rs
\o m a n ts c h \D o c u m e n ts
\R e v it L o c a l\ A
-0
-D u rh a m
-A tr iu m
-N C o m a n ts c h
.r v t
G-004
ICRA INFORMATION AND DETAILS
4 4OKM
CORRECT ATRIUM FIRE
PROTECTION ISSUES
DURHAM VA MEDICAL CENTER
508 FULTON ST.
DURHAM, NC 27705 JULY 28, 2023
CONSTRUCTION DRAWINGS
558-21-10621-045
WVS
Scale: 1/8" = 1'-0"
OFFICE & CONFERENCE ROOM ICRA PLAN
NORTH
0 4 8 16
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
DEMOLITION KEYNOTEWINDOW TYPEDOOR NUMBER TYPICAL KEYNOTECEILING/ SOFFIT
HEIGHT
MATL
1'-0" ?
1 # ##
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND
CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING PRODUCT DIMENSIONS AND DETAILS FROM BASIS OF DESIGN PRODUCT.
PRODUCTS MAY CHANGE IN DIMENSION AND DETAIL BEFORE THEY ARE INCORPORATED INTO
WORK. PRODUCTS FROM OTHER MANUFACTURER’S ARE ALSO ACCEPTABLE. DIMENSIONS AND DETAILS FOR ALTERNATE PRODUCTS MAY VARY FROM BASIS OF DESIGN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED INTO WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO
BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER
QUANTITY OF WORK.
5. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE
DRAWINGS AND SPECIFICATIONS.
6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT, FOR EACH PHASE. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND
ACTUAL FIELD CONDITIONS, NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL
GOVERN.
8. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10. REFER TO ALL OTHER TRADE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THIS
PROJECT.
11. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS.
12. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED
FACE OF EXISTING WALL SURFACE.
13. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT
PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO
PROCEEDING WITH NEW CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS. COORDINATE
WITH COR.
4. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, FOR ADDITION AND RENOVATION PROJECTS: THE CONSTRUCTION AND ASSEMBLY OF THE PATCH OR REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT EXISTING CONSTRUCTION, FOR FIRE RATING, MATERIALS, FINISH, THICKNESS, AND QUALITY.
5. COORDINATE WORKING HOURS ALLOWED FOR DEMOLITION AND WASTE REMOVAL WITH COR.
6. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH
EXISTING.
7. CONTRACTOR SHALL PROTECT AREA ADJACENT TO THE DEMOLITION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES, (IF DAMAGED REPAIR, RE-PATCH, SAND SMOOTH AND REFINISH TO MATCH EXISTING.)
REPAIR OR REPLACE ITEMS DAMAGED DURING CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST.
8. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE
COMPLETION OF THE PROJECT.
9. DO NOT ENCROACH ON ADJACENT OCCUPIED AREAS NOT IDENTIFIED WITHIN THE SCOPE OF WORK.
10. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF ELECTRICAL
SYSTEMS.
11. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW, OR OUTSIDE THE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE PROJECT.
12. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERING FROM THOSE INDICATED OR THAT
ARE NOT IDENTIFIED, SHALL BE REPORTED TO THE COR.
13. AFTER REMOVAL OF EXISTING SOLID CONCRETE MASONRY WALL, FILL FLOOR VOIDS UP TO FINISH CONCRETE
LEVEL AND PERFORM FLOOR LEVELING FOR ENTIRE AREA OF RENOVATION.
14. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR AND ARCHITECT OF ANY
CONFLICTS PRIOR TO PROCEEDING WITH DEMOLITION.
15. ALL ITEMS BEING SALVAGED OR REMOVED SHALL REMAIN THE PROPERTY OF THE VA UNTIL CONFIRMATION HAS BEEN MADE AS TO WHETHER THE VA WILL RETAIN SUCH ITEMS. ALL ITEMS NOT BEING RETAINED BY THE VA OR DESIGNATED ON THE DRAWINGS, ARE TO BE REMOVED FROM THE SITE BY CONTRACTOR IN APPROVED
MANNER.
