J.02 Revised Specifications

View the file

Other files

File Type Posted
IBM17R0007_A003_Grit_Line.pdf PDF
Revised_Grit_Line_Specifications_8-9-2017.docx DOCX document
Mechanical_DRW__M102.docx DOCX document
Picture_II_8-8-2017.docx DOCX document
Picture_8-8-2017.docx DOCX document
Electrical___E_111.docx DOCX document
Sign-in_sheet_for_the_Grit_Line_Project_Site_Visit.pdf PDF
IBM17R0007-A002_Grit_Line_SBIWTP.pdf PDF
J.03_Drawings.zip ZIP file
IBM17R0007_A001_Grit_Line_SBIWTP.pdf PDF
IBM17R0007_Grit_Line_SBIWTP.pdf PDF
J.04_Wage_Determination_CA170001_06.09.2017.pdf PDF
J.01_Grit_Line_Scope_of_Work.pdf PDF
J.02_Specifications.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOUTH BAY INTERNATIONAL WASTEWATER TREATMENT PLANT

ADVANCED PRIMARY TREATMENT PLANT (CC2)

SECTION 01072

REFERENCE STANDARDS

1.1 GENERAL

A.Standards of any technical society, organization, or body are incorporated in the Contract

Documents by specific reference to the applicable sections/portions of the standard.

In the event of a conflict between the referenced standard and these Contract Documents, the provisions of the Contract Documents shall apply. When a reference standard is specified, comply with requirements and recommendations stated in that standard, except when they are modified by the Contract Documents, or when applicable laws, ordinances, rules, regulations or codes establish stricter standards.

The latest provisions of applicable standards shall apply to the Work, unless otherwise specified. Reference standards include, but are not necessarily limited to, the following:

1. Acoustical and Insulating Materials Association (AIMA).

2. Air Pollution Control District (APCD).

3. Aluminum Association (AA).

4.American Association of State Highway and Transportation Officials (AASHTO).

5.American Concrete Institute (ACI).

6. American Gear Manufacturers Association (AGMA).

7.American Institute of Steel Construction (AISC).

8.American Iron and Steel Institute (AISI).

9.American National Standards Institute (ANSI).

10.American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE).

11.American Society of Mechanical Engineers (ASME).

12.American Society for Testing and Materials (ASTM).

13.American Water Works Association (AWWA).

14.American Welding Society (AWS).

15. American Wood Preservers Bureau (AWPB).

16. Anti-Friction Bearing Manufacturers Association (AFBMA).

17. Architectural Aluminum Manufacturers Association (AAMA).

18. California Department of Transportation (CalTrans).

19. Code of Federal Regulations (CFR).

20.Concrete Reinforcing Steel Institute (CRSI).

21.Factory Mutual Association (FM).

22. Federal Acquisition Regulations (FAR).

23. Federal Specification (Fed. Spec. or FS).

24. International Electric Conference (IEC).

25.Institute of Electrical and Electronics Engineers (IEEE).

26. Instrument Society of America (ISA).

27. Insulated Power Cable Engineers Association (IPCEA).

28. Joint Industry Conference (JIC).

29.National Association of Architectural Metal Manufacturers (NAAMM).

30.National Bureau of Standards (NBS) Voluntary Product Standard (PS).

31. National Electric Code (NEC).

32.National Electrical Manufacturer's Association (NEMA).

33. National Fire Protection Association (NFPA).

34. National Woodworkers Manufacturers Association (NWMA).

35. Occupational Safety and Health Administration (OSHA).

36. Prestressed Concrete Institute (PCI).

37. Product Standard (Prod. Std.).

38. San Diego Gas & Electric (SDG&E).

39.Uniform Building Code (UBC).

40.San Diego Regional Standard Drawings (SDRDS).

41.Standard Specifications for Public Works Construction (SSPWS).

42. Steel Door Institute (S.D.I.).

43. Steel Structures Painting Council (SSPC).

44.Underwriters' Laboratories, Inc (UL).

45. United States Department of Agriculture (USDA).

46.All other applicable standards listed in the Specifications, and the standards of utility service companies, where applicable.

B.In some instances, the Contract Specifications cite particular editions of mandatory standards set by regulatory agencies or other governmental authorities; where such standards are or have been subsequently replaced by more recent applicable mandatory standards, the most recent version shall be followed.

+ + END OF SECTION + +

SECTION 01202

PROGRESS MEETINGS

A.Frequency:

1.Regular Weekly Meetings.

2.Other Meetings: As determined by the COR.

B.Place: GOVERNMENT'S field office or mutually agreed upon location.

C.COR will prepare agenda, preside at meetings, and prepare and distribute a transcript of proceedings (minutes of meetings) to all parties.

D.CONTRACTOR shall provide data required and be prepared to discuss all items on agenda.

1.2 MINIMUM ATTENDANCE

A.CONTRACTOR, (Subcontractors and suppliers as required by the CONTRACTOR or

GOVERNMENT). Representatives present for each party shall be authorized to act on their behalf. The CONTRACTOR shall be responsible for coordinating with all subcontractors and suppliers.

B.COR.

C.Others as appropriate.

1.3 AGENDA

A.Agenda will include, but will not necessarily be limited to, the following:

1.Minutes of previous meeting.

2.Progress since last meeting.

a.CONTRACTOR.

b.Subcontractors.

3.Planned progress for next period.

4.Shop Drawings status.

5.Record Drawing status updates.

6.Survey Field Notes status.

7.Problems, conflicts and observations.

8.Changes.

9.Applications for payment.

10.Quality standards and control.

11.Schedules, including status of off-site fabrication and delivery schedules. Corrective measures required.

12.Coordination.

13.Other business.

14.Next meeting date.

1.4 Special Meetings

A.As required by job conditions, special meetings may be called by the COR. These meetings may include representatives of the CONTRACTOR and GOVERNMENT to discuss any particular situation or problem which may arise. The CONTRACTOR shall attend all meetings when requested and shall coordinate with and shall provide subcontractors and vendor's representatives should their presence be required.

1.5 MEASUREMENT AND PAYMENT

A.The costs for all work described in this Section and required to construct the Advanced

Primary Treatment Plant shall be included under the Contractor's Lump Sum Bid in Part III; Section C-Bid Agreement Forms; C.2 Bidding Schedule of the Contract Documents.

SECTION 01311

PROGRESS BAR SCHEDULE

PART 1- GENERAL

1.01 SECTION INCLUDES

A. Description of Requirements

B. Submittals

1.02 DESCRIPTION OF REQUIREMENTS

A. Pursuant to the Contract Clause H.10 entitled "Construction Program," the Contractor shall prepare a schedule for construction which shall reflect completion of all work under this contract, and shall include allotted time for related construction activities by other agencies, within the allotted construction period. The Progress Bar Schedule (PBS) is required to assure adequate planning and execution of the work and to assist the Government in appraising the reasonableness of the proposed schedule and evaluating progress of the work both before and during construction.

B. The PBS shall include a title block in which shall be shown the title of the project, the Contract number, the name of the Contractor, and space for signature of the Contractor and the Contracting Officer’s Representative.

The Contractor shall divide (or subdivide) the Contract work into the salient features of the project, as indicated by sequence of operation and the technical provisions. The PBS shall show the estimated dollar amount of each feature, the order in which the Contractor proposes to carry on the work, the dates to start the salient features (including the procurement of materials, and equipment), and the completion dates of the same. The Contractor shall prepare the PBS to show the scheduled percentage of completed work to be in place on the 15th and the last day of the month for each of the salient features of work, as well as for the Contract as a whole.

The PBS shall indicate which features of the work will be performed by subcontractors, and when they are scheduled to begin and finish their work.

The PBS shall also include all required Submittals, review and confirmation of samples of materials and shop drawings, activities of he required dates for completion of all parts of the work. If the contractor proposes to be paid for bonds, hey must be shown as items on the PBS. The selection of activities and their associated costs will be subject to review and approval by the Government. The Government will accept a PBS on a spreadsheet ( Excell,Word or equal) showing all the requirements of the PBS.

1.04 SUBMITTALS

A. The Contractor shall submit a preliminary PBS within fourteen (14) calendar days after the Notice to Proceed. The Government will review the preliminary PBS and submit comments with required revisions within fourteen(14) calendar days after receipt.

B. The Contractor shall submit a final PBS which includes all required revisions, within seven (7) calendar days following the approval of the preliminary PBS.

C. The approved PBS shall then be the schedule to be used by the Contractor for planning, organizing and directing the work and for reporting progress and requesting payment for work accomplished. If the Contractor thereafter desires to make changes in the method of operating and scheduling, the Contractor shall notify the Government in writing stating the reasons for the change. If the Government considers these changes to be major, the Government shall require the Contractor to revise and submit the PBS for approval, without additional cost to the Government.

D. The Contractor shall submit, as part of the monthly request for payment

(pay estimate), three (3) full size copies of the updated PBS which shows the amount of work completed for each feature of the work, and of the Contract as a whole.

PART 2 - PRODUCTS

A. Sheet size of the chart for full size copies should be 11" x 17". Each updated copy should show the date of the latest revision.

PART 3 - EXECUTION

Not Used

END OF SECTION

CTION 01341

SUBMITTAL REQUIREMENTS

1.1 SUMMARY

A. The CONTRACTOR shall furnish all materials and perform all work required for furnishing submittals to the GOVERNMENT, in accordance with FAR 52.236-21 entitled "Specifications and Drawings for Construction - Alternate I," this paragraph, and the requirements in the provisions, clauses, and paragraphs of this Contract. This shall include providing appropriate representatives to the conferences as indicated in Section 01201, "Pre-Construction Conference," and Section 01202, "Progress Meetings."

B. The word "submittals" shall be interpreted to include shop drawings, qualifications, data, manuals, certifications, engineering calculations, samples, color chips or charts, brochures, reports and other items furnished by the CONTRACTOR for review, information, and other purposes per the requirements of these Contract

1.2 SUBMITTALS

A. Only complete sets of material/information shall be submitted for review unless otherwise authorized by the COR. This Section and individual Sections will specify what data is required for complete submittals. See Part 1.3.F.7 of this Section, the general list of submittals at the end of this Section, and individual specification sections.

B. The CONTRACTOR shall submit complete sets of required submittal material under the cover of a transmittal letter. The CONTRACTOR'S transmittal letter shall include:

1. Reference to U.S. Section, I.B.W.C. contract number and title.

2. Number of complete sets and complete list of material being submitted.

3. Identification of the submittal with a transmittal number and as either an initial submittal or a resubmittal per the requirements of this Section.

4. Space for COR'S stamp.

5. CONTRACTOR'S stamp, initialed or signed, dated and certifying

CONTRACTOR'S review of submittal, certification of field measurements and compliance with Contract.

