This document package includes a solicitation and related federal contract opportunity documents for corrective fire protection work at a Department of Veterans Affairs medical center. The solicitation seeks a contractor to install a new smoke exhaust system, new supply system, and roof replacement to meet design requirements, including new ducting, electrical, and fire alarm system upgrades. The contractor must coordinate installation with the VA to complete all roof replacement work on weekends and off hours to avoid disrupting medical center operations. The contractor will be responsible for all labor, materials, equipment, testing, transportation, and storage for the project. The solicitation number is 36C24624B0007_1 and was issued by the Department of Veterans Affairs Veterans Health Administration VISN 6 for the Y1DA-558-21-106 opportunity to correct fire protection issues at the Durham VA Medical Center located in Durham, North Carolina. The bid opening is scheduled for March 28, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24624B0007 0004.pdf | ||
| 36C24624B0007 0002.docx | DOCX document | |
| Attachment A - Base Bid Cost Breakdown Worksheet.xlsx | XLSX spreadsheet | |
| 558-21-106 IFC Specs 23AUG23.pdf | ||
| 36C24624B0007 0001.docx | DOCX document | |
| IFC 04AUG2023 Specs Revision 2.pdf | ||
| IFC 04AUG2023 Drawings Revision 2.pdf | ||
| 36C24624B0007_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 5
3/14/2024
558-21-106
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive
To all Offerors/Bidders
36C24624B0007
02-06-2024
X
X X
X One
The purpose of this amendment for solicitation 36C24624B0007 is to respond to contractor's questions as of 3/14/2024.
Questions and Answers are on the following page. No further questions will be received as of 3/14/2024.
Please see attached drawings E-102 and E-602 (updated as of 3/13/2024).
Reminder: Bid opening: March 28, 2024, 3:00PM EST (Building 27) ATTN: Vangie T. Miller Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive (Bldg. 27)
Requestion for Information Correct Atrium Fire Protection
Project # 558-21-106: Durham VAMC
Question: Please confirm that the roof replacement portion of this project is the only portion that will need to be completed on weekends, as stated on S-102. If so, please also confirm that all other work can be completed during normal working hours.
Answer: Negative. The interior window replacement, installation of HVAC ducting down the walls, electrical conduit install on the walls, steel reinforcing of the roof trusses will all have to be on off-hours for the dining area.
Per the Scope of Work:
“The contractor will have to coordinate the installation schedule with Durham VA, it is anticipated that all roof replacement will have to be done on weekends…. Shutting down of the entire dining area during normal weekday hours for construction will not be allowed.”
Question: Note 9 on A-201 states: “Limited hour access to first floor courtyard. Coordinate working hours with COR prior to bidding”. What are the available working hours for this courtyard?
Answer: From the Scope of Work:
“Any dust creating activity from the work that will impact the dining area of the canteen (the ground floor area outside the service line area) will have to be done when dining area is closed.
This means after 400pm Monday thru Friday, or weekends. That will be at least: activities where drilling thru the bricks occur (electrical conduit, duct work, etc.), roofing activities (cutting holes thru the roof), steel reinforcing activities, storefront/window replacement, setting of equipment on roof (by any means), or other demolition inside the atrium.”
Question: Would it be possible to consolidate the regular usage of the dining area for either phasing work or storage of materials, and otherwise keep it open for VA use during normal hours, for any portion of this project?
Answer: The VA is open for storing a limited amount/number of items (approximately 12’x12’) in the atrium during non-work, but understand it can’t be isolated by a fence, only construction tape. The VA cannot guarantee the security of any items left in the room. It would have to be secured so nothing accidently tips over on a patron that sits too close at a table, or any other accident while the contractor is not present.
Any dust creating activities cannot occur when the diners are using the area. Non-dust creating activities (i.e., pulling wiring, programing, testing) can be coordinated with COR.
Question: Will there be a space in or near the dining area that can be used for storage or will tools and materials need to be completely removed from the building after every work shift?
Answer: There are no storage rooms available inside the building. The VA will work with the contractor to locate a space for a CONNEX box outside the building as close as possible to the closest entrance. A smaller CONNEX box has a higher likelihood of behind located closer to the building, a larger CONNEX box will have to be located further away.