16. CONTRACTOR SHALL NOTIFY COR OF ANY AREA REQUIRING DEMOLITION OTHER THAN SHOWN IN THESE DRAWINGS DUE TO UNFORESEEN CONDITIONS, TO ACCOMMODATE INSTALLATION OF ALL OTHER TRADES (INCLUDING ROOF PENETRATIONS). AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE
MATERIALS AND FINISHES TO MATCH EXISTING.
17. COORDINATE WITH COR FOR CONSTRUCTION ACCESS ROUTE AND LOCATIONS OF DUMPSTER AREA.
COORDINATE WITH COR FOR SCHEDULE OF USE OF ACCESS ROUTE FOR WASTE REMOVAL AND CONTRACTOR
USE OF FREIGHT ELEVATOR (AS REQUIRED).
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:5
P M
C U s e rs
\o m a n ts c h \D o c u m e n ts
\R e v it L o c a l\ A
-0
-D u rh a m
-A tr iu m
-N C o m a n ts c h
.r v t
A-001
ARCHITECTURAL SYMBOLS,
ABBREVIATIONS AND NOTES
1 15OKM
CORRECT ATRIUM FIRE
PROTECTION ISSUES
DURHAM VA MEDICAL CENTER
508 FULTON ST.
DURHAM, NC 27705 JULY 28, 2023
CONSTRUCTION DRAWINGS
558-21-10621-045
WVS
ABBREVIATIONS
ARCHITECTURAL SYMBOL LEGEND GENERAL NOTES
DEMOLITION NOTES
E
M
E E
E
DN
UP
OFFICE
EG005A
AHU
EG003
OFFICE
EG005
OFFICE
EG007
OFFICE
EG009
OFFICE
EG011
STORAGE
EG013
MECH
ROOM
BG001A
STORAGE
CANTEEN
FG150
CONFERENCE
ROOM
OFFICE,
PRIVACY
FG145
AFGE
FG146A
AFGE
FG146
DECEDENT
AFFAIRS
FG147
OFFICE
FG147A
ISO
OFFICE
FG148
KITCHEN
EG010
CAFETERIA
AG002
STAIR
EG015
RESEARCH
EG017
LAB
EG017A
OFFICE
NURSING
UNION
FG143
ISO
OFFICE
FG142
AG000A
CANTEEN
DINING
CANTEEN
DINING
CANTEEN
DINING
CORRIDOR
STAIR-10
OFFICE
FG137A
21201917A
R
S
T
F.9 F.1
A-501
A-201 3
A-201 4
A-202A-202
3 4
A-2025
A-201
A-201
A-202A-202
1 2
A-201 2
A-201 1
A-501
D-1000
D-AG000A
D-1000A
A-401
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:2
:5
P M
C U s e rs
\o m a n ts c h \D o c u m e n ts
\R e v it L o c a l\ A
-0
-D u rh a m
-A tr iu m
-N C o m a n ts c h
.r v t
A-101
GROUND FLOOR PLAN
2 15OKM
CORRECT ATRIUM FIRE
PROTECTION ISSUES
DURHAM VA MEDICAL CENTER
508 FULTON ST.
DURHAM, NC 27705 JULY 28, 2023
CONSTRUCTION DRAWINGS
558-21-10621-045
WVS
N
KEY PLAN
SCALE: NO SCALE
ATRIUM
CONFERENCE
ROOM
Scale: 1/8" = 1'-0"
GROUND FLOOR PLAN
NORTH
0 4 8 16
1 INSTALL NEW 1 HOUR ROLL UP DOOR.
2 INSTALL NEW STAINLESS STEEL GUARDRAILS
3 NEW MECHANICAL DUCTWORK AND LOUVERS, SEE
MECHANICAL DRAWINGS.
