The document is a set of detailed cross-section engineering drawings for a transportation infrastructure project in Tucson, Arizona, prepared by AECOM USA, Inc. for the City of Tucson's Department of Transportation/Engineering Division. The project involves constructing and modifying roadways and infrastructure along 22nd Street, spanning from Kino Parkway to Tucson Boulevard, and includes multiple associated ramps, connections, and a multi-use path. The project encompasses several key components: the main 22nd Street roadway, Barraza-Aviation Parkway, Campbell-Beverly Connection, Ramp A, Ramp B, and a multi-use path. The cross-section drawings provide comprehensive details about earthwork, including roadway excavation and embankment volumes, right-of-way requirements, and elevation changes across various station points.
The engineering drawings meticulously document cut and fill volumes, with extensive measurements for each cross-section, including area calculations for roadway excavation and embankment. The project involves significant earth moving, with volumes ranging from a few cubic yards to over 3,000 cubic yards in some sections. The drawings indicate multiple construction zones and right-of-way considerations, with notations for existing and new right-of-way boundaries. The project appears to be a complex transportation infrastructure upgrade that will modify the existing roadway landscape, involving precise grading, elevation adjustments, and potential drainage considerations. The plan number I-2010-012 suggests this is a long-planned infrastructure improvement project for the Tucson metropolitan area.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A V
E N
U E
A V
E N
U E
36th
29th ST. SILVERLAKE
P A
R K t h
E N
U E
G R
A N
A D
A A V
E N
U E
P A
L O
E
R D
E
6th
E U
C L I
D
C H
E R
R Y
C A
M P
B E
L L
C O
U N
T R
Y
C L
U B
R A
N D
O L
P H
W
Y
A L
V E
R N
O N
PARKWAY
WAY
DI
VERSI
ON
STREET
RAILROAD
STREET
AVIATION
P A R
K W
A Y
T U
C S
O N
BROADWAY
ARROYO
HIGH SCHOOL
WASH
TUCSON
S T
O N E t h
WASH
K I
N O
STREET
ALAMEDA
UPRR RAIL YARD
22nd
EL=2465.78
EL=2466.21
EL=2466.48
EL=2466.35
EL=2465.85
EL=2466.54
T A
N K
WP
RSR
WP
T A
N K
IV WS
T A
N K
RSR
WP
A
DRN
DRN
WELL
M B
MB
LCB
LCB
LCB
LCB
LCB LCB
LCB
2460TSB
LCB
LCB
LCB
LCB
LCB
TSB
MB
S
S
WELL
WELL
LCB
TSB
MB
MB
MB
MB
MB
MB
MB
T S L
TSLTSL
LCB
LCB
TSB
TSB
PLAN NO.
UCSONT
ITY OF C
DEPARTMENT OF TRANSPORTATION/ENGINEERING DIVISION
:5
:5
M
F i l e n a m e
T i m e l o t t e d
D a l o t t e d
P L
O T
T E
D
B Y
C
P r o j e c t s n d
S
K i n o o
T u c s
D s i g n
T U
C
C A
D
C i v i l
S h e e t s h x s .d g n
K e r s h n e r
M
I-2010-012 www.aecom.com
TRANSPORTATION
AECOM USA, Inc.
KINO PARKWAY TO TUCSON BOULEVARD
22ND STREET
REF. SCALE:
DateSignatoryApprovals
20Approved
TRANSPORTATION DIRECTOR
NO. DATE REVISION BY CHKD. APPR. DRWN. BY DSGN. BY CHKD. BY20 20 20
ENGINEERING ADMINISTRATOR
DESIGN ADMINISTRATOR
TRAFFIC PLANNING &
LANDSCAPE ARCHITECT
N/A
In Maricopa County: (602)263-1100
Dial 8-1-1 or 1-800- STAKE-IT (782-5348) before you being excavation.
Call at least two full working days
Arizona Blue Stake, Inc.
R
MPK24 24 24BRMPK
T 520.887.1800 F 520.887.8438
Tucson, Arizona 85718
1760 E. RIVER RD, SUITE 350
PROJECT SITE
LOCATION MAP
C h e r r y v e
Scale: 1"=200'
Cam pbell Ave
Sec 18
Sec 19 Sec 20
Sec 17
W a r r e
N e f f
S t
Scale: 3"=1 Mile
Gila & Salt River & Meridian, Pima County, Arizona
T 14 S, R 14 E
Sections 17, 18, 19, and 20
KINO PARKWAY TO TUCSON BOULEVARD
22ND STREET
P lu m r e
W il s e
N o r to e
T u c s
B lv d
C h e r r y b e ll
S tr a v
Barraza-Aviation Pkw y
PLAN NO. I-2010-012
JOB NO. SR5A
21st St
22nd
W A
Y
K in o
P k w y
22nd Street
Multi-Use Path
CROSS SECTIONS
ROADWAY
Sheet Index
Sheets 2 - 11
Sheet 1 Cover Sheet
Sheets 11 - 12
ONLY
INFORMATION
FOR
Connection
Cam pbell-Beverly
Ramp A
Sheets 13 - 14
Sheets 15 - 18
Sheets 21 - 28 Barraza-Aviation Pkwy Cross Sections
22nd Street Cross Sections
Barraza-Aviation Pkwy Ramp A Cross Sections
Campbell-Beverly Connection Cross Sections
Multi-Use Path Cross Sections
Barraza-Aviation Pkwy Ramp B Cross Sections
Ram p B
Sheets 19 - 20
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
3:52:56 PMC:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs02.dgn
PLAN NO. I-2010-012 SHEET OF 2802
Sta 42+50 to Sta 46+00
42+50
43+00
43+50
44+00
44+50
45+00
45+50
46+00
3:1
4:1
Warren Ave
Const
Campbell Ave Ramp
Const
Campbell Ave Ramp
Const
Campbell Ave Ramp
Const
Campbell Ave Ramp
Const
Campbell Ave Ramp
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
22ND STREET CROSS SECTIONS
Area Fill = 0.38 SQ FT Volume Fill =0.35 CU YDS
Area Cut =163.75 SQ FT
Area Fill = 0.05 SQ FT
Area Fill = 12.87 SQ FT Volume Fill =11.96 CU YDS
Volume Cut =67.71 CU YDS
Area Cut =14.82 SQ FT
Area Fill = 343.51 SQ FT
Area Cut =23.16 SQ FT
Area Fill = 558.65 SQ FT
Area Cut =43.54 SQ FT
Area Fill = 791.39 SQ FT
Volume Cut =26.42 CU YDS
Volume Cut =35.17 CU YDS
Volume Cut =61.76 CU YDS
Volume Fill =1250.04 CU YDS
Volume Fill =312.39 CU YDS
Volume Fill =572.60 CU YDS
TCE
New
TCE
New
TCE
New
TCE
New
R/W New
R/W New
R/W New
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
TCE
New
R/W Exist R/W
Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
TCE
New
R/W Exist
TCE
New
R/W Exist
Area Cut =179.77 SQ FT Volume Cut =166.45 CU YDS
Volume Cut =318.07 CU YDS
Area Cut =122.21 SQ FT Volume Cut =264.78 CU YDS
Area Fill = 62.48 SQ FT
Area Cut =59.42 SQ FT Volume Cut =168.18 CU YDS
Volume Fill =69.77 CU YDS
Area Cut =13.71 SQ FT
3:1
Volume Fill =0.40 CU YDS
Area Fill = 274.90 SQ FT
Roadway Excavation
Roadway Embankment
50:1
50:1
Volume Fill =835.33 CU YDS
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
PLAN NO. I-2010-012 SHEET 28OF03
Sta 46+50 to Sta 49+50
46+50
47+00
47+50
48+00
48+52
49+00
49+50
3:1
3:1
3:1
3:1
3:1
3:1
4:1
4:1
Neff St
4:1
4:1
4:1
4:1
Const
Campbell Ave Ramp
Const
Campbell Ave Ramp
Const
Campbell Ave Ramp
Const
Campbell Ave Ramp
Const
Campbell Ave Ramp
Const
Campbell Ave Ramp
Const
Campbell Ave Ramp
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
22ND STREET CROSS SECTIONS
Area Cut =70.87 SQ FT
Area Fill = 985.19 SQ FT
Area Cut =112.65 SQ FT
Area Cut =166.55 SQ FT
Area Cut =224.30 SQ FT
Area Cut =288.86 SQ FT
Area Cut =969.25 SQ FT
Volume Fill =1644.98 CU YDS
Volume Cut =169.93 CU YDS
Volume Fill =2030.51 CU YDS
Volume Cut =258.52 CU YDS
Volume Fill =2440.17 CU YDS
Volume Cut =361.90 CU YDS
Volume Fill =2839.04 CU YDS
Volume Cut =1118.32 CU YDS
Volume Cut =494.15 CU YDS
Volume Fill =3303.75 CU YDS
Volume Cut =923.24 CU YDSArea Cut =27.85 SQ FT
R/W New
R/W New
R/W New
R/W New
R/W New
R/W New
R/W Exist
R/W Exist
R/W Exist
R/W Exist
TCE
New
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
C:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs03.dgn 3:52:57 PM
Const
22nd St
Roadway Excavation
Roadway Embankment
50:1
50:1
50:1
50:1
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
Area Fill = 1207.76 SQ FT
Area Fill = 1427.62 SQ FT
Area Fill = 1638.54 SQ FT
Area Fill = 1792.28 SQ FT
Area Fill = 0.58 SQ FT
Area Fill =2.19 SQ FT
Volume Cut =105.94 CU YDS
Volume Fill =0.52 CU YDS
Volume Fill =2.56 CU YDS
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
PLAN NO. I-2010-012 SHEET 28OF04
Sta 50+00 to Sta 53+50
50+50
51+00
51+50
52+00
52+50
53+00
53+50
4:1
Const
Campbell Ave Ramp
Const
Campbell Ave Ramp
Const
Campbell Ave Ramp
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
22ND STREET CROSS SECTIONS
Area Fill = 0.00 SQ FT
Area Cut =0.00 SQ FT
Area Fill = 0.00 SQ FT Volume Fill =0.00 CU YDS
Area Cut =0.00 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =0.00 CU YDS
Volume Fill =0.00 CU YDS
Area Cut =0.00 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =0.00 CU YDS
Volume Fill =0.00 CU YDS
Volume Cut =26.42 CU YDS
Volume Cut =3.42 CU YDS
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
TCE
New
TCE
New
R/W Exist
R/W Exist
50+00
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
Area Cut =38.92 SQ FT
Area Cut =41.68 SQ FT
Volume Cut =62.06 CU YDS
C:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs04.dgn 3:52:57 PM
4:14:1
Const
Campbell Ave Ramp
Const 22nd St
R/W Exist
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
4:1
4:1
4:1
4:1
Const
Campbell Ave Ramp
Area Fill = 3.07 SQ FT
Area Fill = 6.45 SQ FT
Volume Cut =74.63 CU YDS
Volume Fill =8.81 CU YDS
Area Cut =25.34 SQ FT
Area Fill = 4.19 SQ FT Volume Fill =9.85 CU YDS
Volume Cut =46.46 CU YDS
Area Cut =3.69 SQ FT
Roadway Excavation
Roadway Embankment
Area Cut =24.84 SQ FT
Area Fill = 1.72 SQ FT
Volume Cut =61.82 CU YDS
Volume Fill =5.47 CU YDS
Volume Fill =1.59 CU YDS
Volume Fill =4.87 CU YDS
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
PLAN NO. I-2010-012 SHEET 28OF05
Sta 54+00 to Sta 57+50
54+00
54+50
55+00
55+50
56+00
57+50
57+00
56+50
Const
22nd St
Const
22nd St
Const 22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
22ND STREET CROSS SECTIONS
Area Cut =0.00 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =0.00 CU YDS
Volume Fill =0.00 CU YDS
Area Cut =0.00 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =0.00 CU YDS
Volume Fill =0.00 CU YDS
Area Cut =0.00 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =0.00 CU YDS
Volume Fill =0.00 CU YDS
Area Cut =0.00 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =0.00 CU YDS
Volume Fill =0.00 CU YDS
Area Cut =0.00 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =0.00 CU YDS
Volume Fill =0.00 CU YDS
Area Cut =0.00 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =0.00 CU YDS
Volume Fill =0.00 CU YDS
Area Cut =0.00 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =0.00 CU YDS
Volume Fill =0.00 CU YDS
Area Cut =0.00 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =0.00 CU YDS
Volume Fill =0.00 CU YDS
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist ADOT
R/W Exist ADOT
R/W Exist ADOT
R/W Exist ADOT
C:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs05.dgn 3:52:58 PM
Roadway Excavation
Roadway Embankment
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
PLAN NO. I-2010-012 SHEET 28OF06
Sta 58+00 to Sta 61+00
58+00
58+50
59+00
59+50
60+00
60+50
61+00
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const 22nd St
Const
22nd St
22ND STREET CROSS SECTIONS
Area Cut =0.00 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =0.00 CU YDS
Volume Fill =0.00 CU YDS
Area Cut =0.00 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =0.00 CU YDS
Volume Fill =0.00 CU YDS
Area Cut =0.00 SQ FT Volume Cut =0.00 CU YDS
Area Cut =0.00 SQ FT Volume Cut =0.00 CU YDS
Area Cut =0.00 SQ FT Volume Cut =0.00 CU YDS
Area Cut =0.00 SQ FT
Area Cut =0.00 SQ FT
Area Fill = 0.00 SQ FT
Area Fill = 0.00 SQ FT Volume Fill =0.00 CU YDS
Area Fill = 0.00 SQ FT Volume Fill =0.00 CU YDS
Area Fill = 0.00 SQ FT Volume Fill =0.00 CU YDS
Volume Cut =0.00 CU YDS
Volume Cut =0.00 CU YDS
R/W Exist
R/W Exist ADOT
R/W Exist ADOT
Volume Fill =0.00 CU YDS
C:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs06.dgn 3:52:59 PM
Roadway Excavation
Roadway Embankment
Cross Sections
See Ramp A
4:1
Const \ Ramp A
4:1
Cross Sections
See Ramp A
Const
Ramp A
4:1
Cross Sections
See Ramp A
R/W New ADOT
Const
Ramp A
Cross Sections
See Ramp A
R/W New ADOT
Const
Ramp A R/W
New ADOT
4:1 4:1
Area Fill = 345.09 SQ FT Volume Fill =319.53 CU YDS
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
PLAN NO. I-2010-012 SHEET 28OF07
Sta 61+50 to Sta 65+00
61+50
62+00
62+50
62+85
63+50
64+00
65+00
64+50
4:1
4:1
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
22ND STREET CROSS SECTIONS
Const
22nd St
Area Cut =0.00 SQ FT
Area Fill = 2934.95 SQ FT
Area Fill = 2261.39 SQ FT
Area Fill = 2232.62 SQ FT
Area Fill = 2458.30 SQ FT
Area Fill = 2171.98 SQ FT
Volume Cut =0.00 CU YDS Volume Cut =58.01 CU YDS
Volume Cut =40.85 CU YDS
Area Cut =165.67 SQ FT
Volume Fill =700.29 CU YDS Volume Fill =6254.85 CU YDS
Volume Fill =4161.12 CU YDS
Volume Fill =4343.44 CU YDS
Volume Fill =4287.30 CU YDS
C:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs07.dgn 3:52:59 PM
3:1
3:1
3:1
Volume Cut =0.00 CU YDS
Area Cut =60.89 SQ FT
Volume Cut =272.71 CU YDS
Volume Cut =186.77 CU YDS
Roadway Excavation
Area Cut =26.61 SQ FT
Area Cut =17.51 SQ FT
Roadway Embankment
Area Cut =0.00 SQ FT
Area Fill = 411.22 SQ FT
Area Cut =0.00 SQ FT Area Cut =36.04 SQ FTVolume Cut =0.00 CU YDS
Volume Cut =39.47 CU YDS
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
BRIDGE
WB 22ND ST
BRIDGE
EB 22ND ST
4:1 4:1
Const
Ramp AR/W New ADOT
R/W New ADOT
Const
Ramp A
4:1
R/W New ADOT
Const
Ramp A
4:1
4:1
Const
Ramp A
R/W New ADOT
R/W New ADOT
Const
Ramp A
4:1
R/W New ADOT
Const
Ramp A
4:1
R/W New ADOT
4:1
Const
Ramp A
R/W New ADOT
Const
Ramp A
4:1
Area Fill = 335.73 SQ FT
Area Fill = 231.19 SQ FT
Volume Fill =691.62 CU YDS
Volume Fill =524.93 CU YDS
Volume Fill =183.67 CU YDS
Overexcavation & Recompaction
Area Over Ex =28.47 SQ FT Vol Over Ex =31.77 CU YDS
Area Over Ex =56.00 SQ FT Vol Over Ex =78.21 CU YDS
Area Over Ex =81.60 SQ FT Vol Over Ex =127.41 CU YDS
Area Over Ex =5.84 SQ FT Vol Over Ex =0.00 CU YDS
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
PLAN NO. I-2010-012 SHEET 28OF08
Sta 65+50 to Sta 69+00
66+00
65+50
66+50
67+00
67+50
68+00
69+00
68+50
4:1
Plumer Ave
Const 22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
22ND STREET CROSS SECTIONS
Area Fill = 1798.92 SQ FT
Area Cut =0.00 SQ FT
Area Fill = 1516.23 SQ FT
Area Fill = 1291.46 SQ FT
Area Fill = 703.76 SQ FT
Area Fill = 496.01 SQ FT
Area Fill = 381.30 SQ FT
Volume Cut =26.44 CU YDS
Volume Cut =10.22 CU YDS
Volume Cut =1.29 CU YDS
Volume Cut =12.75 CU YDS
Volume Cut =33.34 CU YDS
Volume Cut =44.41 CU YDS
Volume Cut =53.46 CU YDS
Volume Fill =3676.76 CU YDS
Volume Fill =3069.57 CU YDS
Volume Fill =2599.70 CU YDS
Volume Fill =2106.85 CU YDS
Volume Fill =1562.69 CU YDS
Volume Fill =1110.90 CU YDS
Volume Fill =812.32 CU YDS
Volume Fill =598.79 CU YDS
R/W Exist ADOT
R/W Exist ADOT
R/W Exist ADOT
R/W Exist
Area Fill = 265.39 SQ FT
C:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs08.dgn 3:53:00 PM
Const
22nd St
4:1
