Y1DA--558-21-106 | Correct Atrium Fire Protection Issues Federal contract opportunity
Solicitation number
36C24624B0007_1
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This document package includes a solicitation and related federal contract opportunity documents for corrective fire protection work at a Department of Veterans Affairs medical center. The solicitation seeks a contractor to install a new smoke exhaust system, new supply system, and roof replacement to meet design requirements, including new ducting, electrical, and fire alarm system upgrades. The contractor must coordinate installation with the VA to complete all roof replacement work on weekends and off hours to avoid disrupting medical center operations. The contractor will be responsible for all labor, materials, equipment, testing, transportation, and storage for the project. The solicitation number is 36C24624B0007_1 and was issued by the Department of Veterans Affairs Veterans Health Administration VISN 6 for the Y1DA-558-21-106 opportunity to correct fire protection issues at the Durham VA Medical Center located in Durham, North Carolina. The bid opening is scheduled for March 28, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--558-21-106 | Correct Atrium Fire Protection Issues, newest first.
File Type Posted
36C24624B0007 0004.pdf PDF
36C24624B0007 0002.docx DOCX document
Attachment A - Base Bid Cost Breakdown Worksheet.xlsx XLSX spreadsheet
558-21-106 IFC Specs 23AUG23.pdf PDF
36C24624B0007 0001.docx DOCX document
IFC 04AUG2023 Specs Revision 2.pdf PDF
IFC 04AUG2023 Drawings Revision 2.pdf PDF
36C24624B0007_1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 5

3/14/2024

558-21-106

Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667

Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive

To all Offerors/Bidders

36C24624B0007

02-06-2024

X

X X

X One

The purpose of this amendment for solicitation 36C24624B0007 is to respond to contractor's questions as of 3/14/2024.

Questions and Answers are on the following page. No further questions will be received as of 3/14/2024.

Please see attached drawings E-102 and E-602 (updated as of 3/13/2024).

Reminder: Bid opening: March 28, 2024, 3:00PM EST (Building 27) ATTN: Vangie T. Miller Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive (Bldg. 27)

Requestion for Information Correct Atrium Fire Protection

Project # 558-21-106: Durham VAMC

Question: Please confirm that the roof replacement portion of this project is the only portion that will need to be completed on weekends, as stated on S-102. If so, please also confirm that all other work can be completed during normal working hours.

Answer: Negative. The interior window replacement, installation of HVAC ducting down the walls, electrical conduit install on the walls, steel reinforcing of the roof trusses will all have to be on off-hours for the dining area.

Per the Scope of Work:

“The contractor will have to coordinate the installation schedule with Durham VA, it is anticipated that all roof replacement will have to be done on weekends…. Shutting down of the entire dining area during normal weekday hours for construction will not be allowed.”

Question: Note 9 on A-201 states: “Limited hour access to first floor courtyard. Coordinate working hours with COR prior to bidding”. What are the available working hours for this courtyard?

Answer: From the Scope of Work:

“Any dust creating activity from the work that will impact the dining area of the canteen (the ground floor area outside the service line area) will have to be done when dining area is closed.

This means after 400pm Monday thru Friday, or weekends. That will be at least: activities where drilling thru the bricks occur (electrical conduit, duct work, etc.), roofing activities (cutting holes thru the roof), steel reinforcing activities, storefront/window replacement, setting of equipment on roof (by any means), or other demolition inside the atrium.”

Question: Would it be possible to consolidate the regular usage of the dining area for either phasing work or storage of materials, and otherwise keep it open for VA use during normal hours, for any portion of this project?

Answer: The VA is open for storing a limited amount/number of items (approximately 12’x12’) in the atrium during non-work, but understand it can’t be isolated by a fence, only construction tape. The VA cannot guarantee the security of any items left in the room. It would have to be secured so nothing accidently tips over on a patron that sits too close at a table, or any other accident while the contractor is not present.

Any dust creating activities cannot occur when the diners are using the area. Non-dust creating activities (i.e., pulling wiring, programing, testing) can be coordinated with COR.

Question: Will there be a space in or near the dining area that can be used for storage or will tools and materials need to be completely removed from the building after every work shift?

Answer: There are no storage rooms available inside the building. The VA will work with the contractor to locate a space for a CONNEX box outside the building as close as possible to the closest entrance. A smaller CONNEX box has a higher likelihood of behind located closer to the building, a larger CONNEX box will have to be located further away.