4 EXISTING LOW MASONRY WALLS.
21A
R
T
F.9
SLOPE
S L O
P E
OUT OF SCOPE
INDICATES ROOF SLOPE
SLOPE: 1/4"
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:2
P M
C U s e rs
\o m a n ts c h \D o c u m e n ts
\R e v it L o c a l\ A
-0
-D u rh a m
-A tr iu m
-N C o m a n ts c h
.r v t
AD105
ROOF EXISTING CONDITIONS PLAN &
PHOTOS
3 15OKM
CORRECT ATRIUM FIRE
PROTECTION ISSUES
DURHAM VA MEDICAL CENTER
508 FULTON ST.
DURHAM, NC 27705 JULY 28, 2023
CONSTRUCTION DRAWINGS
558-21-10621-045
WVS
Scale: 1/8" = 1'-0"
ROOF EXISTING CONDITIONS PLAN
NORTH
0 4 8 16
N
KEY PLAN
SCALE: NO SCALE
ATRIUM
A
ROOF LEGEND
B C D
E F G H
I J K L
M N
A
B
C
D
E
F
G
H I
KJ
L
N
M
A. CONTRACTOR SHALL PROVIDE PROPER SAFETY
BARRIERS AND ENCLOSURES AT ALL
ENTRY/EXIT POINTS FROM BUILDING WHERE
WORK IS BEING PERFORMED ABOVE TO
PROTECT PATIENTS, STAFF, AND VISITORS.
B. CONTRACTOR SHALL PROVIDE TEMPORARY
GUARDS AT EDGE OF ROOF WHERE WORK IS
BEING PERFORMED. ALL PERSONNEL SHALL
WEAR FALL PROTECTION.
C. CONTRACTOR SHALL TEMPORARILY REMOVE
ALL ROOF DRAIN COVERS AND PROVIDE BLOW
DOWN OF DRAIN PIPES TO ENSURE NO
BLOCKAGE.
D. EXISTING LIGHTNING PROTECTION IS
CONNECTED IN A CONTINUOUS LOOP. IDENTIFY
AND PROTECT EXISTING CONNECTIONS FROM
LOOP TO GROUND CONDUCTOR AND PREPARE
FOR NEW CONNECTIONS. REFER TO
ELECTRICAL DRAWINGS FOR NEW LIGHTNING
PROTECTION SYSTEM REQUIREMENTS.
E. CONTRACTOR SHALL PROVIDE FLASHING,
WATER PROOFING, AND FIRE STOPPING AS
REQUIRED FOR ALL NEW OR EXISTING PIPING,
SUPPORTS, CONDUIT, OR OTHER ITEMS ON OR
PENETRATING THE NEW ROOF SYSTEM.
F. CONTRACTOR SHALL PHASE THE REMOVAL AND
REPLACEMENT OF ROOFING. CONTRACTOR
SHALL NOT REMOVE MORE ROOFING THAN CAN
BE REPLACED IN ONE DAY.
G. ALL ROOF AND FLASHING DETAILS ARE GENERIC
AND FOR REFERENCE ONLY. THE FINAL DETAILS
SHALL BE SUBMITTED WITH THE ROOFING
MANUFACTURER'S RECOMMENDED DETAILS
FOR THEIR ROOFING SYSTEM TO BE INSTALLED.
H. CONTRACTOR SHALL REPAIR ALL AREAS
DAMAGED OR DISTURBED DURING
CONSTRUCTION. THIS INCLUDES BUILDING
FINISHES, LANDSCAPING, SIDEWALKS, PAVING
OR ANY AREA DAMAGED BY CONSTRUCTION
WORK. RESTORE AREAS TO ORIGINAL
CONDITION.
I. DUMPSTER AND TRASH CHUTE LOCATIONS ARE
TO BE COORDINATED WITH THE COR PRIOR TO
LOCATION ON SITE.
J. CONTRACTOR SHALL PREPARE A PLAN
SHOWING LAYDOWN AREA, SECURITY FENCE,
DUMPSTER LOCATION AND ACCESS FOR COR
REVIEW AND APPROVAL.
