IFB_260130_Special_Provisions.pdf
PDF 15 MB Posted
- Solicitation number
- 260130
- Issued by
- Pima County, Tucson City, Arizona
About this file
This document is a special provisions file for the 22nd Street Revitalization Project, a transportation infrastructure improvement initiative involving the City of Tucson, Pima County, Arizona Department of Transportation (ADOT), and Union Pacific Railroad (UPRR). The project involves reconstructing 22nd Street from Kino Parkway to Tucson Boulevard, replacing an existing 4-lane bridge with a new 6-lane facility consisting of two 3-lane bridges and an eight-foot multiuse path. The comprehensive scope includes cast-in-place retaining walls, asphaltic and Portland cement concrete paving, concrete curb and gutter, drainage infrastructure, street lighting, landscaping, pavement marking, traffic signal improvements, and sewer and water system modifications. The contract duration is specified as 975 consecutive calendar days from the notice to proceed, with construction sequencing and expectations detailed in the document.
The project is federally funded, requiring adherence to Build America/Buy America materials provisions, FHWA 1273 provisions, and federal wage rate determinations. The estimated project cost is not explicitly stated, but the comprehensive nature of the improvements suggests a significant investment in transportation infrastructure. Funding appears to be through federal and local sources, with an emphasis on improving safety, equity, and connectivity. The project involves multiple technical specifications and standards, including those from ADOT, PAG Standard Specifications, and Tucson Water Standard Details. Bidders are required to submit detailed documentation, including personnel qualifications, construction schedules, and compliance with various environmental and technical requirements. The project also includes specific provisions for handling hazardous materials, cultural resources, and environmental considerations.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
i
SPECIAL PROVISIONS
FOR
22nd Street, Kino Parkway to Tucson Boulevard
Job No. SR5A
DTM Plan No. I-2010-012
September 2025
PROFESSIONAL ENGINEER SEALS
This book of specifications and related contract documents represents the efforts of the following firm or group:
(1) AECOM Technical Services, Inc.
(2) Consor
(3) PSOMAS
(4) McGann and Assoc.
(5) SCE
A representative of each firm or group has affixed his/her professional seal below, which attests that those portions of these specifications which relate to the plans were prepared under his/her direction.
AECOM (Roadway, Drainage, Signing/Marking & Erosion Control)
Consor (Segmental Bridges) Consor (AASHTO Girder Bridges)
1/16/25
Kershner, Matthew Text Box / 17
Kershner, Matthew Text Box
Kershner, Matthew Text Box / 25
SCE (Drilled Shafts) McGann & Assoc. (Landscape, Irrigation, Hardscape)
AECOM (Lighting, Signals) PSOMAS (Utilities)
/1 6/
Expires: 03/31/25
/1
6/
01/ 17/ 2 chelsi.remme Snapshot
Kershner, Matthew Text Box
Kershner, Matthew Text Box / 17
Kershner, Matthew Text Box / 25
Kershner, Matthew Line
Kershner, Matthew Text Box x ii
TABLE OF CONTENTS
GENERAL NOTES
SECTION 101 ABBREVIATIONS AND DEFINITIONS
SECTION 102 BIDDING REQUIREMENTS AND CONDITIONS
SECTION 103 AWARD AND EXECUTION OF CONTRACT
SECTION 104 SCOPE OF WORK
SECTION 105 CONTROL OF WORK
SECTION 106 CONTROL OF MATERIAL
SECTION 107 LEGAL RELATIONS AND RESPONSIBILITY TO PUBLIC
SECTION 108 PROSECUTION AND PROGRESS
SECTION 109 MEASUREMENT AND PAYMENT
SECTION 201 CLEARING & GRUBBING
SECTION 202 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ITEM 2020002 REMOVAL OF BRIDGE
ITEM 2020003 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (SOUND WALL):
ITEM 2020008 REMOVAL OF STRUCTURAL CONCRETE (RETAINING WALLS)
ITEM 2020010 REMOVAL OF STRUCTURAL CONCRETE (BOX CULVERTS, CATCH BASINS, GRATE
INLETS & CURB INLETS)
ITEM 2020020 REMOVAL OF CONCRETE CURB
ITEM 2020025 REMOVAL OF CONCRETE SIDEWALKS, DRIVEWAYS, AND SLABS
ITEM 2020027 REMOVAL OF CONCRETE BARRIER
ITEM 2020029 REMOVAL OF ASPHALTIC CONCRETE PAVEMENT
ITEM 2020031 REMOVAL OF PORTLAND CEMENT CONCRETE PAVEMENT
ITEM 2020040 REMOVAL OF PIPE
ITEM 2020041 REMOVAL OF SEWER PIPE (10” & SMALLER):
ITEM 2020042 REMOVAL OF SEWER PIPE (12” & LARGER):
ITEM 2020046 REMOVAL OF EXISTING SEWER MANHOLE:
ITEM 2020051 REMOVE (STREET LIGHT POLES)
ITEM 2020052 REMOVE (IMPACT ATTENUATION DEVICE)
ITEM 2020053 REMOVE (MISCELLANEOUS ITEMS)
ITEM 2020057 REMOVE AND DISPOSE (SIGN STRUCTURE)
ITEM 2020101 REMOVAL OF FENCE (POST & CABLE AND BOLLARDS)
iii
ITEM 2020102 RELOCATE FENCE (CHAIN LINK)
ITEM 2020103 REMOVAL OF FENCE (CHAIN LINK)
ITEM 2020168 REMOVE (CONCRETE LINED CHANNEL)
SECTION 203 EARTHWORK
ITEM 2030502 EXCAVATION (OVEREXCAVATION AND RECOMPACTION)
SECTION 206 FURNISH WATER SUPPLY
SECTION 303 AGGREGATE BASE COURSE
ITEM 4010011 PORTLAND CEMENT CONCRETE PAVEMENT (11” THICK, F’c=4,000 PSI)
ITEM 4010012 PORTLAND CEMENT CONCRETE PAVEMENT (12” THICK, F’c=4,000 PSI)
SECTION 406 ASPHALTIC CONCRETE
SECTION 501 DRAINAGE PIPE
SECTION 503 CONCRETE STORM DRAIN CATCHMENTS
ITEM 5030162 INLET STRUCTURE (TRANSVERSE ROADWAY GRATE INLET) (DETAIL D2)
ITEM 5030163 INLET STRUCTURE (GRATE INLET) (DETAIL D1)
ITEM 5030250 GRATE INLET (DETAIL D10) (NEENAH SIDEWALK GRATES)
SECTION 505 STORM DRAIN MANHOLES
SECTION 508 SANITARY SEWER PIPE
ITEM 5088080 8” PVC (SDR 35)
ITEM 5088083 8” PVC (C900 DR25)
ITEM 5088103 10” PVC (C900 DR25)
ITEM 5088120 12” PVC (SDR 35)
ITEM 5088124 12” PVC (C900 DR25)
ITEM 5088186 18” PVC (C900 DR25)
ITEM 5088270 27” PVC (PS46)
ITEM 5088300 30” PVC (PS46)
ITEM 5080001 FLOW MANAGEMENT PLAN (1)
ITEM 5080002 FLOW MANAGEMENT PLAN (2)
ITEM 5080003 FLOW MANAGEMENT PLAN (3)
ITEM 5080004 FLOW MANAGEMENT PLAN (4)
ITEM 5080005 FLOW MANAGEMENT PLAN (5)
ITEM 5080006 FLOW MANAGEMENT PLAN (6)
ITEM 5080007 FLOW MANAGEMENT PLAN (7)
iv
SECTION 509 SANITARY SEWER ADJUSTMENT
ITEM 5090157 SEWER MANHOLE (POLYMER), 4’ DIA. (PER DETAIL A ON SHEET DT1 AND RWRD 202)
ITEM 5090158 SEWER MANHOLE (POLYMER), 5’ DIA. (PER DETAIL A ON SHEET DT1 AND RWRD 202)
ITEM 5090159 SEWER MANHOLE (POLYMER), 6’ DIA. (PER DETAIL A, C-D, AND F-H ON SHEET DT1)
ITEM 5090160 SEWER MANHOLE (POLYMER), 7’ DIA. (PER DETAIL A, B AND E ON SHEET DT1) 84
SECTION 510 POTABLE WATER SYSTEMS
ITEM 5101106 POTABLE WATER PIPE, DUCTILE IRON, DI, 6” (CL 350)
ITEM 5101108 POTABLE WATER PIPE, DUCTILE IRON, DI, 8” (CL 350)
ITEM 5101124 POTABLE WATER PIPE, DUCTILE IRON, DI, 24” (CL 200)
ITEM 5101137 POTABLE WATER PIPE, DUCTILE IRON, DI, 36” (CL 200)
ITEM 5101138 POTABLE WATER PIPE, DUCTILE IRON, DI, 36” (CL 250)
ITEM 5101406 POTABLE WATER PIPE, PVC, 6” (CL 305) (DR-14)
ITEM 5101604 POTABLE WATER PIPE, COPPER, 1” W/FITTINGS
ITEM 5101606 POTABLE WATER PIPE, COPPER, 1-1/2” W/FITTINGS
ITEM 5101608 POTABLE WATER PIPE, COPPER, 2” W/FITTINGS
ITEM 5102103 TAPPING SLEEVE & VALVE, 6”x 6”
ITEM 5102206 POTABLE WATER, GATE VALVE, 6” (BOX & COVER)
ITEM 5102208 POTABLE WATER, GATE VALVE, 8” (BOX & COVER)
ITEM 5102224 POTABLE WATER, GATE VALVE, 24” (BOX & COVER)
ITEM 5102336 BUTTERFLY VALVE, 36”
ITEM 5102607 POTABLE WATER, COMBINATION AIR RELEASE VALVE, 1”
ITEM 5102608 POTABLE WATER, COMBINATION AIR RELEASE VALVE, 2”
ITEM 5103205 POTABLE WATER, FIRE HYDRANT (SD-500)
ITEM 5103636 MISCELLANEOUS WORK (JACK AND BORE 56” STEEL CASING)
ITEM 5104230 ABANDON AND GROUT, 30” PIPE
ITEM 5105010 POTABLE WATER PIPE, NON-CA, REMOVE & DISPOSE, 10” & SMALLER
ITEM 5105012 POTABLE WATER PIPE, NON-CA, REMOVE & DISPOSE, 12” & LARGER
ITEM 5105110 POTABLE WATER PIPE, CA, REMOVE & DISPOSE, 10” & SMALLER
ITEM 5105310 POTABLE WATER, REMOVE & DISPOSE FIRE HYDRANT
ITEM 5105330 POTABLE WATER, REMOVE AND DISPOSE PRESSURE AIR VALVE (ARV) AND VAULT v
ITEM 5106006 POTABLE WATER, CONNECTIONS, 6”
ITEM 5106008 POTABLE WATER, CONNECTIONS, 8”
ITEM 5106024 POTABLE WATER, CONNECTIONS, 24”
ITEM 5106130 NEW 30” STEEL TO EXISTING CCP
ITEM 5107120 CORROSION TEST STATION (CTS), NEW, BELOW GROUND
ITEM 5108114 METER RELOCATION, SERVICE LINE RENEWAL (M/R), 1”
ITEM 5108118 METER RELOCATION, SERVICE LINE RENEWAL, (M/R), 2”
ITEM 5108136 SERVICE LINE RENEWAL (R), 1½”
ITEM 5108154 POTABLE WATER, STUBS (S), 1”
ITEM 5108158 POTABLE WATER, STUBS (S), 2
ITEM 5108160 POTABLE WATER, ABANDONMENT (A)
SECTION 601 CONCRETE STRUCTURES:
SECTION 601 CONCRETE STRUCTURES:
SECTION 601 CONCRETE STRUCTURES:
SECTION 601 CONCRETE STRUCTURES:
SECTION 601 CONCRETE STRUCTURES:
ITEM 6011135 PEDESTRIAN FENCE & CURB
ITEM 6015201 HIGH LOAD MULTI -ROTATIONAL (POT OR DISC) BEARINGS- GUIDED
ITEM 6015202 HIGH LOAD MULTI -ROTATIONAL (POT OR DISC) BEARINGS- NON GUIDED
ITEM 6016400 CONCRETE SPILLWAY (DETAIL AC)
ITEM 6018101 REINFORCED CONCRETE BOX CULVERT (2 - 8’x7’) (ADOT SD 6.02)
ITEM 6018103 REINFORCED CONCRETE BOX CULVERT (8’x3’) (ADOT SD 6.01)
ITEM 6018111 REINFORCED CONCRETE BOX CULVERT (2 - 8’x4’) (SPECIAL AT UPRR) (ADOT SD 6.02)
ITEM 6040011 STRUCTURAL STEEL
ITEM 6040013 PERFORATED STEEL PLATE PANELS
SECTION 606 OVERHEAD SIGN STRUCTURES
ITEM 6060059 BRIDGE SIGN STRUCTURE (TAPERED TUBE) (ADOT STD DWG S-11)
ITEM 6060080 FOUNDATION FOR BRIDGE SIGN STRUCTURE (TAPERED TUBE) (ADOT STD DWG S- 11)
ITEM 6060110 CANTILEVER SIGN STRUCTURE (34’ ARM) (ADOT SD 9.10)
