Replacement of the Grit Lines and the Installation of New Glass Lined Ductile Iron Pipes in Precast Concrete Trench
Solicitation number
IBM17R0007
Issued by

About this file

Mechanical

View the file

Other files

File Type Posted
IBM17R0007_A003_Grit_Line.pdf PDF
Revised_Grit_Line_Specifications_8-9-2017.docx DOCX document
Picture_II_8-8-2017.docx DOCX document
Picture_8-8-2017.docx DOCX document
Electrical___E_111.docx DOCX document
Sign-in_sheet_for_the_Grit_Line_Project_Site_Visit.pdf PDF
J.02_Revised_Specifications_7-14-2017_1.pdf PDF
IBM17R0007-A002_Grit_Line_SBIWTP.pdf PDF
J.03_Drawings.zip ZIP file
IBM17R0007_A001_Grit_Line_SBIWTP.pdf PDF
IBM17R0007_Grit_Line_SBIWTP.pdf PDF
J.04_Wage_Determination_CA170001_06.09.2017.pdf PDF
J.01_Grit_Line_Scope_of_Work.pdf PDF
J.02_Specifications.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Core Drill through Headworks LCC west Wall and Install sleeves and conduits for power and low Voltage wires as required.

Proposed Locations of the new Flow Meters at the Headworks Area.