4:1
4:1
Area Cut =1.39 SQ FT
Volume Cut =69.45 CU YDS
Roadway Excavation
Area Cut =11.04 SQ FT
Roadway Embankment
Const
Ramp A
R/W New ADOT
4:1
Const
Ramp A
Const
Ramp A
4:1
4:1
Const
Ramp A
Const
Ramp A
4:1
Const
Ramp A
4:1
Const
Ramp AR/W Exist ADOT
R/W Exist ADOT
4:1
R/W Exist R/W Exist
Const
Ramp A
4:1
Area Cut =12.38 SQ FT
Area Cut =23.63 SQ FT
Area Cut =24.33 SQ FT
Area Cut =33.41 SQ FT
Area Cut =41.60 SQ FT
Overexcavation & Recompaction
Area Over Ex =92.76 SQ FT Vol Over Ex =161.44 CU YDS
Cross Sections See Ramp B
Cross Sections See Ramp B
Cross Sections See Ramp B
Cross Sections See Ramp B
Cross Sections See Ramp B
Cross Sections See Ramp B
Sections B Cross
See Ramp
4:1
Area Fill = 983.94 SQ FT
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
PLAN NO. I-2010-012 SHEET OF09
Sta 69+50 to Sta 73+00
70+00
69+50
70+50
71+00
71+50
72+00
73+00
72+50
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
22ND STREET CROSS SECTIONS
Volume Fill =378.66 CU YDS
Volume Cut =148.16 CU YDS
R/W Exist
R/W Exist
Area Cut =50.74 SQ FT
Area Fill = 61.74 SQ FT Volume Fill =190.09 CU YDS
Area Cut =61.99 SQ FT
Volume Fill =110.71 CU YDS
Area Cut =77.93 SQ FT
Area Cut =87.68 SQ FT
Area Cut =72.33 SQ FT
Area Cut =64.11 SQ FT Volume Cut =126.33 CU YDS
Volume Fill =23.31 CU YDS
C:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs09.dgn 3:53:00 PM
Area Fill = 143.56 SQ FT
Volume Cut =72.94 CU YDS
Volume Cut =81.41 CU YDS
Area Cut =83.30 SQ FT Volume Cut =134.53 CU YDS
Volume Fill =87.28 CU YDS
Area Fill = 17.93 SQ FT Volume Fill =50.33 CU YDS
Area Fill = 11.71 SQ FT Volume Fill =27.44 CU YDS
Area Fill = 15.23 SQ FT Volume Fill =24.94 CU YDS
Roadway Excavation
Roadway Embankment
4:1
4:1
4:1
4:1
4:1
4:1
4:1
4:1
Const
Ramp A
Const
Ramp A
Const
Ramp A
Const
Ramp A
Area Cut =37.18 SQ FT
Area Fill = 57.83 SQ FT
Area Fill = 36.43 SQ FT Area Fill = 9.95 SQ FT
Volume Cut =149.29 CU YDS
Volume Cut =153.34 CU YDS
4:1
4:1
4:1
Volume Cut =104.38 CU YDS
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:14:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1 4:1
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:14:1
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1 4:1
PLAN NO. I-2010-012 SHEET 28OF10
Sta 73+50 to Sta 77+00
74+00
73+50
74+50
75+00
75+50
76+00
77+00
76+50
Norton Ave
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
22ND STREET CROSS SECTIONS
Area Cut =113.26 SQ FT
Area Fill = 9.57 SQ FT
Area Cut =126.34 SQ FT Volume Cut =221.85 CU YDS
Area Cut =127.37 SQ FT
Volume Fill =17.86 CU YDS
Volume Cut =160.61 CU YDS
Volume Fill =19.31 CU YDS
Volume Cut =234.92 CU YDS
Volume Fill =14.81 CU YDS
R/W Exist
TCE
New
C:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs10.dgn 3:53:01 PM
Area Cut =61.29 SQ FT
Volume Fill =16.06 CU YDS
Area Cut =48.90 SQ FT
Volume Fill =14.17 CU YDS
Area Cut =47.31 SQ FT Volume Cut =89.08 CU YDS
Volume Fill =15.54 CU YDS
Area Cut =56.55 SQ FT
Area Fill = 10.42 SQ FT
Volume Cut =96.17 CU YDS
Area Cut =60.20 SQ FT
Area Fill = 10.17 SQ FT
Volume Cut =108.10 CU YDS
Volume Fill =19.06 CU YDS
Volume Fill =18.28 CU YDS
Area Fill = 11.29 SQ FT
Area Fill = 4.70 SQ FT
Roadway Excavation
Roadway Embankment
4:1
4:1
4:1
Area Fill = 7.39 SQ FT
Area Fill = 7.91 SQ FT
Area Fill = 8.87 SQ FT
Volume Cut =116.11 CU YDS
Volume Cut =102.03 CU YDS
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:14:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1 4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1 4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
4:1
PLAN NO. I-2010-012 SHEET 28OF11
Sta 77+50 to Sta 79+00
78+00
77+50
78+50
79+00
Const
22nd St
Const
22nd St
Const
22nd St
Const
22nd St
22ND STREET CROSS SECTIONS
Area Cut =119.28 SQ FT Volume Cut =228.38 CU YDS
Volume Fill =7.97 CU YDS
Area Cut =123.20 SQ FT
Area Fill = 9.59 SQ FT
Volume Cut =224.52 CU YDS
Area Fill = 0.00 SQ FT
Volume Fill =12.50 CU YDS
Volume Cut =225.88 CU YDS
TCE
New
R/W Exist
R/W Exist
R/W Exist
TCE
New
TCE
New
Area Cut =127.43 SQ FT Volume Cut =229.80 CU YDS
C:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs11.dgn 3:53:01 PM
Area Fill = 3.91 SQ FT
Area Cut =120.75 SQ FT
Area Fill = 7.79 SQ FT Volume Fill =16.09 CU YDS
Volume Fill =7.21 CU YDS
Roadway Embankment
Roadway Excavation
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
12+00
12+50
13+00
4:14:1
4:14:1
4:14:1
4:1
Const
Ramp A
Const
Ramp A
Connection Const Campbell-Beverly
Const
Ramp A
Area Cut =90.78 SQ FT
Area Fill = 0.00 SQ FT Volume Fill =0.00 CU YDS
Area Cut =99.06 SQ FT Volume Cut =175.78 CU YDS
Overexcavation & Recompaction
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Area Fill = 11.26 SQ FT Volume Fill =10.43 CU YDS
Area Cut =70.85 SQ FT
Area Fill = 18.55 SQ FT Volume Fill =27.60 CU YDS
4:14:1
9:1
19:1
4:1
Volume Cut =0.00 CU YDS
Volume Cut =157.32 CU YDS
R/W New ADOT
R/W New ADOT
R/W New ADOT
Area Over Ex =115.02 SQ FT
Sta 12+00 to Sta 13+00
RAMP A CROSS SECTIONS
Area Over Ex =120.43 SQ FT
Area Over Ex =105.64 SQ FT Vol Over Ex =0.00 CU YDS
Vol Over Ex =209.32 CU YDS
Vol Over Ex =218.01 CU YDS
PLAN NO. I-2010-012 SHEET 28OF12
C:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs12.dgn 3:53:02 PM
Roadway Embankment
Roadway Excavation
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
Sta 13+50 to Sta 17+00
RAMP A CROSS SECTIONS
13+50
14+00
14+50
15+00
15+50
17+00
16+50
16+00
4:1 4:1 4:1
4:1 4:1 4:1
4:1 4:1 4:1
4:1
4:1 4:1
4:14:1
5:1
4:1
4:1 4:1 4:1
4:1 4:1
Const
Ramp A
Const
Ramp A
Const
Drainage Channel
Const
Ramp A
Const
Drainage Channel
Const
Ramp A
Const
Ramp A
Const Ramp A
Const
Ramp A
Const
Ramp A
Area Cut =0.00 SQ FT
Area Cut =0.00 SQ FT Volume Cut =0.00 CU YDS
Area Fill = 381.50 SQ FT
Area Fill = 264.00 SQ FT
Area Fill = 155.43 SQ FT
Volume Cut =46.75 CU YDS
Volume Cut =51.25 CU YDS
Volume Fill =745.72 CU YDS
Volume Cut =30.61 CU YDS
Volume Fill =597.69 CU YDS
Volume Fill =388.36 CU YDS
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Area Cut =93.42 SQ FT
Area Fill = 20.65 SQ FT Volume Fill =36.30 CU YDS
Area Cut =43.31 SQ FT
Area Fill = 81.38 SQ FT Volume Fill =94.47 CU YDS
Area Cut =24.56 SQ FT Volume Cut =62.84 CU YDS
Area Fill = 219.73 SQ FT Volume Fill =278.81 CU YDS
Area Cut =28.20 SQ FT Volume Cut =48.85 CU YDS
Area Fill = 296.18 SQ FT Volume Fill =477.69 CU YDS
Area Cut =22.29 SQ FT
Area Fill = 423.88 SQ FT Volume Fill =666.72 CU YDS
Area Cut =33.06 SQ FT
4:1
4:1
4:1
4:14:1
4:1
Volume Cut =152.10 CU YDS
Volume Cut =126.60 CU YDS
Const
Multi-Use Path
R/W New ADOT
R/W New ADOT
R/W New ADOT
R/W New ADOT
R/W New ADOT
R/W New ADOT
R/W New ADOT
R/W New ADOT
R/W New ADOT
R/W New ADOT
R/W New ADOT
Area Over Ex =115.02 SQ FT Vol Over Ex =213.00 CU YDS
Area Over Ex =66.73 SQ FT Vol Over Ex =168.29 CU YDS
Overexcavation & Recompaction
PLAN NO. I-2010-012 SHEET 28OF13
C:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs13.dgn
3:53:02 PM
Roadway Embankment
Roadway Excavation
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
4:14:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
4:14:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
4:14:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
4:1 4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
4:1 4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
4:1 4:1 4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
4:1 4:1 4:1
Sta 13+00 to Sta 16+50
CAMPBELL BEVERLY CROSS SECTIONS
13+00
13+50
14+00
14+50
15+00
15+50
16+00
16+50
4:1
Connection Const Campbell-Beverly
Const
Ramp A
Connection Const Campbell-Beverly
Const
Ramp A
Connection Const Campbell-Beverly
Const
Ramp A
Connection Const Campbell-Beverly
Const
Ramp A
Connection Const Campbell-Beverly
Connection Const Campbell-Beverly
Connection Const Campbell-Beverly
Connection Const Campbell-Beverly
Area Cut =50.72 SQ FT
Area Fill = 0.00 SQ FT
Area Cut =56.80 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =99.56 CU YDS
Volume Fill =0.00 CU YDS
Area Cut =58.54 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =106.80 CU YDS
Volume Fill =0.00 CU YDS
Area Cut =57.28 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =107.24 CU YDS
Volume Fill =0.00 CU YDS
Area Fill = 0.00 SQ FT Volume Fill =0.00 CU YDS
Area Fill = 0.00 SQ FT Volume Fill =0.00 CU YDS
Area Fill = 0.00 SQ FT Volume Fill =0.00 CU YDS
Area Fill = 0.00 SQ FT Volume Fill =0.00 CU YDS
Const
Multi-Use Path
Const
Multi-Use Path
Area Cut =50.11 SQ FT
Area Cut =43.69 SQ FT Volume Cut =86.85 CU YDS
Area Cut =43.91 SQ FT Volume Cut =81.11 CU YDS
Area Cut =45.82 SQ FT
4:1
4:1
Volume Cut =0.00 CU YDS
Volume Fill =0.00 CU YDS
R/W Exist ADOT
R/W Exist ADOT
R/W Exist ADOT
R/W Exist ADOT
R/W Exist
R/W Exist
R/W Exist ADOT
R/W Exist ADOT
R/W Exist ADOT
R/W Exist ADOT
Volume Cut =99.44 CU YDS
Volume Cut =83.08 CU YDS
PLAN NO. I-2010-012 SHEET 28OF14
C:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs14.dgn 3:53:09 PM
Roadway Embankment
Roadway Excavation
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
4:1 4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
4:14:1 4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
4:14:1 4:1 4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
4:14:1 4:1 4:1
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50-60-70-80-90-100
4:1 4:1
Sta 17+00 to Sta 19+00
CAMPBELL BEVERLY CROSS SECTIONS
17+00
17+50
18+00
18+50
19+00
4:1
Connection Const Campbell-Beverly
Connection Const Campbell-Beverly