ITEM 6060245 FOUNDATION FOR CANTILEVER SIGN STRUCTURE (34’ ARM) (ADOT STD
DWG SD 9.10)
vi
SECTION 607 ROADSIDE SIGN SUPPORTS (FOR WORK WITHIN ADOT’S RIGHT-OF-WAY):
ITEM 6070040 SLIP BASE ASSEMBLY (TYPE 2S) (SINGLE)
ITEM 6070210 REMOVE AND SALVAGE SIGNS
ITEM 6070220 REMOVE AND RELOCATE SIGNS
SECTION 608 SIGN PANELS
SECTION 608 SIGN PANELS (FOR WORK WITHIN ADOT’S RIGHT-OF-WAY):
SECTION 609 DRILLED SHAFT FOUNDATIONS
SECTION 610 PAINTING
SECTION 701 MAINTENANCE AND PROTECTION OF TRAFFIC
SECT I ON 703 DELI NEAT ORS AND MARKERS
ITEM 7030074 DELINEATOR (FLEXIBLE) (ADOT STD M-26) (360 DEGREES WHITE OR YELLOW)
(SURFACE-MOUNTED)
ITEM 7030084 OBJECT MARKER (ADOT STD M-23) (TYPE 1 OR 4)
SECTION 704 THERMOPLASTIC STRIPES AND MARKINGS
SECTION 704 THERMOPLASTIC PAVEMENT MARKINGS (FOR WORK WITHIN ADOT’S RIGHT-OF-
WAY):
SECTION 705 PREFORMED PLASTIC PAVEMENT MARKING
ITEM 7050121 PAVEMENT MARKING (PORTLAND GREEN PREFORMED THERMOPLASTIC)
SECTION 706 RAISED PAVEMENT MARKERS
SECTION 708 PERMANENT PAVEMENT MARKINGS (FOR WORK WITHIN ADOT’S RIGHT-OF-WAY):
SECTION 708 PAINTED PAVEMENT MARKINGS
SECTION 730 GENERAL REQUIREMENTS FOR TRAFFIC SIGNAL AND STREET LIGHTING SYSTEMS
SECTION 731 STRUCTURAL SUPPORTS AND FOUNDATIONS FOR TRAFFIC SIGNAL AND STREET
LIGHTING SYSTEMS
SECTION 732 ELECTRICAL MATERIAL AND SERVICE
SECTION 732 ELECTRICAL MATERIAL AND SERVICE
ITEM 7320600 CONDUCTORS (TRAFFIC SIGNALS AND INTEGRAL STREET LIGHTING)
SECTION 733 SIGNAL INDICATIONS AND MOUNTING ASSEMBLIES
ITEM 7330524 SIGN ASSEMBLY (FLAGPOLE MOUNTED STREET NAME SIGNS)
ITEM 7330550 REMOVE AND SALVAGE TRAFFIC SIGNAL APPURTENANCES & METER PEDESTAL
CABINET
SECTION 734 TRAFFIC SIGNAL CONTROLLER ASSEMBLY
vii
ITEM 7340010 WIFI RADIO SYSTEM
SECTION 735 DETECTORS
ITEM 7350001 VIDEO DETECTION UNIT (AGENCY SUPPLIED/CONTRACTOR INSTALLED)
SECTION 736 STREET AND SIGN LIGHTING
SECTION 737 INCIDENTAL ELECTRICAL WORK
SECTION 801 LANDSCAPE EXCAVATION
SECTION 802 LANDSCAPE GRADING
SECTION 803 LANDSCAPE BORROW AND PLATING MATERIAL
SECTION 806 TREES, SHRUBS, AND PLANTS
SECTION 807 LANDSCAPING ESTABLISHMENT
SECTION 808 LANDSCAPE IRRIGATION SYSTEM
SECTION 809 NATIVE PLANT SALVAGE………………………………………………………………………………264
SECTION 810 EROSION CONTROL AND POLLUTION PREVENTION
ITEM 9020037 WELDED WIRE FABRIC
SECTION 905 GUARDRAIL
SECTION 908 CONCRETE CURBS, GUTTERS, SIDEWALKS AND DRIVEWAYS
ITEM 9080096 CONCRETE CURB AND GUTTER (CURB AND GUTTER TO VERTICAL CURB
TRANSITION) (DETAIL AE)
ITEM 9080286 CURB ACCESS RAMP (SPECIAL) (DETAIL K, SHEET 1)
ITEM 9080288 CURB ACCESS RAMP (SPECIAL) (DETAIL M)
ITEM 9080289 CURB ACCESS RAMP (SPECIAL) (DETAIL K, SHEET 2)
ITEM 9080602 CONCRETE BUS SHELTER PAD
SECTION 909 SURVEY MONUMENTS
ITEM 9100040 CONCRETE BARRIER (SPECIAL HALF) (DETAIL I)
ITEM 9100114 CONCRETE HALF BARRIER TRANSITION (42” F-SHAPE TANGENT DEPARTURE)
(DETAIL C)
ITEM 9100115 CONCRETE BARRIER TRANSITION (BARRIER WITH PCCP TO BARRIER WITH AC)
(DETAIL H)
ITEM 9100116 CONCRETE HALF BARRIER TRANSITION (ADOT STD C-10.76 MOD)
ITEM 9100117 CONCRETE BARRIER TRANSITION (ADOT STD C-10.50 TO 42” f-shape) (DETAIL F)288
ITEM 9100118 CONCRETE BARRIER TRANSITION (DETAIL l)
ITEM 9100119 CONCRETE BARRIER TRANSITION (DETAIL E)
ITEM 9100121 CONCRETE BARRIER TRANSITION (DETAIL A)
viii
ITEM 9130008 RIPRAP (HAND PLACED)
ITEM 9140010 MASONRY SOUND WALL (ADOT STD. DWG. SD 8.02)
ITEM 9145102 GLARE SCREEN AND ACCESS CONTROL FENCE (REMOVE AND
RECONSTRUCT)
ITEM 9190001 CONCRETE GORE PAVING
SECTION 925 CONSTRUCTION SURVEYING AND LAYOUT
SECTION 926 ENGINEER’S FIELD OFFICE
ITEM 9300115 MISCELLANEOUS WORK (CURB WALL) (DETAIL P)
SECTION 931 DECORATIVE CONCRETE PAVEMENT
SECTION 933 RAILING
ITEM 9330009 HANDRAIL (DECORATIVE ALONG RETAINNG WALLS)
SECTION 1003 REINFORCING STEEL
SECTION 1006 PORTLAND CEMENT CONCRETE
SECTION 1007 RETROREFLECTIVE SHEETING (FOR WORK WITHIN ADOT’S RIGHT-OF-WAY): .. 312
SECTION 1011 JOINT MATERIALS (FOR WORK WITHIN ADOT’S RIGHT-OF-WAY):
SECTION 1012 GUARDRAIL MATERIALS:
GENERAL NOTES
Proposed Work This project is located within Sections 17, 18, 19, and 20, T14S, R14E of the Gila and Salt River Meridian, within the City of Tucson, Pima County, Arizona. This project provides improvements to 22nd Street from Kino Parkway to Tucson Boulevard. Additional improvement locations include the Campbell-Beverly Connection, the Campbell Avenue Ramp, Ramps A and B at Barraza-Aviation Parkway, eastbound Barraza-Aviation Pkwy realignment, several Cross Streets, and the Multi-Use Path that runs alongside Barraza-Aviation Pkwy under Ramps A and B and traverses underneath 22nd Street. A multi-use connection between the Barraza-Aviation Path and multi-use path along eastbound 22nd Street.