Requestion for Information Correct Atrium Fire Protection

Project # 558-21-106: Durham VAMC

Page Left Intentionally Blank

S S S S S S S S S S SSSSSSSSS

S S

S S

S S S

S S

S

S S SSSSS S

KEEPING

HOUSE

SWITCHGEAR ROOM

ELECTRONIC SHOP STORAGE

STAIR-12

CLOSET

OFFICE

LAB

OFFICE

OFFICE

OFFICE

CLOSET

ELECTRICAL

CANTEEN

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CAFETERIA

CANTEEN DINING

CANTEEN DINING

CORRIDOR

MECH RM

ELECTRICAL

IT

HAC

EG001

BG004

BG000

AG002

EG006

EG007

EG011

EG009

EG010

EG012

EG008

EG004

EG005

EG002

EG005A

EG007A

BG002 BG001A

EG003A EG003B

PNL EC BG00

E

M

E

E

E E

PANEL

'EQROOF'

PROPOSED CONDUIT ROUTE TO

SERVE PANEL 'EQROOF', ABOVE

EXISTING CEILING.

'ELSMDP-2'- 1

'ELSMDP-2'- 2

'ELSMDP-2'- 3

A 17 20 F.1 21F.919

R

S

T

'ELSMDP-2'- 4

'ELSMDP-2'- 5

BUILDING

ATS

ETR

ETR

ATS-5

ETR

500 KVA

XFMR

ATS-3

800A

EMERGENCY SWITCHBORAD (ETR)

NORMAL SWITCHBOARD (ETR)

EXISTING

PANEL

'ELSMDP'

PANEL

'ELSMDP-2'

EXISTING

PANEL 'EEDD'

EXISTING

PANEL 'EE1'

EXISTING

FAN

ATS-6

ETR

ATS-2

ETR

ATS-4

ETR

ATS-1

ETR

ATS

ETR

ATS

ETR

16 16

Engineers Architects

# KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/1

/2

:5

:1

P

M C

U s e rs

\a m a s o n \D o c u m e n ts

\E

-0

-D u rh a m -A tr iu m -N

C a m a s o n a c g

-p a

.c o m

.r v t

E-102

GROUND FLOOR ELECTRICAL PLAN

3 6AMM

CORRECT ATRIUM FIRE

PROTECTION ISSUES

DURHAM VA MEDICAL CENTER

508 FULTON ST.

DURHAM, NC 27705 JULY 28, 2023

CONSTRUCTION DRAWINGS

558-21-10621-045

JKM

N

KEY PLAN

SCALE: NO SCALE

ATRIUM

Scale: 3/16" = 1'-0"

GROUND FLOOR ELECTRICAL PLAN

1 NEW PANEL 'EQROOF', COORDINATE EXACT

LOCATION WITHIN ROOM WITH AVAILABLE

SPACE.

2 NEW LIFE SAFETY ATS, COORDINATE EXACT

LOCATION WITHIN ROOM TO ALIGN WITH

EXISTING ATS AT THIS LOCATION. SEE

KEYNOTE 16.

3 SEAL ALL PENETRATIONS OF RATED WALLS

TO MAINTAIN FIRE RATING.

4 PROVIDE MOTOR RATED SWITCH AND 120V/1

PHASE CIRCUIT FOR NEW FIRE SHUTTER.

COORDINATE WITH OTHER DISCIPLINES.

5 REMOVE EXISTING BREAKER IN SIEMENS

SWITCHGEAR SERVING ATS 5 AND SEND TO

SIEMENS FACILITY IN CHARLOTTE, NC FOR

RETROFIT. SEND THE BREAKER IN TO

SIEMENS REPAIR FACILITY IN CHARLOTTE, NC

TO HAVE THE BREAKER SERVICED AND

RETROFITTED WITH THE AC PRO II TRIP

SYSTEM. NEW CURRENT SENSORS WILL BE

INCLUDED IN THE RETROFIT KIT THAT WILL BE

RATED FOR 1600 AMPS. REFER TO THE

SINGLE LINE DIAGRAM ON SHEET E-602 FOR

ADDITIONAL INFORMATION.

6 ROUTE CONDUITS FROM PANEL 'EQROOF'

VERTICALLY UP WALL, ROUTED ADJACENT TO

AND CLOSE TO VERTICAL HVAC DUCT, SO AS

TO BE AS UNOBTRUSIVE AS POSSIBLE.

7 CIRCUIT FOR FIRE/SMOKE DAMPER LOCATED

IN MECHANICAL ROOM. COORDINATE EXACT

LOCATION WITH FIRE ALARM PLANS. SEE

SHEET MH-103 AND MH-105 FOR LOCATION OF

FIRE/SMOKE DAMPERS. CONNECT USING 2-12

AWG, 1-12 AWG EG IN 3/4" CONDUIT.