K. ALL ROOFTOP EQUIPMENT IS FOR REFERENCE
ONLY. CONTRACTOR SHALL FIELD VERIFY ALL
EQUIPMENT PRIOR TO STARTING DEMOLITION.
L. WHERE NEW ROOFING MEETS EXISTING
ROOFING, VERIFY EXISTING ROOF SYSTEM
MEMBRANE TYPE AND INSULATION TYPE.
M. COORDINATE TRANSITION BETWEEN EXISTING
ROOF SYSTEM AND NEW ROOF SYSTEM TO
PROVIDE POSITIVE DRAINAGE AND PROPER
SHINGLING.
T
F.9
SLOPE: 1/4"
S L O
P E
: 1 /4
3 5 3
OUT OF SCOPE
INDICATES ROOF SLOPE
AREA TO BE REROOFED
SLOPE: 1/4"
NOTE: CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND
DIMENSIONS OF EXISTING SKYLIGHT BEFORE DEMOLITION. CONTACT
ARCHITECT IN CASE OF DISCREPANCIES.
PORTION OF EXISTING
SKYLIGHT ASSEMBLY TO
REMAIN INTACT AND
UNDISTURBED
EXTENT OF DEMOLITION OF
EXISTING SKYLIGHTS
DESIGNATED TO RECEIVE NEW
DUCTWORK
EXISTING SKYLIGHT
FLASHING TO REMAIN
INTACT AND UNDISTURBED
PORTION OF EXISTING
SKYLIGHT ASSEMBLY TO BE
DEMOLISHED
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:2
P M
C U s e rs
\o m a n ts c h \D o c u m e n ts
\R e v it L o c a l\ A
-0
-D u rh a m
-A tr iu m
-N C o m a n ts c h
.r v t
AD105A
ROOF DEMOLITION PLAN - REROOF
WHOLE ROOF AREA
4 15OKM
CORRECT ATRIUM FIRE
PROTECTION ISSUES
DURHAM VA MEDICAL CENTER
508 FULTON ST.
DURHAM, NC 27705 JULY 28, 2023
CONSTRUCTION DRAWINGS
558-21-10621-045
WVS
N
KEY PLAN
SCALE: NO SCALE
ATRIUM
Scale: 1/8" = 1'-0"
ROOF DEMOLITION PLAN - REROOF WHOLE ROOF AREA
BASE BID: COMPLETE TEAR OFF DOWN TO
EXISTING METAL DECK AND RE-ROOF OF
IDENTIFIED AREA
(APPROX. 3,450 SF)
NORTH
0 4 8 16
ROOF LEGEND
Scale: 1 1/2" = 1'-0"
DEMOLITION AT SKYLIGHT
1 REMOVE SKYLIGHT - SEE DETAIL THIS SHEET.
2 COMPLETE ROOF TEAR OFF, INCLUDING
ROOFING MEMEBRANES, COVER BOARD AND
INSULATION DOWN TO EXISTING METAL DECK.
3 REMOVE EXISTING ADDED ON METAL FLASHING
SCREWED INTO SKYLIGHT METAL FLASHING -
ENTIRE LENGTH.
4 DEMOLISH ROOF EDGE.
5 DEMOLISH ROOFING TO EXISTING TERMINATION
BAR UNDER EXISTING SKYLIGHT METAL
FLASHING ON VERTICAL FACE.
A. CONTRACTOR SHALL PROVIDE PROPER SAFETY
BARRIERS AND ENCLOSURES AT ALL
ENTRY/EXIT POINTS FROM BUILDING WHERE
WORK IS BEING PERFORMED ABOVE TO
PROTECT PATIENTS, STAFF, AND VISITORS.
B. CONTRACTOR SHALL PROVIDE TEMPORARY
GUARDS AT EDGE OF ROOF WHERE WORK IS
BEING PERFORMED. ALL PERSONNEL SHALL
WEAR FALL PROTECTION.