C. Each drawing submitted by the CONTRACTOR shall have the CONTRACTOR'S or supplier's title and drawing number on it. Drawings and data shall be labeled with the U.S. Section, I.B.W.C. contract number.

D. Manufacturer's data for commercial products or equipment, such as catalog cut sheets, shall be clearly marked to indicate the item(s) to be furnished. The data shall be sufficiently comprehensive to identify the manufacturer's name, type, model, size, and characteristics of the product or equipment, as well as to fully demonstrate that the product or equipment meets the requirements of the Contract

E. Shop drawings shall be identified by the specification Section number followed by consecutive three digit numbers. For example, submittals required for the Influent Screening Equipment identifed in Section 11001 shall be identified as Submittals No. 11001-001 Shop Drawings, 11001-002 Installation Certifications, and 11001- 003 O&M data. Resubmittals shall be numbered in accordance with the requirements of Part 1.3.F of this Section. For example, a first resubmittal of Shop Drawing Data for the Influent Screening equipment shall be identified as 11001- 001-A, the second resubmittal shall be identified as Submittal 11001-001-B, and so on. All shop drawings shall accurately and distinctly present the following:

1. All working and erection dimensions.

2. Arrangements and sectional views.

3. Necessary details, including complete information for making connections between work under this Contract and work under other contracts where appropriate.

4. Electrical point-to-point wiring diagrams for all connections between all equipment furnished under the Contract, including all internal wiring between internal components of equipment.

5. Kinds of materials and finishes.

6. Parts lists and description thereof.

F. Each drawing or page shall include:

1. Submittal date, revision dates, and transmittal number.

2. Project name and contract number.

3. Specification section number and page number.

4. Identification of equipment, product, or material.

5. Name of CONTRACTOR and subcontractor.

6. Name of supplier and manufacturer.

7. Relation to adjacent structure or material.

8. Field dimensions, clearly identified.

9. Standard, code, test, or specification references.

10. Identification of deviations from the Contract Documents.

11. CONTRACTOR'S stamp, initialed or signed, dated and certifying

CONTRACTOR'S review of submittal, certification of field measurements and compliance with Contract.

12. Location at which the equipment or material are to be installed.

G. Location shall mean both physical location and location relative to other connected or attached material. The COR will return unchecked any submittal which does not contain complete data on the Work and full information on related matters.

H. Stock or standard drawings will not be accepted for review unless full identification and supplementary information is shown thereon in ink or typewritten form.

I. The CONTRACTOR shall check and approve all shop drawings before transmitting them to the COR to determine that they are complete and comply with all other requirements of the Contract Documents. Drawings which are incomplete or are not in compliance with the Contract Documents shall not be submitted for processing by the COR. The CONTRACTOR shall place the CONTRACTOR'S signature or initials on its stamp of approval on all shop drawings submitted to the COR to indicate compliance with this requirement. The CONTRACTOR'S approval shall constitute a representation that all quantities, dimensions, field construction criteria, materials, catalog numbers, performance criteria and similar data have been verified and that, in the CONTRACTOR'S opinion, the submittal fully meets the requirements of the Contract Documents. The CONTRACTOR shall schedule, prepare and submit all shop drawings in accordance with a timetable that will allow its suppliers and manufacturers sufficient time to fabricate, manufacture, inspect, test and deliver their respective products to the project site in a timely manner so as to not delay the complete performance of the work.

1.3 REVIEW OF SUBMITTALS

A. The time required for review of submittals furnished for review as specified herein will not begin until the COR receives complete sets of all the submittal materials.

Submittals that require changes or revisions shall be revised and resubmitted for review, and shall show changes and revisions made with revision date. All requirements specified for the initial submittal shall apply to any resubmittals required. Unless otherwise specified, all submittals which are to be resubmitted shall be resubmitted by the CONTRACTOR within 21 calendar days after the CONTRACTOR has received the COR'S comments.

B. Except as otherwise provided in these Specifications for specific submittals, the GOVERNMENT will require 15 calendar days following the date it receives submittals for review, and this review time will apply to each separate submittal or resubmittal whether compliance is confirmed or the submittal/resubmittal is returned for revisions. A 21 calendar day review period will be required by the GOVERNMENT for the instrumentation and control system submittals, including control panels, and programmable logic controllers; electrical systems submittals including motor control centers, variable frequency drives, and conduit layouts;

and mechanical equipment submittals including Odor Reduction Scrubber Systems, Belt Filter Press Equipment and the Lime Stabilization equipment. A 28-day review period will be required for the fire suppression system specified in Section 15501. The GOVERNMENT review period will end on the date of return mailing of the submittal/resubmittal to the CONTRACTOR.

C. If the GOVERNMENT uses time in excess of the above-stated number of calendar days for review of any submittal or resubmittal, additional time, not to exceed the excess time, will be added to the time allowed the CONTRACTOR for completion of the work affected by such excess time, to the extent it is demonstrated that the excess time caused delay. If the GOVERNMENT'S review of two or more separate submittals or resubmittals is late and results in concurrent days of excess time, such days will be counted only once in computing an extension of the completion date.

Further, if the CONTRACTOR fails to make submittals in the sequence within and the time period specified in the Contract Documents, and thus precludes the GOVERNMENT from reviewing such submittals within the foregoing 15-day period, then the CONTRACTOR shall not be entitled to an extension of time allowed for completion of the work.

D. If the shop drawings incorporate deviations from the Contract requirements, the

CONTRACTOR shall make specific mention thereof in the CONTRACTOR'S letter of transmittal, otherwise confirmation of compliance of such submittals by the COR shall not constitute approval of the departure. Any departure not noted by the CONTRACTOR in the CONTRACTOR'S letter of transmittal may cause rejection of the work. Compliance confirmation of the drawings shall refer to the subject matter thereof only and not to any structure, material, equipment or apparatus shown or indicated.

E. The review of shop drawings will be only for compliance with the information given in the Contract Documents and shall not extend to means, methods, sequences, techniques or procedures of construction or to safety precautions or programs incident thereto. Compliance confirmation shall not relieve the CONTRACTOR of responsibility for the accuracy of such drawings, nor for the proper fitting and construction of the work, nor for the furnishing of materials or work required by the Contract and not indicated on the drawings. No work called for by shop drawings shall be done until compliance has been confirmed by the

COR.

F. The procedure for review of the shop drawings shall be as follows:

1. The CONTRACTOR shall submit eight (8) complete sets of drawings and other descriptive data together with eight (8) copies of a letter of transmittal to the COR for review. The letter of transmittal shall contain the name of the Project, Contract Number, Transmittal Number, Technical Requirements section number, the name of the CONTRACTOR, the list of drawings submitted including numbers and titles, request for approval of any deviations from the Contract requirements and any other pertinent information including statements verifying the CONTRACTOR has reviewed and approved the submittal and coordinated the work of all trades and that the item will fit in the space provided for in the Contract Documents.

2. The COR will stamp drawings or descriptive data "Compliance Confirmed," Compliance Confirmed as Noted," "Examined and Returned for Correction," "Incomplete Submittal," or "Unacceptable" and four (4) copies with a letter of transmittal will be mailed or hand delivered to the CONTRACTOR at an address designated by the CONTRACTOR.

3. If a drawing or data is stamped "Examined and Returned for Correction," "Incomplete Submittal," or "Unacceptable," the CONTRACTOR shall make the necessary corrections and resubmit eight (8) copies of the documents as required in Instruction 1. The letter transmitting corrected documents shall indicate that the documents comprise a resubmittal.

4. If any corrections, other than those noted by the COR, are made on a shop drawing to be resubmitted, such changes should be pointed out by the CONTRACTOR upon resubmittal.

5. The CONTRACTOR shall revise and resubmit the shop drawings as required, until full compliance thereof is obtained.

6. Costs for processing additional copies of submittals beyond the eight (8) specified above shall be borne by the CONTRACTOR as described in Part

1.6 of this Section.

7. The CONTRACTOR shall furnish with each submittal one (1) reproducible for each document included with the submittal that is larger than 17" x 11".

Shop drawings and data shall be submitted in a timely manner to sufficiently allow review of same by the COR and to accommodate the rate of progress of the project required under the Contract. The term "shop drawings" as used herein shall include detailed design calculations including seismic calcula-tions signed and stamped with the seal of a California Registered Professional Engineer as specified in the Specifications or as noted on the Contract Drawings, at the CONTRACTOR'S expense; fabrication and installation drawings; material and parts lists; graphs; test data; operating instructions;

and other items as specified or shown which shall include but not necessarily be limited to:

a. Drawings and/or catalog information and cuts.

b. Specifications, parts list, suggested spare parts lists, and equipment drawings.

c. Complete lubrication, maintenance and operation instructions, including initial startup instructions.

d. Applicable certifications.

e. Anchor bolt templates, mounting instructions and mounting design calculations as required per the Contract Documents.

f. Required maintenance operations to allow all installed equipment to remain idle for a period of time not to exceed 24 months.

g. Other technical, installation, and maintenance data as applicable.

h. Unloading and handling methods, and storage requirements.

i. Proposed changes to the Contract Documents noted and highlighted.

j. Paint or coating submittal showing type of paint or coating and the mils thickness of coating system used. The coating system shall be the approved system as submitted under Division 9.

k. Drawings showing CONTRACTOR field verifications illustrating all field dimensions. CONTRACTOR shall field verify all dimensions and existing materials shown on the drawings. Any modifications required to structures and/or support systems to accommodate CONTRACTOR submitted equipment and/or systems that have been reviewed by the COR and marked to indicate "Compliance Confirmed" shall be at the CONTRACTOR'S expense.

8. After a material has been reviewed, no change in brand or manufacture will be permitted unless satisfactory written evidence is presented to, and accepted in writing by, the COR that manufacturer cannot make scheduled delivery of material, or that the material delivered has been rejected and substitution of suitable material is an urgent necessity.

9. A separate transmittal form shall be used for each specific item or class of material or equipment for which a submittal is required. All deviations from the Contract Documents contained in each CONTRACTOR Submittal shall be listed and described by the CONTRACTOR on a separate cover sheet signed by the CONTRACTOR and included with the submittal. Any and all submittals so marked on the COR'S standard shop drawing transmittal form by the CONTRACTOR to indicate the submittal contains deviations for the Contract Documents and Contract Drawings shall be rejected and returned to the CONTRACTOR if the required listing and description of the deviations are not included with the submittal. Transmittal of shop drawings on various items using a single transmittal form will be permitted only when the items taken together constitute a manufacturer's "package" or are so functionally related that expediency indicates review of the group or package as a whole.

10. It is expected that the information required for each item shall be complete on the first submittal. In the event that a second submittal is required, the CONTRACTOR'S submittal shall be complete and shall have addressed all requirements for acceptability. Costs associated with the review of any third and subsequent submittals shall be borne by the CONTRACTOR in accordance with this Section.

