Electrical___E_111.docx

DOCX document 459 KB Posted

Attached to
Replacement of the Grit Lines and the Installation of New Glass Lined Ductile Iron Pipes in Precast Concrete Trench
Solicitation number
IBM17R0007
Issued by

About this file

Electrical

View the file

Other files

File Type Posted
IBM17R0007_A003_Grit_Line.pdf PDF
Revised_Grit_Line_Specifications_8-9-2017.docx DOCX document
Mechanical_DRW__M102.docx DOCX document
Picture_II_8-8-2017.docx DOCX document
Picture_8-8-2017.docx DOCX document
Sign-in_sheet_for_the_Grit_Line_Project_Site_Visit.pdf PDF
J.02_Revised_Specifications_7-14-2017_1.pdf PDF
IBM17R0007-A002_Grit_Line_SBIWTP.pdf PDF
J.03_Drawings.zip ZIP file
IBM17R0007_A001_Grit_Line_SBIWTP.pdf PDF
IBM17R0007_Grit_Line_SBIWTP.pdf PDF
J.04_Wage_Determination_CA170001_06.09.2017.pdf PDF
J.01_Grit_Line_Scope_of_Work.pdf PDF
J.02_Specifications.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Low Voltage Conduit.

Power supply conduits.

Proposed Locations of the new flow meters.

Existing Two Glass Lined Ductile Iron pipes image1.tiff

File details come from the government source that posted it. Updated .