IFB Cost Estimate Worksheet.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C78626B0003
About this file
This is a cost estimate worksheet template for an Invitation for Bid (IFB) related to the Gravesite Expansion project at Fort Snelling National Cemetery. The worksheet is structured to collect lump sum pricing for each construction division that will be utilized in the project, with instructions to enter "N/A" for divisions not being used and to add additional line items as appropriate. The solicitation number is 36C78626B0003, and the project number is 894CM3044.
The cost estimate framework includes divisions covering all major construction categories: General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood/Plastics/Composites, Thermal and Moisture Protection, Openings, Finishes, Specialties, Equipment, Furnishings, Special Construction, Fire Suppression, Plumbing, HVAC, Integrated Automation, Electrical, Communications, Electronic Safety and Security, Earthwork, Exterior Improvements, and Utilities. The worksheet also requires contractors to provide separate line items for Bonds, Overhead, and Profit, with a designated field for Grand Totals. This template is designed to ensure consistent cost estimation across all potential contractors responding to the Department of Veterans Affairs National Cemetery Administration's solicitation for the Fort Snelling National Cemetery gravesite expansion project located in Minneapolis, Minnesota.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| IFB Contractor Cost Estimate Worksheet |
| Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. |
If a Division is not being used put N/A in that field.
You can Add additional items you feel are appropriate.
| Solicitation Number | 36C78626B0003 |
| Project Nunber | 894CM3044 |
| Project Name | Gravesite Expansion at Fort Snelling National Cemetery |
| Division | Unit | CLIN 001 | Total |
| Division 0 | |||
| Special Sections | |||
| Division 01 | |||
| General Requirements | |||
| Division 02 | |||
| Existing Conditions | |||
| Division 03 | |||
| Concrete | |||
| Division 04 | |||
| Masonry | |||
| Division 05 | |||
| Metals | |||
| Division 06 | |||
| Wood, Plastic, and Composites | |||
| Division 07 | |||
| Thermal and Moisture Protection | |||
| Division 08 | |||
| Openings (Doors, Windows, etc...) | |||
| Division 09 | |||
| Finishes | |||
| Division 10 | |||
| Specialties | |||
| Division 11 | |||
| Equipment | |||
| Division 12 | |||
| Furnishings | |||
| Division 13 | |||
| Special Construction | |||
| Division 14 | |||
| Fire Suppression | |||
| Division 22 | |||
| Plumbing | |||
| Division 23 | |||
| Heat, Ventilating, and Air Conditioning | |||
| Division 25 | |||
| Integrated Automation | |||
| Division 26 | |||
| Electrical | |||
| Division 27 | |||
| Communications | |||
| Division 28 | |||
| Electronic Safety and Security | |||
| Division 31 | |||
| Earthwork | |||
| Division 32 | |||
| Exterior Improvements | |||
| Division 33 | |||
| Utilities | |||
| Bonds |
Overhead
Profit
GRAND TOTALS $ $
File details come from the government source that posted it. Updated .