11. Should a point be reached where more than fifteen (15) percent of the total job submittals as defined in the CONTRACTOR'S approved submittal schedule have required more than one (1) submission by the CONTRACTOR, costs associated with the review of any second and subsequent submittals shall be borne by the CONTRACTOR in accordance with this section.

12. If prints of the shop drawings and other submittals are returned to the CONTRACTOR marked by the COR to indicate that a resubmittal is required, the CONTRACTOR shall revise said shop drawings and other submittals and shall resubmit eight (8) copies of the revised shop drawings and other submittals to the COR. All resubmittals shall be identified by the original submittal number followed by an A for the first resubmittal, a B for the second resubmittal and so on.

13. Fabrication or delivery of any items shall not commence before the COR has reviewed the pertinent shop drawings and returned copies to the CONTRAC- TOR marked to indicate "Compliance Confirmed" or "Compliance Confirmed as Noted." Revisions indicated on shop drawings shall be considered as changes necessary to meet the requirements of the Contract. It shall be the responsibility of the CONTRACTOR to coordinate the timing of the submittals with the necessary lead time for equipment deliveries and the construction schedule. The review of shop drawings by the COR will be limited to checking for general conformity to the drawings and specifications and shall in no way relieve the CONTRACTOR of responsibility for errors or omissions contained therein, nor shall such review operate to waive or modify any provision contained in the Contract Documents.

14. Fabricating dimensions, quantities of material, applicable code requirements, and other requirements shall be the CONTRACTOR'S responsibility.

15. The term "or equal" shall be understood to indicate that the "equal" product is the same or better than the product named in function, performance, integrity, reliability, quality, and general configuration. Where the CONTRACTOR proposes to submit an "equal" item, the installation of which will require any redesign of the structure, partitions, foundations, piping, ductwork, wiring, or of any other part of the project, all such redesign, and all new design drawings and detailing required shall be prepared by and stamped with the seal of a Registered Professional Engineer licensed in the State of California at the CONTRACTOR'S expense and shall be submitted to the COR for review in accordance with the Contract Documents. Where the use of an "or equal" item(s) require modifications, involving a change in quantity of material and equipment from that specified or indicated in the Contract Documents, the CONTRACTOR shall bear the total expense of such changes.

16. All shop drawings and data, after review and processing by the COR shall become a part of the Contract Documents and the Work shown or described shall be performed in conformity with these documents unless otherwise directed by the GOVERNMENT.

1.4 ADDRESSES

A. The CONTRACTOR shall deliver the submittals to the address listed below:

Contracting Officer's Representative International Boundary and Water Commission 2225 Dairy Mart Road San Diego, CA 92154

1.5 SCHEDULE FOR SUBMITTALS

A. A schedule of submittals shall be submitted to the COR within 7 calendar days after the date of receipt of the notice to proceed. Eight (8) copies of this schedule shall be submitted indicating the CONTRACTOR'S proposed schedule for submitting all submittals. Additionally, the schedule shall reflect the following information for each item.

1. Description and Transmittal Number;

2. Reference to the applicable paragraph in the Contract Documents in chronological order that requires the submittal;

3. The dates the CONTRACTOR proposes to furnish the submittals;

4. The dates the materials, equipment, etc. are needed at the job site; and

5. The date confirmation of compliance is needed by the CONTRACTOR (a minimum of 15 days from the date the GOVERNMENT receives the shop drawing unless otherwise noted in the Contract Documents).

6. Whether the submittal is for a deviation or an "equal" item. Complete submittals for all deviations or "equal" items shall be made to the COR within 30 calendar days after the CONTRACTOR'S Submittal Schedule is approved by the COR. Identification by the CONTRACTOR of deviations or "equal" items does not relieve the CONTRACTOR of his responsibility to furnish equipment and materials that meet all the requirements of the plans and specifications.

B. In preparing the schedule, the CONTRACTOR shall coordinate it with the Progress

Schedule and shall allow a minimum of 15 days for its review by the COR.

Furnishing of the schedule shall not be interpreted as relieving the CONTRACTOR of his obligation to comply with all of the contract requirements for the items listed on the schedule. The CONTRACTOR shall review the listing at least every 30 days and take appropriate action to maintain an effective and updated system and a copy of the schedule shall be maintained at the job site. Eight (8) copies of the revised and/or updated submittal schedule shall be submitted to the COR at least every 30 days. The CONTRACTOR shall indicate on the schedule those submittals/re-submittals that were added or updated. Payment will not be made for any material or equipment which does not comply with contract requirements.

C. Updated shop drawing schedule submittals shall be numbered consecutively as

01341-101, 01341-102, and so on. Resubmittals shall be identified with alpha subscripts as specified in this Section.

D. Submittals shall not be accepted by the COR until the submittal schedule has been approved by the COR.

1.6 ADDITIONAL SUBMITTAL PROCESSING COSTS

Costs associated with the review of submittals where more than 15% of submittals have required more than one review, and review of any third and subsequent submittals as identified in this Section shall be borne by the CONTRACTOR. The CONTRACTOR will be billed for these costs by the GOVERNMENT. Costs due may be deducted from any progress payments due the CONTRACTOR by the GOVERNMENT. Costs shall be determined as follows:

C = (D.L.C. x 3.15) + (O.D.C. x 1.10) where:

C = Cost for additional reviews D.L.C. = Direct Labor Cost (Hours spent on review x hourly rate of reviewer) O.D.C. = Other Direct Costs (travel, subsistence, etc.)

1.7 MEASUREMENT AND PAYMENT

A. The costs for all work described in this Section and required to construct the

Advanced Primary Treatment Plant shall be included under the Contractor's Lump Sum Bid in Part III; Section C-Bid Agreement Forms; C.2 Bidding Schedule of the Contract Documents.

SECTION 01700

CONTRACT CLOSEOUT

1.1 FINAL CLEANUP

Prior to final inspection as provided for herein, the CONTRACTOR shall clean the entire worksite as provided in Section 7-8.1, Cleanup and Dust Control, of the SSPWC.

1.2 PROJECT RECORD DOCUMENTS

Prior to final inspection as provided for herein, the CONTRACTOR shall submit all required project record documents, including record drawings in accordance with Section 01720, Project Record Documents.

1.3 FINAL INSPECTION

A.At the completion of all work or any increment thereof established by a completion time stated under Section H, Contract Requirement, paragraph entitled "Commencement, Prosecution, and Completion of Work" or stated elsewhere in the Contract Documents, the CONTRACTOR shall conduct an inspection of the work and develop a "punch list" of those items which do not conform to the approved Contract Documents. Such a list of deficiencies shall be submitted to the COR for review and approval and shall include the estimated date by which the deficiencies will be corrected. The CONTRACTOR shall make a second inspection on the estimated date of correction of the deficiencies to ascertain that all deficiencies have been corrected and so notify the COR in writing requesting a final inspection.

B.Upon written notice by the CONTRACTOR of his preparation for COR'S inspection of the project, the COR will make an inspection within 14 calendar days. If all construction provided for and contemplated by the Contract is found completed in accordance with the Contract Documents, that inspection shall constitute the final inspection and the COR will make final acceptance. The CONTRACTOR will be notified in writing of this acceptance as of the date of the final inspection.

C.If, however, the inspection discloses any work, in whole or in part, as being unsatisfactory, the COR will give the CONTRACTOR the necessary instructions for correction of the same, and the CONTRACTOR shall immediately comply with and execute such instruction. Upon correction of the work, another inspection will be made within 14 days, which shall constitute the final inspection provided the work has been satisfactorily completed. In such event, the COR will make the final acceptance and notify the CONTRACTOR in writing of this acceptance as of the date of the final inspection.

D.In no case will the final progress payment be prepared until the CONTRACTOR has complied with all the requirements set forth and the COR has made his final inspection of the entire work and is satisfied that the entire work has been completed in general conformance with the Contract Documents.

1.4 MEASUREMENT AND PAYMENT

A.The costs for all work described in this Section and required to construct the Advanced

Primary Treatment Plant shall be included under the Contractor's Lump Sum Bid in

SECTION 01710

CLEANING

A.Execute cleaning, during progress of the Work and at completion of the Work.

B.Requirements of Regulatory Agencies:

1.In addition to the requirements herein, maintain the cleanliness of the Work and surrounding premises within the Work limits so as to comply with federal, state, and local fire and safety laws, ordinances, codes and regulations.

2.Comply with all federal, state and local anti-pollution laws, ordinances, codes and regulations when disposing of waste materials, debris and rubbish.

C.Scheduling of Cleaning and Disposal Operations:

1.Execute so that dust, wash water or other contaminants generated during such operations do not damage or mar painted or finished surfaces.

2.Perform at intervals to prevent accumulation of dust, dirt, debris, rubbish and waste materials on or within the Work or on the premises surrounding the Work.

D.Waste Disposal:

1.Dispose of all waste materials, surplus materials, debris and rubbish off the plant site at a minimum of two times per week.

2.Do not burn or bury rubbish and waste materials on the plant site.

3.Do not dispose of volatile or hazardous wastes such as mineral spirits, oil, or paint thinner in storm or sanitary drains.

4.Do not discharge wastes into streams or waterways.

E.Cleaning Materials:

1.Use only cleaning materials recommended by manufacturer of surface to be cleaned.

2.Use each type of cleaning material on only those surfaces recommended by the cleaning material manufacturer.

3.Use only materials which will not create hazards to health or property.

F.During Construction:

1.Keep the Work and surrounding premises within work limits free of accumulations of dirt, dust, waste materials, debris and rubbish.

2.Keep dust generating areas wetted down.

3.Provide suitable containers for storage of waste materials, debris and rubbish until time of disposal.

4.Dispose of waste, debris and rubbish off site at legal disposal areas.

G.When Project is Completed:

1.Remove and legally dispose of all excess or waste materials, debris, rubbish, and temporary facilities from the site, structures and all facilities.

2.Repair pavement, roads, sod, and all other areas affected by construction operations and restore them to original condition or to minimum condition specified.

3.Remove spatter, grease, stains, fingerprints, dirt, dust, labels, tags, packing materials and other foreign items or substances from interior and exterior surfaces, equipment, signs and lettering.

4.Repair, patch and touch up chipped, scratched, dented or otherwise marred surfaces to match specified finish.

5.Remove paint, clean and restore all equipment and material nameplates, labels and other identification markings.

6.Clean all floors, slabs, pavements, and ground surfaces.

7.Maintain cleaning until acceptance and occupation by GOVERNMENT.

