SPECIAL PROVISIONS FOR PROPOSITION 411 TUCSON HEIGHTS, HIGHLAND PARK MILL & FILL PROJECT

This document comprises special provisions for a Proposition 411-funded mill and fill infrastructure project administered by the City of Tucson, Department of Transportation and Mobility in collaboration with Pima County Regional Wastewater Reclamation Department and other utility agencies. The project encompasses resurfacing residential streets and constructing curb access ramps in the Tucson Heights and Highland Park Addition neighborhoods bounded by Oracle Road (west), Euclid Avenue (east), Grant Road (north), and Speedway Boulevard (south). The work includes milling existing asphalt pavement, base preparation, and placement of 2.0 inches of asphalt concrete using PAG Mix 2 (Low Volume) with PG 76-22 TR+ binder across approximately 282,403 square yards. Additional work includes installation of 319 curb access ramps with detectable warning devices, replacement of 32 speed humps and 1 speed table, survey monument installation and adjustment, and utility coordination with water, sewer, gas, and stormwater infrastructure. The project is divided into two neighborhoods with separate phasing: Tucson Heights (6.98 centerline miles, 157,783 square yards) and Highland Park Addition (5.90 centerline miles, 124,620 square yards). Contractors must complete all work within 270 consecutive calendar days from notice to proceed, with a mandatory pre-construction meeting to be held within 30 days of notice of award.

Contractors shall bear all costs for traffic control, erosion control, resident notification, utility adjustments, and quality control measures as incidental to bid items; there is no separate compensation for these services. Funding is provided through Proposition 411, an Arizona-based initiative supporting transportation infrastructure improvements. The contract requires contractors to maintain minimum quality standards with specified payment reductions for asphaltic concrete deficiencies in gradation, asphalt cement content, effective voids, and compaction, with rejected material requiring removal and replacement at contractor expense. Material testing shall comply with ADOT's Materials Quality Assurance Program and be performed by ATI and ACI certified technicians from laboratories approved by the City's Materials Laboratory. Contractors must designate a full-time Quality Control Manager at the pre-construction conference. All work must coordinate with existing utility providers including Tucson Water, Southwest Gas, and Pima County Regional Wastewater Reclamation Department, with Letters of Clearance provided in project appendices detailing specific conditions for sewer facility work.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIAL PROVISIONS

PROPOSITION 411

TUCSON HEIGHTS, HIGHLAND PARK MILL & FILL

SPECIAL PROVISIONS FOR

PROPOSITION 411 PHASE 1 PROJECT

TUCSON HEIGHTS & HIGHLAND PARK ADDITION MILL & FILL

d

Date Signe

.C

ATE NO

CIFITRE

A

ANOZIR

, U A..S.

s

R seforPderetsige ional Engineer (Civi)l

83084

CAMERON M.

REID

02/ 06 2026

TABLE OF CONTENTS

DESCRIPTION

SPECIFICATIONS AND DETAILS:

PROPOSED WORK:

ROADWAY TREATMENT:

WORK SCHEDULE:

CONSTRUCTION SEQUENCE:

GENERAL REQUIREMENTS:

SECTION 106 - CONTROL OF MATERIAL

SECTION 107 – LEGAL RELATIONS AND RESPONSIBILITY TO PUBLIC

SECTION 110 – CORRECTIVE REQUIREMENTS FOR DEFICIENCES

ITEM 2020029 – REMOVAL OF BITUMINOUS PAVEMENT (BY MILLING)

SECTION 205 – ROADWAY GRADING

ITEM 2050004 – ROADWAY GRADING (DISCRETIONARY)

SECTION 303 – AGGREGATE BASE COURSE

ITEM 3030003 – AGGREGATE BASE (DISCRETIONARY)

SECTION 406 - ASPHALTIC CONCRETE

SECTION 701 – MAINTENANCE AND PROTECTION OF TRAFFIC

SECTION 908 – CONCRETE CURBS, GUTTERS, SIDEWALKS, AND DRIVEWAYS

SECTION 909 - SURVEY MONUMENTS

SECTION 1005 – BITUMINOUS MATERIALS FOR SURFACING

SECTION 1006 – PORTLAND CEMENT CONCRETE

APPENDIX A – NON-VIBRATORY ROLLING PATTERN PROCEDURE

APPENDIX B – U-2025-046 – PACAKGE 59 U-DRAWING EXHIBIT

APPENDIX C – LOCATION MAP - TUCSON HEIGHTS

APPENDIX D – LOCATION MAP - HIGHLAND PARK

APPENDIX E – PCRWRD LETTER OF CLEARANCE AND MANHOLE-CLEANOUT TABLES -

TUCSON HEIGHTS

APPENDIX F – PCRWRD LETTER OF CLEARANCE AND MANHOLE-CLEANOUT TABLES -

HIGHLAND PARK

SPECIFICATIONS AND DETAILS:

The work embraced herein shall be performed in accordance with the requirements of the following separate documents:

Specifications

Pima Association of Governments (PAG), Standard Specifications for Public Improvement, 2015

Edition, Volume 1 (typically referenced as “Standard Specifications” unless otherwise specified).

http://apps.pagnet.org/standardspecifications

Details

Pima Association of Governments (PAG), Standard Details for Public Improvements, 2015 Edition, Volume 2.

http://apps.pagnet.org/standardspecifications/

Pima County/City of Tucson, Standard Specifications for Public Improvements, 2003 Edition https://www.tucsonaz.gov/files/sharedassets/public/v/1/government/departments/transportation-and-mobility/documents/standarddetails2003.pdf

City of Tucson, Curb Access Ramp Detail, September 2025 https://www.tucsonaz.gov/files/sharedassets/public/v/1/transportation-and-mobility/engineering/documents/curb_access_ramp_sep2025.pdf

Manuals

U.S. Department of Transportation, Federal Highway Administration, Manual on Uniform Traffic

Control Devices for Streets and Highways, December 2009, and amendments.

https://mutcd.fhwa.dot.gov/kno_2009r1r2.htm

Arizona Supplement to the Manual on Uniform Traffic Control Devices (MUTCD), 2009 edition

(January 2012).

https://azdot.gov/sites/default/files/2019/07/arizona-supplement-to-the-manual-on-uniform-traffic-control-devices-2009-mutcd-edition.pdf

2015 Edition of the Additions by the City of Tucson to the Manual on Uniform Traffic Control

Devices, for Temporary Traffic Control.

https://www.tucsonaz.gov/files/sharedassets/public/government/departments/department-of-transportation-and-mobility/documents/2015_cot_additions_final.pdf

Pima County/City of Tucson, Signing and Pavement Marking Manual, December 2020 First Edition https://content.civicplus.com/api/assets/c8d13f95-b46c-446e-97fe-8e5127201983

Other Specifications and Details

Arizona Department of Transportation Standard Specifications for Road and Bridge Construction, 2021 Edition, http://apps.pagnet.org/standardspecifications https://nam11.safelinks.protection.outlook.com/?url=http%3A%2F%2Fapps.pagnet.org%2Fstandardspecifications%2F&data=05%7C02%7CSadriena.Rodriguez%40kimley-horn.com%7Cc02285f23f9546772b0908dd98907384%7C7e220d300b5947e58a81a4a9d9afbdc4%7C0%7C0%7C638834468358410183%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=%2Fpq4ZDl0t4ym4V1PBEJX1ouguocsracrXhDV1YREdt4%3D&reserved=0 https://nam11.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.tucsonaz.gov%2Ffiles%2Fsharedassets%2Fpublic%2Fv%2F1%2Fgovernment%2Fdepartments%2Ftransportation-and-mobility%2Fdocuments%2Fstandarddetails2003.pdf&data=05%7C02%7CSadriena.Rodriguez%40kimley-horn.com%7Cc02285f23f9546772b0908dd98907384%7C7e220d300b5947e58a81a4a9d9afbdc4%7C0%7C0%7C638834468358460895%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=3nhdlUTcQo5j6Lq9Cgdy0Rtzq4bOK%2BEW%2FQ6uUH4ERMc%3D&reserved=0 https://nam11.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.tucsonaz.gov%2Ffiles%2Fsharedassets%2Fpublic%2Fv%2F1%2Fgovernment%2Fdepartments%2Ftransportation-and-mobility%2Fdocuments%2Fstandarddetails2003.pdf&data=05%7C02%7CSadriena.Rodriguez%40kimley-horn.com%7Cc02285f23f9546772b0908dd98907384%7C7e220d300b5947e58a81a4a9d9afbdc4%7C0%7C0%7C638834468358460895%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=3nhdlUTcQo5j6Lq9Cgdy0Rtzq4bOK%2BEW%2FQ6uUH4ERMc%3D&reserved=0 https://www.tucsonaz.gov/files/sharedassets/public/v/1/transportation-and-mobility/engineering/documents/curb_access_ramp_sep2025.pdf https://www.tucsonaz.gov/files/sharedassets/public/v/1/transportation-and-mobility/engineering/documents/curb_access_ramp_sep2025.pdf https://mutcd.fhwa.dot.gov/kno_2009r1r2.htm https://azdot.gov/sites/default/files/2019/07/arizona-supplement-to-the-manual-on-uniform-traffic-control-devices-2009-mutcd-edition.pdf https://azdot.gov/sites/default/files/2019/07/arizona-supplement-to-the-manual-on-uniform-traffic-control-devices-2009-mutcd-edition.pdf https://nam11.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.tucsonaz.gov%2Ffiles%2Fsharedassets%2Fpublic%2Fgovernment%2Fdepartments%2Fdepartment-of-transportation-and-mobility%2Fdocuments%2F2015_cot_additions_final.pdf&data=05%7C01%7CDavid.Tapia%40kimley-horn.com%7Ca1646049fb66452ecc0908db87079456%7C7e220d300b5947e58a81a4a9d9afbdc4%7C0%7C0%7C638252239283677121%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=eDViWdaiewqSjwfNNadXSUs8NCe4FF4CnF427gAuiB0%3D&reserved=0 https://nam11.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.tucsonaz.gov%2Ffiles%2Fsharedassets%2Fpublic%2Fgovernment%2Fdepartments%2Fdepartment-of-transportation-and-mobility%2Fdocuments%2F2015_cot_additions_final.pdf&data=05%7C01%7CDavid.Tapia%40kimley-horn.com%7Ca1646049fb66452ecc0908db87079456%7C7e220d300b5947e58a81a4a9d9afbdc4%7C0%7C0%7C638252239283677121%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=eDViWdaiewqSjwfNNadXSUs8NCe4FF4CnF427gAuiB0%3D&reserved=0 https://nam11.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcontent.civicplus.com%2Fapi%2Fassets%2Fc8d13f95-b46c-446e-97fe-8e5127201983&data=05%7C01%7CDavid.Tapia%40kimley-horn.com%7Ca1646049fb66452ecc0908db87079456%7C7e220d300b5947e58a81a4a9d9afbdc4%7C0%7C0%7C638252239283677121%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=TJEOcFxLo5qVCqHKWbF2TZYuaYD4iRS4qpCjiVC%2Blao%3D&reserved=0 https://azdot.gov/sites/default/files/media/2021/04/2021_Standard_Specifications_for_Road_and_B ridge_Construction_PC.pdf

Pima County Regional Wastewater Reclamation Department, Standard Specifications & Details for

Construction, 2022 Edition:

https://www.pima.gov/1812/Design-Standards-Specifications-Details

Tucson Water, Standard Specifications and Details, 2017 Edition:

https://www.tucsonaz.gov/Departments/Water/Contractors-Developers-and-Engineers/Tucson- Water-Standard-Specifications-and-Details

These Special Provisions and Bidding Schedule.

https://azdot.gov/sites/default/files/media/2021/04/2021_Standard_Specifications_for_Road_and_Bridge_Construction_PC.pdf https://azdot.gov/sites/default/files/media/2021/04/2021_Standard_Specifications_for_Road_and_Bridge_Construction_PC.pdf https://www.pima.gov/1812/Design-Standards-Specifications-Details https://nam11.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.tucsonaz.gov%2FDepartments%2FWater%2FContractors-Developers-and-Engineers%2FTucson-Water-Standard-Specifications-and-Details&data=05%7C01%7CDavid.Tapia%40kimley-horn.com%7Ca1646049fb66452ecc0908db87079456%7C7e220d300b5947e58a81a4a9d9afbdc4%7C0%7C0%7C638252239283677121%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=Un6C51JepZXXUzEiK8wLR%2BOBSZOGWrWq7yld2K8x0Sk%3D&reserved=0 https://nam11.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.tucsonaz.gov%2FDepartments%2FWater%2FContractors-Developers-and-Engineers%2FTucson-Water-Standard-Specifications-and-Details&data=05%7C01%7CDavid.Tapia%40kimley-horn.com%7Ca1646049fb66452ecc0908db87079456%7C7e220d300b5947e58a81a4a9d9afbdc4%7C0%7C0%7C638252239283677121%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=Un6C51JepZXXUzEiK8wLR%2BOBSZOGWrWq7yld2K8x0Sk%3D&reserved=0

PROPOSED WORK:

The proposed work is located in the City of Tucson city limits. The work under this project includes milling, pavement preparation, and paving of residential streets for the locations table below and maps in Appendices B, C and D.

The proposed work is in the Tucson Heights and Highland Park Addition neighborhood.

PROJECT ROADWAY LIST

TUCSON

HEIGHTS

ID

ROUTE FROM TO

TOTAL

LENGTH

[CL MI]

TOTAL

AREA [SY]

4827 E Sahuaro St EPI N 6th Av 265ft E EPI N 6th Av 0.05 1,001

4956 E Seneca St EPI N 1st Av WPI N Euclid Av 0.07 1,440

4955 E Seneca St EPI N 4th Av WPI N 1st Av 0.27 5,660

5559 E Ventura St EPI N Stone Av 155ft E EPI N 7th Av 0.14 2,980

5678 E Waverly St EPI N 1st Av WPI N Euclid Av 0.08 1,608

5677 E Waverly St 105ft E EPI N 6th Av WPI N 1st Av 0.42 8,844

5676 E Waverly St EPI N 6th Av 105ft E EPI N 6th Av 0.02 420

5979 N 1st Av SPI E North St 200ft S CL E Lester St 0.46 13,003

5981 N 1st Av NPI E Drachman St NPI E Speedway Bl 0.24 5,644

5980 N 1st Av 200ft S CL E Lester St NPI E Drachman St 0.24 5,618

5992 N 2nd Av SPI E Linden St NPI E Drachman St 0.35 7,973

5993 N 2nd Av NPI E Drachman St NPI E Speedway Bl 0.24 5,627

5991 N 2nd Av 80ft N NPI E North St NPI E Seneca St 0.24 4,847

6008 N 3rd Av NPI E Drachman St NPI E Speedway Bl 0.24 5,627

6005 N 3rd Av SPI E Grant Rd NPI E Seneca St 0.27 5,391

6006 N 3rd Av SPI E Linden St 165ft S CL E Elm St 0.17 3,863

6007 N 3rd Av 165ft S CL E Elm St NPI E Drachman St 0.17 3,995

6026 N 4th Av NPI E Drachman St 250ft N CL E Speedway

Bl

0.20 4,640

6025 N 4th Av SPI E Seneca St NPI E Drachman St 0.48 10,942

6024 N 4th Av SPI E Grant Rd SPI E Seneca St 0.26 7,301

6045 N 5th Av SPI E Linden St NPI E Drachman St 0.35 7,900

6046 N 5th Av NPI E Drachman St NPI E Speedway Bl 0.24 5,631

6047 N 5th Av NPI E Helen St NPI E Speedway Bl 0.09 2,001

6114 N 7th Av SPI E Lee St NPI E Drachman St 0.14 2,968

6113 N 7th Av SPI E Grant Rd SPI E Lee St 0.62 13,056

6115 N 7th Av NPI E Drachman St NPI E Speedway Bl 0.24 5,631

N Avenida El

Capitan SPI E Grant Rd NPI E Flores St 0.22 4,307

6727 N Calle Chico SPI N 2nd Av NPI E Seneca St 0.07 1,322

7668 N Flores Dr SPI E Grant Rd CL N Los Altos Av 0.20 3,967

8578 N Los Altos Av 290ft N NPI E Sahuaro St NPI E Flores St 0.17 3,442

6027 N 4th Av 250ft N CL E Speedway Bl NPI E Speedway Bl 0.04 1,135

Tucson Heights Total: 6.98 157,783

HIGHLAND

PARK ID

ROUTE FROM TO

TOTAL

LENGTH

[CL MI]

TOTAL

AREA [SY]

5846 N 10th Av SPI W Drachman St NPI W Mabel St 0.06 1,300

5845 N 10th Av SPI W Lee St NPI W Drachman St 0.14 3,040

5841 N 10th Av 190ft N NPI W Sahuaro St SPI W Rillito St 0.12 2,464

5843 N 10th Av 185ft S CL W Ventura St NPI W Elm St 0.19 3,912

5844 N 10th Av SPI W Elm St WPI W Lee St 0.06 1,336

5842 N 10th Av SPI W Rillito St 185ft S CL W Ventura St 0.18 3,824

5860 N 11th Av SPI W Grant Rd SPI W Rillito St 0.15 3,104

14330 N 11th Av SPI W Helen St NPI W Speedway Bl 0.07 1,681

5861 N 11th Av SPI W Rillito St 185ft S CL W Ventura St 0.18 3,808

5863 N 11th Av SPI W Elm St NPI W Drachman St 0.22 4,600

5862 N 11th Av 185ft S CL W Ventura St NPI W Elm St 0.19 3,928

14328 N 11th Av SPI W Drachman St NPI W Mabel St 0.06 1,335

6137 N 9th Av 185ft S CL W Ventura St NPI W Elm St 0.18 3,896

6136 N 9th Av SPI W Rillito St 185ft S CL W Ventura St 0.18 3,848

6138 N 9th Av SPI W Elm St NPI W Drachman St 0.22 4,568

6135 N 9th Av SPI W Grant Rd SPI W Rillito St 0.15 3,104

6186 N Alder Av SPI W Mabel St NPI W Speedway Bl 0.16 3,287

9438 N Queen Av SPI W Helen St NPI W Speedway Bl 0.07 1,473

978 W Adams St EPI N Oracle Rd WPI N Stone Av 0.33 6,920

2615 W Elm St EPI N Oracle Rd WPI N Stone Av 0.33 6,980

2767 W Flores St EPI N Oracle Rd WPI N Stone Av 0.32 6,840

3236 W Helen St EPI N 11th Av 245ft E EPI N Queen Av 0.09 2,000

3235 W Helen St EPI N Main Av WPI N 11th Av 0.07 1,540

3631 W Lee St EPI N Oracle Rd WPI N 11th Av 0.08 1,680

3633 W Lee St EPI N 10th Av WPI N Stone Av 0.16 3,460

3632 W Lee St EPI N 11th Av WPI N 10th Av 0.08 1,660

3673 W Lester St EPI N Oracle Rd WPI N Stone Av 0.32 6,840

3836 W Mabel St EPI N 11th Av 280ft E EPI N 10th Av 0.15 3,120

3835 W Mabel St EPI N Main Av WPI N 11th Av 0.08 1,720

4518 W Plata St EPI N 11th Av WPI N Stone Av 0.25 5,224

4517 W Plata St EPI N Oracle Rd WPI N 11th Av 0.08 1,620

4666 W Rillito St EPI N Oracle Rd WPI N Stone Av 0.32 6,840

4825 W Sahuaro St EPI N Oracle Rd WPI N Stone Av 0.32 6,828

5556 W Ventura St EPI N Oracle Rd WPI N Stone Av 0.32 6,840

Highland Park Addition Total:

5.90 124,620

Total Tucson Heights, Highland Park Package: 12.88 CL MI & 282,403 SY

Abbreviations:

Centerline (CL) – the imaginary line that is parallel to the curb or edge of pavement located in the middle of the roadway.

NCL is North of Centerline, ECL is East of Centerline, etc.

Point of Intersection (PI) – the imaginary line that would be the curb or edge of pavement if it was extended across an intersecting roadway. NPI is North Point of Intersection, EPI is East Point of Intersection, etc.

LC – Local Collector

PROJECT PAVEMENT SECTION LIST

TYPE TREATMENT

MIX

HV/LV

MIX NO.

CEMENT

TYPE

MIXTURE SPEC

Local Street

2.0” asphalt plane/mill and replace

Low Volume

PAG Mix

PG 76-22

TR+

Non-RAP Section 406

Updated Spec Oct. 31, PROJECT CURB ACCESS RAMP REPLACEMENT LIST

N-S STREET E-W STREET RAMPS COUNT

N 7th Av E Sahuaro St 1 Type IV (NW) 1

N 7th Av Midstreet between E Rillito St and E Flores St 1 Type II (SE) 1

N 7th Av E Flores St 1 Type IV (NE) 1

N 7th Av E Plata St 1 Type IV (NE) 1

N 7th Av Midstreet just north of E Lester St 2 Type II (NW & SW) 2

N 7th Av E Lester St 1 Type IV (NW) 1

N 7th Av E Elm St 1 Type IV (SE) 1

N 7th Av Midstreet between E Lee St and

E Adams St 2 Type II (NW & SW) 2

N 7th Av E Adams St 1 Type IV (SE) 1

N 7th Av Midstreet between E Adams St and E Drachman St 1 Type II (SW) 1

N 7th Av E Drachman St 1 Type IV (NW) 1

N 7th Av Midstreet between E Mabel St and E Helen St 2 Type II (NW & SW) 2

N 7th Av E Helen St 4 Type IV (NW, NE, SW, SE) 4

N 7th Av E Speedway Bl 2 Type IV (NW & NE) 2

Midstreet between N 7th Av and N 6th Av

E Helen St 4 Type II (NW, NE, SW, SE) 4

N 5th Av Midstreet between E Linden St and E Lester St 1 Type II (SE) 1

N 5th Av E Lester St 1 Type IV (SE) 1

N 5th Av Midstreet between E Lee St and

E Adams St 2 Type II (NW & SW) 2

N 5th Av Midstreet between E Adams St and E Drachman St 2 Type II (NW & SW) 2

N 4th Av E Speedway Bl 2 Type IV (NW & NE) 2

N 4th Av Midstreet between E Helen St and E Speedway Bl 2 Type II (NW & SW) 2

N 4th Av E Helen St 2 Type II (SE) 2

N 4th Av E Adams St 1 Type IV (NW) 1

N 4th Av Midstreet between E Adams St and E Lee St 3 Type II (NW, SW, NE) 3

N 4th Av E Lee St 1 Type IV (NE) 1

N 4th Av E Seneca St 2 Type IV (NE & SE) 2

N 4th Av Midstreet between E Sahuaro St and E Seneca St 2 Type II (NE & SE) 2

N 4th Av Midstreet between E Sahuaro St and E Seneca St 2 Type II (NE & SE) 2

N 4th Av Midstreet just sounth of E

Sahuaro St 4 Type II (NW, SW, SE) 4

N 4th Av E Sahuaro St 1 Type II (SW) 1

N 3rd Av Midstreet between E Elm St and

E Lee St 2 Type II (NW & SW) 2

N 3rd Av Midstreet between E Lee St and

E Adams St 2 Type II (NW & SW) 2

N 3rd Av E Adams St 1 Type IV (NW) 1

N 3rd Av Midstreet between E Adams St and E Drachman St 3 Type II (NW, SW, SE) 3

N 3rd Av E Drachman St 1 Type IV (NE) 1

N 3rd Av Midstreet between E Helen St and E Speedway Bl 2 Type II (NW & SW) 2

N 3rd Av E Speedway Bl 2 Type IV (NW & NE) 2

N Avenida El Capitan E Sahuaro St 4 Type IV (NW, NE, SW, SE) 4

N Avenida El Capitan E Rillito St 4 Type IV (NW, NE, SW, SE) 4

N Avenida El Capitan E Flores St 2 Type IV (NW & NE) 2

N 3rd Av E Flores St 4 Type IV (NW, NE, SW, SE) 4

N 3rd Av E Seneca St 2 Type IV (NW & NE) 2

N 3rd Av E Rillito St 4 Type IV (NW, NE, SW, SE) 4

N 3rd Av E Sahuaro St 4 Type IV (NW, NE, SW, SE) 4

N Los Altos Av E Sahuaro St 4 Type IV (NW, NE, SW, SE) 4

N Los Altos Av E Rillito St 4 Type IV (NW, NE, SW, SE) 4

N Los Altos Av E Flores St 2 Type IV (NW & NE) 2

N Flores Dr E Rillito St 2 Type IV (NW & SW) 2

N Flores Dr E Edison St 1 Type IV (NE) 1

N Flores Dr E North St 2 Type IV (NE & SE) 2

N Calle Chico E North St 4 Type IV (NW, NE, SW, SE) 4

N Calle Chico E Edison St 4 Type IV (NW, NE, SW, SE) 4

N Calle Chico E Edison St 4 Type IV (NW, NE, SW, SE) 4

N 2nd Av E Seneca St 2 Type IV (NW & NE) 2

N Calle Chico E Seneca St 3 Type IV (NW, SW, NE) 3

N Euclid Ave E Seneca St 2 Type IV (NW & SW) 2

N Euclid Ave E Edison St 1 Type IV (SW) 1

N 1st Av E Edison St 2 Type IV (NE & SE) 2

N 2nd Av E Linden St 1 Type IV (SE) 1

N 2nd Av E Elm St 1 Type IV (NW) 1

N 2nd Av E Lee St 1 Type IV (NE) 1

N 2nd Av Midstreet between E Lee St and

E Adams St 2 Type II (NW & SW) 2

N 2nd Av Midstreet between W Adams St and E Drachman St 2 Type II (NW & SW) 2

N 2nd Av E Drachman St 1 Type IV (NE) 1

N 2nd Av E Speedway Bl 1 Type IV (NE) 1

N 1st Av E Speedway Bl 2 Type IV (NW & NE) 2

N 1st Av Midstreet between E Helen St and E Speedway Bl 2 Type II (NW & SW) 2

N 1st Av E Drachman St 2 Type IV (NW & SW) 2

N 1st Av Midstreet between W Adams St and E Drachman St 2 Type II (NE & SE) 2

N 1st Av E Lee St 1 Type IV (SW) 1

N 1st Av Midstreet between E Linden St and E Lester St 1 Type II (SE) 1

N 1st Av Midstreet just north of E Lester St 1 Type II (SE) 1

N 1st Av E Linden St 1 Type IV (SE) 1

Midstreet between N

6th Av and N 5th Av E Helen St 4 Type II (NW, NE, SW, SE) 4

Midstreet between N

4th Av and N 3rd Av E Helen St 4 Type II (NW, NE, SW, SE) 4

Midstreet between N 3rd Av and N 2nd Av

E Helen St 4 Type II (NW, NE, SW, SE) 4

Midstreet between N 2nd Av and N 1st Av

E Helen St 4 Type II (NW, NE, SW, SE) 4

Midstreet between N

1st Av and N Euclid Av

E Helen St 4 Type II (NW, NE, SW, SE) 4

N Euclid Av E Helen St 2 Type IV (NW & SW) 2

N Euclid Av E Mabel St 2 Type IV (NW & SW) 2

Midstreet between N 1st Av and N Euclid

Av

E Mabel St 4 Type II (NW, NE, SW, SE) 4

Midstreet between N 2nd Av and N 1st Av

E Mabel St 4 Type II (NW, NE, SW, SE) 4

Midstreet between N 3rd Av and N 2nd Av

E Mabel St 2 Type II (SW & SE) 2

Midstreet between N

4th Av and N 3rd Av E Mabel St 4 Type II (NW, NE, SW, SE) 4

Midstreet between N

5th Av and N 4th Av E Mabel St 4 Type II (NW, NE, SW, SE) 4

Midstreet between N 6th Av and N 5th Av

E Mabel St 4 Type II (NW, NE, SW, SE) 4

Midstreet between N 7th Av and N 6th Av

E Mabel St 2 Type II (NE & SW) 2

N 6th Av E Drachman St 1 Type IV (NE) 1

Midstreet between N 5th Av and N 4th Av

E Drachman St 2 Type II (SW & SE) 2

Midstreet between N 4th Av and N 3rd Av

E Drachman St 2 Type II (SW & SE) 2

Midstreet between N 3rd Av and N 2nd Av

E Drachman St 2 Type II (SW & SE) 2

Midstreet between N

2nd Av and N 1st Av E Drachman St 2 Type II (SW & SE) 2

Midstreet between N 1st Av and N Euclid

Av

E Drachman St 2 Type II (SW & SE) 2

Midstreet between N 2nd Av and N 1st Av

E Adams St 4 Type II (NW, NE, SW, SE) 4

N 6th Av E Lee St 4 Type IV (NW, NE, SW, SE) 4

Midstreet between N

2nd Av and N 1st Av E Lee St 2 Type II (SW & SE) 2

Midstreet between N 2nd Av and N 1st Av

E Lee St 2 Type II (SW & SE) 2

N Euclid Av E Adams St 2 Type IV (NW & SW) 2

N Euclid Av E Lee St 2 Type IV (NW & SW) 2

N Euclid Av E Elm St 1 Type IV (SW), 1 Type II (NW) 2

N 6th Av E Elm St 4 Type IV (NW, NE, SW, SE) 4

N 6th Av E Lester St 4 Type IV (NW, NE, SW, SE) 4

N Euclid Av E Lester St 1 Type IV (SW), 1 Type II (NW) 2

N 6th Av E Linden St 1 Type IV (NE), 1 Type II (SE) 2

N 6th Av E Linden St 1 Type IV (SE), 1 Type II (NE) 2

N 4th Av E Linden St 1 Type IV (SW) 1

N 6th Av E Waverly St 2 Type IV (NE & SE) 2

N 4th Av E Sahuaro St 2 Type IV (NE & SE) 2

N Flores Dr E Sahuaro St 2 Type IV (NW & SW) 2

Tucson Heights Total: 247

N-S STREET E-W STREET RAMPS COUNT

N 11th Av W Sahuaro St 1 Type IV (SW) 1

N 10th Av W Sahuaro St 1 Type IV (SE) 1

N 10th Av W Rillito St 2 Type IV (NE & SE) 2

N 11th Av W Rillito St 1 Type IV (NW) 1

Midstreet between N

Oracle Rd & N 11th Av

W Flores St 2 Type II (SW & SE) 2

N 9th Av W Flores St 1 Type IV (NW) 1

Midstreet between N Stone Ave & N 9th Av

W Flores St 3 Type II (NE, SE, SW) 3

Midstreet between N

Stone Ave & N 9th Av W Ventura St 4 Type II (NW, SW, NE, SE) 4

N 10th Av W Ventura St 1 Type IV (NE) 1

Midstreet between N Oracle & N 11th Av

W Plata St 1 Type II (SE) 1

Midstreet between N 11th Av & N10th Av

W Plata St 2 Type II (NW & NE) 2

N 10th Av W Plata St 1 Type IV (NW) 1

Midstreet between N Stone Ave & N 9th Av

W Plata St 2 Type II (NW & NE) 2

Midstreet between N Stone Ave & N 9th Av

W Lester St 3 Type II (NW, SW, NE) 3

N 10th Av W Lester St 1 Type IV (NW & SW) 2

N 11th Av W Lester St 1 Type IV (NE) 1

Midstreet between N Oracle Rd & N 11th

Av W Lester St 1 Type II (NE) 1

Midstreet between N Oracle & N 11th Av

W Elm St 1 Type II (NE) 1

N 11th Av W Elm St 2 Type IV (NW & SE) 2

N 10th Av W Elm St 1 Type IV (SW) 1

Midstreet between N Oracle Rd & N 11th

Av W Lee St I Type II (NE) 1

Midstreet between N Oracle & N 9th Av

W Lee St 2 Type II (NW & SW) 2

N 11th Av W Adams St 2 Type IV (SW) 1

N 9th Av W Adams St 1 Type IV (SE) 1

Midstreet between N

Oracle & N 9th Av W Adams St 2 Type II (SW & SE) 2

N 9th Av W Drachman St 2 Type IV (NE & SW), 2 Type II (SW &

SE)

N Main Av W Mabel St 2 Type IV (NE & SE) 2

N Alder Av W Mabel St 1 Type II (NW) 1

N 10th Av W Mabel St 1 Type II (SE) 1

N Main Av W Helen St 2 Type IV (NE & SE) 2

N Alder Av W Helen St 1 Type IV (SE) 1

Midstreet between N Alder Av & N 11th Av

W Helen St 1 Type II (SW) 1

N Queen Av W Helen St 1 Type II (NW) 1

N Alder Av W Speedway Blvd 2 Type IV (NW & NE) 2

N 11th Av W Speedway Blvd 2 Type IV (NW & NE) 2

N Queen Av W Speedway Blvd 2 Type IV (NW & NE) 2

N 11th Av Midstreet between W Adams St and W Drachman St 1 Type II (NE) 1

N 11th Av W Lee St 3 Type IV (SW, NE, SE), 2 Type II (NW) 5

N 11thAv Midstreet between W Rillito St and W Sahuaro St 2 Type II (NW & SW) 2

N 10th Av Midstreet between W Rillito St and W Sahuaro St 2 Type II (NE & SE) 2

N 10th Av Midstreet between W Flores St and W Ventura St 2 Type II (NE & SE) 2

N 10th Av Midstreet between W Plata St and W Lester St 1 Type II (SW) 1

N 9th Av Midstreet between W Adams St and W Drachman St 2 Type II (NE & SE) 2

N 9th Av Midstreet between W Grant Rd and W Sahuaro St 1 Type II (NW) 1

Highland Park Total: 72

Package Total: 319 Curb Ramps

RAMP AND SIDEWALK NOTES

• The City expects that the Contractor will have some flexibility in the layout of the ramps using City and PAG ramp details, provided that federal ADA standards are met.

• Sidewalks are to be constructed to PROWAG Standards; City or PAG standard details may be used, as applicable.

• No changes or modifications shall be made by the contractor without approval of a City representative.

• The removal of sidewalk and curb ramps is included in Item 2020001 Removal of Structures and Obstructions. Plans with the locations of sidewalk and curb ramp removals will not be provided. Field adjustments are anticipated. See General Requirements note number 19

Removal of Structures and Obstructions.

PROJECT SPEED HUMP/ SPEED TABLE REPLACEMENT LIST

MAP STREET SPEED HUMPS EACH SPEED TABLES EACH

Tucson Heights N 4th Av 2 1

Tucson Heights N 3rd Av 1

Tucson Heights E Flores St 1

Tucson Heights N 1st Av 1

Tucson Heights E Drachman St 1

Tucson Heights E Adams St 2

Tucson Heights E Helen St 2

Tucson Heights E Lester St 5

Tucson Heights E Linden St 2

Tucson Heights E Sahuaro St 4

Tucson Heights E Waverly St 5

Tucson Heights N Avenida El

Capitan

Highland Park W Adams St 2

Highland Park

W Helen St 2

Tucson Heights, Highland Park

Total:

32 Speed Humps 1 Speed Table

Tucson Heights, Highland Park Total: 32 Speed Humps & 1 Speed Table

Surface treatment shall include the speed humps and tables with new striping and raised pavement markings per City of Tucson Department of Transportation & Mobility Detail 220 (Revised 10/24).

Speed humps and speed tables shall receive the PAG 2-LV, as a non-RAP mixture with PG70-10 binder.

ROADWAY TREATMENT:

Treatment A – Mill and Infill

ID TREATMENT A - MILL AND INFILL

1 Data Collection:

-Contractor shall identify and document existing roadway features including pavement markings, utility facilities, survey monumentation, and speed humps.

-The City’s surveyor will cross-section the roadway prior to the treatment in order to provide pavement grades.

2 Pavement Preparation:

-Contractor shall adjust utility facilities (as required) prior to and after work efforts. No utility holes will be left overnight without trench plates.

-Contractor shall remove obstructions and eradicate any vegetation within or adjacent to the roadway necessary to execute the contract.

3 ADA Ramps:

-Contractor shall remove and replace ADA ramps per the table information provided. New ramps are only to be installed where there is existing sidewalk.

-Contractor shall complete replacement of any and all landscape materials (brick, gravel, etc.) removed or relocated during the curb ramp/sidewalk installation in an attempt to return these materials to state of pre-ramp installation.

-Contractor shall complete any other miscellaneous work necessary to deliver the final product, complete in place, of the completed curb ramp installation.

4 Milling:

-Contractor shall mill/plane the existing asphalt per the depth identified in the Project Roadway List.

5 Subgrade Preparation:

-When the existing asphalt remaining is thin and not suitable for overlay operations, Contractor shall run a sheepsfoot roller on the remaining asphalt and prepare the subgrade for pavement.

-Contractor shall prepare subgrade for paving per PAG Standard Specifications for Public Improvements, 2015

Edition, Section 205. Expected preparation shall include but is not limited to grading and shaping of subgrade to allow positive drainage away from road or across drainage areas such as washes, compacting subgrade to a point that is acceptable for pavement placement, hydration of subgrade material to promote desired compaction and any other work consistent with prior to paving operations.

6 Paving:

- When there is existing asphalt remaining, Contractor shall sweep existing milled roadway where required and tack with Certified Boot Truck using CSS1 50/50 dilute at a maximum application rate of .08 gallons/SY and tack all vertical surfaces. Note: When the bid schedule quantities for the pavement milling and the roadway grading items are similar, the existing asphalt surface to remain is not anticipated for the project.

-Contractor shall pave new asphalt per the depth identified in the Project Treatment List.

7 Finish Work:

-Contractor shall replace all survey monumentation disturbed during work efforts in kind.

-Contractor shall replace all traffic marking/striping (paint, symbols, legends, thermoplastic, raised pavement markers) and match to standard using Pima County and City of Tucson Department of Transportation Signing and Pavement Manual, December 2020, First Edition. Note: Traffic marking/striping may not be anticipated for the project. See bid schedule for pavement marking bid items.

-Contractor shall replace signage impacted as part of this project.

-Contractor shall complete any other miscellaneous work necessary to deliver final paved roadway, complete and in place.

-If speed humps are present on any roadway on the project list, contractor shall replace speed humps that were removed during the milling process.

WORK SCHEDULE:

Proposed work is to be completed within 270 consecutive calendar days from the date of the notice to proceed. Construction sequencing and expectations shall be as described herein. Construction, including permanent striping, must be completed within this time frame. The Contractor shall consider the following contract requirements:

• The Contractor shall schedule a pre-construction meeting within 14 calendar days of notice of award and hold the meeting within 30 days of notice of award.

• The Contractor shall prepare traffic control plans prior to the pre-construction meeting in accordance with these specifications. 3The Contractor shall, at a minimum, be required to maintain at least one open lane of traffic unless the Contractor offers an alternative traffic control approach that will minimize disturbance to residents and businesses along the project.

No contract time extensions will be granted to the Contractor for the DTM approval of a traffic control plan.

• DTM will issue a notice to proceed at the pre-construction meeting.

• At the pre-construction meeting, the Contractor shall submit a critical path construction schedule for all project elements that meets or decreases the allotted Calendar Contract Days.

• All work shall be done during the day.

CONSTRUCTION SEQUENCE:

The Contractor shall be issued a Notice to Proceed at the Pre-Construction meeting. The Contractor shall field verify all existing conditions shown on plans and specified herein prior to beginning construction. Any significant deviations to the conditions that may affect the timely construction of improvements shall be brought to the attention of the Engineer within 24 hours of discovery.

Prior to the delivery of any equipment, materials or supplies to the site of any work, or the beginning of any construction work, it is strongly recommended that the Contractor take pre-construction photos or videos for the purpose of establishing the conditions existing in all the areas to be affected by the construction.

The Contractor shall follow the sequencing and/or steps as described under Treatment A. Paving schedules shall be coordinated closely with any weather. Pavement data is provided in the Proposed

Work Section. If the paving operation is not started directly behind the milling, grading and compaction steps and weather-related issues arise, the contractor will be held responsible for any issues that may arise.

ID CONTRACTOR REQUIREMENTS

1 Contractor shall not leave any areas milled over a weekend and/or holiday period for any reason if not previously approved by Field Engineering.

2 Contractor shall shore up edge of pavement at all driveways, mailboxes and areas not level with new pavement within one week of completion of paving roadway/street.

3 Contractor to match improved driveways with asphalt (i.e., brick, concrete, or asphalt).

4 Contractor shall have all utility adjustments, including water, sewer, and survey, completed within 30 days of completion of paving for roadway, street or subdivision unless prior approval from Field Engineering has been obtained.

5 Contractor shall re-install speed humps, when removed for paving operations, within 45 days of completion of paving for roadway, street or subdivision unless prior approval from Field Engineering has been obtained.

6 Contractor is not allowed to place millings on shoulder unless prior approval from Field Engineering has been obtained.

7 Chip Seal tabs shall be placed upon final asphalt placement and removed prior to thermoplastic stripe installation.

Contractor is to lay out temporary striping and give the City 3 working days to review prior to installation. Temporary striping shall be installed within 7 days of final asphalt placement and must include all striping, i.e., shoulder, stop bars, pavement marking legends. Temporary stripe application rate and bead quantity shall be approved by Field Engineering. Note: Traffic marking/striping may not be anticipated for the project. See bid schedule for pavement marking bid items.

8 Final Thermoplastic Striping shall be completed 21-30 calendar days after temporary stripe placement for roadway, street, or subdivision unless prior approval from Field Engineering. Application rate and bead quantity shall be approved by Field Engineering. Note: Traffic marking/striping may not be anticipated for the project. See bid schedule for pavement marking bid items.

9 Cleanup shall be completed within 10 calendar days of all utility adjustments for roadway, street, or subdivision unless prior approval from the Engineer.

GENERAL REQUIREMENTS:

1. Maintenance and Protection of Traffic

Description and Construction

Traffic control shall protect vehicles and pedestrian traffic in the work area and from construction equipment. Traffic control shall comply with the referenced traffic control manuals and guidelines.

The Contractor shall prepare and construct a Traffic Control Plan and Detour Plan for construction for each neighborhood. The traffic control plan shall comply with all dimensions, signing, restrictions, signalization, and detours for all phases of construction. Approved detour plans shall be in-place and approved by the City of Tucson prior to starting construction. No construction shall be done unless the approved traffic control signs are in place.

Contractor shall take into consideration the parking requirements and situations during the performance of the work and shall prepare a construction schedule to reflect a “construction phasing work” to ensure residents and businesses will have adequate parking at nearby streets and minimizing the inconvenience of finding distant parking during the course of the work.

Convenient access to all residences and businesses shall be maintained and shall be available at all times during construction. It shall be the Contractor’s responsibility to coordinate his work with the residents and businesses so as to minimize local traffic through the work area. Closure of roadways to through traffic may be allowed with prior approval of the Engineer. Requests for roadway closure shall be made in writing at least five (5) days in advance for the Engineer’s review and for ample time for notification and posting.

The Contractor shall be required to maintain at least one open lane of traffic unless the Contractor offers a traffic control approach that will minimize disturbance to residents. Appropriate signage and flagmen shall be utilized at all times during one lane operation. The Contractor is advised of peak period traffic during the following intervals:

Morning 7:00 a.m. to 9:00 a.m.

Evening 4:00 p.m. to 6:00 p.m.

Public Posting and Notification

It shall be the Contractor's responsibility to contact adjacent property owners one week prior to construction.

The Contractor shall:

1. With City guidance, prepare and distribute notification letter to affected residents and businesses. The letter shall provide information on the date and time when the work will commence, parking restrictions when conducting the work, contractor contact numbers for any additional information, and other relevant information on the project and scope of the work.

2. Message Boards shall also be utilized to notify the traveling public.

3. Post No-Parking signs (as necessary) stating actual dates & times work is to commence and restricting access to private properties.

4. Maintain access to all side streets, access roads, business, residences, driveways, alleys, and parking lots except for the period when the paving operation is being conducted with required curing time.

5. Post No Lane Marking signs prior to striping activities.

The Engineer shall be immediately notified if there are changes in the dates and times of the posted No-Parking signs. The contractor shall change the posted signs to read the revised dates and time and re-distribute a revised notification letter to affected residents.

No work shall be allowed to commence unless the conditions and requirements of this specification section is adhered to. Failure of the contractor to abide by this specification section shall be grounds for the City to suspend work.

Re-posting of street postings, distribution of notices, and re-mobilization shall be performed by the contractor per the requirements of the special provisions and these specifications. Contractor shall be charged for the working days for the suspension of the work, including re-posting, re-distributing of notices, all mobilization and demobilization for this scope of work at no additional cost to the City.

Throughout the duration of construction, access to SunTran bus stops shall be maintained. When access to a bus stop is restricted or relocation of a bus stop is requested by the Contractor, and where the Engineer determines that relocation of a bus stop is necessary to maintain access, the Contractor shall notify SunTran Operation ((520) 206-8934) and Davita Mueller at SunTran ((520) 206-8825) or Jackie Basterfield ((520) 206-8807) 5 days in advance of work at that location.

Access to all schools shall be maintained during hours of school operation and activities. The Contractor shall coordinate his work with each school site administrator.

The Contractor shall not store equipment, supplies, materials, or debris on the sidewalks or bike paths.

There shall be no separate pay item for the cost of the resident notification and shall be included as part of the overall project.

2. Permits

Before undertaking work at any location covered by this project, the Contractor shall obtain all applicable permits, including but not limited to: air quality permits, water quality permits, street closure permits, and permits required to adjust any sanitary sewer facilities. Excavation permits, issued by the City of Tucson Engineering Division, for work in public rights-of-way, shall not be required if the work is being done under a contract administered by the City of Tucson, Department of Transportation and Mobility.

3. Disposal of Materials

Any unutilized excess asphalt millings shall be the property of the City of Tucson Transportation Department and the price to haul and stockpile them shall be included in the cost of Pavement

Removal by Milling. All millings shall be delivered to the Los Reales Landfill located at Los

Reales Road and Swan Road. The contractor will need to provide all equipment to stockpile the millings. Contact Frank Bonillas or Justin Nicholas at the City of Tucson Environmental and General Services Department at 520.837.3814 to coordinate access.

4. Proposition Construction Signs

Two Proposition 411 signs shall be required to be installed at the beginning limits of each project segment prior to the start of work. Signs shall be provided by DTM; however, it is the Contractor’s responsibility to pick them up at the City’s storage yard, maintain the signs, and relocate them to each project segment. The Contractor shall be responsible for replacing any damaged or lost signs at no cost to the Department. There shall be no payment for the installation and removal of these signs.

The Contractor shall deliver the signs back to the City upon Final Acceptance of the contract. The work associated (including the time to pick-up, maintenance, relocate to each project segment, and return the signs to the City) shall be incidental to the cost of the work. Sign stands for these signs shall be paid under Item 7010005.

5. Striping

It is the Contractor’s responsibility to as-built existing stripe layout prior to the milling operations.

The Contractor shall coordinate with the Engineer for final layout configuration prior to replacing all striping, symbols and legends.

6. Staging Area

Identification of equipment, materials storage/stockpiling and Contractor/Sub-contractor parking shall be the responsibility of the Contractor. The Contractor shall provide the Engineer with a copy of the written approval of the property owner indicating that the property owner is fully aware and agreeable to said equipment, materials storage/stockpiling, and Contractor/Sub-contractor parking.

This written approval is to be provided to the Engineer prior to commencement of the work.

No work shall be allowed to commence unless the requirements of this specification section are adhered to. Failure of the contractor to abide by this specification section shall be grounds for the City to suspend work.

7. Shoulder Grading

Because of the type of work being proposed and the elevation change to the existing pavement is minimal, it is not anticipated that any shoulder grading, other than areas of erosion to be verified by the City for which a borrow item shall be used, will be required. If the construction operation results in minor gaps between the new pavement and the existing shoulder, any filling of this minor gap shall be considered incidental to the other items of construction and shall not be measured or paid separately.

8. Match Existing

The existing pavement to be milled shall be replaced to maintain the cross slope and profile of the existing pavement; therefore, a clean, smooth edge shall be provided between those areas being milled and overlaid and areas of existing paving. A vertical saw cut shall be provided at the match lines for existing and proposed mill and overlay areas. The vertical saw cut surfaces should be cleaned and tack coated for adhesion prior to the placement of the new overlay.

9. Construction Survey and GPS Documentation

The Contractor shall provide GPS documentation of utilities within the pavement. The survey GPS data shall be in the most recent State Plane Coordinates (NAD 1983 State Plane Arizona, Central) and will be gathered using survey quality equipment, and accurate to within 0.5-feet. This data will be provided to the City of Tucson. The basis of coordinates will be included. This data will be categorized by street segment and labeled with street names and supplied in either raw data in text or an Excel workbook format. The format will include coordinates in northings and eastings and each point shall contain a description of the utility appurtenance: all water & gas valves, monitor wells, sewer manholes & clean outs, communication manholes, and so forth. These structures shall be documented by GPS methods before they are lowered. The surveying/GPS documentation of the utility appurtenances shall be considered incidental and included in the respective pre-lowering utility item. This work shall be considered incidental to the other items of construction and shall not be measured or paid separately.

The City’s surveyor will be required to cross-section the roadway prior to the treatment in order to be able to provide the contractor information to grade to.

DTM forces will perform survey for monument and project layout.

10. Construction Surveillance

DTM forces, including consultant inspectors, shall perform the inspection of the Contractor’s work. Assistance may be provided by the Field Engineering inspection staff.

11. Coordination of Residential Garbage and Recycling Services

Before undertaking work at any location covered by this project, the Contractor shall coordinate with City of Tucson Environmental Services (ES) to coordinate continuous weekly residential garbage and recycling services for the duration of construction. Damage to the pavement caused by Brush and Bulky equipment activity due to improper scheduling on the part of the contractor shall be repaired in a manner acceptable to the City at no cost to the contract.

In addition, the Contractor shall address the City of Tucson Environmental Services Brush and Bulky

Material Collection in the project schedule and sequence all work, at any location covered by this project, to be complete at least one month in advance of the next bi-annual Brush and Bulky

Material Collection. The Brush and Bulky Material Collection schedule is available at the following website: https://www.tucsonaz.gov/es/brush-and-bulky

12. Erosion Control Measures

This project exceeds 1 acre. The Contractor shall implement the Arizona Department of Environmental Quality (ADEQ) requirements for protecting the quality of stormwater runoff during construction, as specified under the Arizona Pollutant Discharge Elimination System (AZPDES) General Permit for Construction Activities.

The construction activities are considered “Exempt Discharges” under AZPDES General Permit for

Construction Activities, Part 1.D.6.b. However, efforts to prevent pollutants from discharging from the project must be utilized by providing, installing, maintaining, removing and disposing of erosion control measures including, but not limited to, such items as gravel filter berms, dikes, catch basin inlet protection, end-of-pipe filtering devices, silt fences, dams, sediment basins, netting, straw bale barriers, slope drains, and other erosion control devices or methods.

The Contractor shall not be required to prepare a Stormwater Pollution Prevention Plan (SWPPP) but shall follow Best Management Practices in accordance with t h e A Z P D E S General Permit for Construction Activities, in conjunction with the DTM Construction Project Manager and Pima County’s Stormwater Management Section.

A Notice of Intent (NOI) and Notice of Termination (NOT) shall not be required.

There shall be no separate pay items for providing ‘good housekeeping’ practices, the cost being considered as included in the price of the other items.

13. Pre-lower Water Valve Box and Cover; Manhole and Cleanout (Sanitary Sewer); and Survey Monument

The Contractor shall survey/locate all manholes, water valve boxes by GPS and record all items prior to their removal. This information shall be provided to DTM, Tucson Water Operations staff, https://www.tucsonaz.gov/es/brush-and-bulky and to the PCRWRD Field Engineering Staff and prior to beginning the milling operations.

Steel plates of a size appropriate for the utility to be lowered shall be used over the water valve riser or the manhole opening. Survey monuments concrete shall be removed. A sufficient thickness of temporary asphalt concrete shall be placed and compacted within the void created by the item removal or pre-lowering so that no damage to the utility valve or manhole and equipment used during the milling, grading and paving operations occurs.

The contractor shall install new survey monuments (PC/COT Detail 103, 1 of 3) to the final pavement grade elevation.

There shall be no separate pay items for pre-lowering water valve box and cover; manhole and cleanout (Sanitary Sewer); and survey monuments, the cost being considered as included in the price of the adjustment/reset items.

There shall be no separate pay item for concrete collars, the cost being considered as included in the price of the adjustment/reset items.

14. Storm Drain and Utility Manholes

If the new roadway surface causes the existing storm drain and utility manholes to be depressed by

0.04 Ft. or more, as determined by the Engineer or designated representative, the existing manholes shall be adjusted to the new finish grade in accordance with the requirements of the Standard Specifications and as modified for this contract.

Vaults, communications and electric manholes which cannot reasonably be lowered in advance of milling shall be protected in place and avoided. Avoidance shall be considered incidental to the contract.

15. Speed Humps and Speed Tables

Use bid item number 4060200 for speed hump and 4060201 for speed table payment. Asphalt for the speed humps and speed tables is incidental to the speed hump and speed table bid items. The asphalt mix design for the speed humps and tables shall be approved by the engineer prior to installation.

Speed hump and speed table signs and object markers as indicated on the speed hump and speed table details are not required on this contract. The Contractor, if the milling equipment permits the removal, can use the milling operation to remove the speed humps, but the speed hump existing appurtenances shall remain in-place (i.e., object markers and speed hump ahead signs).

No separate measurement or payment will be made for pavement markings, chevron striping, and raised pavement markers installed as part of each speed hump or speed table, the cost being considered included in the price of the speed hump and speed table bid item.

16. Type F Reflective Pavement Markers

There shall be no separate pay item for Type F, Blue, Two-Way Reflective Pavement Markers, used to identify fire hydrant and fire connection locations, the cost being considered as included in the price of the contract bid items.

17. Raised Pavement Markers

The list of approved manufacturers for bituminous adhesive may be found on the ADOT’s approved products list at: http://www.azdot.gov/tpd/atrc/apl/APL.asp http://www.azdot.gov/tpd/atrc/apl/APL.asp

The contractor shall submit to the project inspector, or designated representative, certificates of compliance for each type and batch of reflective pavement markers, in accordance with the provisions of 106-5 (B) of the Standard Specifications for Public Improvements.

18. Remove Asphaltic Concrete Pavement (By Milling)

This item will require asphalt mill, sweep as needed, tack as needed, and patched as needed with asphalt concrete. The City does not guaranty any contamination of the millings due to AC thickness or milling widths that are outside edge of pavement. Contractor shall haul off millings. In some circumstances, with prior approval from DTM Project Manager, the contractor may be able to place, grade, and compact millings along the shoulder provided the millings are blended with the existing soil to change the color of the millings to match the surrounding soil and will not impede natural flow of existing drainages.

Milled surfaces must be repaved within 24 hours. The Contractor shall maintain the milled surface until repaving occurs.

19. Removal of Structures and Obstructions

Items included in item 2020001 Removal of Structures and Obstructions, includes but not limited to: debris on existing sidewalks, header, curb, ramps, concrete slabs, and sidewalk.

No separate measurement or payment will be made for the removal of…