This document contains a sample task order attachment and unit cost worksheet for facilities reduction services. The task order outlines fixed project costs, square footage demolition costs by structure, and non-square footage demolition costs. Services include pre-mobilization documentation, building assessment, mobilization, demobilization, contractor reporting, asbestos abatement, demolition, site restoration, salvage, and slab concrete removal. Unit pricing is provided for flooring, insulation, transite boards, asbestos paint, disposal fees, lighting, thermostats, oils, and hazmat disposal. Relatedly, the federal contract opportunity is for small to very large facility demolition and abatement services under the Facilities Reduction Program Pacific Region Multiple Award Task Order Contract. The Army Corps of Engineers seeks environmental assessments, abatement of contaminants, waste redirection, transportation of debris, disposal of regulated materials, and other demolition and destruction activities.

View the file

Other files for this federal contract opportunity

Other files attached to FRP Pacific Region MATOC, newest first.
File Type Posted
I.B.08 Attachment 19 - Questions- Dated 9 September 2020.pdf PDF
I.B.08 FRP Pacific Region SYNOPSIS-Amendment 1- W912DY20R0034 - 9 September 2020.pdf PDF
I.B.08 FRP Pacific Region RFP MOD - 11 September 2020.pdf PDF
I.B.08 Attachment 16 - Sample Task Order Rev 01 - Dated 9 September 2020.pdf PDF
I.B.08 Attachment 17 - Sample Task Order Attachment B Rev 01 - Dated 9 September 2020.xlsx XLSX spreadsheet
I.B.08 FRP Pacific Region RFP Conform - 11 September 2020.pdf PDF
I.B.08 Attachment 13 Specification Guide 02220 - Demolition.pdf PDF
I.B.08 FRP Pacific Region RFP W912DY20R0034 - 26 AUG 2020 - FINAL.pdf PDF
I.B.08 Attachment 10 - Accident Prevention Plan Checklist.pdf PDF
I.B.08 Attachment 3 - Experience Reporting Form.pdf PDF
I.B.08 Attachment 14 Specification Guide 02221 - Ex-Back-Site.pdf PDF
I.B.08 Attachment 9 - Work Plans, Sub-Plans, and Appendices.pdf PDF
I.B.08 Attachment 8 - Monthly Progress Report Format.pdf PDF
I.B.08 Attachment 1 - Performance Requirements Summary.pdf PDF
I.B.08 Attachment 15 - Descriptive Data for ECPs and REAs.pdf PDF
I.B.08 Attachment 12 - Demolition and Recycling Final Report.pdf PDF
I.B.08 Attachment 2 - Quality Assurance Surveillance Plan.pdf PDF
I.B.08 Attachment 6- Letter of Commitment (Key Subcontractor).pdf PDF
I.B.08 Attachment 16 - Sample Task Orderr.pdf PDF
I.B.08 FRP Pacific Region SYNOPSIS W912DY20R0034 - 26 AUG 2020 - FINAL.pdf PDF
I.B.08 Attachment 7 - FRP Small Business Decision Matrix.pdf PDF
I.B.08 Attachment 5 - Small Business Participation Commitment.pdf PDF
I.B.08 Attachment 18 - Estimated Quantities.xlsx XLSX spreadsheet
I.B.08 Attachment 4- Past Performance Questionnaire.pdf PDF
I.B.08 Attachment 11 - Safety and Health Program Requirements.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Directions

ATTACHMENT 17 SAMPLE TASK ORDER B
1. Delete any Option tabs that are not required for the project.

2. Remove unneccessary option lines from the, "Summary" tab by right clicking the unneccary option cell then, "delete" and selecting, "entire row".

3. Input data into the highlighted cells in the Base and Option tabs as appropriate.

4. Remove highlights from Base and option tabs.

5. Delete the Directions tab.

Summary

Facilities Reduction Program - Proposal Estimate Worksheet Summary
Company Name:
Project Site/Locations:Redstone Arsenal, ALContract Phase:INITIAL BIDProposal Date:
Fiscal Year:2020

Base $ - 0

Total $ - 0

Base Task Pricing

Facilities Reduction Program - Proposal Estimate Worksheet Summary
Company Name:Contract Phase:INITIAL BID
Project Site/Locations:Redstone Arsenal, ALProposal Date:
Fiscal Year:2020
Number of Facilities:5
SECTION #1 Fixed Project CostsSunk Costs
Item NumberDescriptionUoMUnitsUnit PriceExtension
1.1Pre-Mobilization Documentation (PWS Par. 3.2 & 3.3 specifically)L.S.1$ - 0
1.2Pre-Demolition Building Assessment (PWS Par 3.3.1)L.S.1$ - 0
1.3Mobilization/Site Setup (PWS Par. 3.3.2)L.S.1$ - 0
1.4Demobilization (PWS Par. 3.3.2)L.S.1$ - 0
1.5Contractor Reporting (PWS Par. 3.6)L.S.1$ - 0
Section #1 Price$ - 0
SECTION #2 Square Footage FacilitiesACM Abatement and Demolition (by structure)
(PWS Par. 3.3.3 THRU 3.3.7 & 3.4 associated with Par. 3.5)Per Each FacilityAbatementDemolitionSite RestorationSalvage
Item NumberFacility TypeFacility DescriptionUoM# of UnitsPer S.F. Unit PricePer S.F. Unit PricePer S.F. Unit PricePer Facility ValueExtension

Brian Spear: Instruction:

Extension = # of Units * (Abatement Per SF Unit Price + Demolition Per SF Unit Price +

2.11ADMIN GEN PURPS.F.8,920$ - 0
2.22ADMIN GEN PURPS.F.4,720$ - 0
2.33TT ENL BARRACKSS.F.4,720$ - 0
2.44CLASSROOM BUILDINGS.F.18,224$ - 0
2.55WAREHOUSES.F.21,931$ - 0
TOTAL S.F. (1 of EA Type)58,515Section #2 Price$ - 0
Section #2 Average Per S.F. Price:$ - 0
SECTION #3 Non-Square Footage FacilitiesACM Abatement and Demolition (by structure)
(PWS Par. 3.3.3 THRU 3.3.7 & 3.4 associated with Par. 3.5)Per Each FacilityAbatementDemolitionSite RestorationSalvagePer Each Facility
Item NumberFacility TypeFacility DescriptionUoM# of UnitsPer UoM Unit PricePer UoM Unit PricePer UoM Unit PricePer Facility ValueExtension
1SLABCONCRETE SLABS.Y.100$ - 0
FACILITY TYPE COUNT1Section #3 Price:$ - 0
Section #3 Average Per S.Y. Price:$ - 0
BASE TOTAL PRICE$ - 0
BASE TOTAL AVERAGE PER S.F. PRICE$ - 0
Price Proposal Notes:

UnitPriceWorksheet

Facilities Reduction Program - Small Unforeseen Quantity Unit Cost Estimate Worksheet
Company Name:
Project Site/Locations:Redstone Arsenal, ALProposal Date:0
Fiscal Year:2020
The intent of these unit costs are for small unforeseen changes to the project and are intended for expediting low value changes.
The Government reserves the right to evaluate all Modifications, ECPs, and REAs or any other contractual change on an individual basis to assess a fair and reasonable rate.
No.ItemUOMQuanityUnit CostExtensionNotes
1Floor TileSF
2MasticSF
3Caulk or SealantLF
4Pipe Insulations - 2" & underLF
5Pipe Insulations - 2" - 10"LF
6Pipe Insulation - 12" & aboveLF
7Transite Board'SF
8Asbestos Containing PaintSF
9ACM Disposal FeeTon
10Lighting Ballasts (PCB)Each
11Fluorescent Lighting TubesSF
12Mercury ThermostatsEach
13POL ProductsGal
14Haz/Mat Disposal FeesLS
15FoundationsCY
16HardstandSF
17Trees & Vegetation (per Area)Acre
18Power PolesEach
19Backfill FoundationsCY
20GradingSF
21Mulch & SeedingSF