1.2 MEASUREMENT AND PAYMENT

A.The costs for all work described in this Section and required to construct the Advanced

Primary Treatment Plant shall be included under the Contractor's Lump Sum Bid in

SECTION 01720

PROJECT RECORD DOCUMENTS

A.CONTRACTOR shall maintain and provide the COR with the project record documents as specified below except where otherwise specified or modified in other Divisions of the Contract Documents. Current status of record drawings shall be a condition precedent to progress payments.

B.Maintenance of Documents:

1.A set of reproducibles of the Contract Drawings will be furnished to the

CONTRACTOR by the GOVERNMENT. Bluelines shall be made from these reproducibles by the CONTRACTOR and shall be updated by the CONTRACTOR with record information and reviewed by the COR prior to each request for payment made by the CONTRACTOR.

2.Maintain in CONTRACTOR'S field office in clean, dry, legible condition complete sets of the following: Contract Documents, Addenda, approved Shop Drawings, Samples, photographs, Change Orders, other Modifications of Contract, test records, copies of all survey data prepared by the CONTRACTOR, Field Orders, and all other documents pertinent to CONTRACTOR'S Work.

3.Provide files and racks for proper storage and easy access. File in accordance with filing format of Construction Specification Institute (CSI) unless otherwise approved by COR.

4.Make documents available at all times for inspection by COR.

5.Record documents shall not be used for any other purpose and shall not be removed from the office without COR'S approval.

C.Recording:

1.Keep record documents current, and updated at least monthly.

2.Do not permanently conceal any Work until required information has been recorded.

3.Contract Drawings: Legibly mark to record actual construction including:

a.Depths of various elements of foundation in relation to datum.

b.Horizontal and vertical location of underground utilities and appurtenances referenced to permanent surface improvements.

c.Location of internal utilities and appurtenances concealed in construction referenced to visible and accessible features of structure.

d.Field changes of dimensions and details.

e.Changes made by modification or field change.

f.Details not on original Contract Drawings.

4.Specifications and Addenda: Legibly mark up each Section to record:

a.Manufacturer, trade name, catalog number, and supplier of each product and item of equipment actually installed.

b.Changes made by modification or field change.

c.Other matters not originally specified.

5.Shop Drawings: Maintain as record documents and legibly annotate drawings to record changes made after review.

D.Record Drawings:

1.Record Drawings shall be prepared for all the Work included in the Contract showing the actual in-place installation of the items installed under this Contract.

The drawings shall show the Work in plan and sections as required for clarity with reference dimensions and elevations for complete record drawings.

2.The Contract Drawings may be used as a starting point in developing these drawings. Subcontractor and manufacturer drawings may be included in this drawing package. The drawing package must be fully integrated and include the necessary cross references between drawings. The drawing package shall include interconnection and termination details to equipment furnished under this Contract.

3.The record drawings of the electrical work shall shown one-line diagrams with all conduit and wire sizes shown of the distribution systems and the actual in-place grounding system, lighting arrangement, motor control centers, corrected wiring diagrams, equipment and conduit and cable plans. The following composite drawings shall also be furnished:

a.Schematic (Elementary) Diagrams: This shall also include but not be limited to complete schematics including items furnished by others for the following:

1)Motor Control Circuits for Starter furnished under this Contract.

2)Substation controls.

b.Wiring (Connection) Diagrams: These shall be included for all pre-wired equipment furnished under this Contract.

c.Interconnection Diagrams: These shall include all interconnections to be furnished under this Contract.

d.Conduit and Cable Schedules: These shall include all conduit and cable furnished under this Contract.

e.Dimension of Outline Drawings: These shall include all equipment furnished under this Contract.

f.Power and Lighting Layout Drawings: These shall include all conduits and wirings furnished under this Contract.

4.The record drawings of the instrumentation work shall include the following:

a.Programmable Controller System Information:

1)Detailed block diagram showing system hardware configuration 2)Input/output point listing with I/O module cross reference identification.

b.Equipment Hardware:

1)Layout drawings showing front, rear, end, and plan views to scale of all processing equipment, I/O components, power supplies, and peripheral devices.

2)Construction details and features.

3)Interconnection diagrams including termination details, cable identification lists, and cable lengths.

4)Plans showing equipment layout in control panels.

c.Panels, Consoles and Cabinets Information:

1) Layout Drawings, including the following:

a) Front, rear, end and plan views to scale.

b) Dimensional information.

c)Tag number and functional name of components mounted in and on panel, console, or cabinet.

d)Location of external wiring and/or piping connections.

e) Mounting and installation details.

f)Subpanel layouts and mounting details for all items located inside control panels.

2)Panel schematic and internal point-to-point wiring and/or piping diagrams, including the following:

a) Name of panel, console, or cabinet.

b) Wiring sizes, types, and numbers.

c) Piping sizes, types, and numbers.

d)Terminal strip and post numbers for all interconnections.

e) Color coding.

f)Functional name and manufacturer's designation for components to which wiring and piping are connected.

3)Electrical control schematics in accordance with JIC standards for all circuits indicated in the specifications or on the Contract Drawings. All wires shall be labeled and shown on the submittal drawings.

4) Plan showing equipment layout in each area.

5)Stock lists or Bill of Materials for each panel including tag number, functional name, manufacturer's name, manu-facturer's model number, and quantity for all components mounted in or on the panel or enclosure.

d. Field wiring and piping diagrams, including the following:

1) Wiring and piping sizes, types, and numbers.

2) Terminal strip numbers for each wire termination.

3) Color coding.

4)Conduits, junction boxes, and pull boxes in which wiring is to be located.

5)Location, functional name, and manufacturer's designation of items to which wiring and/or piping are connected.

6)Point-to-point wiring diagrams shall include all interconnections between field devices, panels, control stations, lighting panels, and motor starters.

e.Instrument loop diagrams for all analog display and control loops prepared using ISA standard symbols in accordance with ISA standard S5.4, including the following:

1)Functional name of loop.

2)ISA tag numbers as shown in the Specifications and on the Contract Drawings.

3)Functional name and manufacturer's name and model, product or catalog number for each item in the loop.

4)Location of each item.

5)Signal type and calibrated range, scale, or setpoint for each item.

6)Transmitter output drive and receiver input impedances. Show total loop impedance and reserve.

7)Identification of loop and instrument energy sources.

8)Identification of all interconnections. Include wire numbers, sizes and types, cable numbers, conduit numbers, intermediate junction box identification and location, terminal numbers, and grounding connections.

5.Survey documentation shall be submitted in accordance with the requirements of Section 01050.

E.Submittal:

1.No later than 30 days after the completion of the Work, the CONTRACTOR shall furnish three (3) blueline sets of the record drawings to the COR for review and approval. The Record Drawings will be reviewed and returned to the CONTRACTOR within 30 days. A set of reproducibles and three (3) blueline sets of the final record documents shall be submitted to the COR. The final submittal of record drawings shall be made not later than 30 days after the COR returns the documents and prior to final payment.

2.Accompany submittal with transmittal letter containing:

a.Date.

b. Project title and number.

c.CONTRACTOR'S name and address.

d.Title and number of each record document.

e.Certification that each document as submitted is complete and accurate.

f.Signature of CONTRACTOR, or his authorized representative.

1.2 MEASUREMENT AND PAYMENT

A.The costs for all work described in this Section and required to construct the Advanced

Primary Treatment Plant shall be included under the Contractor's Lump Sum Bid in

SECTION 02050

DEMOLITION

PART 1 - GENERAL

1.1 DESCRIPTION

A.General: This section describes the general demolition requirements for structural, civil, mechanical, electrical, instrumentation and appurtenant work required for removal, salvage, tie-ins and modifications of existing facilities. These general demolition requirements apply, in general, to all demolition work furnished under this Contract.

They shall supplement the notes and details on the Contract Drawings, and requirements of other sections of the Specifications.

B.Scope:

1.CONTRACTOR shall provide all labor, materials, equipment, services, and incidentals required for demolitions, tie-ins, removal and disposal Work as shown and as specified in the Contract Documents.

2.The CONTRACTOR shall retain ultimate responsibility under this contract for all demolition work and for coordination of all work under this section with all other work required by the Contract Documents; and the CONTRACTOR shall furnish and install all equipment, labor, materials, appurtenances, specialty items and services not provided by the CONTRACTOR's subcontractors, suppliers or fabricators but required for complete demolition work, and complete and operable facilities.

3.All materials and debris generated and not designated for salvage shall be legally disposed of by the CONTRACTOR at the CONTRACTOR's expense.

C.Related work specified elsewhere that shall apply to all equipment, materials, labor and services furnished under this section shall include, but not be limited to, the following:

1.Division 1, General Requirements:

a.Section 01030, Special Construction Conditions.

b.Section 01040, Coordination.

c.Section 01045, Cutting and Patching.

d.Section 01047, Maintenance and Operation of Existing Facilities.

e.Section 01050, Field Engineering.

f.Section 01341, Submittals.

g.Section 01545, Protection of the Work and Property.

h.Section 01610, Transportation, Handling, and Storage of Materials and

Equipment.

i.Section 01701, Warranty.

2.Division 2, Site Work.

3.Division 3, Concrete.

D.The CONTRACTOR's subcontractors, suppliers and fabricators furnishing equipment, labor, materials, services and appurtenant work under this section shall be required to review and satisfy all relevant requirements of other sections of the Contract Documents and the requirements of the Contract Drawings. The CONTRACTOR, suppliers, fabricators and/or subcontractors furnishing and/or installing equipment, labor, services and specialties associated with this Section shall fully coordinate their efforts to avoid potential claims that are based on failure to review all relevant Contract Documents, including the Contract Drawings.

1.2 SUBMITTALS

A.The CONTRACTOR shall submit proposed methods, equipment and operating sequences for demolition and/or tie-in to existing facilities including coordination requirements with GOVERNMENT for shut-off, temporary services, continuation of utility service, and other applicable items to ensure continuous and safe operation of existing facilities affected by the CONTRACTOR'S work.

B.Submittals shall be made in accordance with the procedures specified in Section 01341, and the requirements specified in Parts 3.1.A, 3.2.F, and 3.2.I of this Section.

1.3 MEASUREMENT AND PAYMENT

A.The costs for all work described in this Section and required to construct the Advanced

Primary Treatment Plant shall be included under the Contractor's Lump Sum Bid in

PART 2 - NOT USED

3.1 CONTRACTOR VERIFICATION

A.Contract Drawings: The Contract Drawings show the location of known existing structures and facilities. The information on exposed structures has been obtained from field investigations, observations and available Record Drawings. The information on buried objects has been obtained from available Record Drawings.

Screened backgrounds shown on the drawings have been developed from the existing GOVERNMENT-furnished Record Drawings. The information is not guaranteed to be either complete or accurate and must be verified by the CONTRACTOR via potholing and hand excavation, and field measurements as required prior to starting demolition work.