This is a Key Personnel Designation submittal document for the City of Austin related to IFB 5000 MAS1005. The document establishes requirements for maintaining continuity of staffing throughout the contract term. The Contractor must retain the same key personnel assigned to the engagement for its duration, with any necessary replacements requiring individuals possessing equivalent experience and competence relevant to the project scope. The Contractor is obligated to promptly notify the City and obtain approval for any personnel changes, with such approval not to be unreasonably withheld. Key personnel roles to be designated include a Contractor Contract Manager, Contractor Single Point of Contact (SPOC), and Contractor After-hours SPOC.
The City's key personnel include Maggie Stenz, identified as the City Contract Administrator and Procurement Specialist, reachable at 512-974-3020 or Margaret.Stenz@austintexas.gov. Additional City Project Manager and Department SPOC information will be provided at contract execution. The submittal requires the Contractor to identify and list all designated key personnel with their respective roles, contact information, and qualifications to ensure adequate staffing oversight and communication channels throughout the contract period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB_5000_MAS1005_ATT_5_v1.docx | DOCX document | |
| IFB_5000_MAS1005_ATT_1_v1.docx | DOCX document | |
| IFB_5000_MAS1005_ATT_8_v1.docx | DOCX document | |
| IFB_5000_MAS1005_ATT_7_v1.docx | DOCX document | |
| IFB_5000_MAS1005_ATT_10_v1.docx | DOCX document | |
| IFB_5000_MAS1005_ATT_2_v1.pdf | ||
| IFB_5000_MAS1005_ATT_9_v1.docx | DOCX document | |
| IFB_5000_MAS1005_ATT_12_v1.docx | DOCX document | |
| IFB_5000_MAS1005_PAC1_v1.docx | DOCX document | |
| IFB_5000_MAS1005_ATT_3_v1.pdf | ||
| IFB_5000_MAS1005_ATT_4_v1.pdf | ||
| IFB_5000_MAS1005_ATT_11_v1.docx | DOCX document | |
| IFB_5000_MAS1005_BID_DOC_v1.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL – Key Personnel
Designation of Key Personnel. The City and the Contractor resolve to keep the same key personnel assigned to this engagement throughout its term. In the event that it becomes necessary for the Contractor to replace any key personnel, the replacement will be an individual having equivalent experience and competence in executing projects such as the one described herein. Additionally, the Contractor shall promptly notify the City and obtain approval for the replacement. Such approval shall not be unreasonably withheld. The Contractor’s and City’s key personnel are identified as follows:
| Role |
| Name |
| Phone |
Contractor Contract Manager
Contractor SPOC
Contractor Afterhours SPOC
| City Project Manager |
| List of Department SPOCs will be provided at contract execution |
| City Contract Administrator, Procurement Specialist |
| Maggie Stenz |
| 512-974-3020 |
| Margaret.Stenz@austintexas.gov |
| SUBMITTAL – Key Personnel, IFB 5000 MAS1005 |
| Pg. 1 |