The work consists of reconstructing 22nd Street from Kino Parkway to Tucson Boulevard and replacing the existing 4-lane 22nd Street bridge that runs over Barraza-Aviation Parkway and the Union Pacific Railroad (UPRR) with a new 6-lane facility. The facility will consist of two 3-lane bridges with a protected eight-foot multiuse path, one for the eastbound travel direction and one for the westbound travel direction. In addition to the bridge components, improvements shall consist of cast-in-place retaining walls; asphaltic concrete and Portland cement concrete paving, concrete curb/curb and gutter, concrete barrier and sidewalk, paved pathways; a drainage channel, pipe culverts, storm drains, manholes, catch basins and associated inlet and outlet structures; street lighting; landscaping and irrigation;
pavement marking and signing; traffic signal improvements at the Tucson Boulevard intersection and Barraza-Aviation Pkwy/Ramp B; sewer modifications; water modifications, and other incidental work.
The Contractor is advised to review the construction requirements for this project. The Contractor is directed to visit the site, become familiar with the conditions to be encountered, and address all concerns before providing a proposal.
All work is to be complete within 975 consecutive calendar days from the date of the notice to proceed.
Construction sequencing and expectations shall be as described herein. Construction, including permanent striping, must be completed within this time frame. The Contractor shall consider the following contract requirements:
• The Contractor shall schedule a pre-construction meeting within 14 calendar days of notice of award and held within 30 days of notice of award.
• The Contractor shall prepare traffic control plans prior to the pre-construction meeting in accordance with these specifications.
• TDOT will issue a notice to proceed at the pre-construction meeting.
At the pre-construction meeting, the Contractor shall submit a critical path construction schedule, in accordance with section 108-12 herein, for all project elements that meet or decrease the allotted Calendar Contract Days.
Specifications and Details Unless otherwise noted in the contract documents, the below listed reference materials are hereby incorporated into the contract where applicable:
• City of Tucson Materials Quality Assurance Program Manual (December 2015)
• Pima County/City of Tucson, Pavement Marking Design Manual, August 2008 with updates.
• Pima County/City of Tucson Signing Manual, May 2002.
• City of Tucson Department of Transportation Traffic Signal Design Manual, May 2003.
• Tucson Water, Standard Waterworks Specifications.
• Arizona Dept. of Transportation, Standard Specifications for Road and Bridge Construction, 2008.
• Arizona Department of Transportation, Highways Division, 2012 Construction Standard Drawings (C-series), and current revisions.
• Arizona Dept of Transportation, Highways Division, Structures Detail Drawings and current revisions.
• Arizona Department of Transportation, Traffic Group - Manual of Approved Signs, Traffic Engineering Guidelines and Processes (TGP), Signing and Marking Standard Drawings, and Signals and Lighting Standard Drawings, latest editions.
• 2005 Edition of the Additions by the City of Tucson to the Manual on Uniform Traffic Control Devices for
Temporary Traffic Control.
• Pima Association of Governments (PAG), Standard Details for Public Improvements, 2015 Edition, Volume 2, http://apps.pagnet.org/standardspecifications
• Pima County/City of Tucson, Pavement Marking Design Manual, Latest Edition
• http://webcms.pima.gov/cms/one.aspx?portalId=169&pageId=63368
• Pima County/City of Tucson Signing Manual, Latest Edition
• http://webcms.pima.gov/cms/one.aspx?portalId=169&pageId=63368
• Pima County Street Lighting and ITS Conduit Design Manual, Latest Edition
• http://webcms.pima.gov/cms/one.aspx?portalId=169&pageId=63368
• Pima County Traffic Signal Design Manual, Latest Edition
• http://webcms.pima.gov/cms/one.aspx?portalId=169&pageId=63368
• Pima County Regional Wastewater Reclamation Department Standard Specifications and Details for
Construction for Public Sanitary Sewers, 2022
• http://webcms.pima.gov/cms/one.aspx?portalId=169&pageId=56988
• U.S. Department of Transportation, Federal Highway Administration, Manual on Uniform Traffic Control Devices for Streets and Highways, December 2009, and amendments
• http://mutcd.fhwa.dot.gov/kno_2009r1r2.htm
• Arizona Supplement to the Manual on Uniform Traffic Control Devices (MUTCD), 2009 edition (January 2012), http://www.azdot.gov/Highways/Traffic/Standards.asp
• Arizona Department of Transportation Standard Specifications for Road and Bridge Construction, 2008
Edition, http://www.azdot.gov/docs/business/2008-standards-specifications-for-road-and-bridge-construction.pdf?sfvrsn=0
• Arizona Department of Transportation, Highways Division, Part 1 - Construction Standard Drawings, May
2012 with current updates
• http://azdot.gov/business/engineering-and-construction/roadway-engineering/roadway-design-standards-and-guidelines/construction-standard-drawings
• Arizona Department of Transportation, Highways Division, Part 2 - Bridge Group Structural Detail Drawings, current edition
• http://azdot.gov/business/engineering-and-construction/bridge/structure-detail-drawings
• Arizona Department of Transportation, Highways Division, Part 3 - Traffic Signals and Lighting Standard Drawings, December, 2012 http://webcms.pima.gov/cms/one.aspx http://webcms.pima.gov/cms/one.aspx?portalId=169&pageId=63368 mailto:mjackson@tep.com?portalId=169&pageId=63368 http://webcms.pima.gov/cms/one.aspx?portalId=169&pageId=63368 http://webcms.pima.gov/cms/one.aspx?portalId=169&pageId=63368 mailto:thomas.porter@pima.gov?portalId=169&pageId=56988 http://www.azdot.gov/Highways/Traffic/Standards.asp mailto:brian.thome@lumen.com mailto:brian.thome@lumen.com
• http://azdot.gov/business/engineering-and-construction/traffic/signals-and-lighting-standard-drawings
• Arizona Department of Transportation, Highways Division, Part 4 - Signing and Marking Standard Drawings, January 2002 with current updates
• http://azdot.gov/business/engineering-and-construction/traffic/signing-and-marking-standard-drawings
Federal Requirements:
This project contains federal funding therefore all requirements for federally funded projects shall be followed. This includes, but is not limited to, adherence to most recent Build America/Buy America materials provisions (Special Provision 106.17), adherence to FHWA 1273 Provisions (Attached), adherence to most recent, at time of contract execution, Federal Wage Rate Determination for the appropriate locality and scope of work (https://sam.gov/content/wage-determinations), and adherence to DBE program requirements as set forth in the contract documents.
