The documents are contract drawings for the Veterans Road Hangar Infrastructure project at Leesburg International Airport in Lake County, Florida, prepared by AVCON, Inc. for the City of Leesburg. The project involves constructing new infrastructure including roadways, taxilanes, utility systems, drainage improvements, and associated site work. The contract drawings are dated June 2025 and issued for bidding, with the project located at 8807 Airport Boulevard in Leesburg. The scope includes approximately 3.22 acres of clearing and grubbing, new roadway and taxilane pavement sections, utility installations including water mains, sanitary sewer lines, electrical infrastructure, and associated site improvements.
The project includes multiple work areas with specific time constraints: Work Area A is limited to 180 calendar days, Work Area B requires a partial taxiway closure and is limited to 30 calendar days, and Work Area C is also limited to 30 calendar days. The contract includes specific requirements for utility relocations, drainage improvements, and environmental considerations, such as gopher tortoise survey and relocation protocols. Utility work involves installing new 8-inch and 12-inch water mains, sanitary sewer lines, electrical conduits, and transformer installations. The project will require coordination with the City of Leesburg utilities department and adherence to specific technical specifications for materials, installation, and testing of infrastructure components.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DRAWINGS
FOR THE CONSTRUCTION OF
VETERANS ROAD HANGAR
INFRASTRUCTURE
LEESBURG INTERNATIONAL AIRPORT
LAKE COUNTY, FLORIDA
CITY OF LEESBURG PROJECT NO. 480003
PARCEL ID: 011925050003800000
ALTKEY: 3801605
JUNE 2025
ISSUED TO BID
AIRPORT LOCATION MAP
SHEET NO.
GI001
SCALE = NOT TO SCALE
SILVER LAKE
LAKE HARRIS
CONSERVATION
AREA
LAKE HARRIS
LAKE GRIFFIN
LEESBURG
INTERNATIONAL
AIRPORT
AIRPORT LOCATION MAP
SEAL
DANIEL J. NICKOLS, JR., P.E.
Lic. No. 78634
PROJECT
AREA
T H
I S
H E
E T
M
U
B
P
R I
N T
D
N
C O
L
V A
L
GI002
G
EN
ER
AL
N O
TE
S, S H
EE
T
IN
D
EX
, A
N D
A
BB
R
EV
IA
TI
O N
S
1 2 3 4
1 2 3 4
A
B
C
A
B
C
A1 GENERAL NOTES
GENERAL NOTES
1. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND OTHER
FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE AT THE TIME OF
PREPARATION OF THESE PLANS. THE CONTRACTOR SHALL FIELD LOCATE, VERIFY, AND FURTHER IDENTIFY THE LOCATIONS, ELEVATIONS, AND DIMENSIONS OF ALL EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES (IDENTIFIED ON THE PLANS OR NOT) AFFECTING ANY COMPONENT OF WORK HEREIN PRIOR TO THE START OF ANY CONSTRUCTION. DISCREPANCIES, CONFLICTS, OR POTENTIAL DEVIATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO THE START OF ANY
CONSTRUCTION.
2. THE CONTRACTOR SHALL CHECK PLANS FOR CONFLICTS AND DISCREPANCIES PRIOR TO THE START OF ANY CONSTRUCTION. SPECIAL ATTENTION SHALL BE TAKEN WITH THOSE EXISTING UTILITIES, STRUCTURES OR FEATURES (IDENTIFIED ON THE PLANS OR NOT) THAT MAY POTENTIALLY CONFLICT OR CROSS PROPOSED DESIGN COMPONENTS (I.E., AIRFIELD ELECTRICAL, STORM SEWERS, SANITARY SEWERS, WATER MAINS, COMMUNICATION LINES, HIGH POWER TRANSMISSION LINES, BUILDING FOUNDATIONS, ETC) AND ANY DISCREPANCIES, CONFLICTS, OR POTENTIAL DEVIATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO THE START OF ANY CONSTRUCTION. ANY
COST ASSOCIATED WITH THE LOCATION OF EXISTING UTILITIES AS OUTLINED ABOVE IS THE
RESPONSIBILITY OF THE CONTRACTOR.
3. ERRORS OR OMISSIONS - DO NOT TAKE ADVANTAGE OF ANY APPARENT ERROR OR OMISSION
DISCOVERED IN THE CONTRACT DOCUMENTS, BUT IMMEDIATELY NOTIFY THE ENGINEER OF SUCH
DISCOVERY. THE ENGINEER WILL THEN MAKE SUCH CORRECTIONS AND INTERPRETATIONS AS
NECESSARY TO REFLECT THE ACTUAL SPIRIT AND INTENT OF THE CONTRACT DOCUMENTS.
4. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN AREAS OF BURIED UTILITIES AND SHALL PROVIDE AT LEAST 48-HOURS NOTICE TO THE UTILITY COMPANIES PRIOR TO CONSTRUCTION TO
OBTAIN FIELD LOCATIONS OF EXISTING UNDERGROUND UTILITIES.
5. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING FACILITIES, ABOVE OR
BELOW GROUND, THAT MAY OCCUR AS A RESULT OF THE WORK PERFORMED BY THE CONTRACTOR
CALLED FOR IN THIS CONTRACT. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING
SURVEY MONUMENTATION, AND ANY DISTURBED MONUMENTATION SHALL BE RESTORED AT
CONTRACTOR'S EXPENSE BY A SURVEYOR SELECTED BY THE OWNER.
6. ALL UNDERGROUND UTILITIES MUST BE IN PLACE AND PASS ALL TESTING OR INSPECTION
REQUIREMENTS PRIOR TO ROAD BASE AND/OR SURFACE IMPROVEMENT CONSTRUCTION.
7. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE PERMITS AND INSPECTION REQUIREMENTS SPECIFIED BY THE VARIOUS GOVERNMENTAL AGENCIES AND THE ENGINEER. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION, AND SCHEDULE
INSPECTIONS AND TESTING ACCORDING TO AGENCY REQUIREMENTS.
8. ALL WORK PERFORMED SHALL COMPLY WITH THE CODES, STANDARDS, REGULATIONS AND
REQUIREMENTS OF THE CITY OF LEESBURG LAND DEVELOPMENT CODE AND ENGINEERING
STANDARDS, THE CURRENT EDITION OF THE FDOT STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND UTILITY CONSTRUCTION, THE FAA ADVISORY CIRCULARS, AND THE REGULATIONS AND ORDINANCES OF
THE VARIOUS OTHER GOVERNMENTAL AGENCIES HAVING JURISDICTION OVER THE WORK.
9. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS ON ALL PRECAST AND MANUFACTURED ITEMS TO THE ENGINEER FOR APPROVAL. FAILURE TO OBTAIN APPROVAL BEFORE INSTALLATION COULD RESULT IN REMOVAL AND REPLACEMENT AT CONTRACTOR'S EXPENSE. THE ENGINEER'S REVIEW OF THE SHOP DRAWINGS IS FOR CONFORMITY WITH THE CONTRACT DOCUMENTS AND DOES NOT INCLUDE IN-DEPTH CHECK FOR THE ABILITY OF THE CONTRACTOR TO PERFORM THE WORK IN A SAFE OR EFFICIENT MANNER. THE ENGINEER'S REVIEW OF THE SHOP DRAWINGS DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR DIMENSIONAL ACCURACY TO ENSURE FIELD FIT AND CONFORMITY OF THE
VARIOUS COMPONENTS AND DETAILS.
10. CONTRACTOR SHALL KEEP ENGINEER ADVISED OF CONSTRUCTION SCHEDULE CHANGES SO THAT
ENGINEER CAN PROVIDE CONSTRUCTION CERTIFICATIONS TO JURISDICTIONAL AGENCIES.
11. WORK PERFORMED UNDER THIS CONTRACT SHALL INTERFACE SMOOTHLY WITH OTHER WORK BEING PERFORMED ON OR ADJACENT TO THE SITE BY OTHER CONTRACTORS AND UTILITY COMPANIES. IT WILL BE NECESSARY FOR THE CONTRACTOR TO COORDINATE AND SCHEDULE THEIR ACTIVITIES, WHERE
NECESSARY, WITH OTHER CONTRACTORS AND UTILITY COMPANIES.
12. SAFETY - DURING THE CONSTRUCTION AND/OR MAINTENANCE OF THIS PROJECT, ALL SAFETY
REGULATIONS ARE TO BE ENFORCED. THE CONTRACTOR OR THEIR REPRESENTATIVE SHALL BE
RESPONSIBLE FOR THE CONTROL AND SAFETY OF THE TRAVELING PUBLIC AND THE SAFETY OF HIS PERSONNEL. LABOR SAFETY REGULATIONS SHALL CONFORM TO THE PROVISIONS SET FORTH BY OSHA
IN THE FEDERAL REGISTER OF THE DEPARTMENT OF TRANSPORTATION.
13. CONTRACTOR SHALL PROVIDE ALL EQUIPMENT NECESSARY FOR DEWATERING. DISCHARGE WATER FROM DEWATERING SHALL BE CLEAR WITH NO VISIBLE SOIL PARTICLES. DISCHARGE WATER FROM DEWATERING SHALL BE DISPOSED OF IN SUCH A MANNER THAT IT WILL NOT INTERFERE WITH THE NORMAL DRAINAGE OF THE AREA IN WHICH THE WORK IS BEING PERFORMED, OR CREATE PONDING.
THE OPERATION SHALL NOT CAUSE ANY DAMAGE TO ANY PORTION OF THE WORK COMPLETED, OR IN PROGRESS. THE DEWATERING OPERATION SHALL COMPLY WITH THE REQUIREMENTS OF APPLICABLE
REGULATORY AGENCIES. A PRE-WORK MEETING WILL BE CONDUCTED WITH THE OWNER, THE
CONTRACTOR, AND THE ENGINEER PRIOR TO BEGINNING ANY SITE EXCAVATION.
14. "AS-BUILT" PLANS FOR THE PROPOSED CONSTRUCTION SHALL BE PROVIDED UPON COMPLETION OF
CONSTRUCTION, THE CONTRACTOR SHALL FURNISH THE OWNER'S ENGINEER WITH COMPLETE
"AS-BUILT" INFORMATION CERTIFIED BY A FLORIDA REGISTERED PROFESSIONAL SURVEYOR.
15. PIPE LENGTHS SHOWN ARE APPROXIMATE AND SHOULD BE ORDERED FROM FIELD STAKED QUANTITIES.
PLAN PIPE LENGTHS ARE MEASURED FROM CONNECTION POINT TO END OF THE LINES FOR WATER
LINES.
16. THESE DRAWINGS HAVE BEEN PREPARED, IN PART, BASED UPON RECORD DRAWINGS AND/OR CAD FILES FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, THOSE
UTILIZING THE INFORMATION ON THESE DRAWINGS ARE ADVISED TO OBTAIN INDEPENDENT
VERIFICATION OF ITS ACCURACY BEFORE USING IT FOR ANY PURPOSE.
17. ALL AREAS DISTURBED AS A RESULT OF THE CONTRACTOR'S STAGING AND CONSTRUCTION
OPERATIONS OUTSIDE OF THE PROJECT GRADING LIMITS SHALL BE RESTORED EQUAL TO OR BETTER
THAN ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.
18. DURING THE WORK OF THIS CONTRACT, THE CONTRACTOR SHALL FURNISH, ERECT AND MAINTAIN
WHATEVER TEMPORARY LIGHTING MAY BE NECESSARY TO KEEP THE TAXILANE IN OPERATING
CONDITION WHEN OPEN FOR AIRCRAFT.
19. ALL DIRT, DUST, STONES AND LOOSE DEBRIS SHALL BE CONTINUOUSLY REMOVED FROM ALL PAVED
SURFACES DURING THIS CONTRACT.
20. THE CONTRACTOR SHALL MAINTAIN THE EXISTING ACCESS ROADS AT THE APPROXIMATE LOCATION SHOWN. IF NECESSARY, CONTRACTOR SHALL ALSO CONSTRUCT AND MAINTAIN PROPOSED GRAVEL ACCESS ROADS AT LOCATIONS APPROVED IN THE FIELD BY THE ENGINEER OR OWNER. PAYMENT FOR
ANY PROPOSED ACCESS ROADS NEEDED TO MAINTAIN THE FLOW OF CONSTRUCTION SHALL BE
INCIDENTAL TO ITEM GP-80 CONSTRUCTION SAFETY AND PHASING PLAN.
21. ALL OF THE CONTRACTOR'S OPERATIONS SHALL REMAIN ON AIRPORT PROPERTY AT ALL TIMES. UNDER
NO CIRCUMSTANCES WILL THE CONTRACTOR BE ALLOWED ON ADJACENT PROPERTY.
22. TO THE EXTENT THAT WETLAND AREAS ARE KNOWN, THEY HAVE BEEN DEPICTED ON THE CONTRACT
DRAWINGS.
23. ALL WETLAND AREAS SHOWN WITHIN THE GRADING LIMITS HAVE BEEN PREVIOUSLY MITIGATED.
24. THE CONTRACT DOES NOT ALLOW FOR PRICE INCREASES DUE TO ESCALATION IN COST OF UNIT BID ITEMS. THE CONTRACTOR SHALL TAKE THIS INTO CONSIDERATION WHEN PREPARING UNIT PRICES FOR
BID.
25. THE CITY OF LEESBURG RESERVES THE RIGHT TO ELIMINATE ANY ITEMS OF THE CONTRACT AND
PERFORM THESE ITEMS WITH COUNTY SUPPLIED FORCES AND MATERIALS.
26. THE CONTRACTOR SHALL BE AWARE THAT OTHER CONCURRENT PROJECTS MAY BE UNDER
CONSTRUCTION ON THE AIRPORT. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE THEIR ACTIVITIES WITH THE OTHER CONTRACTORS ON THE AIRPORT. THIS COORDINATION WILL NOT BE PAID SEPARATELY AND IS CONSIDERED A NECESSARY AND INCIDENTAL PORTION OF THE WORK.
27. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PAYMENT OF ALL FAILED QA TESTING
REGARDLESS OF THE REASON FOR FAILURE. THE CONTRACTOR SHALL ENSURE AREAS ARE PASSING
OR ABLE TO PASS PRIOR TO REQUESTING QA TESTING.
28. THE CONTRACTOR SHALL HAVE A REPRESENTATIVE ON CALL AT ALL TIMES FOR EMERGENCY MAINTENANCE OF AIRPORT HAZARD LIGHTING AND BARRICADES. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR ENSURING THAT ALL SAFETY MEASURES ARE IN GOOD WORKING ORDER AT THE
END OF EACH DAY.
29. ALL ELEVATIONS REFERENCE NAVD 88 VERTICAL DATUM. COORDINATES REFERENCE NAD 83
HORIZONTAL DATUM.
30. THE TOPOGRAPHIC FEATURES SHOWN HEREIN WERE COMPILED FROM FIELD SURVEY PERFORMED BY
GAI CONSULTANTS, INC. DATED 02-16-2023.
GRADING NOTES
1. SELECTIVE GRADING SHALL BE REQUIRED AS DIRECTED BY THE ENGINEER. IF DIRECTED BY THE ENGINEER, SELECTIVE GRADING SHALL BE PAID AT THE CONTRACT UNIT PRICE FOR UNCLASSIFIED
EXCAVATION.
2. THE QUANTITY OF UNCLASSIFIED EXCAVATION, ITEM P-152, INCLUDES 100 CY OF UNDERCUT
EXCAVATION WHICH WILL BE USED ONLY WHEN DIRECTED BY THE ENGINEER.
3. THE QUANTITY OF LIME ROCK BASE COURSE, ITEM P-211, INCLUDES 100 CY FOR REPLACEMENT OF
UNDERCUT EXCAVATION WHICH WILL BE USED ONLY WHEN DIRECTED BY THE ENGINEER.
4. ALL SPOIL MATERIAL WHICH IS SUITABLE FOR EMBANKMENT AND EXCESS TOPSOIL SHALL BE DISPOSED OF ON AIRPORT PROPERTY AS SHOWN ON THE CONTRACT DRAWINGS, UNLESS OTHERWISE DIRECTED BY THE AIRPORT AUTHORITIES. SPOIL MATERIAL WHICH IS NOT SUITABLE FOR EMBANKMENT SHALL BE
DISPOSED OF OFF AIRPORT.
5. EMBANKMENTS SHALL BE CONSTRUCTED WITH SUITABLE ON-SITE MATERIAL UNLESS OTHERWISE
DIRECTED BY THE ENGINEER.
6. THE LIMITS FOR SODDING ARE THE LIMITS OF GRADING SHOWN ON THE GRADING PLANS. ALL AREAS OF SODDING SHALL BE SMOOTH AND FREE RUTTING AT THE COMPLETION OF THE PROJECT. ALL AREAS OUTSIDE OF THE GRADING LIMITS WHICH ARE DISTURBED SHALL BE RESTORED, WITH SOD, BY THE
CONTRACTOR AT THEIR EXPENSE.
7. EXISTING WETLANDS LOCATED ADJACENT TO THE GRADING AREA SHALL NOT BE DISTURBED DURING CONSTRUCTION. PRIOR TO CONSTRUCTION, THE WETLAND BOUNDARIES SHALL BE CLEARLY MARKED IN THE FIELD BY THE CONTRACTOR AND APPROVED BY THE ENGINEER. THE CONTRACTOR SHALL KEEP ALL MATERIALS AND EQUIPMENT FROM ENTERING EXISTING WETLANDS. ANY IMPACTS TO WETLANDS OUTSIDE THE DESIGNATED GRADING AREA SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY AND MITIGATED BY THE CONTRACTOR AS DIRECTED BY THE ENGINEER AND ALL AT THE CONTRACTORS
EXPENSE.
8. THE COST OF MEASURES AND PRACTICES FOR COMPLIANCE WITH POLLUTION, EROSION, AND
SILTATION CONTROL SUCH AS AIR POLLUTION PREVENTION, WATER POLLUTION PREVENTION,
TEMPORARY SEEDING, TEMPORARY MULCHING, CONSTRUCTION ROAD STABILIZATION, DUST CONTROL, PROTECTING VEGETATION, AND EROSION AND SILTATION CONTROL PRACTICES DUE TO THE
CONTRACTOR'S MEANS AND METHODS, SHALL BE INCLUDED IN ITEM C-102 UNDER PAYMENT FOR
"TEMPORARY AIR AND WATER POLLUTION, SOIL EROSION, AND SILTATION CONTROL".
9. ALL SOIL EROSION AND SEDIMENT CONTROL DEVICES AND MATERIALS SHALL BE IN PLACE PRIOR TO
BEGINNING EARTHWORK OPERATIONS AND SHALL BE MAINTAINED UNTIL THE NEW SLOPES ARE
STABILIZED WITH SODDING AND/OR SLOPE PROTECTION.
10. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE ADEQUATE GROWTH OF GRASS FOR ALL AREAS RESTORED WITH SOD. CONTRACTOR SHALL WATER AND MAINTAIN THE SOD AS NECESSARY TO ENSURE CURRENT AND FUTURE GROWTH. FINAL PAYMENTS SHALL NOT BE MADE UNTIL FULL GRASS IS ACHIEVED AS DETERMINED BY THE ENGINEER. WATERING AND MAINTENANCE OF THE SOD SHALL BE
CONSIDERED NECESSARY AND INCIDENTAL TO THE WORK OF THIS CONTRACT.
PAVING NOTES:
1. ALL AREAS TO BE PAVED SHALL BE PREPARED IN ACCORDANCE WITH ITEM P-101, COLD MILLING
EXISTING PAVEMENT - FULL DEPTH.
2. EMULSIFIED ASPHALT TACK COAT, ITEM P-603, SHALL BE APPLIED PRIOR TO PLACING EACH LIFT OF
PAVEMENT, UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
3. IN CASES OTHER THAN CENTERLINE JOINTS, LONGITUDINAL PAVING JOINTS IN ONE LAYER SHALL BE OFFSET FROM THAT IN THE PREVIOUS LAYER BY AT LEAST ONE FOOT. THE JOINT AT THE CENTERLINE
OF THE PAVEMENT SHALL LINE UP WITH PREVIOUS LAYER CENTERLINE JOINTS.
4. PAVING LANES IN WHICH THE SURFACE TEMPERATURE HAS COOLED TO LESS THAN 160°F (71° C) SHALL
BE CUT BACK WITH A CUTTING WHEEL OR PAVEMENT SAW A MAXIMUM OF 3 INCHES (75 MM) TO EXPOSE A CLEAN, SOUND, UNIFORM VERTICAL SURFACE FOR THE FULL DEPTH OF THE COURSE. ALL CUTBACK
MATERIAL AND ANY LAITANCE PRODUCED FROM CUTTING JOINTS SHALL BE REMOVED FROM THE
PROJECT.
5. WHEN CUTTING CORES DURING ASPHALT QC TESTING, THE CONTRACTOR SHALL MAKE ANY AND ALL NECESSARY EFFORTS TO REMOVE SAWCUT SLURRY DURING CORE DRILLING, INCLUDING BUT NOT LIMITED TO UTILIZATION OF A SHOP VAC TO REMOVE SLURRY FROM THE PAVEMENT SURFACE. IF SLURRY REMAINS AFTER CUTTING OPERATIONS, THE CONTRACTOR SHALL RINSE/WASH THE ASPHALT SURFACE. NO ADDITIONAL COMPENSATION SHALL BE MADE FOR SLURRY REMOVAL OR CLEANUP. IT SHALL BE CONSIDERED A NECESSARY AND INCIDENTAL PORTION OF THE QC TESTING PROCEDURE..
STORMWATER SYSTEM NOTES:
1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY INVERTS AND LOCATIONS OF THE EXISTING STORM SEWER SYSTEM PRIOR TO SUBMITTAL OF SHOP DRAWINGS AND CONSTRUCTION AND
NOTIFY THE ENGINEER IF ANY DISCREPANCY IN INVERTS AND LOCATIONS EXIST.
2. THE CONTRACTOR SHALL PROVIDE SHOP DRAWINGS, PRODUCT INFORMATION/CUT SHEETS, AND/OR CERTIFICATIONS FOR ALL STORM WATER STRUCTURES, STORM SEWER PIPES, AND CONCRETE DESIGN
MIX.
3. THE CONTRACTOR SHALL MAKE ALL NECESSARY PROVISIONS TO MAINTAIN EXISTING STORM SEWER
SYSTEM IN SERVICE.
4. SURFACE DRAINAGE SHALL BE DIVERTED FROM EXCAVATIONS, AND STOCKPILE AREAS SUCH THAT PROPER SITE CONDITIONS ARE MAINTAINED AND EROSION DUE TO RAIN RUN-OFF OR SEEPAGE IS
PREVENTED OR MINIMIZED.
UTILITY SYSTEM NOTES:
1. CONTRACTOR SHALL NOTIFY ALL PUBLIC AND PRIVATE UTILITY OWNERS AND FLORIDA'S "SUNSHINE ONE-CALL" SYSTEM 72-HRS PRIOR TO STARTING CONSTRUCTION. COST OF REPLACEMENT AND REPAIR
OF EXISTING UTILITIES DAMAGED AS A RESULT OF THE CONTRACTOR'S OPERATION SHALL BE
CONTRACTOR'S RESPONSIBILITY.
2. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR MAKING ALL NECESSARY ARRANGEMENTS FOR PERFORMING WORK INVOLVED IN CONNECTION WITH THE DISCONTINUANCE OR INTERRUPTION OF ALL
UTILITIES UNDER THE JURISDICTION OF THE UTILITY COMPANIES.
3. EXISTING OUT-OF-SERVICE BURIED UTILITIES ENCOUNTERED WITHIN THE PROPOSED PROJECT SHALL
BE REMOVED WHEN LOCATED WITHIN THE EXCAVATED AREA.
4. CONFLICTS BETWEEN UNDERGROUND UTILITIES, I.E. WATER, ELECTRICAL, COMMUNICATIONS, AND STORM OR SANITARY SEWERS SHALL BE RESOLVED BY ADJUSTING THE UNDERGROUND UTILITIES AS
APPROVED BY THE ENGINEER, AND IS INCLUSIVE IN CONTRACTORS COST.
5. CONTRACTOR SHALL MAKE EXPLORATORY EXCAVATIONS AT ALL INTERSECTIONS OF PROPOSED WORK WITH EXISTING UTILITIES. THE EXPLORATORY EXCAVATIONS SHALL BE MADE A MINIMUM OF 72-HRS IN ADVANCE OF THE PROPOSED WORK, AND PRIOR TO SHOP DRAWINGS SUBMITTALS, WHEN APPLICABLE.
THE CONTRACTOR SHALL IMMEDIATELY INFORM THE ENGINEER IF THERE IS A CONFLICT. INFORMATION TO BE FURNISHED BY THE CONTRACTOR SHALL INCLUDE: LOCATION, ELEVATION, UTILITY TYPE, MATERIAL AND SIZE.
6. UTILITY APPURTENANCES SHALL MEET THE FOLLOWING REQUIREMENTS: A) BE AESTHETICALLY ACCEPTABLE. B) IN COMPLIANCE WITH INDUSTRY AND MANUFACTURER'S STANDARDS. C) PLACED IN AREA WITH THE MINIMUM INTERFERENCE TO THE OPERATION AND MAINTENANCE OF THE SITE. D) NOT
IN CONFLICT WITH OTHER FACILITIES.
7. CONTRACTOR SHALL PROVIDE FOR THE TEMPORARY SUPPORT AND PROTECTION OF EXISTING
UTILITIES WITHIN THE WORK ZONE. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE ADEQUACY
OF THESE METHODS I.E. ALL SHEETING, SHORING, AND BRACING SYSTEMS.
8. THE CONTRACTOR SHALL PROVIDE APPLICABLE TEST RESULTS FOR THE PURPOSE OF CERTIFICATIONS
REQUIRED BY THE FDEP OR OTHER GOVERNING AGENCY HAVING JURISDICTION. TESTING AND
CERTIFICATION SHALL INCLUDE BUT ARE NOT LIMITED TO: WATER LINE, COMMUNICATION LINE, POWER/ELECTRICAL LINE, SANITARY SEWERS TRENCH BACKFILL AND COMPACTION, PAVING
MATERIALS.
ELECTRICAL NOTES:
1. ALL ELECTRICAL WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE AND NATIONAL ELECTRICAL
CODES.
2. THE ELECTRICAL CHARACTERISTICS OF PROPOSED EQUIPMENT SHALL BE VERIFIED TO BE COMPATIBLE
WITH EXISTING EQUIPMENT MANUFACTURER PRIOR TO INSTALLATION.
3. ABANDONED CABLES MAY EXIST IN THE VICINITY OF THE PROPOSED WORK. IF ENCOUNTERED, CONTRACTOR SHALL VERIFY THAT THEY ARE ABANDONED PRIOR TO REMOVAL. IF THEY ARE NOT
ABANDONED, CABLES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE IF DAMAGED.
4. ITEMS OF SPECIFIC MANUFACTURE SHALL BE INSTALLED IN STRICT ACCORDANCE WITH
MANUFACTURER'S PRINTED INSTRUCTIONS AND OR MANUFACTURER'S REPRESENTATIVE DIRECTIONS.
5. ALL GROUND CONNECTIONS SHALL BE MADE USING EXOTHERMIC CONNECTIONS.
6. ALL CABLE CONNECTIONS SHALL BE MADE AT LIGHT UNITS OR AT ENDS OF DUCT BANKS UNLESS
DIRECTED OTHERWISE BY THE ENGINEER.
7. ALL ELECTRICAL EQUIPMENT REMOVED WHICH IS DESIRED BY THE OWNER TO BE SALVAGED SHALL BE TURNED OVER TO THE OWNER. THE EQUIPMENT SHALL BE STOCKPILED AT A LOCATION DESIGNATED BY THE OWNER IN PROPER WORKING CONDITION. ALL OTHER MATERIALS SHALL BE SPOILED OFF AIRPORT
PROPERTY AT A PROPER DISPOSAL SITE AT THE CONTRACTOR'S EXPENSE.
8. TEMPORARY CABLE SHALL BE INSTALLED IN CONDUIT AND ANCHORED AT FREQUENT INTERVALS (EVERY 10FT MINIMUM) TO PREVENT MOVING. IF TEMPORARY CABLES MUST BE INSTALLED IN AREAS SUBJECT TO VEHICULAR TRAFFIC, CABLES SHALL BE INSTALLED IN RIGID GALVANIZED STEEL CONDUIT ANCHORED AT FREQUENT INTERVALS (EVERY 10FT MINIMUM) TO PREVENT MOVING. ALL TEMPORARY CABLES SHALL BE CLEARLY LABELED AND MARKED SO AS TO BE VISIBLE FROM A DISTANCE. SOME JUMPERS MAY BE OF SIGNIFICANT LENGTH, SEE PHASING DRAWINGS FOR ADDITIONAL INFORMATION.
C4 SHEET INDEX
B4 GOPHER TORTOISE RESPONSIBILITES
DJN
PV
PV, DJN
JUNE 2025
AS SHOWN
SEAL
SHEET
AVCON PROJECT NUMBER
APPROVED:
DESIGNED:
DRAWN:
DATE:
SCALE:
N O
D
AT
E
R
EV
IS
IO
N S
D
ES
C R
IP
TI
O N
VE
TE
R
AN
S R
D H
AN
G
AR
IN
FR
AS
TR
U
C
TU
R E
LE
ES
BU
R
G
IN
TE
R
N
AT
IO
N
AL
A
IR
PO
R T
(K
LE
E) , 8
AI
R
PO
R
T
BL
VD
, L
EE
SB
U R
G , F
L
2024.236.02
DANIEL J. NICKOLS, JR., P.E.
Lic. No. 78634
6-
9-
IS
SU
ED
T O
B
ID
D R
AW
IN
G S
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
IS
SU
ED
T
O B
ID
D
R
AW
IN
G
S
1. THE CONTRACTOR SHALL COMPLETE A GOPHER TORTOISE SURVEY, PAID UNDER THE LUMP SUM, "GOPHER TORTOISE SURVEY/PROTECTION." SURVEY RESULTS SHALL BE PROVIDED TO THE ENGINEER ONCE COMPLETED. GOPHER TORTOISE SURVEY BOUNDARY SHALL EXTEND 15' PAST THE WORK AREA
LIMITS.
2. CONTRACTOR SHALL PROTECT ALL DISCOVERED BURROWS IN ACCORDANCE WITH THE FLORIDA FISH
AND WILDLIFE REQUIREMENTS.
3. CONTRACTOR SHALL BE REQUIRED TO OBTAIN THE NECESSARY GOPHER TORTOISE RELOCATION
PERMITS. THIS WORK WILL BE PAID UNDER THE ALLOWANCE, "GOPHER TORTOISE PERMIT."
4. ALL COSTS FOR DIGGING, RELOCATION OF GOPHER TORTOISES, BACKFILLING, AND PERMITS FOR THE RECIPIENT SITE SHALL BE PAID UNDER THE ALLOWANCE, "GOPHER TORTOISE BURROW EXCAVATION AND
RELOCATION."
5. THE CONTRACTOR SHALL TRACK TIME AND MATERIALS FOR THE EFFORT NECESSARY TO EXCAVATE ALL
IDENTIFIED BURROWS AND TO RELOCATE TORTOISES.
6. THE GOPHER TORTOISE SURVEY SHALL BE COMPLETED AS SOON AS POSSIBLE. EXCAVATIONS AND RELOCATIONS SHALL BE COMPLETED BEFORE WORK AREA A. GOPHER TORTOISE EXCAVATIONS AND RELOCATION WORK COMPLETED PRIOR TO THE CONTRACT BEGINNING SHALL NOT COUNT AGAINST
OVERALL CONTRACT TIME.
A4 ABBREVIATIONS
ABAN. - ABANDONED
APPROX. - APPROXIMATE
ASPH. - ASPHALT
BL - BASELINE
BLDG. - BUILDING
BM - BENCHMARK
CL - CENTERLINE
CCR - CONSTANT CURRENT REGULATOR
CIP - CAST IRON PIPE
CMP - CORRUGATED METAL PIPE
CONC. - CONCRETE
CSP - CORRUGATED STEEL PIPE
D - DIAMETER
E - EASTING
ELEV. - ELEVATION
FND. - FOUNDATION
HP - HIGH POINT
INV. - INVERT
JCP - JUNCTION CAN PLAZA
LT- LEFT
LP - LOW POINT
MAX. - MAXIMUM
MES - MITERED END SECTION
MIN. - MINIMUM
N - NORTHING
NA - NOT ACCEPTABLE
NFPA - NATIONAL FIRE PROTECTION ASSOCIATION
OFA - OBJECT FREE AREA
O.C - ON CENTER
PAV'T - PAVEMENT
PC - POINT OF CURVATURE
PCC - PORTLAND CEMENT CONCRETE PAVEMENT
PI - POINT OF INTERSECTION
PL - PROPERTY LINE
PVI - POINT OF VERTICAL INTERSECTION
PVC - POLYVINYL CHLORIDE PIPE
PVT - POINT OF TANGENCY (VERTICAL CURVE)
R - RADIUS
RCP - REINFORCED CONCRETE PIPE
RGS - RIGID GALVANIZED STEEL
ROFA - RUNWAY OBJECT FREE AREA
RSA - RUNWAY SAFETY AREA
ROW - RIGHT OF WAY
RPZ - RUNWAY PROTECTION ZONE
RT - RIGHT
RWY - RUNWAY
SHDR. - SHOULDER
SICPP - SMOOTH INTERIOR CORRUGATED
POLYETHYLENE PIPE
STA. - STATION
TLOFA - TAXILANE OBJECT FREE AREA
TOFA - TAXIWAY OBJECT FREE AREA
TSA - TAXIWAY SAFETY AREA
TWY - TAXIWAY
TYP. - TYPICAL
UG - UNDERGROUND
T H
E
I
N T
L
L
TLOFA
TLO
FA
TL
O
FA
TL
O
FA
TLOFA
TL
O
FA
TL
O
FA
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W W W
W
W
W
W
W
W
W
W W
W W W W W W W W W W W W W W W W W
W W
W W
W W
W W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
RW
RW
RW
RW
R W
R W
R W
R W
R
W RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW
RW
RW
RW
RW RW RW RW RW
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TOFA
R
SA
R
SA
R
SA
R
SA
R
SA
ROFA
ROFA
ROFA
R O
FA
R O
FA
R O
FA
R O
FA
R O
FA
R O
FA
R O
FA
R O
FA
R O
FA
R O
FA
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
E E
E
FO
E
W
W
W
W W
W
W W
W W
W W
W W
W W W W W
W W
W W
W W
W
W W
WW
W
W W
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW RW RW RW RW RW RW RW RW RW RW RW
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
UGE
UGE
UGE
UGE
UG
E
UGE
UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGEE
W
E
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W
W W W W W W W W W W W W W W W W W W W W W W W W W W W W
UG
E
UG
E
U G E
U G E
S
S
S
S
U G E
U G E
U G E
U G E
U G E
U G E
U G E
UGE
U G E
U
GE
U G E
U G E
U G E
U G E
UGE
E
W
UGE
U G E
U G E
U G E
U G E
U G E
U G E
S
E E
E
E
E
CO
CO
CO
CO
GC101
G
EN
ER
AL
P
LA
N A
N D
C O
N
ST
R U
C
TI
O N
S
AF
ET
Y
AN
D
PH
AS
IN
G
P
LA
N
1 2 3 4
1 2 3 4
A
B
C
A
B
C
A1 GENERAL PLAN AND CONSTRUCTION SAFETY AND PHASING PLAN A4 KEY PLAN
B4 CSPP NOTES AND SHEET LEGEND
DJN
PV
PV, DJN
JUNE 2025
AS SHOWN
SEAL
SHEET
AVCON PROJECT NUMBER
APPROVED:
DESIGNED:
DRAWN:
DATE:
SCALE:
N O
D
AT
E
R
EV
IS
IO
N S
D
ES
C R
IP
TI
O N
VE
TE
R
AN
S R
D H
AN
G
AR
IN
FR
AS
TR
U
C
TU
R E
LE
ES
BU
R
G
IN
TE
R
N
AT
IO
N
AL
A
IR
PO
R T
(K
LE
E) , 8
AI
R
PO
R
T
BL
VD
, L
EE
SB
U R
G , F
L
2024.236.02
DANIEL J. NICKOLS, JR., P.E.
Lic. No. 78634
6-
9-
IS
SU
ED
T O
B
ID
D R
AW
IN
G S
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
IS
SU
ED
T
O B
ID
D
R
AW
IN
G
S
NORTH
WORK AREA A
WORK AREA A SHALL CONSIST OF ALL PROJECT RELATED SCOPE WITHIN THE WORK AREA LIMITS INCLUDING, BUT NOT LIMITED TO CLEARING AND GRUBBING, EXCAVATION/GRADING, PAVING OPERATIONS, UTILITY WORK, MARKINGS, AND DRAINAGE IMPROVEMENTS.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE BEST WAY TO ACCESS THE CONTRACTOR'S STAGING, LAY-DOWN, STOCKPILE, AND PERSONAL VEHICLE PARKING AREA. WORK IN THIS AREA SHALL BE
LIMITED TO 180 CALENDAR DAYS.
WORK AREA B
WORK AREA B SHALL CONSIST OF ALL PROJECT RELATED SCOPE WITHIN THE WORK AREA LIMITS INCLUDING, BUT NOT LIMITED TO EXCAVATION/GRADING, MARKINGS, PAVING OPERATIONS, AND ELECTRICAL WORK.
WORK IN WORK AREA B SHALL BE CONCURRENT TO WORK WITHIN WORK AREA A.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE BEST WAY TO ACCESS THE CONTRACTOR'S STAGING, STORING, LAY-DOWN, STOCKPILE, AND PERSONAL VEHICLE PARKING AREA. WORK AREA B SHALL REQUIRE A PARTIAL TAXIWAY CLOSURE AND WILL BE LIMITED TO 30 CALENDAR DAYS. A PARTIAL TAXIWAY CLOSURE SHALL BE REQUIRED FOR THE DURATION OF WORK AREA B. LIMITS OF THE TAXIWAY CLOSURE SHALL BE FROM RUNWAY 4-22 RUNWAY SAFETY AREA TO THE EDGE OF PAVEMENT TAXILANE FOR FIRE
STATION ENTRANCE.
THE START DATE FOR WORK AREA B SHALL BE COORDINATED WITH THE OWNER AND ENGINEER AT LEAST 72 HOURS IN ADVANCE. NOTAMS SHALL BE IN PLACE A MINIMUM OF 72 HOURS PRIOR TO THE PLANNED PARTIAL
TAXIWAY CLOSURE.
EXISTING PAVEMENT DISTURBED BY WORK IN WORK AREA B OUTSIDE OF THE LIMITS SHOWN SHALL BE
RESTORED TO ORIGINAL CONDITION
OR BETTER.
TEMPORARY WIRING SHALL BE REQUIRED TO MAINTAIN ALL AIRFIELD LIGHT SYSTEMS. THE CONTRACTOR SHALL PROVIDE TEMPORARY JUMPERS AS NECESSARY TO MAINTAIN AIRFIELD LIGHTING. ALL AIRFIELD SYSTEMS SHALL REMAIN IN OPERATING CONDITION FOR ALL PORTIONS OF THE AIRFIELD WHICH ARE OR COULD BE OPENED TO TRAFFIC AT THE END OF THE WORK PERIOD. OTHER LIGHTING SYSTEMS WITHIN THE WORK AREA, WHICH WILL BE TAKEN OUT OF SERVICE WHEN REQUIRED BY CONSTRUCTION SHALL BE
RESTORED AT THE COMPLETION OF THE PHASE.
WORK AREA C:
WORK AREA C SHALL CONSIST OF ALL PROJECT RELATED SCOPE WITHIN THE WORK AREA LIMITS INCLUDING, BUT NOT LIMITED TO EXCAVATION/GRADING, MARKINGS, PAVING OPERATIONS, AND UTILITY WORK. WORK IN
WORK AREA C SHALL BE CONCURRENT TO WORK WITHIN WORK AREAS A AND B.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE BEST WAY TO ACCESS THE CONTRACTOR'S STAGING, STORING, LAY-DOWN, STOCKPILE, AND PERSONAL VEHICLE PARKING AREA. WORK AREA C SHALL
BE LIMITED TO 30 CALENDAR DAYS.
EXISTING PAVEMENT DISTURBED BY WORK IN WORK AREA C OUTSIDE OF THE LIMITS SHOWN SHALL BE
RESTORED TO ORIGINAL CONDITION
OR BETTER.
FULL CLOSURES ON VETERANS ROAD SHALL NOT BE PERMITTED UNDER ANY CIRCUMSTANCES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ADHERE TO THE STANDARDS SET FORTH BY THE FDOT TEMPORARY TRAFFIC CONTROL (MAINTENANCE OF TRAFFIC) HANDBOOK, AUGUST 2016 EDITION AND TO FOLLOW THE GUIDELINES SET FORTH BY DESIGN STANDARD 603 "TWO-LANE, TWO-WAY WORK WITHIN THE TRAVEL WAY" SHEET 1 LOCATED IN THE 2018 FDOT DESIGN STANDARDS FOR TRAFFIC CONTROL THROUGH WORK ZONES TO MAINTAIN CONSTANT WORK IN WORK AREA C. MEASUREMENT AND PAYMENT SHALL BE INCLUDED IN THE
CONTRACT UNIT PRICE FOR ITEM GP-80, CONSTRUCTION SAFETY AND PHASING.
NORTH
CRACKER
BARREL
FIRE
STATION
VETERANS ROAD
U.S. HIGHWAY 441
U.S. HIGHWAY 441
C O
LLEG
E D
R
COLLEGE DR
VETERANS ROAD
C O
LLEG
E D
R
TA
XI
W
AY
K
TA
XI
W
AY
K
EXISTING TREELINE,
(TYP.)
AIRPORT PROPERTY
LINE, (TYP.)
EXISTING TREE,
(TYP.)
EXISTING
FENCELINE, (TYP.)
EXISTING AIRFIELD
PAVEMENT
MARKING, (TYP.)
PROJECT
WORK AREA
LIMITS, (TYP.)
PARKING LOT
PROPOSED
FENCELINE,
(TYP.)
NEW TWO LANE, 24'
WIDE ROADWAY
NEW VEHICLE
TURNAROUND
WORK AREA A
CONTRACTOR STAGING, LAY-DOWN,
STOCKPILE, AND PERSONAL VEHICLE
PARKING AREA. AREA MAY BE INCREASED
ONCE CLEARING AND GRUBBING IS
COMPLETED BUT SHALL REMAIN OUTSIDE
OF AIRPORT SECURITY FENCELINE.
NEW ROADWAY
ASPHALT PAVEMENT
SECTION
NEW TAXILANE
ASPHALT PAVEMENT
SECTION
LOW-PROFILE BARRICADES
INTENDED FOR WORK AREA B,
SEE DETAIL C4/GC501
CONTRACTOR ACCESS ROUTE,
(TYP.)
NEW TAXIWAY
EDGE LIGHTS,
(TYP.)
NEW UTILITY INFRASTRUCTURE,
(TYP.), SEE CU SERIES FOR
MORE INFORMATION
EXISTING UTILITIES TO BE
PROTECTED IN PLACE, (TYP.)
BLAST WALL
STABILIZED CONSTRUCTION
ENTRANCE, ITEM GP-80, SEE
DETAIL A3/GC501
NEW TAXILANE
OBJECT FREE
AREA, (TYP.)
WORK AREA B
WORK AREA C
POTENTIAL LAND LEASE
BOUNDARIES
EXISTING UTILITIES TO BE
PROTECTED IN PLACE, (TYP.)
PARKING LOT
PR
O
PO
SE
D T
AX
IL
AN
E
PR
O
PO
SE
D R
O
AD
W
AY
NEW AIRFIELD
ELECTRICAL
CONDUIT, (TYP.)
EXISTING AIRFIELD
ELECTRICAL
CONDUIT, (TYP.)
EXISTING
CANTILEVER GATE
NEW UTILITY INFRASTRUCTURE,
(TYP.), SEE CU SERIES FOR
MORE INFORMATION
NEW DRAINAGE PIPE,
STORM DRAIN INLETS,
AND CROSS DRAIN
MITERED END
SECTIONS, (TYP.)
PROPOSED
TAXILANE 2
T H
E
I
N T
L
L
GC501
O
N
ST
R U
C
TI
O N
S
AF
ET
Y
AN
D
P H
AS
IN
G P
LA
N
D
ET
AI
LS
1 2 3 4
1 2 3 4
A
B
C
A
B
C
A3 STABILIZED CONSTRUCTION ACCESS ENTRANCE AND TEMPORARY DRAINAGE DETAILA1 GENERAL SAFETY AND INSPECTION NOTES
DJN
PV
PV, DJN
JUNE 2025
AS SHOWN
SEAL
SHEET
AVCON PROJECT NUMBER
APPROVED:
DESIGNED:
DRAWN:
DATE:
SCALE:
N O
D
AT
E
R
EV
IS
IO
N S
D
ES
C R
IP
TI
O N
VE
TE
R
AN
S R
D H
AN
G
AR
IN
FR
AS
TR
U
C
TU
R E
LE
ES
BU
R
G
IN
TE
R
N
AT
IO
N
AL
A
IR
PO
R T
(K
LE
E) , 8
AI
R
PO
R
T
BL
VD
, L
EE
SB
U R
G , F
L
2024.236.02
DANIEL J. NICKOLS, JR., P.E.
Lic. No. 78634
6-
9-
IS
SU
ED
T O
B
ID
D R
AW
IN
G S
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
IS
SU
ED
T
O B
ID
D
R
AW
IN
G
S
C4 HDPE LOW PROFILE BARRICADE DETAIL
GENERAL NOTES
1. ALL VEHICLES IN THE CONSTRUCTION AREA MUST BE EQUIPPED WITH AN ORANGE AND WHITE
CHECKERED FLAG ON THE HIGHEST POINT OR A FLASHING/ROTATING AMBER CONSTRUCTION
BEACON.
2. THE CONTRACTOR SHALL CONDUCT ALL WORK IN ACCORDANCE WITH FAA ADVISORY CIRCULAR
AC 150/5370-2, LATEST EDITION.
3. THE CONTRACTOR SHALL CONTACT THE ENGINEER FOR CONTACT INFORMATION OF KEY
AIRPORT PERSONNEL.
4. ACCESS TO THIS PROJECT REQUIRES USE OF EXISTING CITY AND AIRPORT ROADS. IT SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL ACCESS SURFACES REMAIN
CLEAN AND CLEAR OF DIRT AND DEBRIS AT ALL TIMES.
5. ADDITIONALLY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY AN ALL DAMAGE
INFLICTED UPON THE ACCESS ROUTES OVER THE DURATION OF THE PROJECT. THE
ENGINEER/OWNER SHALL DOCUMENT THE EXISTING CONDITION AND POST-CONDITION OF ALL
ACCESS ROUTES. ANY MEASURABLE DAMAGE SHALL BE REPAIRED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE OWNER
6. THE BARRICADES INDICATED ON THE PLAN REPRESENT THE TRAFFIC CONTROL REQUIRED
DURING CONSTRUCTION. IN THE EVENT THAT MORE TRAFFIC CONTROL IS REQUIRED DURING
CONSTRUCTION, IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE NUMBER AND
LOCATION OF BARRICADES REQUIRED TO KEEP THE ACTIVE WORK AREA PROTECTED.
7. THE CONTRACTOR SHALL BE REQUIRED TO PREPARE A MOT PLAN FOR ROAD CLOSURES AND TO
SUBMIT FOR MOT/ROW PERMITS AS NEEDED FOR PARTIAL ROAD CLOSURES. ALL COSTS
ASSOCIATED WITH MOT PLAN PREP AND MOT/ROW PERMITTING SHALL BE INCLUDED IN THE
CONTRACT UNIT PRICE FOR ITEM GP-80, CONSTRUCTION SAFETY AND PHASING PLAN.
8. THE CONTRACTOR IS REQUIRED TO SUBMIT A SAFETY PLAN COMPLIANCE CERTIFICATION
(SPCC). THIS DOCUMENT CERTIFIES THAT THE CONTRACTOR HAS READ AND UNDERSTANDS THE
SAFETY AND PHASING REQUIREMENTS OF THE PROJECT. ADDITIONALLY THE CONTRACTOR
AGREES TO FOLLOW THE RULES AND REQUIREMENTS OF THIS SAFETY AND PHASING PLAN, THE
CONTRACT DOCUMENTS AND THE REQUIREMENTS OF FAA ADVISORY CIRCULAR 150/5370-2,
LATEST EDITION. A NOTICE TO PROCEED (NTP) WILL NOT BE ISSUED UNTIL THE SPCC IS
SUBMITTED.
9. NO BADGING IS REQUIRED FOR THIS PROJECT/AIRPORT, HOWEVER THE CONTRACTOR SHALL BE
REQUIRED TO COORDINATE WITH THE OWNER FOR ACCESS THROUGH THE AUTOMATED GATES.
INSPECTION REQUIREMENTS
1. AT THE END OF EACH DAY, THE CONSTRUCTION AREA SHALL BE INSPECTED FOR ANY FOREIGN
OBJECT DEBRIS (FOD) ON AIRFIELD OR NON AIRFIELD PAVEMENTS AND FOR ANY EXCESS
CONSTRUCTION MATERIALS LEFT IN THE TAXIWAY OR TAXILANE OBJECT FREE AREA. NO
MATERIAL STOCKPILE OR EQUIPMENT CAN BE STAGED OR LEFT IN ANY OBJECT FREE AREA.
2. AT THE BEGINNING OF EACH CONSTRUCTION DAY, THE CONTRACTOR SHALL VERIFY ALL
BARRICADES ARE PLACED CORRECTLY AND THAT ALL REFLECTORS OR SOLAR POWERED
WARNING LIGHTS ARE FULLY OPERATIONAL.
SAFETY REQUIREMENTS
1. THE WORK OF THIS PROJECT REQUIRES WORKING IN THE VICINITY OF AND ADJACENT TO AN EXISTING TAXIWAY. THE CONTRACTOR SHALL YIELD TO AIRCRAFT TRAFFIC AT ALL TIMES, AND
SHALL MAKE ALL NECESSARY ARRANGEMENTS TO PREVENT IMPACTS TO EXISTING TENANTS
WITHOUT PROPER/EXTENDED NOTICE.
2. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REMOVE ANY CONSTRUCTION EQUIPMENT FROM WITHIN THE TOFA DURING INTRUSIVE CONSTRUCTION ACTIVITIES WHENEVER AIRCRAFT IS
PRESENT.
3. DURING PERFORMANCE OF THIS CONTRACT, THE AIRPORT TAXIWAY SHALL REMAIN IN USE BY
AIRCRAFT TO THE MAXIMUM EXTENT POSSIBLE. AIRCRAFT USE OF AREAS NEAR THE
CONTRACTOR'S WORK WILL BE CONTROLLED TO MINIMIZE DISTURBANCE TO THE
CONTRACTOR'S OPERATION. THE CONTRACTOR SHALL NOT ALLOW EMPLOYEES,
SUBCONTRACTORS, SUPPLIERS OR ANY OTHER UNAUTHORIZED PERSON TO ENTER OR REMAIN
IN ANY AIRPORT AREA WHICH WOULD BE HAZARDOUS TO PERSONS OR TO AIRCRAFT
OPERATIONS.
4. ALL WORK WHICH IS TOO CLOSE TO AN ACTIVE TAXIWAY TO BE PERFORMED UNDER
OPERATIONAL CONDITIONS SHALL BE PERFORMED WHEN THE TAXIWAY IS NOT IN USE. SUCH
WORK SHALL NOT BE ACCOMPLISHED WITHOUT PRIOR PERMISSION FROM THE OWNER OR
ENGINEER.
5. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO ENSURE THE SAFETY OF
OPERATING AIRCRAFT AS WELL AS THAT OF HIS OWN EQUIPMENT AND PERSONNEL. THE
CONTRACTOR SHALL OBEY ALL INSTRUCTIONS AS TO ROUTES TO BE TAKEN BY EQUIPMENT
TRAVELING WITHIN THE AIRPORT AREA. THE CONTRACTOR SHALL MAKE HIS OWN ESTIMATE OF
ALL DIFFICULTIES TO BE ENCOUNTERED.
6. THE CONTRACTOR OR HIS PROJECT REPRESENTATIVE SHALL NOTIFY THE AIRPORT
REPRESENTATIVE PRIOR TO STARTING WORK EACH DAY AND WHEN WORK HAS BEEN
COMPLETED FOR THE DAY. IT SHALL ALSO BE THE CONTRACTOR OR HIS REPRESENTATIVE'S
RESPONSIBILITY TO MAKE A THOROUGH CHECK OF THE WORK AREAS, TO SEE THAT ALL
EQUIPMENT HAS BEEN RETURNED AND PARKED IN THE PARKING AREAS DESIGNATED BY THE
ENGINEER.
7. EQUIPMENT NOT ACTUALLY IN OPERATION SHALL BE KEPT CLEAR OF ACTIVE OPERATIONAL
AREAS; PERSONNEL SHALL NOT ENTER OR OPERATE EQUIPMENT WITHIN ACTIVE OPERATIONAL
AREAS OF THE AIRPORT WITHOUT SPECIFIC PERMISSION FROM THE OFFICE OF THE AIRPORT
REPRESENTATIVE.
8. WHEN ANY VEHICLE OTHER THAN THOSE APPROVED FOR USE IN THE AIRCRAFT MOVEMENT
AREA IS REQUIRED TO TRAVEL OVER ANY PORTION OF THAT AREA, IT SHALL BE ESCORTED BY A VEHICLE PROPERLY IDENTIFIED TO OPERATE IN THE AREA AND BE PROVIDED WITH A FLAG ON A
STAFF ATTACHED TO THE VEHICLE. A FLAG OR ESCORT VEHICLE IS NOT REQUIRED FOR
VEHICLES WHICH HAVE BEEN PAINTED, MARKED AND LIGHTED FOR ROUTING USE ON AIRCRAFT
MOVEMENT AREAS. ANY VEHICLE OPERATING ON THE MOVEMENT AREA DURING THE HOURS OF
DARKNESS SHALL BE EQUIPPED WITH A FLASHING LIGHT IN ACCORDANCE WITH NOTE 9 BELOW.
9. ALL CONSTRUCTION EQUIPMENT AND VEHICLES WILL BE REQUIRED TO HAVE A FLAG ON STAFF
OR A YELLOW/AMBER LENS ROTATING/FLASHING LIGHT MOUNTED ON THE ROOF OR SO
ATTACHED TO THE VEHICLE THAT THE FLAG OR LIGHT WILL BE READILY VISIBLE. THE FLAG
SHOULD BE NO LESS THAN 3 FEET SQUARE CONSISTING OF A CHECKERED PATTERN OF
INTERNATIONAL ORANGE AND WHITE SQUARES OF NOT LESS THAN ONE FOOT ON EACH SIDE.
THE CONTRACTOR SHALL HAVE A SUFFICIENT NUMBER OF FLAGS AND STAFFS TO PROVIDE FOR
ALL VEHICLE AND EQUIPMENT NEEDS.
10. EMPLOYEE PARKING AND ACCESS TO THE JOB SITE BY ALL CONTRACTOR PERSONNEL AND
CONSTRUCTION VEHICLES AND EQUIPMENT SHALL BE AS SHOWN ON SHEET GC101.
11. UNAUTHORIZED ENTRANCE OF CONTRACTOR EMPLOYEES AND EQUIPMENT INTO AN AIR
OPERATIONS AREA WILL BE CAUSE FOR IMMEDIATE ACTION AS PROVIDED FOR IN GENERAL
PROVISIONS SUBSECTION TITLED CHARACTER OF WORKERS METHODS AND EQUIPMENT OF
SECTION 80.
12. OPEN FLAME WELDING OR TORCH CUTTING OPERATIONS ARE PROHIBITED UNLESS ADEQUATE
FIRE AND SAFETY PRECAUTIONS ARE PROVIDED AND HAVE BEEN APPROVED BY THE ENGINEER.
13. OPEN TRENCHES, EXCAVATIONS AND STOCKPILED MATERIAL AT THE CONSTRUCTION SITE
SHALL BE PROMINENTLY MARKED WITH ORANGE FLAGS AND LIGHTED BY LIGHT UNITS OR LOW
PROFILE LIGHTED BARRICADES DURING HOURS OF RESTRICTED VISIBILITY AND/OR DARKNESS.
14. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT MOVEMENT
RESULTING FROM MAXIMUM ANTICIPATED AIRCRAFT BLAST AND WIND CONDITIONS.
15. WASTE AND LOOSE MATERIAL CAPABLE OF CAUSING DAMAGE TO AIRCRAFT LANDING GEARS, PROPELLERS OR BEING INGESTED IN JET ENGINES, SHALL NOT BE PLACED ON ACTIVE AIRCRAFT
MOVEMENT AREAS. MATERIALS TRACKED ON THESE AREAS SHALL BE REMOVED CONTINUOUSLY
DURING THE PROJECT.
CONDITIONS REQUIRING PARTIAL TAXIWAY CLOSURE
1. CLOSING OF THE EXISTING TAXIWAY WILL BE NECESSARY WHEN ONE OR MORE OF THE
FOLLOWING CONDITIONS EXIST DURING CONSTRUCTION ACTIVITIES.
1.1. EXCAVATIONS REQUIRED WITHIN THE TAXIWAY OBJECT FREE AREA. THE TAXIWAY OBJECT
FREE AREA IS DESCRIBED AS AN AREA CENTERED ON THE TAXIWAY AT A WIDTH OF 124'.
1.2. MOUNDS OR STOCKPILES OF EARTH, CONSTRUCTION MATERIAL, TEMPORARY STRUCTURES,
AND OTHER OBSTACLES WITHIN THE TAXIWAY OBJECT FREE AREA.
1.3. OPEN TRENCHES OR EXCAVATIONS EXCEEDING 3 INCHES IN DEPTH AND 3 INCHES IN WIDTH
WITHIN THE TAXIWAY OBJECT FREE AREA.
1.4. HEAVY EQUIPMENT, STATIONARY OR MOBILE, OPERATING OR IDLE WITHIN THE TAXIWAY
OBJECT FREE AREA.
1.5. TALL, RELATIVELY LOW VISIBILITY UNITS SUCH AS CRANES, DRILLS OR THE LIKE IN CRITICAL
AREAS SUCH AS SAFETY AREAS AND OBJECT FREE AREAS.
1.6. IMPROPER OR MALFUNCTIONING LIGHTS OR UNLIGHTED HAZARDS.
1.7. HOLES, OBSTACLES, LOOSE PAVEMENT, TRASH AND OTHER DEBRIS IN THE TAXILANE
OBJECT FREE AREA.
1.8. BIRD ATTRACTANTS SUCH AS TRASH, GRASS SEEDING OR PONDED WATER WITHIN THE
TAXILANE OBJECT FREE AREA.
1.9. INADEQUATE OR IMPROPER METHODS OF MARKING TEMPORARILY CLOSED AIRPORT
OPERATIONS AREAS INCLUDING IMPROPER AND UNSECURED BARRICADES.
1.10. CONSTRUCTION ACTIVITIES WITHIN TAXIWAY SAFETY AREAS.
2. CLOSURE OF AIRPORT TAXIWAY AND CONSTRUCTION ZONES SHALL BE EFFECTED BY ISSUANCE OF APPLICABLE NOTAM(S). NOTAM(S) SHALL BE INITIATED BY THE AIRPORT REPRESENTATIVE OR
OTHER AUTHORIZED REPRESENTATIVE OF THE OWNER. ADDITIONAL NOTICE SHALL BE
PROVIDED TO THE DIRECTLY AFFECTED TENANTS IN THE ADJACENT HANGAR BUILDINGS.
CONTRACTOR DAILY CLEAN UP AND INSPECTION
1. AFTER ALL WORK HAS BEEN COMPLETED FOR THE DAY AND PRIOR TO DEPARTING THE PROJECT
AREA, THE CONTRACTOR OR HIS SUPERINTENDENT SHALL SEE THAT:
1.1. ALL TOOLS, EQUIPMENT AND CONSTRUCTION MATERIALS HAVE BEEN REMOVED AND
PROPERLY STORED AT THE CONSTRUCTION SITE.
1.2. PLACE BARRICADES, RAILINGS, PLACE COVERS OVER HOLES AND TRENCHES, ROPE OFF
AREAS AND TAKE OTHER PRECAUTIONS NECESSARY TO MINIMIZE THE POSSIBILITY OF
INJURY TO ANY PERSON(S) WHO MAY FOR ANY REASON ENTER THE PROJECT WORK AREA.
1.3. OPEN TRENCHES, EXCAVATIONS AND STOCKPILED MATERIAL AT THE CONSTRUCTION SITE
SHALL BE PROMINENTLY MARKED WITH LIGHTS DURING HOURS OF DARKNESS.
COMMUNICATIONS
1. VHF/UHF RADIOS SHALL BE SUPPLIED BY THE CONTRACTOR ON AN AS NEEDED BASIS.
2. THE CONTRACTOR SHALL PROVIDE FOR CONTINUOUS MONITORING OF THE RADIO WHEN HE HAS
PERSONNEL ON THE AIRPORT PROPERTY OR IN AN AIR OPERATIONS AREA.
3. THE INDIVIDUAL(S) ASSIGNED TO MONITOR THE RADIOS SHALL BE RESPONSIVE TO ALL RADIO
COMMUNICATIONS TRANSMITTED FOR THE CONTRACTOR, BY THE AIRPORT REPRESENTATIVE.
LEESBURG GROUND COMMUNICATION FREQUENCY IS 121.725.
CONTRACTOR QUALITY CONTROL TESTING REQUIREMENTS:
1. THE CONTRACTOR IS RESPONSIBLE TO HAVE A QUALIFIED QC TESTING FIRM TO CONDUCT THE
REQUIRED TESTING NOTED HEREIN, AS WELL AS ANY ADDITIONAL REQUIREMENTS PER THE
CONTRACT SPECIFICATIONS.
1.1. P-152 UNCLASSIFIED EXCAVATION:
1.1.1. DENSITY TESTING IS REQUIRED FOR EVERY 3,000 SY OF COMPACTED EMBANKMENTS,
OR 2 TESTS PER 1,000 SY FOR SUBGRADE, OR AS OTHERWISE DETERMINED BY THE
RPR/ENGINEER.
1.1.2. IN-FIELD DENSITY SHALL MEET AT LEAST 100% OF THE MAXIMUM DRY DENSITY
(MAXIMUM DRY DENSITY AT OPTIMUM MOISTURE CONTENT) OF THE LABORATORY
SPECIMENS COMPACTED AND TESTED PER ASTM D698.
1.1.3. THE IN-FIELD OPTIMUM MOISTURE CONTENT SHALL BE WITHIN +/- 2% OF THE
LABORATORY OPTIMUM MOISTURE.
1.1.4. IF THE SPECIFIED DENSITY IS NOT MET THE ENTIRE LOT SHALL BE
REWORKED/RE-COMPACTED AND ADDITIONAL RANDOM TESTS MADE UNTIL THE
SPECIFIED DENSITY IS REACHED.
1.2. P-211 LIMEROCK:
1.1.1. DENSITY TESTING IS REQUIRED FOR THE SAMPLING METHOD DETERMINED BY THE
ENGINEER OR RPR. DENSITY TESTS SHALL BE PERFORMED IN THE PRESENCE OF THE
RPR AND PROVIDE TEST RESULTS UPON COMPLETION FOR ACCEPTANCE. TWO TESTS
SHALL BE CONDUCTED PER 1000 SY BUT THERE SHALL BE NO LESS THAN TWO TESTS
UNDER ANY CIRCUMSTANCES PER LIFT.
1.1.1.1. FIELD DENSITY SHALL BE ACCEPTED IS IT MEETS AT LEAST 100% OF THE MAXIMUM
DENSITY (MAXIMUM DRY DENSITY AT OPTIMUM MOISTURE CONTENT) OF THE
LABORATORY SPECIMENS COMPACTED AND TESTED PER ASTM D698.
1.1.1.2. IN-FIELD DENSITY TESTS SHALL BE DETERMINED PER ASTM D6938 USING
PROCEDURE A, AND ASTM D6938 SHALL BE USED TO DETERMINE THE MOISTURE
CONTENT OF THE MATERIAL.
1.1.1.3. IF THE DENSITY FAILS, THE AREA SHALL BE REWORKED AND/OR RECOMPACTED,
AND RETESTED UNTIL THE SPECIFIED DENSITY IS REACHED.
1.1.2. GRADE CHECKS ARE REQUIRED FOR FINISHED LIMEROCK. THE THICKNESS OF THE BASE
COURSE SHALL BE WITHIN +0" AND -1/2" OF THE FINISHED BASE COURSE GRADE. WHERE
THE THICKNESS IS DEFICIENT BY MORE THAN 12" DEPTH, THE CONTRACTOR SHALL
CORRECT THE AREAS AT NO ADDITIONAL COST, SCARIFY THE AREA, ADD IN NEW
MATERIAL OF PROPER GRADATION, AND BLEND/RECOMPACT THE MATERIAL TO GRADE.
1.2. P-401 ASPHALT SURFACE COURSE:
1.2.1. DURING PAVING OPERATIONS, THE CONTRACTOR SHALL HAVE A QUALIFIED QC TEAM ON
SITE FOR THE DURATION OF THE DAY.
1.2.2. MINIMUM QC REQUIREMENTS INCLUDE:
1.2.2.1. ASPHALT TEMPERATURE CHECKS AS TRUCKS ARRIVE ON SITE.
1.2.2.2. A MINIMUM OF TWO TESTS SHALL BE PERFORMED PER DAY FOR DETERMINATION
OF ASPHALT CONTENT.
1.2.2.3. IN PLACE DENSITY CHECKS DURING ROLLING/COMPACTION EFFORTS TO ENSURE
ACCEPTANCE OF FINAL TEST RESULTS.
1.2.2.4. KEEP A RECORD OF PAVING LANES, PAVING DIRECTION, IN PLACE TONNAGE, WASTE
TONNAGE, AND REJECTED TONNAGE DUE TO FAILED TESTING. THIS RECORD SHALL
BE TURNED INTO THE RPR/ENGINEER BEFORE THE START OF THE NEXT PAVING
OPERATION.
1.2.2.5. CUT MAT AND JOINT CORES AS DIRECTED BY THE RPR/ENGINEER. CORES SHALL BE
CUT, MEASURED, LABELED, AND STORED IN THE PRESENCE OF THE RPR. CORES
SHALL BE PATCHED PRIOR TO THE END OF DAY, AND ALL SLURRY CLEANED FROM
THE AREA TO PREVENT STAINS ON THE FINISHED ASPHALT.
2. THE ENGINEER RETAINS THE RIGHT TO PERFORM ANY QA TESTING IF DEEMED NECESSARY,
REGARDLESS OF WHETHER QA IS REQUIRED PER THE SPECIFICATIONS.
3. THE COST OF ALL FAILED QA TESTING SHALL BE AT THE COST OF THE CONTRACTOR.
NOTES:
1. BARRICADES SHALL BE 6" X 8' AIRPORT LOW PROFILE BARRICADE (ORANGE) AS MANUFACTURED
BY NEUBERT AERO CORP OR AN APPROVED EQUIVALENT.
2. FLAT, BIDIRECTIONAL WARNING LIGHTS WILL NOT BE ACCEPTABLE.
3. EXACT LOCATIONS SHALL BE DETERMINED DURING CONSTRUCTION BY THE CONTRACTOR AND
SHALL BE APPROVED BY THE ENGINEER.
4. BARRICADES SHALL BE WATER FILLED OR WEIGHTED IN A WAY TO PREVENT MOVEMENT DUE
TO WIND, JET BLAST, OR PROP WASH.
5. PLACEMENT, MAINTENANCE, AND REMOVAL OF BARRICADES SHALL NOT BE PAID SEPARATELY
AND SHALL BE INCIDENTAL TO ITEM GP-80, CONSTRUCTION SAFETY AND PHASING PLAN.
360° SOLAR-POWERED
FLASHING RED WARNING
LIGHT
SAFETY ORANGE AND WHITE,
HIGH IMPACT, UV RESISTANT,
HDPE WATER-FILLED BARRICADE
6" X 6' ORANGE AND WHITE
REFLECTIVE SHEETING, CLASS B
CONNECTOR TO
NEXT UNIT, (TYP.)
8' (TYP.)
6" (T
YP
PIPE SHALL BE SIZED AS
NEEDED TO MAINTAIN
PROPER DRAINAGE
FLOW IN SWALE
BACKFILL WITH SUITABLE
ON-SITE MATERIAL AND
COMPACT IN ACCORDANCE
WITH CURRENT FAA
SPECIFICATIONS
EXISTING ASPHALT PAVEMENT
EXISTING
LIMEROCK BASE
PROFILE VIEW
CONTRACTOR SHALL PROTECT AGAINST
UNDERMINING OF EXISTING SHOULDER
DURING INSTALLATION AND REMOVAL
OF STABILIZED ENTRANCE. DAMAGE TO
EXISTING ROADWAY OR SHOULDER, AS
DETERMINED BY THE ENGINEER, SHALL
BE REPAIRED BY THE CONTRACTOR AT
NO ADDITIONAL COST TO THE OWNER.
NOTE:
PAYMENT FOR STABILIZED CONSTRUCTION ENTRANCE SHALL BE MADE AT THE CONTRACT UNIT PRICE PER LUMP SUM UNDER ITEM GP-80, "STABILIZED CONSTRUCTION ACCESS ENTRANCE AND TEMPORARY DRIANAGE", AND SHALL INCLUDE INSTALLATION IN ACCORDANCE WITH THIS DETAIL, REMOVAL, AND RESTORATION OF THE
AREA.
EXISTING ROADWAY
PROVIDE COVER PER
MANUFACTURER
RECOMMENDATIONS.
12" STABILIZED CONTRACTOR ACCESS
ROAD MATERIAL SHALL BE SELECTED BY
THE CONTRACTOR IN ORDER TO PROVIDE
AN UNYIELDING DRIVING SURFACE
A
ED
G
E O
F
PA
VE
M
EN
T
EX
IS
TI
N
G R
O
AD
W
AY
4H :1V
BACKFILL WITH SUITABLE ON-SITE
MATERIAL AND COMPACT IN
ACCORDANCE WITH FAA SPECIFICATIONS
PLAN VIEW
PIPE SHALL BE SIZED AS
NEEDED TO MAINTAIN PROPER
DRAINAGE FLOW IN SWALE
CONSTRUCTION ENTRANCE SECTION A-A VIEW
SWALE ℄
SWALE
BOTTOM
OF BANK
SWALE TOP OF BANK
SWALE ℄
SWALE
BOTTOM
OF BANKSWALE TOP OF BANK
20'
R
' (T
YP
PIPE SHALL BE SIZED AS
NEEDED TO MAINTAIN PROPER
DRAINAGE FLOW IN SWALE
4H :1V
2' MIN.
ANY DAMAGE TO THE EXISTING
PAVEMENT OR SHOULDER SHALL
BE REPAIRED BY THE
CONTRACTOR AT NO ADDITIONAL
COST TO THE OWNER.
PIPE SHALL EXTEND A MIN
OF 2' BEYOND BACKFILL
TO PREVENT SILT FROM
ENTERING THE PIPE (TYP.)
SWALE CENTERLINE
CONSTRUCTION ENTRANCE
ROAD SHALL BE SLOPED AS
NEEDED TO PROVIDE
POSITIVE DRAINAGE AND
PREVENT PONDING.
BACKFILL WITH SUITABLE ON
SITE MATERIAL AND COMPACT IN
ACCORDANCE WITH FAA
SPECIFICATIONS
STABILIZED CONSTRUCTION ENTRANCE
CONSTRUCTION
ENTRANCE TO
CONTRACTOR STAGING
AREA AND ENTRANCE
TO CONSTRUCTION
WORK AREA.
STABILIZED
CONSTRUCTION
ENTRANCE
T H
E
I
N T
L
L
66 71
737373
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W W W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W W W W W W W W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
R W
RW
RW
RW
RW
RW
RW
RW
RW
R W
R W
R W
R W
R W
R W
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW RW RW RW RW RW
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
TO
FA
R
SA
R
SA
R
SA
R
SA
R O
FA
R O
FA
R O
FA
R O
FA
R O
FA
R O
FA
R O
FA
R O
FA
R O
FA
R O
FA
R O
FA
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
G
AS
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
TSA
SS
SS
SS
SS
S
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
S
S
CB
E E
E
E
FO
E
W
W
W
W W
W
W W
CO
W W
W W
W W
W W
W W
W W W W W W W W
W W
W W
W W
W W
W W
W W
W W
W W
W W W
W W
W W
BFO BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
BFO
RW
RW
RW
RW RW
RW
RW
RW
RW
RW
RW
RW
RW
RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UGE
UGE
UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE UGE UGE UGE
W
E
IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
W W W W
1-TK
1-TK
1-TK
1-TK
2-TK
CE101
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
PL
AN
1 2 3 4
1 2 3 4
A
B
C
A
B
C
C4 SHEET NOTES
A1 EXISTING CONDITIONS PLAN A4 KEY PLAN
B4 BENCHMARK INFORMATION AND LEGEND
DJN
PV
PV, DJN
JUNE 2025
AS SHOWN
SEAL
SHEET
AVCON PROJECT NUMBER
APPROVED:
DESIGNED:
DRAWN:
DATE:
SCALE:
N O
D
AT
E
R
EV
IS
IO
N S
D
ES
C R
IP
TI
O N
VE
TE
R
AN
S R
D H
AN
G
AR
IN
FR
AS
TR
U
C
TU
R E
LE
ES
BU
R
G
IN
TE
R
N
AT
IO
N
AL
A
IR
PO
R T
(K
LE
E) , 8
AI
R
PO
R
T
BL
VD
, L
EE
SB
U R
G , F
L
2024.236.02
DANIEL J. NICKOLS, JR., P.E.
Lic. No. 78634
6-
9-
IS
SU
ED
T O
B
ID
D R
AW
IN
G S
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
IS
SU
ED
T
O B
ID
D
R
AW
IN
G
S
NORTH NORTH
TOPOGRAPHIC SURVEY BENCHMARK (BM) LOCATION
THE DATA PROVIDED IN THE TABLE ABOVE WAS TAKEN FROM THE FIELD
TOPOGRAPHIC SURVEY COMPLETED BY GAI CONSULTANTS ON FEBRUARY 16TH,
2023. THE ORIGINAL TOPOGRAPHIC SURVEY IS ON FILE IN THE MAIN AIRPORT
ADMINISTRATIVE OFFICE AND IS AVAILABLE FOR REVIEW.
SHEET NOTES:
1. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND OTHER
FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE AT THE TIME OF
PREPARATION OF THESE PLANS. THE CONTRACTOR SHALL FIELD LOCATE, VERIFY, AND FURTHER IDENTIFY THE LOCATIONS, ELEVATIONS, AND DIMENSIONS OF ALL EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES (IDENTIFIED ON THE PLANS OR NOT) AFFECTING ANY COMPONENT OF WORK HEREIN PRIOR TO THE START OF ANY CONSTRUCTION. DISCREPANCIES, CONFLICTS, OR POTENTIAL DEVIATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO THE START OF ANY
CONSTRUCTION.
2. THE CONTRACTOR SHALL CHECK PLANS FOR CONFLICTS AND DISCREPANCIES PRIOR TO THE START OF ANY CONSTRUCTION. SPECIAL ATTENTION SHALL BE TAKEN WITH THOSE EXISTING UTILITIES, STRUCTURES OR FEATURES (IDENTIFIED ON THE PLANS OR NOT) THAT MAY POTENTIALLY CONFLICT OR CROSS PROPOSED DESIGN COMPONENTS (I.E., AIRFIELD ELECTRICAL, STORM SEWERS, POTABLE WATER LINES, ETC.) AND ANY DISCREPANCIES, CONFLICTS OR POTENTIAL DEVIATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO THE START OF ANY CONSTRUCTION. ANY
COST ASSOCIATED WITH THE LOCATION OF EXISTING UTILITIES AS OUTLINED ABOVE IS THE
RESPONSIBILITY OF THE CONTRACTOR.
3. ERRORS OR OMISSIONS - DO NOT TAKE ADVANTAGE OF ANY APPARENT ERROR OR OMISSION
DISCOVERED IN THE CONTRACT DOCUMENTS, BUT IMMEDIATELY NOTIFY THE ENGINEER OF SUCH
DISCOVERY. THE ENGINEER WILL THEN MAKE SUCH CORRECTIONS AND INTERPRETATIONS AS
NECESSARY TO REFLECT THE ACTUAL SPIRIT AND INTENT OF THE CONTRACT DOCUMENTS.
FIRE STATION
EXISTING TAXIWAY
OBJECT FREE AREA,
(TYP.)
TOP OF
BANK, (TYP.)
BOTTOM OF
BANK, (TYP.)
BM 7
BM 8
BM 9
BM 10
BM 11
BM 12
BM 14
BM 13
BM 1
BM 2
BM 3
BM 4
BM 5
BM 6
EXISTING
FENCELINE, (TYP.)
EXISTING
MOUNTED LIGHT
POLE
ELECTRIC PULL
BOX, (TYP.)
EXISTING DETENTION POND
POND BOTTOM ELEV: 69.00'
AIRPORT PROPERTY
LINE, (TYP.)
EXISTING RUNWAY
OBJECT FREE AREA,
(TYP.)
EXISTING SIGN, (TYP.)
EXISTING UNLIT
AIRFIELD GUIDANCE
SIGN, (TYP.)
LIMIT OF EXISTING
TOPOGRAPHIC
SURVEY, (TYP.)
EXISTING TAXIWAY
CENTERLINE MARKING,
(TYP.)
EXISTING ELECTRICAL
TRANSFORMER, (TYP.)
TA
XI
W
AY
K
EXISTING RUNWAY HOLDING
POSITION MARKING, (TYP.)
EXISTING TREELINE,
(TYP.)
EXISTING AIRFIELD
ELECTRICAL CONDUIT,
(TYP.)
EXISTING 12" PVC
POTABLE WATER
MAIN, (TYP.)
EXISTING 12"
PVC RECLAIMED
WATER, (TYP.)
EXISTING
UNDERGROUND
GAS LINE, (TYP.)
EXISTING 8" PVC
SEWER GRAVITY
MAIN
EXISTING
UNDERGROUND
ELECTRIC LINE,
(TYP.)EXISTING
WATER
VALVE, (TYP.)
FIBER OPTIC
PULL BOX
EXISTING
AIRFIELD
MARKER, (TYP.)
EXISTING FIRE
HYDRANT, (TYP.)
PARKING LOT
BM 15
EXISTING TWO-WAY
JUNCTION CAN PLAZA, (TYP.)
EXISTING 2"
FIBER CONDUIT,
(TYP.)
EXISTING RUNWAY
EDGE LIGHT, (TYP.)
BLAST WALL
U.S. HIGHWAY 441 EXISTING ROADWAY PAVEMENT
MARKING, (TYP.)
EXISTING
TREE, (TYP.)
VETERANS ROAD
EXISTING SEWER
MANHOLE, (TYP.)
EXISTING 6" PVC
SANITARY
SERVICE LINE
4" PVC UTILITY
SLEEVE, (TYP.)
EXISTING
BOLLARDS, (TYP.)
EXISTING
DUMPSTER
EXISTING
IRRIGATION LINE
EXISTING SEWER
CLEAN OUT
EXISTING CARD
CONTROLLED VEHICULAR
CANTILEVER GATE
EXISTING
BACKFLOW
PREVENTOR
EXISTING
SEWER CAP
AND STAKED
EXISTING
GENERATOR
EXISTING
FUEL TANK
EXISTING
WATER VALVE
COVER
EXISTING
UNDERGROUND
UTILITY BOX
EXISTING GATE
OPERATOR
EXISTING RUNWAY
SAFETY AREA,
(TYP.)
SANITARY MANHOLE
RIM = 71.52'
NE INV: 67.30'
SE INV: 67.16'
SW INV: 67.27'
NW INV: 67.37'
SEWER MANHOLE
RIM = 70.95'
NW INV: 67.03'
E INV: 66.90'
SEWER MANHOLE
This is the start of the file's text. The full file is on GovTribe.