This is a Bid Schedule for Invitation for Bid (IFB) 260223 issued by the City of Tucson for the Prop 411 Phase 1 - Tucson Heights & Highland Park Addition Mill & Fill project. The project encompasses mill and fill resurfacing work in neighborhoods bounded by Oracle Road on the west, Euclid Avenue on the east, Grant Road on the north, and Speedway Boulevard on the south. The scope includes removal of bituminous pavement from 282,403 square yards, roadway grading across the same area, placement of asphaltic concrete totaling 31,347 tons, construction of 32 speed humps and 1 speed table, installation of 319 curb access ramps (represented as 10,176 square feet of concrete sidewalk and 30,225 square feet of curb access ramps in the bid items), and comprehensive pavement markings including white and yellow extruded thermoplastic lines, preformed symbols, and painted markings. Additional work includes traffic control, sewer manhole adjustments for 210 locations, potable water valve box adjustments for 480 locations, concrete curb installation totaling 8,914 linear feet, and survey monument reset work for 104 monuments.

The bid schedule itemizes all work components with unit quantities but does not populate unit prices or amounts, reflecting that this is the blank form distributed to potential bidders for completion. The project includes a bituminous material price adjustment item set at $391,838 with a $1.00 unit price to capture market fluctuations, and two allowance items totaling $60,000 for landscape work and miscellaneous items. Funding is provided through Proposition 411, which supports infrastructure improvements in the identified neighborhoods. The total construction cost shows as $0.00 in the template, indicating this schedule awaits bidder submissions to establish the contract value.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

CITY OF TUCSON
IFB 260223- Prop 411 Tucson Heights & Highland Park Addition Mil & Fill
BID SCHEDULE
Agency :City of Tucson
Project No :260223
Project :Prop 411 Phase 1 - Tucson Heights & Highland Park Addition
ITEM NO.ITEM DESCRIPTIONUNITQUANTITYUNIT PRICEAMOUNT
1100201PAVEMENT DEFICIENCY CREDITS-NO BID
2020001REMOVAL OF STRUCTURES & OBSTRUCTIONSL.S.1
2020029REMOVAL OF BITUMINOUS PAVEMENT (BY MILLING)S.Y.282,403
2050004ROADWAY GRADING (DISCRETIONARY)S.Y.282,403
3030003AGGREGATE BASE (DISCRETIONARY)C.Y.3,700
4060012ASPHALTIC CONCRETE (MIX NO. 2)TON31,347
4060200ASPHALTIC CONCRETE (SPEED HUMP)EACH32
4060201ASPHALTIC CONCRETE (SPEED TABLE)EACH1
4060510BITUMINOUS MATERIAL PRICE ADJUSTEMENTUSD391,838$ 1.00
5090110SEWER MANHOLE/CLEANOUT, ADJUSTMENTEACH210
5103101POTABLE WATER, ADJUST VALVE BOX AND COVEREACH480
7010005TRAFFIC CONTROLL.S.1
7010025FLASHING ARROW PANELEA/DAY540
7010027CHANGEABLE MESSAGE BOARDEA/DAY540
7040005PAVEMENT MARKING (WHITE EXTRUDED THERMOPLASTIC) (0.090")L.F.24,790
7040006PAVEMENT MARKING (YELLOW EXTRUDED THERMOPLASTIC) (0.090")L.F.13,020
7040032PAVEMENT MARKING LEGEND (WHT EXTRUDED THERMOPLASTIC) SGL. ARROW (0.090")EACH2
7040130PAVEMENT MARKING (WHITE EXTRUDED THERMOPLASTIC) (TRANSVERSE) (0.090")L.F.1,850
7050091PAVEMENT MARKING, PREFORMED, TYPE 1, SYMBOL, SHARED LANE MARKINGEACH62
7060025PAVEMENT MARKER, REFLECTIVE, (TYPE D, YELLOW, TWO-WAY)EACH335
7080001PAINTED PAVEMENT MARKINGL.F.41,510
7080100PAVEMENT MARKING (PORTLAND GREEN THERMOPLASTIC)S.Y.50
8080111MISCELLANEOUS LANDSCAPE WORK ALLOWANCEUSD30,000$ 1.00
9010001MOBILIZATIONL.S.1
9080005CONCRETE CURB (STD. DTL. 209) (TYPE 2)L.F.4,937
9080040CONCRETE CURB (RAMP CURB)L.F.3,977
9080201CONCRETE SIDEWALKS.F.10,176
9080290CURB ACCESS RAMPS.F.30,225
9090031SURVEY MONUMENT, RESET FRAME AND COVEREACH104
9300100MISCELLANEOUS ITEMS ALLOWANCEUSD30,000$ 1.00
TOTAL CONSTRUCTION COST$0.00