Connection Const Campbell-Beverly
Const
Ramp A
Connection Const Campbell-Beverly
Const
Ramp A
Connection Const Campbell-Beverly
Const
Ramp A
Area Fill = 0.00 SQ FT Volume Fill =0.00 CU YDS
Area Fill = 0.00 SQ FT
Area Cut =64.13 SQ FT
Area Fill = 0.00 SQ FT Volume Fill =0.00 CU YDS
Area Cut =56.17 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =111.39 CU YDS
Volume Fill =0.00 CU YDS
Area Cut =35.16 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =84.56 CU YDS
Volume Fill =0.00 CU YDS
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Area Cut =47.46 SQ FT
Area Cut =56.50 SQ FT
4:14:1
4:14:1
4:1
Volume Fill =0.00 CU YDS
Volume Cut =111.69 CU YDS
R/W New
R/W Exist ADOT
R/W New ADOT
R/W New ADOT
Volume Cut =86.37 CU YDS
Volume Cut =96.26 CU YDS
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
PLAN NO. I-2010-012 SHEET OF
MULTI-USE PATH CROSS SECTIONS
Sta 66+00 to Sta 69+50
Const
Ramp A
Const
Ramp A
Const
Ramp A
Const
Ramp A
Const
Ramp A
Const
Ramp A
Const
Ramp A
Const
Ramp A
Connection Const Campbell-Beverly
Connection Const Campbell-Beverly
Connection Const Campbell-Beverly
Connection Const Campbell-Beverly
Connection Const Campbell-Beverly
Connection Const Campbell-Beverly
4:14:1
4:1 4:1
4:1 4:1
4:1 4:1
4:1
4:1
4:1
Area Cut =6.15 SQ FT
Area Fill = 0.11 SQ FT
Volume Cut =0.00 CU YDS
Volume Fill =0.00 CU YDS
Area Cut =9.02 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =14.05 CU YDS
Volume Fill =0.10 CU YDS
Area Cut =12.10 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =19.56 CU YDS
Area Cut =20.55 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =30.23 CU YDS
Area Cut =33.83 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =50.35 CU YDS
Volume Fill =0.00 CU YDS
Area Cut =63.88 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =90.47 CU YDS
Volume Fill =0.00 CU YDS
Area Cut =106.02 SQ FT
Area Fill = 0.00 SQ FT Volume Fill =0.00 CU YDS
Area Fill = 0.00 SQ FT
Area Cut =319.44 SQ FT
66+00
66+50
67+00
67+50 69+50
69+00
68+50
68+00
Volume Fill =0.00 CU YDS
Volume Cut =393.94 CU YDS
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
4:1
Volume Fill =0.00 CU YDS
Volume Fill =0.00 CU YDS
Volume Cut =157.31 CU YDS
R/W New
R/W New ADOT
R/W New ADOT
R/W New ADOT
R/W New ADOT
R/W New ADOT
R/W Exist ADOT
R/W Exist ADOT
R/W Exist ADOT
C:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs15.dgn 3:53:10 PM
Roadway Embankment
Roadway Excavation
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
PLAN NO. I-2010-012 SHEET OF
MULTI-USE PATH CROSS SECTIONS
Sta 70+00 to Sta 73+50
Const
Drainage Channel
Const
Drainage Channel
Const
Drainage Channel
Const
Drainage Channel
Const
Drainage Channel
Const
Ramp A
16 28
4:1 4:1
4:1
4:1
4:1 4:1
4:1
4:1
4:1
4:1
Area Fill = 0.00 SQ FT Volume Fill =0.00 CU YDS
Area Fill = 0.00 SQ FT Volume Fill =0.00 CU YDS
Area Fill = 0.00 SQ FT Volume Fill =0.00 CU YDS
Area Fill = 32.30 SQ FT
Volume Fill =73.99 CU YDS
Area Cut =417.45 SQ FT
Area Cut =451.59 SQ FT
Area Cut =483.02 SQ FT
Area Cut =479.67 SQ FT
Area Cut =356.67 SQ FT
Area Cut =277.66 SQ FT
70+00
70+50
71+00
71+50 73+50
73+00
72+50
72+00 Volume Cut =682.31 CU YDS
Volume Cut =804.67 CU YDS
Volume Cut =865.38 CU YDS
Volume Cut =330.25 CU YDS
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
4:1
4:1
4:1
Volume Fill =29.91 CU YDS
Area Cut =221.66 SQ FTVolume Cut =891.38 CU YDS
Volume Cut =774.39 CU YDS
Volume Fill =103.90 CU YDS
Volume Cut =257.09 CU YDS
Volume Cut =462.33 CU YDS
R/W New
R/W New
R/W New
R/W New
R/W New
R/W New ADOT
R/W New ADOT
R/W New ADOT
R/W New ADOT
R/W New ADOT
R/W New ADOT
R/W New ADOT R/W
New ADOT
R/W New ADOT
R/W New ADOT
C:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs16.dgn 3:53:10 PM
Roadway Embankment
Roadway Excavation
4:1
Area Fill = 79.91 SQ FT
Area Cut =0.00 SQ FT
Area Fill = 0.00 SQ FT
Area Fill = 0.00 SQ FT Volume Fill =0.00 CU YDS
Volume Fill =171.19 CU YDSArea Fill = 184.88 SQ FT
PLAN NO. I-2010-012 SHEET OF
MULTI-USE PATH CROSS SECTIONS
Sta 74+00 to Sta 77+50
17 28
C:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs17.dgn 3:53:11 PM
Roadway Embankment
Roadway Excavation
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
74+00
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
74+50
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
75+00
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
75+50
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
76+00
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
76+50
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
77+00
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
77+50
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Const
Multi-Use Path
Const
Drainage Channel
Const
Drainage Channel
Const
Drainage Channel
Const
Drainage Channel
Const
Drainage Channel
Const
Drainage Channel
Const
Drainage Channel \ Const
Connection Multi-Use Path
Const
Connection Multi-Use Path
Const
Connection Multi-Use Path
Const
Connection Multi-Use Path
Const
Connection Multi-Use Path
Const
Connection Multi-Use Path
Area Fill = 270.07 SQ FT
Area Cut =282.14 SQ FT
Volume Fill =421.25 CU YDS
Volume Cut =466.48 CU YDS
Area Fill = 206.44 SQ FT
Area Cut =335.99 SQ FT
Volume Fill =441.21 CU YDS
Volume Cut =572.34 CU YDS
Area Fill = 129.93 SQ FT
Area Cut =269.58 SQ FT
Volume Fill =311.45 CU YDS
Volume Cut =560.71 CU YDS
Area Fill = 95.02 SQ FT
Area Cut =269.78 SQ FT
Volume Fill =208.29 CU YDS
Volume Cut =499.41 CU YDS
Area Fill = 154.32 SQ FT
Area Cut =409.50 SQ FT
Volume Fill =230.87 CU YDS
Volume Cut =628.96 CU YDS
Area Fill = 188.66 SQ FT
Area Cut =452.27 SQ FT
Volume Fill =317.57 CU YDS
Volume Cut =797.94 CU YDS
Area Fill = 119.97 SQ FT
Area Cut =379.63 SQ FT
Volume Fill =285.77 CU YDS
Volume Cut =770.28 CU YDS
Volume Fill =111.08 CU YDS
Volume Cut =351.51 CU YDS
4:1
4:1
4:1
4:1
Varies
Varies
Varies
Area Cut =0.00 SQ FT
Area Fill = 0.00 SQ FT
Varies
Varies
Varie s
PLAN NO. I-2010-012 SHEET 28OF18
C:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs18.dgn 3:53:11 PM
MULTI-USE PATH CROSS SECTIONS Roadway Embankment
Roadway Excavation
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
77+89
Const
Multi-Use Path
Sta 77+89
Area Cut =0.00 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =0.00 CU YDS
Volume Fill =0.00 CU YDS
PLAN NO. I-2010-012 SHEET 28OF19
C:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs19.dgn 3:53:11 PM
Roadway Embankment
Roadway Excavation
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
10+71
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
11+00
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
11+50
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
12+00
Const
Ramp B
Const
Ramp B
Const
Ramp B
Const
Ramp B
Const
Connection Multi-Use Path
Sta 10+71 to Sta 12+00
RAMP B CROSS SECTIONS
Area Cut =71.92 SQ FT
Area Fill = 137.30 SQ FT Volume Fill =78.83 CU YDS
Area Cut =58.09 SQ FT
Volume Fill =127.13 CU YDS
Area Cut =68.41 SQ FT Volume Cut =117.13 CU YDS
Area Fill = 9.49 SQ FT
Area Cut =0.00 SQ FT
Area Fill = 0.00 SQ FT
Area Fill = 0.00 SQ FT
Volume Cut =0.00 CU YDS
Volume Fill =0.00 CU YDS
Volume Cut =38.62 CU YDS
Volume Cut =53.79 CU YDS
PLAN NO. I-2010-012 28OF20
C:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs20.dgn 3:53:12 PM
SHEET OF
Roadway Embankment
Roadway Excavation
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
12+50
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
13+00
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
13+50
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
14+00
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
14+50
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
15+00
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
15+50
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
15+86
Const
Ramp B
Const
Ramp B
Const
Ramp B
Const
Ramp B
Const
Ramp B
Const
Ramp B
Const
Ramp B
Const
Ramp B
Const
Connection Multi-Use Path
Const
Connection Multi-Use Path
Const
Connection Multi-Use Path
RAMP B CROSS SECTIONS
Sta 12+50 to Sta 15+86
Area Fill = 31.77 SQ FT
Area Cut =24.11 SQ FT
Volume Fill =29.42 CU YDS
Area Fill = 87.55 SQ FT Volume Fill =110.48 CU YDS
Area Fill = 138.36 SQ FT Volume Fill =209.18 CU YDS
Area Fill = 38.98 SQ FT Volume Fill =164.20 CU YDS
Area Fill = 34.40 SQ FT Volume Fill =67.94 CU YDS
Area Fill = 38.68 SQ FT Volume Fill =67.67 CU YDS
Area Fill = 42.57 SQ FT Volume Fill =75.23 CU YDS
Area Fill = 37.03 SQ FT Volume Fill =53.07 CU YDS
Cross Sections See 22nd St
Cross Sections See 22nd St
Cross Sections See 22nd St
Cross Sections See 22nd St
Cross Sections See 22nd St
Cross Sections See 22nd St
Cross Sections See 22nd St
Cross Sections See 22nd St
Area Cut =9.35 SQ FT
Area Cut =0.00 SQ FT
Area Cut =6.94 SQ FT
Area Cut =5.76 SQ FT
Area Cut =2.86 SQ FT
Area Cut =7.10 SQ FT Area Cut =0.00 SQ FT
Volume Cut =85.67 CU YDS
Volume Cut =30.98 CU YDS
Volume Cut =8.66 CU YDS
Volume Cut =0.00 CU YDS
Volume Cut =6.43 CU YDS
Volume Cut =11.76 CU YDS
Volume Cut =7.98 CU YDS
Volume Cut =6.64 CU YDS
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
C:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs21.dgn 3:53:12 PM
PLAN NO. I-2010-012 SHEET OF21 28
253+86
254+00
254+50
255+00
255+50
256+00
256+50
257+00
BARRAZA-AVIATION PKWY CROSS SECTIONS
Sta 253+86 to Sta 257+00
Area Cut =0.00 SQ FT Volume Cut =0.00 CU YDS
Area Cut =0.00 SQ FT Volume Cut =0.00 CU YDS
