IFB_7800_MAS1010_ATT_5_v1.docx
DOCX document 32 KB Posted
- Solicitation number
- IFB 7800 MAS1010
- Issued by
- Texas
About this file
This is a Key Personnel Designation submittal document for the City of Austin related to an Invitation for Bid (IFB) for Original Equipment Manufacturer (OEM) parts, equipment, and repair services for Kubota agricultural tractors in Texas. The document establishes requirements for contractor key personnel assignments throughout the contract term and specifies the roles and contact information for both the Contractor and City representatives involved in the engagement, including a Contractor Contract Manager, City Contract Manager, City Project Manager, and City Contract Administrator/Procurement Specialist.
The document stipulates that the same key personnel must remain assigned to the engagement for its duration, with any necessary replacements requiring equivalent experience and competence in executing similar projects. The Contractor is obligated to promptly notify the City and obtain approval for any personnel changes, with such approval not to be unreasonably withheld. The submittal includes a table listing the designated key personnel by role, name, phone number, and email address, though specific individual names and contact details are not provided in the available content.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB_7800_MAS1010_ATT_6_v1.docx | DOCX document | |
| IFB_7800_MAS1010_BID_DOC_v1.xlsx | XLSX spreadsheet | |
| IFB_7800_MAS1010_ATT_2_v1.docx | DOCX document | |
| IFB_7800_MAS1010_ATT_4_v1.docx | DOCX document | |
| IFB_7800_MAS1010_ATT_10_v1.docx | DOCX document | |
| IFB_7800_MAS1010_PAC1_v1.docx | DOCX document | |
| IFB_7800_MAS1010_ATT_7_v1.docx | DOCX document | |
| IFB_7800_MAS1010_ATT_1_v1.docx | DOCX document | |
| IFB_7800_MAS1010_ADD_1_v1.docx | DOCX document | |
| IFB_7800_MAS1010_ATT_9_v1.docx | DOCX document | |
| IFB_7800_MAS1010_ATT_8_v1.docx | DOCX document | |
| IFB_7800_MAS1010_ATT_3_v1.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL – Key Personnel
Designation of Key Personnel. The City and the Contractor resolve to keep the same key personnel assigned to this engagement throughout its term. In the event that it becomes necessary for the Contractor to replace any key personnel, the replacement will be an individual having equivalent experience and competence in executing projects such as the one described herein. Additionally, the Contractor shall promptly notify the City and obtain approval for the replacement. Such approval shall not be unreasonably withheld. The Contractor’s and City’s key personnel are identified as follows:
| Role |
| Name |
| Phone |
Contractor Contract Manager
City Contract Manager
City Project Manager
City Contract Administrator, Procurement Specialist
| SUBMITTAL – Key Personnel |
| Pg. 1 |
image1.png
File details come from the government source that posted it. Updated .