ID04140153_Attachment_1_QASP.docx

DOCX document 24 KB Posted

Attached to
Base Integrated Environmental Support Tasks (BIEST) Federal contract opportunity
Solicitation number
ID04140153
Issued by
General Services Administration Federal Acquisition Service Assisted Acquisition Services

About this file

Attachment 1 QASP

View the file

Other files for this federal contract opportunity

Other files attached to Base Integrated Environmental Support Tasks (BIEST), newest first.
File Type Posted
Amend_03_ID04140153_Attachment_7_Pricing_Template_09_Feb_2015.xlsx XLSX spreadsheet
Amend_03_Questions_and_Answers_09_Feb_2015.docx DOCX document
Amend_02_Questions_and_Answers_03_Feb_2015.docx DOCX document
Amend_02_ID04140153__UCF_PWS_V.03_03_Feb_2015_Final.docx DOCX document
Amend_02_ID04140153_Purpose_of_Amend_02.docx DOCX document
Amend_01_ID04140153_Attachment_6_Minimum_Experience_ _Education_Requirements_29_Jan_2015.docx DOCX document
Amend_01_ID04140153_Questions_and_Answers_29_Jan_2015.docx DOCX document
Amend_01_ID04140153_Invasive_Species_Control_At_Robins_AFB.docx DOCX document
Amend_01_WQ_Documents.zip ZIP file
Amend_01_ID04140153_Purpose_of_Amend_01.docx DOCX document
Amend_01_ID04140153__UCF_PWS_V.02_29_Jan_2015_Final.docx DOCX document
Amend_01_ID04140153_Attachment_7_Pricing_Template_29_Jan_2015.xlsx XLSX spreadsheet
ID04140153_Attachment_6_Minimum_Experience_ _Education_Requirements.docx DOCX document
ID04140153_Attachment_9_Past_Performance_Contract_Listing.docx DOCX document
ID04140153_Attachment_7_Pricing_Template.xlsx XLSX spreadsheet
ID04140153_Attachment_8_Past_Performance_Questionnaire.docx DOCX document
ID04140153_Attachment_5_Historical_Workload.xlsx XLSX spreadsheet
ID04140153__UCF_PWS_16_Jan_2015_Final.docx DOCX document
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE BASED

QUALITY ASSURANCE SURVEILLANCE PLAN

FOR BASE INTEGRATED ENVIRONMENTAL SUPPORT

TASKS (BIEST) CONTRACT FOR ROBINS AFB

ORDER NUMBER: ID04140153

INTRODUCTION

This Quality Assurance Surveillance Plan (QASP) has been developed to evaluate contractor actions while implementing this Performance Work Statement (PWS). It is designed to provide an effective surveillance method of monitoring contractor performance for each listed objective on the Performance Requirements Matrix in the contract. The QASP provides a systematic method to evaluate the services the contractor is required to furnish.

The contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the contract. The role of the Government is quality assurance to ensure contract standards are achieved.

In this contract the quality control program is the driver for product quality. The contractor is required to develop a comprehensive program of inspections and monitoring actions. The first major step to ensuring a “self-correcting” contract is to ensure that the quality control program approved at the beginning of the contract provides the measures needed to lead the contractor to success.

Once the quality control program is approved, careful application of the process and standards presented in the remainder of this document will ensure a robust quality assurance program.

PWS

PARA

PERFORMANCE

OBJECTIVE

PERFORMANCE THRESHOLD
SURVEILLANCE

METHOD

C.2.1.2 through C.2.1.13
Minimal disruption of projects/programs supported
95% compliance with government requirements with no disruption for duration of Task Order
Customer Feedback
C.2.1.2 through C.2.1.13
Timeliness of Deliverables
100% of deliverables submitted on schedule
Periodic Inspection & Customer Feedback
C.2.1.2 through C.2.1.13
Deliverables prepared by Contractor are accurate
Each deliverable contains no more than 3 technical errors
Periodic Inspection & Customer Feedback
C.2.1.2 through C.2.1.13
Management of Deliverables and Reporting
95% compliance with government requirements with no disruption for duration of Task Order
Customer Feedback

SURVEILLANCE

The Government will evaluate the performance objectives through surveillance as reflected above by reviews and acceptance of work products and services.

STANDARD

The Contractor shall perform all work required in a satisfactory manner in accordance with the appropriate PWS paragraph. The QA shall not consider the services complete until all deficiencies have been corrected. The Contracting Officer’s Representative (COR) or Contracting Officer’s Technical Representative (COTR) shall notify the Senior Contracting Officer (SCO) for appropriate action if any of the above performance objectives are not in accordance with acceptable AQL.

PROCEDURES

The COR will inspect all tasks required by the contract to ensure Contractor compliance with the contract requirements. Inspection results will be recorded in a Surveillance Log noting the date, time and result of inspection or verification.

The COR will document all defects using a “Task Discrepancy Report (TDR)”. The COR will verbally notify the GSA Contract Specialist or SCO of the defect and will submit a copy of the TDR as an Action Memo in ITSS to the GSA SCO. The COR will ensure the TDR is completed in its entirety and coordinated through the Contracting Officer. The Contractor will also be furnished a copy of the TDR. The Contractor shall furnish their response to the TDR. The Contractor’s response will address the accuracy and validity of the defect, planned corrective action and actions to prevent recurrence. The TDR information will be included when assessing the Contractor’s overall performance (i.e., past performance assessments, exercise of options, etc.).

If any of the services do not conform to the contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements. The Contractor must correct the defect(s) within the timeframes established in the PWS. The COR shall not certify satisfactory performance for the contract until all defects have been corrected.

When the defects in services cannot be corrected by re-performance, the Government may:

1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and,

2) Reduce the contract price to reflect the reduced value of the services performed.

The COR shall, in addition to providing documentation to the GSA SCO, maintain a complete quality assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions relating to the Government’s performance of the quality assurance function, including originals of all surveillance activity checklists. All such records will be retained for the life of the contract. The COR shall forward these records to the GSA SCO at completion or termination of the contract.

The COR shall upload a copy of the Surveillance Log as an Action Memo in ITSS addressed to the GSA SCO at least once every three months.

ACCEPTANCE OF SERVICES

Acceptance of services shall be based upon compliance with performance standards described in the PWS and surveillance procedures described in this QASP. Prior to approving/certifying any Contractor invoices, the COR will verify that all invoiced services have been performed in compliance with contract requirements. The COR shall not certify satisfactory performance for the contract until all defects have been corrected.

[ATTACHMENTS: SURVEILLENCE LOG & TASK DESCREPANCY REPORT]

SURVEILLANCE LOG

PROJECT TITLE: BIEST CONTRACT FOR ROBINS AFB

ORDER NUMBER: ID04140153

Task Requirement

PWS

Ref.

Method of Surveillance Date Accomplished

Compliance Results

Task Discrepancy Report

1. Order Number: ID04140153
2. Report Number

3. To: (Contractor and Manager’s Name)

4. From: (Name of Client Representative)

5. Dates

Prepared:
Returned by Contractor
Action Completed

6. Discrepancy or Problem: (Describe in detail; include reference to PWS Directive; attach continuation sheet if necessary.)

Contractor Response

7. To: (Contracting Officer)

8. From: (Contractor)

9. Contractor Response as to Cause, Corrective Action and Actions to Prevent Recurrence; Attach continuation sheet if necessary. (Cite applicable Q.C. program procedures or new Q.C. procedures)

10. Government Evaluations (Acceptance, partial acceptance, rejection: attach continuation sheet if necessary)

11. Government Actions (Reduced payment, cure notice, show cause, other)

Closeout

Name-Title
Signature
Date

Contractor Notified

Client Rep

CO/PM