8 PROVIDE 120V CIRCUITS FOR NEW

ASPIRATING SMOKE DETECTION PANEL, NEW

DDC CONTROL PANEL, AND NEW FIRE ALARM

SUBPANEL. COORDINATE EXACT LOCATION

WITH MECHANICAL AND FIRE ALARM

CONTRACTORS.

9 APPROXIMATE ROUTE FROM NORMAL

SWITCHBOARD TO NEW RACK-MOUNTED

WIREWAY. CONTRACTOR TO FIELD VERIFY

EXACT ROUTE.

10 PROPOSED ROUTE OF FEEDER FROM ATS TO

NEW PANEL. CONTRACTOR TO FIELD VERIFY

ROUTE AND UTILIZE THE OPTIMAL PATH.

11 PROPOSED ROUTE OF CONDUITS FROM NEW

PANEL UP TO ROOF. CONCEAL CONDUITS

BEHIND NEW VERTICAL DUCTWORK TO THE

GREATEST EXTENT POSSIBLE.

12 CONDUIT UP THROUGH ROOF TO EXISTING

GENERATOR BREAKER. CONTRACTOR TO

VERIFY DISTANCE.

13 MOUNT TWO ENCLOSED CIRCUIT BREAKERS

ON CONTRACTOR PROVIDED RACK, LOCATED

ADJACENT TO NEW ATS. SEE SINGLE LINE

DIAGRAM.

14 EXISTING OVERHEAD 800A BUS DUCT

SERVING ATS TO BE RAISED AT THIS SECTION

TO MAKE AVAILABLE CLEARANCE FOR NEW

ATS. ALL WORK ASSOCIATED WITH RAISING

THE BUSWAY SERVING ATS-3 MUST BE DONE

ON THE WEEKEND AND COORDINATED WITH

THE VA A MINIMUM OF TWO WEEKS PRIOR TO

THE OUTAGE.

15 1000A ECB. SEE SINGLE LINE. FIELD

COORDINATE EXACT PLACEMENT WITH

AVAILABLE SPACE TO MAINTAIN

CLEARANCES.

16 INSTALL VOLTAGE SENSING MODULE/RELAY

ON THE LINE SIDE OF THE MAIN BREAKER OF

EACH MAIN BREAKER OF THE DOUBLE ENDED

SWITCHGEAR, TO COMMUNICATE STATUS TO

THE ATS. ATS TO START THE GENERATOR

AND CONTINUE ON EMERGENCY ANY TIME

EITHER OF THE TWO PRIMARY FEEDS TO THE

DOUBLE ENDED SWITCHGEAR IS

DE-ENERGIZED. MODULE/RELAY IS TO HAVE

NO AND NC CONTACTS TO COMMUNICATE

WITH ATS.

A. COORDINATE ROUTING WITH OTHER

DISCIPLINES.

B. POWER WIRING FOR FIRE SHUTTER SHALL BE

RUN ABOVE CEILING AS MUCH AS POSSIBLE. ALL

EXPOSED CONDUIT SHALL BE METALLIC

SURFACE MOUNTED WIREWAY, PAINTED TO

MATCH SURFACE OF WALL.

C. REFER TO FIRE ALARM PLAN FOR LOCATION OF

LOBBY ANNUNCIATOR, CIRCUITED TO CIRCUIT

'ELSMDP-2'-6. CONDUIT SHALL ROUTE TO MAIN

LOBBY, VIA CHASE BESIDE EXISTING STAIRWELL.

NORTH

0 42 8

1 REMOVE EXISTING SURFACE MOUNTED

RACEWAY ON WALL AND DEMOLISH BACK TO

SOURCE OR NEAREST JUNCTION BOX WHICH

SERVES OTHER DEVICES.

1 SWITCHBOARD MONITORING CHANGES 3/13/2024

DocuSign Envelope ID: 25114CC0-7AAE-4454-93A6-23C7D3B72E79

3/13/2024

Engineers Architects Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

Date Checked Drawn

# 6 6AMMJKM

1 SWITCHBOARD MONITORING CHANGES 3/08/2024

36C24624B0007 0003
21-045-Electrical Updated 031324
21-045-Electrical Updated
Sheets
E-102 - GROUND FLOOR ELECTRICAL PLAN

21-045-Electrical Updated 2

File details come from the government source that posted it. Updated .