Requestion for Information Correct Atrium Fire Protection
Project # 558-21-106: Durham VAMC
Page Left Intentionally Blank
S S S S S S S S S S SSSSSSSSS
S S
S S
S S S
S S
S
S S SSSSS S
KEEPING
HOUSE
SWITCHGEAR ROOM
ELECTRONIC SHOP STORAGE
STAIR-12
CLOSET
OFFICE
LAB
OFFICE
OFFICE
OFFICE
CLOSET
ELECTRICAL
CANTEEN
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CAFETERIA
CANTEEN DINING
CANTEEN DINING
CORRIDOR
MECH RM
ELECTRICAL
IT
HAC
EG001
BG004
BG000
AG002
EG006
EG007
EG011
EG009
EG010
EG012
EG008
EG004
EG005
EG002
EG005A
EG007A
BG002 BG001A
EG003A EG003B
PNL EC BG00
E
M
E
E
E E
PANEL
'EQROOF'
PROPOSED CONDUIT ROUTE TO
SERVE PANEL 'EQROOF', ABOVE
EXISTING CEILING.
'ELSMDP-2'- 1
'ELSMDP-2'- 2
'ELSMDP-2'- 3
A 17 20 F.1 21F.919
R
S
T
'ELSMDP-2'- 4
'ELSMDP-2'- 5
BUILDING
ATS
ETR
ETR
ATS-5
ETR
500 KVA
XFMR
ATS-3
800A
EMERGENCY SWITCHBORAD (ETR)
NORMAL SWITCHBOARD (ETR)
EXISTING
PANEL
'ELSMDP'
PANEL
'ELSMDP-2'
EXISTING
PANEL 'EEDD'
EXISTING
PANEL 'EE1'
EXISTING
FAN
ATS-6
ETR
ATS-2
ETR
ATS-4
ETR
ATS-1
ETR
ATS
ETR
ATS
ETR
16 16
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/1
/2
:5
:1
P
M C
U s e rs
\a m a s o n \D o c u m e n ts
\E
-0
-D u rh a m -A tr iu m -N
C a m a s o n a c g
-p a
.c o m
.r v t
E-102
GROUND FLOOR ELECTRICAL PLAN
3 6AMM
CORRECT ATRIUM FIRE
PROTECTION ISSUES
DURHAM VA MEDICAL CENTER
508 FULTON ST.
DURHAM, NC 27705 JULY 28, 2023
CONSTRUCTION DRAWINGS
558-21-10621-045
JKM
N
KEY PLAN
SCALE: NO SCALE
ATRIUM
Scale: 3/16" = 1'-0"
GROUND FLOOR ELECTRICAL PLAN
1 NEW PANEL 'EQROOF', COORDINATE EXACT
LOCATION WITHIN ROOM WITH AVAILABLE
SPACE.
2 NEW LIFE SAFETY ATS, COORDINATE EXACT
LOCATION WITHIN ROOM TO ALIGN WITH
EXISTING ATS AT THIS LOCATION. SEE
KEYNOTE 16.
3 SEAL ALL PENETRATIONS OF RATED WALLS
TO MAINTAIN FIRE RATING.
4 PROVIDE MOTOR RATED SWITCH AND 120V/1
PHASE CIRCUIT FOR NEW FIRE SHUTTER.
COORDINATE WITH OTHER DISCIPLINES.
5 REMOVE EXISTING BREAKER IN SIEMENS
SWITCHGEAR SERVING ATS 5 AND SEND TO
SIEMENS FACILITY IN CHARLOTTE, NC FOR
RETROFIT. SEND THE BREAKER IN TO
SIEMENS REPAIR FACILITY IN CHARLOTTE, NC
TO HAVE THE BREAKER SERVICED AND
RETROFITTED WITH THE AC PRO II TRIP
SYSTEM. NEW CURRENT SENSORS WILL BE
INCLUDED IN THE RETROFIT KIT THAT WILL BE
RATED FOR 1600 AMPS. REFER TO THE
SINGLE LINE DIAGRAM ON SHEET E-602 FOR
ADDITIONAL INFORMATION.
6 ROUTE CONDUITS FROM PANEL 'EQROOF'
VERTICALLY UP WALL, ROUTED ADJACENT TO
AND CLOSE TO VERTICAL HVAC DUCT, SO AS
TO BE AS UNOBTRUSIVE AS POSSIBLE.
7 CIRCUIT FOR FIRE/SMOKE DAMPER LOCATED
IN MECHANICAL ROOM. COORDINATE EXACT
LOCATION WITH FIRE ALARM PLANS. SEE
SHEET MH-103 AND MH-105 FOR LOCATION OF
FIRE/SMOKE DAMPERS. CONNECT USING 2-12
AWG, 1-12 AWG EG IN 3/4" CONDUIT.
