36C24624B0007 0002.docx
DOCX document 100 KB Posted
- Attached to
- Y1DA--558-21-106 | Correct Atrium Fire Protection Issues Federal contract opportunity
- Solicitation number
- 36C24624B0007_1
About this file
This document contains an amendment to a solicitation for corrective fire protection work at the Durham VA Medical Center. The amendment provides responses to contractor questions to clarify project requirements. The scope of work involves installing a new smoke exhaust system, supply system, and roof replacement to meet design specifications for fire protection in the atrium. New ducting, electrical, and fire alarm upgrades are required along with coordination of installation schedules. The contractor will be responsible for all labor, materials, equipment, testing, and storage. The existing DDC control system is Siemens and will be utilized with the new JCI fire alarm panel for atrium control and read only notifications. Clarification was provided that no new ECC is needed, the BAS contractor is responsible for VFDs, and utilizing existing Siemens P1/P2 protocols is allowed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24624B0007 0004.pdf | ||
| 36C24624B0007 0003.pdf | ||
| Attachment A - Base Bid Cost Breakdown Worksheet.xlsx | XLSX spreadsheet | |
| 558-21-106 IFC Specs 23AUG23.pdf | ||
| 36C24624B0007 0001.docx | DOCX document | |
| 36C24624B0007_1.pdf | ||
| IFC 04AUG2023 Specs Revision 2.pdf | ||
| IFC 04AUG2023 Drawings Revision 2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information Correct Atrium Fire Protection Project # 558-21-106: Durham VAMC
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning ___One_______ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
3/13/2024
558-21-106
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667
Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667 To all Offerors/Bidders
36C24624B0007 02-06-2024
X
One The purpose of this amendment for solicitation 36C24624B0007 is to respond to contractor's questions as of 3/13/2024.
Questions and Answers are on the following page.
IMPORTANT NOTE: Spec 01 91 00 – General Commissioning Requirements Amended to include:
The Contractor’s commissioning responsibility is to appoint an independent commissioning Agent to perform commissioning process prior to project close out. Any commissioning observations and issues that are found throughout the commissioning process will be forwarded to the A/E on record and the VA for final approval.
*Another amendment will be posted on or about 3/15/2024 to provide new stamped drawings and electrical sheets.
Reminder: Bid opening: March 28, 2024, 3:00PM EST (Building 27)
CONTINUATION PAGE
Question: Who provides the Aspirating Smoke Detection Panel (ASP-1)? BAS contractor?
Answer: The Prime contractor shall determine the SOW for the various subcontractors.
Question: Is there a preferred brand for the ASP-1?
Answer: The basis of design equipment is Xtralis Question: Please confirm that the contractor providing the ASP-1 will also be providing all of the associated devices (audio/visual alarms, space pressure transducers, control of fans/fire-smoke dampers/motorized dampers/AHU-54 interlock/etc.
Answer: The Prime contractor shall determine the SOW for the various subcontractors.
Question: Spec calls for “the control system shall accommodate 1 Engineering Control Center (ECC) and the control system shall accommodate 5 web-users simultaneously – VAMC Durham currently has a Siemens BAS with capability for 5 simultaneous users, please confirm these existing systems are sufficient and do not need to be modified.
Answer: No new ECC is required.
Question: Spec calls for 230923 to provide the VFD’s – Please confirm if BAS contractor is to provide VFD’s.
Answer: The Prime contractor shall determine the SOW for the various subcontractors Question: Spec clarifies that “this facility’s existing DDC system is manufactured by JCI” – Currently VAMC Durham has a Siemens DDC BAS, please confirm this.
Answer: The system shall be controlled by the new JCI Fire Alarm panel for the atrium with read only notification to the Siemens DDC.
Question: Spec calls for an “upgrade to the existing DDC systems ECC. The upgraded ECC shall continue to communicate with the existing DDC system’s devices. The upgraded ECC shall communicate directly with eh new native BACnet devices over the existing control system’s communications network”. It continues to describe the “combined system shall operate and function as one complete system. VAMC Durham currently has a Siemens BAS with that is utilizing Siemens P1 and P2 communication protocols due to the VAMC Durham IT groups not allowing BACnet on their network. Please confirm utilizing the existing Siemens BAS will be sufficient and do not need to be modified and also that utilizing Siemens P1 and P2 communication protocols will be allowed.
Answer: Confirmed.
Question: Spec calls for the controls and instrumentation subcontractor to be responsible for temporary operations and maintenance of the control system during controlling period until final commissioning. Please confirm if this is required.
Answer: Confirmed Question: Spec calls for a BACnet protocol analyzer to be provided. RFI #7 discusses utilization of P1/P2 communication so this should not be needed, please confirm.
Answer: Confirmed Question: What company has DDC systems on campus?
Answer: Siemens
Page Left Intentionally Blank
Page 1 of
Page 1 of