Hurricane_Nicole_Seawall_Extension_and_Repairs_14th_15th_29th_Ave_New_Smyrna_Beach_-_Bid_Tab.xlsx
XLSX spreadsheet 47 KB Posted
- Attached to
- Hurricane Nicole Seawall Extensions and Repairs for 14th, 15th, and 29th Avenues in New Smyrna Beach
- Solicitation number
- 25-B-70IF
- Issued by
- Volusia County, Florida
About this file
This is a bid tabulation document for hurricane recovery seawall extension and repair projects in New Smyrna Beach, Florida, encompassing three separate work sites across 14th Avenue, 15th Avenue, and 29th Avenue. The project addresses storm surge damage from Hurricane Nicole that eroded dunes and compromised seawall effectiveness, requiring extension of seawall returns westward to stabilize public beach access points, backfill erosion damage, and restore access to dune walkovers. The work scope across all three locations includes mobilization and demobilization, construction and as-built surveys, environmental compliance, temporary traffic control, demolition and disposal, sheet pile bulkhead installation, concrete caps and plugs, helical anchors, and timber railings. Specific quantities vary by location: 14th Avenue requires 38 linear feet of UC 75 sheet pile bulkhead and 5 helical anchors; 15th Avenue requires 73 linear feet of U75 sheet pile bulkhead, 141 linear feet of timber railing, and 9 helical anchors; and 29th Avenue requires 58 linear feet of U75 sheet pile bulkhead, 161 linear feet of timber railing, and 7 helical anchors.
The bid tabulation reflects all line items with zero pricing entries across mobilization, survey work, environmental compliance, traffic control, demolition, fill material quantities ranging from 15 to 65 cubic yards by location, structural components, and ancillary items. No pricing data, award information, contract term, bidder details, submission deadlines, or site visit requirements are populated in this tabulation document.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hurricane Nicole Dune Walkover
| Hurricane Nicole Seawall Extension and Repair 14th Ave . | |||||
| Contractor's Cost | |||||
| ITEM No. | DESCRIPTION | QUANTITY | UNIT | PRICE / UNIT | PRICE |
| 1 | Mobilization and Demobilization | 1 | LS | $ - 0 | $ - 0 |
| 2 | Construction Survey and As-Built Survey | 1 | LS | $ - 0 | $ - 0 |
| 3 | Environmental Compliance | 1 | LS | $ - 0 | $ - 0 |
| 4 | Temporary Traffic Control | 1 | LS | $ - 0 | $ - 0 |
| 5 | Demolition, Hauling and Disposal | 1 | LS | $ - 0 | $ - 0 |
| 6 | Fill Material | 40 | CY | $ - 0 | $ - 0 |
| 7 | UC 75 Sheet Pile Bulkhead | 38 | LF | $ - 0 | $ - 0 |
| 8 | Concrete Cap | 38 | LF | $ - 0 | $ - 0 |
| 9 | Concrete Plug | 1 | LS | $ - 0 | $ - 0 |
| 10 | Helical Anchors | 5 | EA | $ - 0 | $ - 0 |
| Sub Total | $ - 0 | ||||
| LS=Lump Sum; LF= Linear Foot; CY=Cubic Yard; SY= Square Yard; SF= Square Foot; EA= Each; TN=Ton | |||||
| Hurricane Nicole Seawall Extension and repair 15th Ave. | |||||
| Contractor's Cost | |||||
| ITEM No. | DESCRIPTION | QUANTITY | UNIT | PRICE / UNIT | PRICE |
| 1 | Mobilization and Demobilization | 1 | LS | $ - 0 | $ - 0 |
| 2 | Construction Survey and As-Built Survey | 1 | LS | $ - 0 | $ - 0 |
| 3 | Environmental Compliance | 1 | LS | $ - 0 | $ - 0 |
| 4 | Temporary Traffic Control | 1 | LS | $ - 0 | $ - 0 |
| 5 | Demolition, Hauling and Disposal | 1 | LS | $ - 0 | $ - 0 |
| 6 | Fill Material | 15 | CY | $ - 0 | $ - 0 |
| 7 | U75 Sheet Pile Bulkhead | 73 | LF | $ - 0 | $ - 0 |
| 8 | Concrete Cap | 73 | LF | $ - 0 | $ - 0 |
| 9 | Timber Railing | 141 | LF | $ - 0 | $ - 0 |
| 10 | Concrete Plug | 1 | LS | $ - 0 | $ - 0 |
| 11 | Helical Anchors | 9 | EA | $ - 0 | $ - 0 |
| Sub Total | $ - 0 | ||||
| LS=Lump Sum; LF= Linear Foot; CY=Cubic Yard; SY= Square Yard; SF= Square Foot; EA= Each; TN=Ton | |||||
| Hurricane Nicole Seawall Extension and Repair 29th Ave | |||||
| Contractor's Cost | |||||
| ITEM No. | DESCRIPTION | QUANTITY | UNIT | PRICE / UNIT | PRICE |
| 1 | Mobilization and Demobilization | 1 | LS | $ - 0 | $ - 0 |
| 2 | Construction Survey and As-Built Survey | 1 | LS | $ - 0 | $ - 0 |
| 3 | Environmental Compliance | 1 | LS | $ - 0 | $ - 0 |
| 4 | Temporary Traffic Control | 1 | LS | $ - 0 | $ - 0 |
| 5 | Demolition, Hauling and Disposal | 1 | LS | $ - 0 | $ - 0 |
| 6 | Fill Material | 65 | CY | $ - 0 | $ - 0 |
| 7 | U75 Sheet Pile Bulkhead | 58 | LF | $ - 0 | $ - 0 |
| 8 | Timber Railing | 161 | LF | $ - 0 | $ - 0 |
| 9 | Concrete Cap | 58 | LF | $ - 0 | $ - 0 |
| 10 | Concrete Plugs | 1 | LS | $ - 0 | $ - 0 |
| 11 | Helical Anchors | 7 | EA | $ - 0 | $ - 0 |
| Sub Total | $ - 0 | ||||
| LS=Lump Sum; LF= Linear Foot; CY=Cubic Yard; SY= Square Yard; SF= Square Foot; EA= Each; TN=Ton |
Total $ - 0 image1.jpeg image2.jpeg