IBM17R0007_A001_Grit_Line_SBIWTP.pdf

PDF 134 KB Posted

Attached to
Replacement of the Grit Lines and the Installation of New Glass Lined Ductile Iron Pipes in Precast Concrete Trench
Solicitation number
IBM17R0007
Issued by

About this file

Add FAR Clause 52.228-1 Bid Guarantee and incorporate potential Offeror's questions and Government answers. Offeror's are required to sign and return the solicitation and all amendments with their proposal.

View the file

Other files

File Type Posted
IBM17R0007_A003_Grit_Line.pdf PDF
Revised_Grit_Line_Specifications_8-9-2017.docx DOCX document
Mechanical_DRW__M102.docx DOCX document
Picture_II_8-8-2017.docx DOCX document
Picture_8-8-2017.docx DOCX document
Electrical___E_111.docx DOCX document
Sign-in_sheet_for_the_Grit_Line_Project_Site_Visit.pdf PDF
J.02_Revised_Specifications_7-14-2017_1.pdf PDF
IBM17R0007-A002_Grit_Line_SBIWTP.pdf PDF
J.03_Drawings.zip ZIP file
IBM17R0007_Grit_Line_SBIWTP.pdf PDF
J.04_Wage_Determination_CA170001_06.09.2017.pdf PDF
J.01_Grit_Line_Scope_of_Work.pdf PDF
J.02_Specifications.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE RATING

2. AMENDMENT/MODIFICATION NO.

A001

3. EFFECTIVE DATE

06/27/2017

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

IBWC_CODE

International Boundary and Water Commission

(IBWC)

USIBWC - ACQUISITIONS DIV

4171 NORTH MESA, STE. C100

EL PASO, TX 79902-1441

Philip Johnson

NAME

TEL.

johnsonpk@state.gov

EMAIL

6. ISSUED BY IBWC_CODE

International Boundary and Water Commission (IBWC)

USIBWC - ACQUISITIONS DIV

4171 NORTH MESA, STE. C100

EL PASO, TX 79902-1441

7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NO.

IBM17R0007

CONTACT DUNS

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

06/21/2017

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning __0__copies of the amendment;(b)By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.__1__X

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment A001 is as follows:

1. Add FAR Clause 52.228-1 Bid Guarantee.

2. Incorporate potential Offeror's questions and Government answers. See Continuation page 3.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Philip Johnson

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

IBM17R0007

Section I- Contract Clauses

52.228-1 Bid Guarantee (Sept 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coin-surance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $130,000, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for ac-ceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

IBM17R0007

Question: For the bid bond required what is the percentage needed? 10 or 20%?

Answer: Solicitation amended to include bid bond for 20%.

Is form SF28 still required, if we provide Form SF24 (Bid Bond)? or do we need both?

Answer: Yes, when an individual surety are involved.

In reference to the Replacement of the Grit Lines project, will be there a job walk and will it be mandatory?

Answer: See solicitation box 10 for information on Site Visit. The Site Visit is not mandatory but highly encouraged.

IBM17R0007 A001 Grit Line SBIWTP.pdf
Continuation Page 3.pdf