I.B.08.2_21R0034 USDA-ARS Kerrville 4C2 - Supplemental Letter 2 2020-0421.PDF

PDF 700 KB Posted

Attached to
USDA-ARS Knipling-Bushland Research Laboratory Modernization Project
Solicitation number
W9126G21R0034
Issued by

About this file

This document provides supplemental retaining wall parameters for a geotechnical engineering study of the USDA-ARS Knipling-Bushland Research Laboratory Modernization Project. The retaining wall parameters include recommended active lateral earth pressure values and friction angles for various on-site formations and lithologies that may be encountered, including clayey gravel, lean clay, limestone, and select fill. Concrete retaining walls are planned as part of the facility improvement and expansion. The retaining wall parameters were not included in the original May 29, 2019 geotechnical engineering report but are necessary for design of the planned retaining walls. The Army Corps of Engineers Engineering District Fort Worth is the agency overseeing the solicitation for the USDA-ARS Knipling-Bushland Research Laboratory Modernization Project.

View the file

Other files

File Type Posted
I.B.08.3_21R0034 P00006 USDA-ARS Kerrville RFP AMD6.pdf PDF
I.B.08.3_21R0034 P00005 USDA-ARS Kerrville RFP AMD5.pdf PDF
I.B.08.3_21R0034 P00004 USDA-ARS Kerrville RFP AMD4.pdf PDF
I.B.08.3_21R0034 P00003 USDA-ARS Kerrville RFP AMD3.pdf PDF
I.B.08.3_21R0034 P00001 USDA-ARS Kerrville RFP AMD2.pdf PDF
I.B.07.1_Kerrville USACE Presolicitation Site Visit Sign In.pdf PDF
I.B.08.3_21R0034 P00001 USDA-ARS Kerrville RFP AMD1.pdf PDF
I.B.08.2_21R0034 USDA-ARS Kerrville 4D4 -LimitedSubsurfaceReport2019-0604.pdf PDF
I.B.08.2_21R0034 USDA-ARS Kerrville RFP Pkg2 B998 Drawings pt. 1.pdf PDF
I.B.08.2_21R0034 USDA-ARS Kerrville 4D2 - Asbestos Inspection Reports.pdf PDF
I.B.08.2_21R0034 USDA-ARS Kerrville RFP Pkg2 B998 Drawings pt. 2.pdf PDF
I.B.08.2_21R0034 USDA-ARS Kerrville 4A3 - Topographical Survey.pdf PDF
I.B.08.2_21R0034 USDA-ARS Kerrville 4A1 - StateTX USDA Easement.pdf PDF
I.B.08.2_21R0034 USDA-ARS Kerrville 4C1 - Geotech Report Rev-1 2019-0702.pdf PDF
I.B.08.2_21R0034 USDA-ARS Kerrville 4B1 - Water Pressure Calculations.pdf PDF
I.B.08.2_21R0034 USDA-ARS Kerrville RFP Pkg5 B994 & S994 Drawings.pdf PDF
I.B.08.2_21R0034 USDA-ARS Kerrville RFP Pkg1 Civil & Sitework Drawings.pdf PDF
I.B.08.2_21R0034 USDA-ARS Kerrville RFP Pkg3 B997 Drawings.pdf PDF
I.B.08.2_21R0034 USDA-ARS Kerrville 4E - Commissioning Plan.pdf PDF
I.B.08.2_21R0034 USDA-ARS Kerrville RFP Pkg4 B995 & B996 Drawings.pdf PDF
I.B.08.2_21R0034 USDA-ARS Kerrville 4A2 - KerrvilleUSDAAnnexation2020-05.pdf PDF
I.B.08.2_21R0034 USDA-ARS Kerrville 4D3 - Lead Based Paint Inspections.pdf PDF
I.B.08.2_21R0034 USDA-ARS Kerrville 4C3 - Supplemental Letter 3 2020-1008.pdf PDF
I.B.08.2_21R0034 USDA-ARS Kerrville 4D1 - Hazardous Materials Inspection.pdf PDF
I.B.08.2_21R0034 USDA-ARS Kerrville RFP.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARIAS

GEOPROFESSIONALS

To: Mr. Jon C. DeLay, P.E.

Company: Merrick & Company

From: Jerry D. Shepherd, P.E., D.GE Kacy M. Crawford, P.E.

Date: April21, 2020

Page: 1 of 1

Arias Job No.: 2018-933

Subject: Retaining Wall Parameters: USDA ARS KBUSLIRL Kerrville, Texas

Arias Geoprofessionals, Inc. (Arias) previously prepared a geotechnical engineering study for the above referenced project. The results of our study were originally presented in Arias Geotechnical Engineering Report, project number 2018-933, dated May 29, 2019 and revised July 2, 2019.

Please contact me for any additional parameters that are needed.

Sincerely, Arias & Associates, Inc.

TBPE Registration No: F-32 c~~ i~j)

4 ‘.~c5~ ~ “~~r •.*..

JERRY D.SHEPHERD ~

a ~

112142 ••‘~‘

Retaining wall recommendations were not within the scope of work for the above referenced Report.

Concrete retaining walls are now planned as part of the improvement and expansion of the facility, and recommended retaining wall parameters for the site are provided below in Table 1. The parameters presented for the Select Fill is an assumed value, since we do not know what the Select FilIwill be ultimately utilized at the site

Table 1: Retaining Wall Parameters

Formation and ~ - - Active Lateral Earth Pressure Values Lithology ¶•~ ~‘ ‘~ Friction, 0 EFD

~PCI (°) . . (pc~ Clayey Gravel (GC) 125 22 0.45 57

Lean Clay (CL) 120 20 0.40 45

Limestone 135 36 0.25 35

Select Fill 125 30 0.33 42

4/21/2020

~~96 rry D. Shepherd, P.E., D.GE Senior Geotechnical Engineer

Kacy . Crawford, P.E.

Geotechnical Engineer