C. CONTRACTOR SHALL TEMPORARILY REMOVE
ALL ROOF DRAIN COVERS AND PROVIDE BLOW
DOWN OF DRAIN PIPES TO ENSURE NO
BLOCKAGE.
D. EXISTING LIGHTNING PROTECTION IS
CONNECTED IN A CONTINUOUS LOOP. IDENTIFY
AND PROTECT EXISTING CONNECTIONS FROM
LOOP TO GROUND CONDUCTOR AND PREPARE
FOR NEW CONNECTIONS. REFER TO
ELECTRICAL DRAWINGS FOR NEW LIGHTNING
PROTECTION SYSTEM REQUIREMENTS.
E. CONTRACTOR SHALL PROVIDE FLASHING,
WATER PROOFING, AND FIRE STOPPING AS
REQUIRED FOR ALL NEW OR EXISTING PIPING,
SUPPORTS, CONDUIT, OR OTHER ITEMS ON OR
PENETRATING THE NEW ROOF SYSTEM.
F. CONTRACTOR SHALL PHASE THE REMOVAL AND
REPLACEMENT OF ROOFING. CONTRACTOR
SHALL NOT REMOVE MORE ROOFING THAN CAN
BE REPLACED IN ONE DAY.
G. ALL ROOF AND FLASHING DETAILS ARE GENERIC
AND FOR REFERENCE ONLY. THE FINAL DETAILS
SHALL BE SUBMITTED WITH THE ROOFING
MANUFACTURER'S RECOMMENDED DETAILS
FOR THEIR ROOFING SYSTEM TO BE INSTALLED.
H. CONTRACTOR SHALL REPAIR ALL AREAS
DAMAGED OR DISTURBED DURING
CONSTRUCTION. THIS INCLUDES BUILDING
FINISHES, LANDSCAPING, SIDEWALKS, PAVING
OR ANY AREA DAMAGED BY CONSTRUCTION
WORK. RESTORE AREAS TO ORIGINAL
CONDITION.
I. DUMPSTER AND TRASH CHUTE LOCATIONS ARE
TO BE COORDINATED WITH THE COR PRIOR TO
LOCATION ON SITE.
J. CONTRACTOR SHALL PREPARE A PLAN
SHOWING LAYDOWN AREA, SECURITY FENCE,
DUMPSTER LOCATION AND ACCESS FOR COR
REVIEW AND APPROVAL.
K. ALL ROOFTOP EQUIPMENT IS FOR REFERENCE
ONLY. CONTRACTOR SHALL FIELD VERIFY ALL
EQUIPMENT PRIOR TO STARTING DEMOLITION.
L. WHERE NEW ROOFING MEETS EXISTING
ROOFING, VERIFY EXISTING ROOF SYSTEM
MEMBRANE TYPE AND INSULATION TYPE.
M. COORDINATE TRANSITION BETWEEN EXISTING
ROOF SYSTEM AND NEW ROOF SYSTEM TO
PROVIDE POSITIVE DRAINAGE AND PROPER
SHINGLING.
T
F.9
SLOPE: 1/4"
S L O
P E
: 1 /4
2 2
OUT OF SCOPE
INDICATES ROOF SLOPE
AREA TO BE REROOFED
SLOPE: 1/4"
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:3
P M
C U s e rs
\o m a n ts c h \D o c u m e n ts
\R e v it L o c a l\ A
-0
-D u rh a m
-A tr iu m
-N C o m a n ts c h
.r v t
AD105B
ROOF DEMOLITION PLAN - PARTIAL
ROOF AREA RE-ROOF
5 15OKM
CORRECT ATRIUM FIRE
PROTECTION ISSUES
DURHAM VA MEDICAL CENTER
508 FULTON ST.
DURHAM, NC 27705 JULY 28, 2023
CONSTRUCTION DRAWINGS
558-21-10621-045
WVS
N
KEY PLAN
SCALE: NO SCALE
ATRIUM
Scale: 1/8" = 1'-0"
ROOF DEMOLITION PLAN - PARTIAL ROOF AREA RE-ROOF
DEDUCT ALTERNATE: COMPLETE TEAR OFF AND
RE-ROOF OF IDENTIFIED AREA
(APPROX. 1,260 SF)
NORTH
0 4 8 16
ROOF LEGEND
1 REMOVE SKYLIGHT - SEE DETAIL ON SHEET AD105A
2 APPROXIMATE AREA OF ROOF SYSTEM REMOVAL
FOR INSTALLATION OF REINFORCEMENT STEEL.
DEMOLISH MEMBRANE, COVER BOARD, AND
INSULATION DOWN TO EXISTING METAL DECK.
3 EXISTING ROOF EDGE TO REMAIN.
4 DEMOLISH ROOFING TO EXISTING TREMINATION
BAR UNDER EXISTING SKYLIGHT METAL FLASHING
ON VERTICAL FACE.
A. CONTRACTOR SHALL PROVIDE PROPER SAFETY
BARRIERS AND ENCLOSURES AT ALL
ENTRY/EXIT POINTS FROM BUILDING WHERE
WORK IS BEING PERFORMED ABOVE TO
PROTECT PATIENTS, STAFF, AND VISITORS.
B. CONTRACTOR SHALL PROVIDE TEMPORARY
GUARDS AT EDGE OF ROOF WHERE WORK IS
BEING PERFORMED. ALL PERSONNEL SHALL
WEAR FALL PROTECTION.
C. CONTRACTOR SHALL TEMPORARILY REMOVE
ALL ROOF DRAIN COVERS AND PROVIDE BLOW
DOWN OF DRAIN PIPES TO ENSURE NO
BLOCKAGE.
D. EXISTING LIGHTNING PROTECTION IS
CONNECTED IN A CONTINUOUS LOOP. IDENTIFY
AND PROTECT EXISTING CONNECTIONS FROM
LOOP TO GROUND CONDUCTOR AND PREPARE
FOR NEW CONNECTIONS. REFER TO
ELECTRICAL DRAWINGS FOR NEW LIGHTNING
PROTECTION SYSTEM REQUIREMENTS.
E. CONTRACTOR SHALL PROVIDE FLASHING,
WATER PROOFING, AND FIRE STOPPING AS
REQUIRED FOR ALL NEW OR EXISTING PIPING,
SUPPORTS, CONDUIT, OR OTHER ITEMS ON OR
PENETRATING THE NEW ROOF SYSTEM.
F. CONTRACTOR SHALL PHASE THE REMOVAL AND
REPLACEMENT OF ROOFING. CONTRACTOR
SHALL NOT REMOVE MORE ROOFING THAN CAN
BE REPLACED IN ONE DAY.
G. ALL ROOF AND FLASHING DETAILS ARE GENERIC
AND FOR REFERENCE ONLY. THE FINAL DETAILS
SHALL BE SUBMITTED WITH THE ROOFING
MANUFACTURER'S RECOMMENDED DETAILS
FOR THEIR ROOFING SYSTEM TO BE INSTALLED.
H. CONTRACTOR SHALL REPAIR ALL AREAS
DAMAGED OR DISTURBED DURING
CONSTRUCTION. THIS INCLUDES BUILDING
FINISHES, LANDSCAPING, SIDEWALKS, PAVING
OR ANY AREA DAMAGED BY CONSTRUCTION
WORK. RESTORE AREAS TO ORIGINAL
CONDITION.
I. DUMPSTER AND TRASH CHUTE LOCATIONS ARE
TO BE COORDINATED WITH THE COR PRIOR TO
LOCATION ON SITE.
J. CONTRACTOR SHALL PREPARE A PLAN
SHOWING LAYDOWN AREA, SECURITY FENCE,
DUMPSTER LOCATION AND ACCESS FOR COR
REVIEW AND APPROVAL.
K. ALL ROOFTOP EQUIPMENT IS FOR REFERENCE
ONLY. CONTRACTOR SHALL FIELD VERIFY ALL
EQUIPMENT PRIOR TO STARTING DEMOLITION.
L. WHERE NEW ROOFING MEETS EXISTING
ROOFING, VERIFY EXISTING ROOF SYSTEM
MEMBRANE TYPE AND INSULATION TYPE.
M. COORDINATE TRANSITION BETWEEN EXISTING
ROOF SYSTEM AND NEW ROOF SYSTEM TO
PROVIDE POSITIVE DRAINAGE AND PROPER
SHINGLING.
T
A-105A
F.9
A-105A
SLOPE: 1/4"
S L O
P E
: 1 /4
2 2
+12"+12"
+12"
/2
+2"+2"
+2"
+2"
3 3
EXISTING LOAD BEARING
PERPENDICULAR TRUSS
EXISTING
FILLER TRUSS
FILLER TRUSS
BEYOND
CUSTOM RETROFIT CURB.
INSTALLED OVER EXISTING
SKYLIGHT FRAMING
NEW 2-LAYER COLD
APPLIED SBS
ROOFING SYSTEM
CANT
EXISTING FLASHING TO
REMAIN INTACT AND
UNDISTURBED
EXISTING
STRUCTURAL
SKYLIGHT CURB
EXISTING EXTERIOR
FLASHING AT
EXISTING EXTERIOR
WALL AND SKYLIGHT
CURB. TO REMAIN
SEAL AT PENETRATION OF
DUCTWORK AND NEW RETROFIT
CURB ALL SIDES. TYP.
SLOPE CURB AWAY FROM EDGE OF
EXISTING EXTERIOR WALL
EXISTING EXPANSION
JOINT
EXISTING EIFS
INTERIOR FINISH
NEW RIGID INSULATION
NEW 2X2 TUBE STEEL
FABRICATION TO SUPPORT
MECHANICAL UNIT -
COORDINATE SUPPORT
POINTS. VERTICALS TO BE
WELDED TO TOP OF STEEL
RAILS
1'-4 1/2"
1"
12"
NEW DUCTWORK SEE
MECHANICAL
EXISTING
FILLER TRUSS
BEYOND
BRICK BEYOND
SEAL AT PENETRATION OF
DUCTWORK AND NEW
RETROFIT CURB ALL SIDES.
TYP.
OPEN TO ROOF
BEYOND
T 13
10'-3 1/2"
EQ EQ
NEW DUCT WORK, CENTER
IN SKYLIGHT
CUSTOM RETROFIT CURB.
INSTALLED OVER EXISTING
SKYLIGHT FRAMING
ALL INTERIOR DUCTWORK
TO BE PAINTED TO
UNDERSIDE OF CURB
OUT OF SCOPE
INDICATES ROOF SLOPE
AREA TO BE REROOFED
SLOPE: 1/4"
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:5
P M
C U s e rs
\o m a n ts c h \D o c u m e n ts
\R e v it L o c a l\ A
-0
-D u rh a m
-A tr iu m
-N C o m a n ts c h
.r v t
A-105A
ROOF PLAN - REROOF WHOLE ROOF
AREA
6 15OKM
CORRECT ATRIUM FIRE
PROTECTION ISSUES
DURHAM VA MEDICAL CENTER
508 FULTON ST.
DURHAM, NC 27705 JULY 28, 2023
CONSTRUCTION DRAWINGS
558-21-10621-045
WVS
Scale: 1/8" = 1'-0"
ROOF PLAN - REROOF WHOLE ROOF AREA
N
KEY PLAN
SCALE: NO SCALE
ATRIUM
Scale: 1/2" = 1'-0"
SECTION AT SKYLIGHT
Scale: 1/2" = 1'-0"
SECTION AT SKYLIGHT AND DUCTWORK
(APPROX. 3,450 SF)
A. CONTRACTOR SHALL PROVIDE PROPER SAFETY
BARRIERS AND ENCLOSURES AT ALL
ENTRY/EXIT POINTS FROM BUILDING WHERE
WORK IS BEING PERFORMED ABOVE TO
PROTECT PATIENTS, STAFF, AND VISITORS.
B. CONTRACTOR SHALL PROVIDE TEMPORARY
GUARDS AT EDGE OF ROOF WHERE WORK IS
BEING PERFORMED. ALL PERSONNEL SHALL
WEAR FALL PROTECTION.
C. CONTRACTOR SHALL TEMPORARILY REMOVE
ALL ROOF DRAIN COVERS AND PROVIDE BLOW
DOWN OF DRAIN PIPES TO ENSURE NO
BLOCKAGE.
D. EXISTING LIGHTNING PROTECTION IS
CONNECTED IN A CONTINUOUS LOOP. IDENTIFY
AND PROTECT EXISTING CONNECTIONS FROM
LOOP TO GROUND CONDUCTOR AND PREPARE
FOR NEW CONNECTIONS. REFER TO
ELECTRICAL DRAWINGS FOR NEW LIGHTNING
PROTECTION SYSTEM REQUIREMENTS.
E. CONTRACTOR SHALL PROVIDE FLASHING,
WATER PROOFING, AND FIRE STOPPING AS
REQUIRED FOR ALL NEW OR EXISTING PIPING,
SUPPORTS, CONDUIT, OR OTHER ITEMS ON OR
PENETRATING THE NEW ROOF SYSTEM.
F. CONTRACTOR SHALL PHASE THE REMOVAL AND
REPLACEMENT OF ROOFING. CONTRACTOR
SHALL NOT REMOVE MORE ROOFING THAN CAN
BE REPLACED IN ONE DAY.
G. ALL ROOF AND FLASHING DETAILS ARE GENERIC
AND FOR REFERENCE ONLY. THE FINAL DETAILS
SHALL BE SUBMITTED WITH THE ROOFING
MANUFACTURER'S RECOMMENDED DETAILS
FOR THEIR ROOFING SYSTEM TO BE INSTALLED.
H. CONTRACTOR SHALL REPAIR ALL AREAS
DAMAGED OR DISTURBED DURING
CONSTRUCTION. THIS INCLUDES BUILDING
FINISHES, LANDSCAPING, SIDEWALKS, PAVING
OR ANY AREA DAMAGED BY CONSTRUCTION
WORK. RESTORE AREAS TO ORIGINAL
CONDITION.
I. DUMPSTER AND TRASH CHUTE LOCATIONS ARE
TO BE COORDINATED WITH THE COR PRIOR TO
LOCATION ON SITE.
J. CONTRACTOR SHALL PREPARE A PLAN
SHOWING LAYDOWN AREA, SECURITY FENCE,
DUMPSTER LOCATION AND ACCESS FOR COR
REVIEW AND APPROVAL.
K. ALL ROOFTOP EQUIPMENT IS FOR REFERENCE
ONLY. CONTRACTOR SHALL FIELD VERIFY ALL
EQUIPMENT PRIOR TO STARTING DEMOLITION.
L. WHERE NEW ROOFING MEETS EXISTING
ROOFING, VERIFY EXISTING ROOF SYSTEM
MEMBRANE TYPE AND INSULATION TYPE.
M. COORDINATE TRANSITION BETWEEN EXISTING
ROOF SYSTEM AND NEW ROOF SYSTEM TO
PROVIDE POSITIVE DRAINAGE AND PROPER
SHINGLING.
1 NEW ROOFING SYSTEM. POLY-ISO INSULATION
ATTACHED TO EXISTING METAL DECK (SEE NOTES
FOR THICKNESSES) WITH 5/8" GYPSUM COVER
BOARD AND 2 PLY SBS ROOF - BASE AND CAP
SHEET - COLD APPLIED ADHERED.
2 INDICATES…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .