ID04140153_Attachment_1_QASP.docx
DOCX document 24 KB Posted
- Attached to
- Base Integrated Environmental Support Tasks (BIEST) Federal contract opportunity
- Solicitation number
- ID04140153
About this file
Attachment 1 QASP
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE BASED
QUALITY ASSURANCE SURVEILLANCE PLAN
FOR BASE INTEGRATED ENVIRONMENTAL SUPPORT
TASKS (BIEST) CONTRACT FOR ROBINS AFB
ORDER NUMBER: ID04140153
INTRODUCTION
This Quality Assurance Surveillance Plan (QASP) has been developed to evaluate contractor actions while implementing this Performance Work Statement (PWS). It is designed to provide an effective surveillance method of monitoring contractor performance for each listed objective on the Performance Requirements Matrix in the contract. The QASP provides a systematic method to evaluate the services the contractor is required to furnish.
The contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the contract. The role of the Government is quality assurance to ensure contract standards are achieved.
In this contract the quality control program is the driver for product quality. The contractor is required to develop a comprehensive program of inspections and monitoring actions. The first major step to ensuring a “self-correcting” contract is to ensure that the quality control program approved at the beginning of the contract provides the measures needed to lead the contractor to success.
Once the quality control program is approved, careful application of the process and standards presented in the remainder of this document will ensure a robust quality assurance program.
PWS
PARA
PERFORMANCE
OBJECTIVE
| PERFORMANCE THRESHOLD |
| SURVEILLANCE |
METHOD
| C.2.1.2 through C.2.1.13 |
| Minimal disruption of projects/programs supported |
| 95% compliance with government requirements with no disruption for duration of Task Order |
| Customer Feedback |
| C.2.1.2 through C.2.1.13 |
| Timeliness of Deliverables |
| 100% of deliverables submitted on schedule |
| Periodic Inspection & Customer Feedback |
| C.2.1.2 through C.2.1.13 |
| Deliverables prepared by Contractor are accurate |
| Each deliverable contains no more than 3 technical errors |
| Periodic Inspection & Customer Feedback |
| C.2.1.2 through C.2.1.13 |
| Management of Deliverables and Reporting |
| 95% compliance with government requirements with no disruption for duration of Task Order |
| Customer Feedback |
SURVEILLANCE
The Government will evaluate the performance objectives through surveillance as reflected above by reviews and acceptance of work products and services.
STANDARD
The Contractor shall perform all work required in a satisfactory manner in accordance with the appropriate PWS paragraph. The QA shall not consider the services complete until all deficiencies have been corrected. The Contracting Officer’s Representative (COR) or Contracting Officer’s Technical Representative (COTR) shall notify the Senior Contracting Officer (SCO) for appropriate action if any of the above performance objectives are not in accordance with acceptable AQL.
PROCEDURES
The COR will inspect all tasks required by the contract to ensure Contractor compliance with the contract requirements. Inspection results will be recorded in a Surveillance Log noting the date, time and result of inspection or verification.
The COR will document all defects using a “Task Discrepancy Report (TDR)”. The COR will verbally notify the GSA Contract Specialist or SCO of the defect and will submit a copy of the TDR as an Action Memo in ITSS to the GSA SCO. The COR will ensure the TDR is completed in its entirety and coordinated through the Contracting Officer. The Contractor will also be furnished a copy of the TDR. The Contractor shall furnish their response to the TDR. The Contractor’s response will address the accuracy and validity of the defect, planned corrective action and actions to prevent recurrence. The TDR information will be included when assessing the Contractor’s overall performance (i.e., past performance assessments, exercise of options, etc.).
If any of the services do not conform to the contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements. The Contractor must correct the defect(s) within the timeframes established in the PWS. The COR shall not certify satisfactory performance for the contract until all defects have been corrected.
When the defects in services cannot be corrected by re-performance, the Government may:
1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and,
2) Reduce the contract price to reflect the reduced value of the services performed.
The COR shall, in addition to providing documentation to the GSA SCO, maintain a complete quality assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions relating to the Government’s performance of the quality assurance function, including originals of all surveillance activity checklists. All such records will be retained for the life of the contract. The COR shall forward these records to the GSA SCO at completion or termination of the contract.
The COR shall upload a copy of the Surveillance Log as an Action Memo in ITSS addressed to the GSA SCO at least once every three months.
ACCEPTANCE OF SERVICES
Acceptance of services shall be based upon compliance with performance standards described in the PWS and surveillance procedures described in this QASP. Prior to approving/certifying any Contractor invoices, the COR will verify that all invoiced services have been performed in compliance with contract requirements. The COR shall not certify satisfactory performance for the contract until all defects have been corrected.
[ATTACHMENTS: SURVEILLENCE LOG & TASK DESCREPANCY REPORT]
SURVEILLANCE LOG
PROJECT TITLE: BIEST CONTRACT FOR ROBINS AFB
ORDER NUMBER: ID04140153
Task Requirement
PWS
Ref.
Method of Surveillance Date Accomplished
Compliance Results
Task Discrepancy Report
| 1. Order Number: ID04140153 |
| 2. Report Number |
3. To: (Contractor and Manager’s Name)
4. From: (Name of Client Representative)
5. Dates
| Prepared: |
| Returned by Contractor |
| Action Completed |
6. Discrepancy or Problem: (Describe in detail; include reference to PWS Directive; attach continuation sheet if necessary.)
Contractor Response
7. To: (Contracting Officer)
8. From: (Contractor)
9. Contractor Response as to Cause, Corrective Action and Actions to Prevent Recurrence; Attach continuation sheet if necessary. (Cite applicable Q.C. program procedures or new Q.C. procedures)
10. Government Evaluations (Acceptance, partial acceptance, rejection: attach continuation sheet if necessary)
11. Government Actions (Reduced payment, cure notice, show cause, other)
Closeout
| Name-Title |
| Signature |
| Date |
Contractor Notified
Client Rep
CO/PM