8 PROVIDE 120V CIRCUITS FOR NEW
ASPIRATING SMOKE DETECTION PANEL, NEW
DDC CONTROL PANEL, AND NEW FIRE ALARM
SUBPANEL. COORDINATE EXACT LOCATION
WITH MECHANICAL AND FIRE ALARM
CONTRACTORS.
9 APPROXIMATE ROUTE FROM NORMAL
SWITCHBOARD TO NEW RACK-MOUNTED
WIREWAY. CONTRACTOR TO FIELD VERIFY
EXACT ROUTE.
10 PROPOSED ROUTE OF FEEDER FROM ATS TO
NEW PANEL. CONTRACTOR TO FIELD VERIFY
ROUTE AND UTILIZE THE OPTIMAL PATH.
11 PROPOSED ROUTE OF CONDUITS FROM NEW
PANEL UP TO ROOF. CONCEAL CONDUITS
BEHIND NEW VERTICAL DUCTWORK TO THE
GREATEST EXTENT POSSIBLE.
12 CONDUIT UP THROUGH ROOF TO EXISTING
GENERATOR BREAKER. CONTRACTOR TO
VERIFY DISTANCE.
13 MOUNT TWO ENCLOSED CIRCUIT BREAKERS
ON CONTRACTOR PROVIDED RACK, LOCATED
ADJACENT TO NEW ATS. SEE SINGLE LINE
DIAGRAM.
14 EXISTING OVERHEAD 800A BUS DUCT
SERVING ATS TO BE RAISED AT THIS SECTION
TO MAKE AVAILABLE CLEARANCE FOR NEW
ATS. ALL WORK ASSOCIATED WITH RAISING
THE BUSWAY SERVING ATS-3 MUST BE DONE
ON THE WEEKEND AND COORDINATED WITH
THE VA A MINIMUM OF TWO WEEKS PRIOR TO
THE OUTAGE.
15 1000A ECB. SEE SINGLE LINE. FIELD
COORDINATE EXACT PLACEMENT WITH
AVAILABLE SPACE TO MAINTAIN
CLEARANCES.
16 INSTALL VOLTAGE SENSING MODULE/RELAY
ON THE LINE SIDE OF THE MAIN BREAKER OF
EACH MAIN BREAKER OF THE DOUBLE ENDED
SWITCHGEAR, TO COMMUNICATE STATUS TO
THE ATS. ATS TO START THE GENERATOR
AND CONTINUE ON EMERGENCY ANY TIME
EITHER OF THE TWO PRIMARY FEEDS TO THE
DOUBLE ENDED SWITCHGEAR IS
DE-ENERGIZED. MODULE/RELAY IS TO HAVE
NO AND NC CONTACTS TO COMMUNICATE
WITH ATS.
A. COORDINATE ROUTING WITH OTHER
DISCIPLINES.
B. POWER WIRING FOR FIRE SHUTTER SHALL BE
RUN ABOVE CEILING AS MUCH AS POSSIBLE. ALL
EXPOSED CONDUIT SHALL BE METALLIC
SURFACE MOUNTED WIREWAY, PAINTED TO
MATCH SURFACE OF WALL.
C. REFER TO FIRE ALARM PLAN FOR LOCATION OF
LOBBY ANNUNCIATOR, CIRCUITED TO CIRCUIT
'ELSMDP-2'-6. CONDUIT SHALL ROUTE TO MAIN
LOBBY, VIA CHASE BESIDE EXISTING STAIRWELL.
NORTH
0 42 8
1 REMOVE EXISTING SURFACE MOUNTED
RACEWAY ON WALL AND DEMOLISH BACK TO
SOURCE OR NEAREST JUNCTION BOX WHICH
SERVES OTHER DEVICES.
1 SWITCHBOARD MONITORING CHANGES 3/13/2024
DocuSign Envelope ID: 25114CC0-7AAE-4454-93A6-23C7D3B72E79
3/13/2024
Engineers Architects Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
Date Checked Drawn
# 6 6AMMJKM
1 SWITCHBOARD MONITORING CHANGES 3/08/2024
| 36C24624B0007 0003 |
| 21-045-Electrical Updated 031324 |
| 21-045-Electrical Updated |
| Sheets |
| E-102 - GROUND FLOOR ELECTRICAL PLAN |
21-045-Electrical Updated 2
File details come from the government source that posted it. Updated .