Contractor Responsibilities:
For milling, pavement striping obliteration, bridge work, and culvert railing work.
• An approved contractor shall develop and implement a Lead-Based Paint Removal and Abatement Plan for the removal of the lead-based paint, Toxicity Characteristic Leaching Procedure testing of the generated waste stream, and proper disposal of the waste stream derived from the removal of the pavement striping, paint on culvert railing, and existing bridge structure within the project limits. Lead discovered on existing project facilities is outlined in the attached test report. The contractor shall select a lead abatement contractor that meets the qualification requirements specified in the special provisions and as approved by the Engineer. The contractor shall follow all applicable federal, state, and local codes and regulations, including Arizona Department of Transportation Standard Specifications for Road and Bridge Construction (2008 Edition), related to the treatment and handling of lead-based paint.
• The contractor shall submit a Lead-Based Paint Removal and Abatement Plan for the removal of the pavement striping, existing bridge demolition, culvert railing within the project limits to the Engineer and the Arizona Department of Transportation Environmental Planning hazardous materials coordinator (602.920.3882 or 602.712.7767) for review and approval at least 10 (ten) working days prior to milling, pavement marking obliteration, bridge demolition work, or culvert railing work.
• No milling, pavement marking obliteration, bridge demolition work, or culvert railing work shall occur until the Lead-Based Paint Removal and Abatement Plan is approved by the Arizona Department of Transportation Environmental Planning hazardous materials coordinator and implemented.
• Visible fugitive dust emissions from paint removal shall be controlled through wet or dry (e.g., vacuum) means during the removal process. If the liquid waste stream generated by a water-blasting obliteration method passes the Toxicity Characteristic Leaching Process analysis, it may be used as a dust palliative or for compaction on the project. If the water is not used on the project, it shall be properly disposed of in accordance with all applicable federal, state, and local regulations.
• Paint containing lead was found in the pavement striping, existing bridge superstructure, and bridge rails;
therefore, the contractor shall notify its employees prior to any disturbance where lead is present in the paint below the 0.5 percent US Department of Housing and Urban Development/US Environmental Protection Agency action levels but above the US Department of Labor Occupational Safety and Health Administration detection level. As part of the notification, the contractor shall make the US Department of Labor Occupational Safety and Health Administration publication number 3142-12R 2004 Lead in Construction (http://www.osha.gov/Publications/ osha3142.pdf) available to workers.
http://www.blm.gov/wo/st/en/prog/more/veg_eis.html
• For milling activities, the roadway surface preceding the milling machine shall be kept sufficiently wet so as to prevent the generation of any visible fugitive dust particles but not so wet as to cause excess runoff from the roadway surface onto the roadway shoulder.
• The contractor shall complete a National Emission Standards for Hazardous Air Pollutants notification for work associated with bridge demolition and submit it to the Engineer for review.
• After Engineer approval, the notification shall be submitted to the Arizona Department of Transportation Environmental Planning hazardous materials coordinator (602.920.3882 or 602.712.7767) for a 5 (five)-working-day review and approval. Upon approval by the Arizona Department of Transportation Environmental Planning hazardous materials coordinator, the contractor shall file the notification with the Pima County Department of Environmental Quality at least 10 (ten) working days prior to demolition associated with the bridge.
• The contractor cannot start work associated with demolition of the bridge until 10 (ten) working days have passed since the submittal of the National Emission Standards for Hazardous Air Pollutants notification to the regulatory agency.
• If suspected hazardous materials are encountered during construction, work shall cease at that location and the Engineer shall be notified immediately to make arrangements for proper treatment or disposal of those materials.
• If vegetation clearing will occur during the migratory bird breeding season (March 1 to August 31), the contractor shall avoid any active bird nests. If active nests cannot be avoided, the contractor shall notify the Engineer to evaluate the situation. During the nonbreeding season (September 1 to February 28), vegetation removal is not subject to this restriction.
• To prevent the introduction of invasive species seeds, the contractor shall inspect all earthmoving and hauling equipment at the storage facility. All vehicles and equipment shall be washed and free of all attached plant/vegetation and soil/mud debris prior to entering the construction site.
• To prevent invasive species seeds from leaving the site, the contractor shall inspect all construction equipment and remove all attached plant/vegetation and soil/mud debris prior to leaving the construction site.
• If previously unidentified cultural resources are encountered during activity related to the construction of the project, the contractor shall stop work immediately at that location and shall take all reasonable steps to secure the preservation of those resources. The Engineer will immediately make arrangements for the proper treatment of those resources.
• The contractor shall notify owners of adjacent properties regarding construction timing and driveway restrictions a minimum of 14 (fourteen) calendar days prior to construction.
• The contractor shall post signs at bus stop locations within the project limits a minimum of 14 (fourteen) calendar days prior to construction to inform transit riders of the temporary relocations of the bus stops.
• The contractor shall not store equipment, supplies, materials, or debris on the sidewalks or bike paths.
Permits Before undertaking work at any location covered by this project, the Contractor shall obtain all applicable permits, including but not limited to: street closure permits and permits for excavation/construction in the public rights-of-way, from the City of Tucson and ADOT, as needed.
The contractor shall obtain all necessary permits from UPRR related to any relevant work impacting their property or right of way. Contractor shall follow all UPRR requirements for relevant work impacting their property or right of way.
The contractor shall file a Notice of Intent to use the statewide Construction General Permit for Discharge to Waters of the United States and a Notice of Termination when the site is stabilized with the Arizona Department of Environmental Quality (ADEQ). The contractor shall maintain and implement Pima County’s Stormwater Pollution Prevention Plan under the Construction General Permit. The contractor is directed to Section 810 of these Special Provisions and the Stormwater Pollution Prevention Plan for the project.
Prior to any ground disturbing activity, the contractor shall obtain an Activity Permit from the Pima County Department of Environmental Quality. The contractor shall implement the standard specifications for dust suppression.
Construction Requirements:
Incidental work shall include, but not be limited to: equipment facilities, furnishing water supply, clean-up, removal of debris and relocation of all existing traffic control and warning signs, and street name signs, as required. Incidental work shall also include placing embankment and grading behind sidewalk to match existing grades as shown on the plan details and all other small items not itemized herein. There shall be no payment for incidental work. It shall be considered as included in other items of work and will not be considered for payment.
Saw cutting is required where:
• New pavement meets existing pavement
• New concrete curb/curb and gutter meets existing concrete curb/curb and gutter
• New concrete sidewalk meets existing concrete sidewalk
Saw cutting will be considered incidental to the installation of the new items.
Clearing and grubbing will be required to a distance of 3 feet behind new edge of pavement or sidewalks, unless otherwise indicated on the plans or by the Engineer. Disposal of asphaltic concrete pavement and concrete curb and sidewalk shall be the responsibility of the Contractor.
It has been determined that the average elevation of the roadway for the project is 2,450 feet.
Where temporary striping is required, follow Subsections 701-2.04(B) of these Special Provisions and 701-3.10 of the Standard Specifications.
All permanent striping shall be as noted on the Pavement Marking General Notes sheet, conforming to the applicable specifications, and shall be applied as also noted on the Pavement Marking General Notes sheet.
Maintenance & Protection of Traffic The contractor may elect to close the entire 22nd Street Corridor from the intersection of 22nd Street and Cherrybell Strav to the intersection of 22nd Street and Tucson Blvd for the duration of the project. The 22nd and Cherrybell intersection shall remain open and be temporarily modified to allow Northbound and Westbound traffic and Northbound/Southbound movements between Cherrybell Strav and Cherry Ave. The existing signal pole in the 22nd Street median shall be protected in place and modified as needed. Temporary paving in the median will be allowed.
Tucson Blvd shall remain open. Access to all businesses in and around the corridor shall remain open.
For this closure the contractor shall submit, for review, a comprehensive Traffic Control Plan. This plan will utilize and refer to the established detour plan designated by the City of Tucson.
All existing warning signs shall be relocated when the sign conflicts with the new construction. Locations may be temporary or may be located as shown on the plans or as directed by the City of Tucson Traffic Engineer. Relocated signs shall be affixed to new signpost foundations at each designated location. All remaining signs, other than warning signs, that are removed as a result of conflicts with new construction shall be salvaged. The Contractor shall contact the City of Tucson Traffic Engineer to determine where salvaged signs shall be stored. Signs damaged by the Contractor during removal and storage shall be replaced by the Contractor at no cost to the City.
Throughout the duration of construction, access to Sun Tran bus stops must be maintained. If access to any bus stop is not possible, the Contractor must notify Bea Paulus at Sun Tran 206-8826 or 206-8934, 5 days in advance of work at that location.
Utility Relocation and Adjustments The Contractor shall notify Pima County Regional Wastewater Reclamation Department (PCRWRD) and Tucson Water, at least 48 hours prior to any utility adjustment work, so that the Contractor, the City of Tucson's Representative, Tucson Water, and Pima County Wastewater Management can verify the exact number and location of water valves and manholes to be adjusted.
Adjust Existing Valve Box and Cover of these Special Provisions and Tucson Water Standard Detail 300.
The Contractor shall raise or lower to the new pavement surface, all sanitary sewers manholes in accordance with PCRWRD Standards.
Sanitary Sewer:
The frame and cover of every existing public sanitary sewer manhole and cleanout that will remain in service shall be adjusted to match the new finished grade. Reconstruction of manholes per Pima County Regional Wastewater Reclamation Department Standard Specifications and Details for Construction 2012, RWRD-211, -212, -304, or -305 (as applicable) may be necessary when adjusting manhole rims. PCRWRD also may require that the manhole frame and cover be replaced if the age, condition, or type of the existing frame and cover warrants such replacement.
Manholes and cleanouts that are located in areas subject to stormwater runoff or pedestrian traffic shall have waterproof covers (RWRD-213, -214, -215, -216, -217 or -218). If the manhole is in an unpaved area, a protective concrete collar shall be placed around the manhole as set forth in RWRD-212. Per RWRD-306, the Contractor is required to cover the bench during the adjustment process in order to prevent debris from entering the sewage flow.
The cover must be in place prior to removing the rim and cover. The Contractor shall contact Field Operations 2 weeks prior to installing any covers. If the Contractor must enter a manhole to install or remove the bench cover, a no-cost Manhole Entry Permit must be obtained from PCRWRD Mapping & Records (5th Floor, 201 N. Stone) prior to making the entry. Contact PCRWRD Field Engineering (724-2651) to arrange an inspection if there are any questions concerning adjustments to existing manholes.
When reconstruction of an existing brick manhole is required, remove the tapered section of existing brick. If brick or mortar of the straight (vertical) wall is deteriorated, continue removing the wall until solid material is reached.
The PCRWRD Inspector shall inspect the existing brick wall prior to reconstruction in order to verify that the condition is satisfactory. The Contractor shall use standard precast sections to rebuild the manhole to grade.
Where sewers that are to be abandoned are connected to in-service manholes that will remain in service, the Contractor shall plug the sewer at the manhole and rebench the manhole to accommodate changes in flow direction.
Manholes that are to be abandoned shall be demolished to at least three (3) feet below finished grade. The rings and covers shall be salvaged and delivered to the storage yard located adjacent to the Outlying Facilities office on the I-10 eastbound frontage road south of the Ina Road Water Pollution Control Facility. Contact the Field Operations Division (326-4333) to arrange for delivery of salvaged items. Debris that is generated by the removal of existing sewer shall be taken from the site by the Contractor and disposed of appropriately. Disturbed areas shall be backfilled compacted to 95% of maximum density.
Where new water mains violate the vertical separation requirements between sanitary sewer lines and potable water lines, the sanitary sewer shall be replaced with ductile iron pipe for no less than a distance of six (6) feet on each side of the waterline-sewer line intersection. This requirement shall apply to House Connection Service’s as well as sanitary sewer mains.
When trenching or excavating within six (6) feet of an existing sanitary sewer manhole, the Contractor shall adequately protect the manhole with shoring or other methods approved by PCRWRD
Drainage:
The Contractor's attention is directed to Subsection 701-3.04, Basic Maintenance and Protection of Traffic, paragraph
(C) Drainage, and Subsection 107-20, Damage by Storm, Flood or Earthquake of the Standard Specifications. The Contractor shall devote particular attention to all drainage facilities, keeping them fully operative at all times.
Conveyance of stormwater runoff shall be provided at all times, even during grading operations, to adequately drain the traveled way including the remainder of the right-of-way areas. In addition, the Contractor shall maintain existing drainage patterns and shall provide temporary conveyance for stormwater runoff to all storm drains, manholes and catch basins affected by the new construction. To this end, the Contractor shall develop a stormwater management plan, in accordance with the provisions of Subsection 107-19 Contractor's Responsibility for Work which addresses the control and disposal of stormwater throughout the duration of the construction.
Damage:
The Contractor's attention is directed to Subsection 501-3.03(A). In addition to the requirements specified in this section, the Contractor shall be solely responsible for all existing pipe, catch basins and grates that are to remain and which are deemed to have been damaged by the actions of the Contractor or the Contractor's subcontractors. Any damage so caused shall be corrected at the sole cost of the Contractor.
Regional Transportation Authority (RTA) Construction Signs:
Where applicable, the RTA has contracted with a Sign Contractor to provide and install signs on all RTA funded construction projects. Signs will indicate to the traveling public the type of project being constructed, the jurisdiction in which the project is located and that RTA funding is being utilized for the project. The Sign Contractor will work with the City representative to ensure that signs are installed a minimum of 7 days prior to construction start and will remain in place a minimum of 30 days after construction ends. The Sign Contractor will be responsible for Blue Staking for the sign installation and any required permits and will install signs in a location to be coordinated with the City representative and the Construction Contractor. Signs will be 4 ft. x 4 ft. for most projects, 4 ft. x 8 ft. for larger corridor projects and will be placed at all logical approaches to the project. The Construction Contractor will work with the City representative and the Sign Contractor to ensure that locations selected for signs are visible to the traveling public, do not violate sight distance requirements, and do not block other signs, business lines of sight, or construction access.
Coordination with Union Pacific Railroad:
Construction activities within the Union Pacific Railroad (UPRR) will require close coordination with UPPR.
Construction activities include, but are not limited to, construction of bridge piers (both temporary and permanent), box culvert and slope paving, water service modifications, and other miscellaneous items. UPRR requires their flagging personnel to be on site during any construction activity that is within 25 feet of the track both horizontally and vertically. Prior to beginning construction, the Contractor shall submit to the Engineer and UPRR a schedule defining the start date and duration for construction of each activity required within the yard. The Contractor will be responsible for coordination with UPRR to schedule the flagging personnel.
Coordination with the Arizona Department of Transportation:
Construction activities within the Arizona Department of Transportation (ADOT) right-of-way will require coordination with ADOT. Construction activities include, but are not limited to, the removal of the existing bridge, the new 22nd Street bridges, Barraza-Aviation Parkway and Ramps A, B and C reconstruction, drainage improvements, water and sewer improvements, street lighting, traffic signal modifications, signing, pavement marking, and other miscellaneous items. Prior to beginning construction, the Contractor shall submit to the Engineer and ADOT a schedule defining the start date and duration for construction of each activity required on an ADOT facility.
The Contractor shall include the timeframe for lane closures required to complete construction activities on or adjacent to Barraza-Aviation Parkway in their construction schedule and submitted to ADOT for final approval. Lane closures beyond the limits approved by ADOT will inconvenience the traveling public and will be a cost to the Agency.
It is impractical to determine the actual damages the Agency will sustain in the event Traffic Lanes are closed beyond the limits approved by ADOT. Therefore, the Contractor shall pay to the Agency, not as a penalty, but as liquidated damages, $500 per 15 minutes, or for a portion of 15 minutes, per lane, for any lane closure beyond the limits approved by ADOT. In addition to the liquidated damages, all added cost for traffic control measures, including flagging, required to maintain the lane closures beyond the allowed time limits, will be at no additional cost to the Agency. The required traffic control measures will be as determined by the Engineer.
The Engineer will determine when it is safe to reopen lanes to traffic. Assessment of liquidated damages will stop when all lanes have been safely reopened. Any liquidated damages assessed under these provisions will be in addition to those listed in the PAG Standard Specification Sections 105 and 108.
Project Limits The contractor shall perform all work within the public right-of-way, legally obtained easements and property legally acquired by the Agency. The contractor shall assume all responsibility and liability for any encroachment upon private property. The use of private property for construction yards will be allowed only if zoning requirements allows its use for this purpose. See Section 106-9 for further details regarding temporary construction yards.
Disposal of Materials All construction debris, rubble, and other materials that are not recycled on the project, sent to a recycling facility, or taken by the contractor, shall be disposed of by the contractor at a waste disposal facility.
Hazardous Materials If suspected hazardous materials are encountered during construction, work shall cease at the location and the Engineer shall be immediately notified to arrange for proper assessment, treatment, or disposal of those materials.
The area will be taped off, and further investigation and clean up. If potentially hazardous or contaminated materials are encountered, the contractor shall stop work and remove all workers within the contaminated area. For life threatening situations, follow the procedures in the Safety Plan, as specified in Subsection 107-7.02.
Construction Water/Dust Control The contractor shall provide potable water for use in construction, compaction and dust control. Reclaimed water may only be used if there is no discharge of this water to surface waters of the U.S. and the reclaimed water remains on-site. The contractor shall notify the Arizona Department of Environmental Quality (ADEQ) for all discharges of reclaimed water to surface waters of the U.S. or off-site.
Work Within City of Tucson and ADOT Right-Of-Ways All work done within City of Tucson Right-of-Way shall follow PAG Specifications and these Special Provisions as applicable. All work done on Barraza-Aviation Parkway and Ramps A and B shall follow ADOT Specifications and these Special Provisions as applicable.
Geotechnical Information The Contractor shall refer to the Geotechnical Report and the four Geotechnical Report Addendums for additional information.
Construction Documents Order of Precedence The order of precedence of the construction documents shall be as follows:
1. Project Special Provisions
2. PAG Standard Specifications (2015)
3. ADOT Standard Specifications for Road and Bridge Construction (2008)
4. Project Plans
5. AASHTO LRFD Bridge Construction Specifications 3rd Edition
6. Bid Schedule
Materials Testing Program
Materials testing for this project will be in accordance with The City of Tucson Materials Quality Assurance (COTMQA) Program Manual (December 2015). As per the manual, Section A7:
1. Acceptance Sampling and Testing will be performed by Qualified TDOT sampling and testing personnel or a qualified consultant independent laboratory selected and compensated by TDOT.
2. Independent Assurance (IA) Testing will be performed by TDOT Materials and Testing Laboratory.
However, the same individual shall not perform both the Independent Assurance Sampling and Testing and the Acceptance Sampling and Testing.
3. Acceptance Testing will be performed at the frequencies shown in Tables 1-8 in the COTMQA manual.
4. Independent Assurance (IA) Testing shall be performed on materials identified in Tables 1-8 of the
COTMQA at the frequencies outlined in Section A8.
5. Materials requiring Material Certificates are shown on the checklist in Item 3, Appendix B of the COTMQA
The Contractor is responsible for quality control measures necessary to provide acceptable quality in production, handling, and placement of all materials.
(101ABREV, 6/5/14)
SECTION 101 ABBREVIATIONS AND DEFINITIONS
101-3 TERMS of the Standard Specifications are revised as follows:
Contract Time - Change to read “Construction Time”. This change is applicable when the term “Contract Time” is used in all sections throughout the Standard Specifications.
Supplemental Agreement - Add the following: “All supplemental agreements will be issued in compliance with Section 11.16.010 of the Pima County Procurement Code.”
SECTION 102 BIDDING REQUIREMENTS AND CONDITIONS
is hereby modified to add:
102-15 Award Dependent Personnel Submittal Requirements.
102-15.01 Submittal Requirements.
The apparent low bidder shall submit all verifiable documentation in support of each proposed key individual in accordance with the requirements of these specifications by 4:30 pm MST no later than the fifth (5th) business day following the bid letting (excluding Saturdays, Sundays, and legal holidays). Apparent low bidder’s who fail to conform to these requirements may be deemed non-responsive. One original and five (5) copies shall be submitted to the COT Resident Engineer in a sealed container labeled “22nd Street: Kino Parkway to Tucson Boulevard Contractor’s Personnel Submittal, Submitted by <CONTRACTOR NAME>”. Submittal shall be to:
Mr. Austin Wesnitzer Engineering Manager City of Tucson 201 N. Stone Avenue, 4th Flr.
Tucson, AZ 85701 Phone: 520-837-6614
The Department will review the apparent low bidder’s personnel submittal. The Department reserves the right to request additional information or documentation, and the right to confirm provided information through communication with the references provided. The information provided by the apparent low bidder, and communication with provided references (if deemed necessary by the Engineer) will be used by the Department to rate proposed personnel on a pass or fail basis. The Department will provide a written acceptance, or denial, of the proposed individuals within five (5) business days of receipt of the complete personnel submittal from the apparent low bidder.
If the apparent low bidder’s proposed personnel are not accepted by the Department, the apparent low bidder shall at no cost to the Department and at no extension of schedule, propose alternate personnel whose verifiable relevant experience and qualifications comply with the requirements of this specification. Proposed alternate personnel will be subject to review by the Department in the same manner as for originally proposed personnel, and the Department will provide a written acceptance or denial for the proposed alternate personnel within five (5) business days of receipt. This process will continue as required to ensure personnel are assigned to key roles in accordance with these specifications. However, failure of the apparent low bidder to complete this process and meet the requirements of these specifications to the satisfaction of the Department within the award of contract time (within twenty (20) business days) may result in cancellation of award.
102-15.02 Agency Provided Construction Engineering Inspection. During construction, representatives from the team of design consulting Engineers or other consultants may be under contract with the Department to assist with construction Engineering and inspection, and may be on the job site to provide the Engineer with technical expertise.
The presence of design team consulting Engineers and other consultants on the project shall in no way relieve the Contractor of full responsibility for contract compliance including, but not limited to, conformance of the work to the requirements of the Contract Documents, the structural adequacy of the construction scheme, and the safety of workmen and the general public.
102-15.03 Method of Measurement. Contractor’s personnel requirements as specified in this Special Provision shall not be measured separately, but shall be considered incidental to the work.
102-15.04 Basis of Payment. All costs associated with the Contractor’s personnel requirements as specified in this Special Provision shall not be paid for separately, but shall be included in the work.
SECTION 103 AWARD AND EXECUTION OF CONTRACT
103-6 Contractors Insurance; Indemnification: of the Standard Specifications is modified to add:
The Contractor shall indemnify and hold harmless the Regional Transportation Authority (RTA) in Pima County, Arizona, its board, committees, regional partners, officials, officers, and employees, individually and collectively.
SECTION 104 SCOPE OF WORK
104-2.02 Due to Physical Conditions of the Standard Specifications is revised to read:
104-2.02 Differing Site Conditions
(A) During the progress of the work, if subsurface or latent physical conditions are encountered at the site differing materially from those indicated in the contract or if unknown physical conditions of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in the work provided for in the contract, are encountered at the site, the party discovering such conditions shall promptly notify the other party in writing of the specific differing conditions before the site is disturbed and before the affected work is performed.
(B) Upon written notification, the Engineer will investigate the conditions and if it is determined that the conditions materially differ and cause an increase or decrease in the cost or time required for the performance of any work under the contract, an adjustment, excluding anticipated profits, will be made and the contract modified in writing accordingly. The Engineer will notify the contractor of the determination whether or not an adjustment of the contract is warranted.
(C) No contract adjustment which results in a benefit to the contractor will be allowed, unless the contractor has provided the required written notice.
(D) No contract adjustment will be allowed under this clause for any effects caused on unchanged work.
(E) The contract contains no indication of the soil conditions to be encountered. Caliche-like material is prevalent throughout the Tucson area and the Contractor is expected to utilize the proper equipment to excavate the material. Hard digging is not considered a differing site condition.
(F) Archaeological or cultural features shall be treated as noted in Subsection 107-6.
104-5 Maintenance of Traffic: of the Standard Specifications is modified to add:
Contractor shall coordinate with City of Tucson Public Information office to contact adjacent property owners 14 days prior to installation of new sidewalks and curbing, and paving operations. The Contractor shall maintain access to all side streets, access roads, businesses, residences, driveways, alleys and parking lots except for that period when asphaltic concrete is actually being placed and finished across their frontage.
Throughout the duration of construction, access to Sun Tran bus stops not affected by the closure and detour of 22nd Street, shall be maintained. When relocation of a bus stop is requested by the Contractor, and where the Engineer determines that relocation of a bus stop is necessary to maintain access, the Contractor shall notify Sun Tran five (5) days in advance of work at that location.
Access to all schools shall be maintained during the hours of school operation and activities. The Contractor shall coordinate the work with each school site administrator.
104-11 MISCELLANEOUS WORK: of the Standard Specifications is modified to add:
(A) General. Miscellaneous work shall…