Volume Cut =15.06 CU YDS
Area Cut =0.00 SQ FT Volume Cut =15.06 CU YDS
Area Cut =0.00 SQ FT Volume Cut =0.00 CU YDS
Area Cut =3.10 SQ FT
Area Fill = 13.27 SQ FT Volume Fill =18.43 CU YDS
Volume Cut =2.87 CU YDS
Area Cut =5.48 SQ FT
Area Fill = 18.55 SQ FT
Volume Cut =7.94 CU YDS
Area Cut =6.94 SQ FT
Area Fill = 23.76 SQ FT Volume Fill =39.18 CU YDS
Volume Cut =11.50 CU YDS
Roadway Excavation
Roadway Embankment
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const
Kino Ramp D
Const
Kino Ramp D
Const
Kino Ramp D
Const
Kino Ramp D
Const
Kino Ramp D
Const
Kino Ramp D
Const
Kino Ramp D
Const
Kino Ramp D
Area Fill = 0.00 SQ FT Volume Fill =0.00 CU YDS
Area Fill = 0.00 SQ FT Volume Fill =0.00 CU YDS
Area Fill = 0.00 SQ FT Volume Fill =0.00 CU YDS
Area Cut =16.27 SQ FT
Area Fill = 0.00 SQ FT
Area Fill = 6.63 SQ FT
Volume Fill =0.00 CU YDS
Volume Fill =6.14 CU YDS
Volume Fill =29.46 CU YDS
R/W Exist
R/W Exist
R/W Exist
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
SHEETPLAN NO. I-2010-012 28OF22
C:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs22.dgn 3:53:13 PM
257+50
258+00
258+50
259+00
259+50
260+00
260+50
261+00
Sta 257+50 to Sta 261+00
BARRAZA-AVIATION PKWY CROSS SECTIONS
Area Cut =8.32 SQ FT
Area Fill = 27.43 SQ FT Volume Fill =47.40 CU YDS
Volume Cut =14.13 CU YDS
Area Fill = 31.91 SQ FT
Volume Cut =18.63 CU YDS
Area Fill = 37.12 SQ FT Volume Fill =63.92 CU YDS
Volume Cut =23.58 CU YDS
Area Fill = 39.63 SQ FT Volume Fill =71.06 CU YDS
Volume Cut =27.84 CU YDS
Area Fill = 41.04 SQ FT Volume Fill =74.69 CU YDS
Volume Cut =29.68 CU YDS
Area Fill = 44.03 SQ FT Volume Fill =78.77 CU YDS
Volume Cut =30.45 CU YDS
Area Fill = 45.31 SQ FT Volume Fill =82.72 CU YDS
Volume Cut =35.63 CU YDS
Area Fill = 38.68 SQ FT
Volume Cut =42.59 CU YDS
Roadway Excavation
Roadway Embankment
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const
Kino Ramp D
Const
Kino Ramp D
Const
Kino Ramp D
Const
Kino Ramp D
Const
Kino Ramp D
Const
Kino Ramp D
Const
Kino Ramp D
Const
Kino Ramp D
Area Cut =11.80 SQ FT
Area Cut =13.67 SQ FT
Area Cut =16.40 SQ FT
Area Cut =15.65 SQ FT
Area Cut =17.24 SQ FT
Area Cut =21.24 SQ FT
Area Cut =24.76 SQ FT
Volume Fill =77.77 CU YDS
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W
Volume Fill =54.94 CU YDS
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
PLAN NO. I-2010-012 SHEET 28OF23
C:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs23.dgn 3:53:13 PM
261+50
262+00
262+50
263+00
263+50
264+00
264+50
265+00
Sta 261+50 to Sta 265+00
BARRAZA-AVIATION PKWY CROSS SECTIONS
Area Fill = 40.81 SQ FT
Volume Cut =50.40 CU YDS
Area Fill = 41.56 SQ FT Volume Fill =76.27 CU YDS
Volume Cut =60.52 CU YDS
Area Fill = 41.98 SQ FT Volume Fill =77.35 CU YDS
Volume Cut =71.05 CU YDS
Area Fill = 46.45 SQ FT Volume Fill =81.88 CU YDS
Volume Cut =83.04 CU YDS
Area Fill = 47.76 SQ FT Volume Fill =87.23 CU YDS
Volume Cut =93.97 CU YDS
Area Fill = 49.91 SQ FT Volume Fill =90.44 CU YDS
Area Fill = 51.80 SQ FT Volume Fill =94.18 CU YDS
Area Fill = 53.16 SQ FT Volume Fill =97.19 CU YDS
Roadway Excavation
Roadway Embankment
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const
Kino Ramp D
Const
Kino Ramp D
Const
Kino Ramp D
Const
Kino Ramp D
Const
Kino Ramp D
Const
Kino Ramp D
Const
Kino Ramp D
Const
Kino Ramp D
Area Cut =29.67 SQ FT
Area Cut =35.69 SQ FT
Area Cut =41.04 SQ FT
Area Cut =48.64 SQ FT
Area Cut =52.85 SQ FT
Area Cut =53.98 SQ FT
Area Cut =58.46 SQ FT
Area Cut =61.82 SQ FT
Volume Fill =73.60 CU YDS
Volume Cut =190.04 CU YDS
Volume Cut =104.11 CU YDS
Volume Cut =111.37 CU YDS
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
R/W Exist
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
E le v a t io n
0 10 20 30 40 50 60 70 80 90 100 110 120 125-10-20-30-40-50-60-70-80-90-100-110-120-125
24PLAN NO. I-2010-012 SHEET 28OF
C:\Projects\60269301 22nd St_Kino to Tucson Design_TUC\000_CAD\006_Civil\Sheets\Cross Sections\h9301xs24.dgn 3:53:14 PM
265+50
266+00
266+50
267+00
267+50
268+00
268+50
269+00
Sta 265+50 to Sta 269+00
BARRAZA-AVIATION PKWY CROSS SECTIONS
Area Fill = 54.59 SQ FT Volume Fill =99.77 CU YDS
Area Fill = 54.39 SQ FT Volume Fill =100.91 CU YDS
Area Fill = 56.72 SQ FT Volume Fill =102.88 CU YDS
Area Fill = 57.10 SQ FT Volume Fill =105.39 CU YDS
Area Fill = 56.75 SQ FT Volume Fill =105.42 CU YDS
Area Fill = 63.32 SQ FT Volume Fill =111.18 CU YDS
Area Fill = 72.70 SQ FT Volume Fill =125.94 CU YDS
Area Fill = 88.42 SQ FT Volume Fill =149.19 CU YDS
Volume Cut =65.26 CU YDS
Roadway Excavation
Roadway Embankment
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const Pkwy
Barraza-Aviation
Const
Kino Ramp D
Const
Kino…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .