Exhibit_B_-_PRIME-SUB_FORM_25-B-70IF.xls
XLS spreadsheet 38 KB Posted
- Attached to
- Hurricane Nicole Seawall Extensions and Repairs for 14th, 15th, and 29th Avenues in New Smyrna Beach
- Solicitation number
- 25-B-70IF
- Issued by
- Volusia County, Florida
About this file
The document is a Prime/Subcontractor Form (Exhibit B) for Contract No. C-2024, ITB No. 25-B-70IF, associated with a county-level construction project. The form is designed for bidders to list all proposed subcontractors and detail their scope of work, with disciplines including demolition, excavation, sitework, seawall panel installation, helical anchor installation, backfill, grading, concrete work, testing, and surveying. The form requires bidders to specify the dollar value and percentage of work for both prime and subcontractors, with a mandatory requirement that total subcontractor work percentages must equal 100%.
The document emphasizes that prime contractors are responsible for ensuring subcontractors hold appropriate licenses and that any subcontractor changes require prior approval from the County Project Manager. The form will be used to determine local preference in accordance with Section 2.8, D of the solicitation. Currently, all dollar values and percentages are listed as zero, indicating this is a blank template for potential bidders to complete. The county reserves the right to seek clarification about subcontractors but will not allow changes to the total submitted base bid pricing.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2024 | ITB No. 25-B-70IF | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Exhibit G - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| $ - 0 | 0.00% | ||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| Demolition | $ - 0 | 0.00% | |
| Excavation and Sitework | $ - 0 | 0.00% | |
| Seawall Panel Installation | $ - 0 | 0.00% | |
| Helical Anchor Installation | $ - 0 | 0.00% | |
| Backfill and Grading | $ - 0 | 0.00% | |
| Concrete | $ - 0 | 0.00% | |
| Testing (Concrete & Compaction) | $ - 0 | 0.00% | |
| Surveying | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |