This document is a geotechnical engineering report prepared by Universal Engineering Sciences (UES) for a seawall replacement project located at 14th Avenue and Hill Street in New Smyrna Beach, Volusia County, Florida. The report details a subsurface evaluation conducted after the existing seawall was damaged during Hurricanes Ian and Nicole in 2022. UES performed a Standard Penetration Test (SPT) boring to a depth of 40 feet, examining soil conditions and groundwater levels to support the design and construction of the new seawall. The investigation was completed on March 7, 2024, with the primary objective of providing soil design parameters and evaluating the subsurface conditions at the project site.
The geotechnical report includes detailed findings about the soil composition, which consists of intermittent layers of medium dense to very dense fine sand with varying shell contents and silt. Groundwater was encountered at approximately one foot below the existing grade. The report provides comprehensive soil design parameters, including angle of internal friction, unit weight, and lateral earth pressure coefficients. UES recommends construction materials testing, field observations, and on-site monitoring during the project. The report also includes important disclaimers about the limitations of geotechnical investigations, emphasizing that subsurface conditions can vary and that the recommendations are based on professional judgment and should be verified during actual construction.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
March 7, 2024
Ms. Natalie Tejada Dredging & Marine Consultants 4643 Clyde Morris Boulevard Port Orange, Florida 32129
Reference: GEOTECHNICAL EVALUATION 14th Avenue and Hill Street Seawall
New Smyrna Beach, Volusia County, Florida UES Project No. 0430.2300226.0001
UES Report No. 2037161
Dear Ms. Tejada, UES has completed the subsurface evaluation for the subject project located in New Smyrna Beach, Volusia County, Florida. This letter presents the results of our field exploration and associated engineering evaluation. We understand the proposed project will consist of replacing the existing seawall near the intersection 14th Avenue and Hill Street in New Smyrna Beach, Florida. We understand that the existing wall was damaged during the impact of Hurricanes Ian and Nicole in 2022. We understand that the existing seawall will be removed prior to the installation of the new seawall. It was requested we evaluate the subsurface conditions at the locations provided to us by you and to provide soil design parameters to aid in design.
FIELD EXPLORATION
UES performed one (1) Standard Penetration Test (SPT) boring to a depth of approximately 40 feet below existing grade adjacent to the existing seawall at the approximate location shown on the attached Boring Location Plan in Appendix A. The SPT boring was performed in accordance with the procedures of ASTM D- 1586.
The boring was located using taped measurements from existing landmarks and should only be considered accurate according to the method used. The soil samples recovered from the soil test borings were returned to our laboratory and a UES Engineer visually examined and reviewed the field descriptions. The samples were visually classified in accordance with the Unified Soil Classification System (USCS).
FINDINGS
SUBSURFACE CONDITIONS
The results of the SPT boring generally indicated intermittent layers of medium dense to very dense fine sand with trace silt with various shell contents (SP) and fine sand with silt with various shell contents (SP-SM) to the boring termination depth of approximately 40 feet below existing grade.
Groundwater was encountered at a depth of approximately one-foot below existing grade.
B-1
GRAPHIC SCALE
0 30 60
(IN FEET)
1 INCH ~ 60 ft.~
APPROXIMATE LOCATION OF STANDARD PENETRATION TEST (SPT) BORING
LEGEND
PROJECT:
CHECKED BY:
DRAWN BY:
TITLE:
REPORT NO.:
PROJECT NO.:
DATE:
DATE:
PAGE/FIG. NO.:
MKL
A-1
SCALE:
1" ~ 60'~
BP
GEOTECHNICAL EVALUATION
14TH AVENUE AND HILL STREET
NEW SMYRNA BEACH, FLORIDA
2037161 0430.2300226.000103/06/24
03/06/24
BORING LOCATION PLAN
N
25'25'
20'20'
15'15'
03/04/24 1.0'
E.O.B. @ 40.0'
B-1
10'
5'
0'
10'
5'
0' Medium dense light gray fine SAND (SP)
30'30'
35'35'
40'40'
DRAWN BY:
CHECKED BY:
DATE:
DATE:
PROJECT NO.:
REPORT NO.:
MKL SCALE:
TITLE:
PAGE/FIG. NO.:
SUBSURFACE PROFILE
NA (in feet) A-2
PROJECT:
BP
GEOTECHNICAL EVALUATION
14TH AVENUE AND HILL STREET
NEW SMYRNA BEACH, FLORIDA
2037161
0430.2300226.000103/06/24
03/06/24
Medium dense light brown fine SAND (SP)
Dense light brown fine SAND with trace SILT and trace SHELL fragments (SP)
Dense gray fine SAND with SILT and few SHELL fragments (SP-SM)
Dense light brown fine SAND (SP)
Dense gray fine SAND (SP)
Dense gray fine SAND with trace SHELL fragments (SP)
Fine SAND (SP)
Fine SAND with some to many SHELL fragments (SP)
SHELL
NOTES:
Measured Groundwater Level 24 (+) Hours Subsequent to Time of Drilling Unified Soil Classification System End of Boring Penetr. Resistance, Blows/ft.
Hand Auger Method Weight of Hammer Coefficient of Permeability, (ft/day) % Passing No. 200 Sieve
(SP)
EOB
N
HA
WOH
Kv
-200
Fine SAND with
SILT (SP-SM)
Medium dense gray fine SAND with SILT and few SHELL fragments (SP-SM)
DRAWN BY:
CHECKED BY:
DATE:
DATE:
PROJECT NO.:
REPORT NO.:
MKL SCALE:
TITLE:
PAGE/FIG. NO.:
SOIL DESIGN PARAMETERS
NA (in feet) A-3
PROJECT:
BP
03/06/24
03/06/24
= Angle of Internal Friction (degrees) = Effective Unit Weight (PCF) = Unit Weight Below Water Table (PCF) = Coefficient of Active Lateral Earth Pressure = Coefficient of Passive Lateral Earth Pressure = Coefficient at Rest Lateral Earth Pressure = Cohesion (psf) f g gb Ka Kp Ko C
Fine SAND (SP)
Fine SAND with some to many SHELL fragments (SP)
SHELL
NOTES:
Measured Groundwater Level 24 (+) Hours Subsequent to Time of Drilling Unified Soil Classification System End of Boring Penetr. Resistance, Blows/ft.
Hand Auger Method Weight of Hammer Coefficient of Permeability, (ft/day) % Passing No. 200 Sieve
(SP)
EOB
N
HA
WOH
Kv
-200
Fine SAND with
SILT (SP-SM)
N
25'25'
20'20'
15'15'
03/04/24 1.0'
E.O.B. @ 40.0'
B-1
10'
5'
0'
10'
5'
0'
30'30'
35'35'
40'40'
GEOTECHNICAL EVALUATION
14TH AVENUE AND HILL STREET
NEW SMYRNA BEACH, FLORIDA
2037161
0430.2300226.0001
= 32 = 115 = 55 f g gb
= 0.47 = 0.31 = 3.25
Ko Ka Kp
= 34 = 115 = 55 f g gb
= 0.44 = 0.28 = 3.54
Ko Ka Kp
= 36 = 121 = 60 f g gb
= 0.41 = 0.26 = 3.85
Ko Ka Kp
= 38 = 127 = 65 f g gb
= 0.38 = 0.24 = 4.20
Ko Ka Kp
= 36 = 121 = 60 f g gb
= 0.41 = 0.26 = 3.85
Ko Ka Kp
= 40 = 127 = 65 f g gb
= 0.36 = 0.22 = 4.60
Ko Ka Kp
= 36 = 121 = 60 f g gb
= 0.41 = 0.26 = 3.85
Ko Ka Kp
= 34 = 115 = 55 f g gb
= 0.44 = 0.28 = 3.54
Ko Ka Kp
KEY TO BORING LOGS
UNIFIED SOIL CLASSIFICATION SYSTEM
MAJOR DIVISIONS GROUP
SYMBOLS TYPICAL NAMES
GW Well-graded gravels and gravel-sand mixtures, little or no fines CLEAN
GRAVELS
GP
Poorly graded gravels and gravel-sand mixtures, little or no fines
GM Silty gravels and gravel-sand-silt mixtures
GRAVELS
50% or more of coarse fraction retained on No. 4 sieve
GRAVELS
WITH FINES
GC Clayey gravels and gravel-sand-clay mixtures
SW** Well-graded sands and gravelly sands, little or no fines
CLEAN
SANDS
5% or less passing No.
200 sieve SP** Poorly graded sands and gravelly sands, little or no fines
SM** Silty sands, sand-silt mixtures
C O
A R
S E
G R
A
IN
E D
S O
IL
S
M or e th an
0% re ta in ed o n th e
N o.
s ie ve
SANDS
More than
50% of coarse fraction passes No.
4 sieve
SANDS with 12% or more passing No.
200 sieve SC** Clayey sands, sand-clay mixtures
ML
Inorganic silts, very fine sands, rock flour, silty or clayey fine sands
CL
Inorganic clays of low to medium plasticity, gravelly clays, sandy clays, lean clays
SILTS AND CLAYS
Liquid limit 50% or less
OL Organic silts and organic silty clays of low plasticity
MH
Inorganic silts, micaceous or diamicaceous fine sands or silts, elastic silts
CH Inorganic clays or clays of high plasticity, fat clays
OH Organic clays of medium to high plasticity
FI
N
E -G
R A
IN
E
D S
IO
LS
o r m or e pa ss es th e
N o.
s ie ve
SILTS AND CLAYS
Liquid limit greater than 50%
PT Peat, muck and other highly organic soils
*Based on the material passing the 3-inch (75 mm) sieve ** Use dual symbol (such as SP-SM and SP-SC) for soils with more than 5% but less than 12% passing the No. 200 sieve
RELATIVE DENSITY
(Sands and Gravels)
Very loose – Less than 4 Blow/Foot Loose – 4 to 10 Blows/Foot
Medium Dense – 11 to 30 Blows/Foot Dense – 31 to 50 Blows/Foot
Very Dense – More than 50 Blows/Foot
CONSISTENCY
(Silts and Clays)
Very Soft – Less than 2 Blows/Foot Soft – 2 to 4 Blows/Foot Firm – 5 to 8 Blows/Foot Stiff – 9 to 15 Blows/Foot
Very Stiff – 16 to 30 Blows/Foot Hard – More than 30 Blows/Foot
RELATIVE HARDNESS
(Limestone)
Soft – 100 Blows for more than 2 Inches Hard – 100 Blows for less than 2 Inches
MODIFIERS
These modifiers Provide Our Estimate of the Amount of Minor Constituents (Silt or Clay Size Particles) in the Soil Sample
Trace – 5% or less With Silt or With Clay – 6% to 11%
Silty or Clayey – 12% to 30% Very Silty or Very Clayey – 31% to 50%
These Modifiers Provide Our Estimate of the Amount of Organic Components in the Soil Sample
Trace – Less than 3% Few – 3% to 4%
Some – 5% to 8% Many – Greater than 8%
These Modifiers Provide Our Estimate of the Amount of Other Components (Shell, Gravel, Etc.) in the Soil Sample
Trace – 5% or less Few – 6% to 12%
Some – 13% to 30% Many – 31% to 50%
SYMBOLS AND ABBREVIATIONS
SYMBOL DESCRIPTION
N-Value No. of Blows of a 140-lb. Weight Falling 30 Inches Required to Drive a Standard Spoon 1 Foot
WOR Weight of Drill Rods
WOH Weight of Drill Rods and Hammer
Sample from Auger Cuttings
Standard Penetration Test Sample
Thin-wall Shelby Tube Sample (Undisturbed Sampler Used)
RQD Rock Quality Designation
Stabilized Groundwater Level
Seasonal High Groundwater Level (also referred to as the W.S.W.T.)
NE Not Encountered
GNE Groundwater Not Encountered
BT Boring Terminated
-200 (%) Fines Content or % Passing No. 200 Sieve
MC (%) Moisture Content
LL Liquid Limit (Atterberg Limits Test)
PI Plasticity Index (Atterberg Limits Test)
NP Non-Plastic (Atterberg Limits Test)
K Coefficient of Permeability
Org. Cont. Organic Content
G.S. Elevation Ground Surface Elevation
Geotechnical-Engineering Report
Geotechnical Services Are Performed for Specific Purposes, Persons, and Projects Geotechnical engineers structure their services to meet the specific needs of their clients. A geotechnical-engineering study conducted for a civil engineer may not fulfill the needs of a constructor — a construction contractor — or even another civil engineer. Because each geotechnical- engineering study is unique, each geotechnical-engineering report is unique, prepared solely for the client. No one except you should rely on this geotechnical-engineering report without first conferring with the geotechnical engineer who prepared it. And no one
— not even you — should apply this report for any purpose or project except the one originally contemplated.
Read the Full Report Serious problems have occurred because those relying on a geotechnical-engineering report did not read it all. Do not rely on an executive summary. Do not read selected elements only.
Geotechnical Engineers Base Each Report on a Unique Set of Project-Specific Factors Geotechnical engineers consider many unique, project-specific factors when establishing the scope of a study. Typical factors include: the client’s goals, objectives, and risk-management preferences; the general nature of the structure involved, its size, and configuration; the location of the structure on the site; and other planned or existing site improvements, such as access roads, parking lots, and underground utilities. Unless the geotechnical engineer who conducted the study specifically indicates otherwise, do not rely on a geotechnical-engineering report that was:
• not prepared for you;
• not prepared for your project;
• not prepared for the specific site explored; or
• completed before important project changes were made.
Typical changes that can erode the reliability of an existing geotechnical-engineering report include those that affect:
• the function of the proposed structure, as when it’s changed from a parking garage to an office building, or from a light-industrial plant to a refrigerated warehouse;
• the elevation, configuration, location, orientation, or weight of the proposed structure;
• the composition of the design team; or
• project ownership.
As a general rule, always inform your geotechnical engineer of project changes—even minor ones—and request an assessment of their impact. Geotechnical engineers cannot accept responsibility or liability for problems that occur because their reports do not consider developments of which they were not informed.
Subsurface Conditions Can Change A geotechnical-engineering report is based on conditions that existed at the time the geotechnical engineer performed the study. Do not rely on a geotechnical-engineering report whose adequacy may have been affected by: the passage of time;
man-made events, such as construction on or adjacent to the site; or natural events, such as floods, droughts, earthquakes, or groundwater fluctuations. Contact the geotechnical engineer before applying this report to determine if it is still reliable. A minor amount of additional testing or analysis could prevent major problems.
Most Geotechnical Findings Are Professional Opinions Site exploration identifies subsurface conditions only at those points where subsurface tests are conducted or samples are taken. Geotechnical engineers review field and laboratory data and then apply their professional judgment to render an opinion about subsurface conditions throughout the site. Actual subsurface conditions may differ — sometimes significantly — from those indicated in your report. Retaining the geotechnical engineer who developed your report to provide geotechnical-construction observation is the most effective method of managing the risks associated with unanticipated conditions.
A Report’s Recommendations Are Not Final Do not overrely on the confirmation-dependent recommendations included in your report. Confirmation-dependent recommendations are not final, because geotechnical engineers develop them principally from judgment and opinion. Geotechnical engineers can finalize their recommendations only by observing actual subsurface conditions revealed during construction. The geotechnical engineer who developed your report cannot assume responsibility or liability for the report’s confirmation-dependent recommendations if that engineer does not perform the geotechnical-construction observation required to confirm the recommendations’ applicability.
A Geotechnical-Engineering Report Is Subject to Misinterpretation Other design-team members’ misinterpretation of geotechnical-engineering reports has resulted in costly
Important Information about This
Subsurface problems are a principal cause of construction delays, cost overruns, claims, and disputes.
While you cannot eliminate all such risks, you can manage them. The following information is provided to help.
problems. Confront that risk by having your geo technical engineer confer with appropriate members of the design team after submitting the report. Also retain your geotechnical engineer to review pertinent elements of the design team’s plans and specifications. Constructors can also misinterpret a geotechnical-engineering report. Confront that risk by having your geotechnical engineer participate in prebid and preconstruction conferences, and by providing geotechnical construction observation.
Do Not Redraw the Engineer’s Logs Geotechnical engineers prepare final boring and testing logs based upon their interpretation of field logs and laboratory data. To prevent errors or omissions, the logs included in a geotechnical-engineering report should never be redrawn for inclusion in architectural or other design drawings. Only photographic or electronic reproduction is acceptable, but recognize that separating logs from the report can elevate risk.
Give Constructors a Complete Report and Guidance Some owners and design professionals mistakenly believe they can make constructors liable for unanticipated subsurface conditions by limiting what they provide for bid preparation.
To help prevent costly problems, give constructors the complete geotechnical-engineering report, but preface it with a clearly written letter of transmittal. In that letter, advise constructors that the report was not prepared for purposes of bid development and that the report’s accuracy is limited;
encourage them to confer with the geotechnical engineer who prepared the report (a modest fee may be required) and/ or to conduct additional study to obtain the specific types of information they need or prefer. A prebid conference can also be valuable. Be sure constructors have sufficient time to perform additional study. Only then might you be in a position to give constructors the best information available to you, while requiring them to at least share some of the financial responsibilities stemming from unanticipated conditions.
Read Responsibility Provisions Closely Some clients, design professionals, and constructors fail to recognize that geotechnical engineering is far less exact than other engineering disciplines. This lack of understanding has created unrealistic expectations that have led to disappointments, claims, and disputes. To help reduce the risk of such outcomes, geotechnical engineers commonly include a variety of explanatory provisions in their reports. Sometimes labeled “limitations,” many of these provisions indicate where geotechnical engineers’ responsibilities begin and end, to help others recognize their own responsibilities and risks. Read these provisions closely. Ask questions. Your geotechnical engineer should respond fully and frankly.
Environmental Concerns Are Not Covered The equipment, techniques, and personnel used to perform an environmental study differ significantly from those used to perform a geotechnical study. For that reason, a geotechnical-engineering report does not usually relate any environmental findings, conclusions, or recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Unanticipated environmental problems have led to numerous project failures. If you have not yet obtained your own environmental information, ask your geotechnical consultant for risk-management guidance. Do not rely on an environmental report prepared for someone else.
Obtain Professional Assistance To Deal with Mold Diverse strategies can be applied during building design, construction, operation, and maintenance to prevent significant amounts of mold from growing on indoor surfaces.
To be effective, all such strategies should be devised for the express purpose of mold prevention, integrated into a comprehensive plan, and executed with diligent oversight by a professional mold-prevention consultant. Because just a small amount of water or moisture can lead to the development of severe mold infestations, many mold- prevention strategies focus on keeping building surfaces dry. While groundwater, water infiltration, and similar issues may have been addressed as part of the geotechnical- engineering study whose findings are conveyed in this report, the geotechnical engineer in charge of this project is not a mold prevention consultant;
none of the services performed in connection with the geotechnical engineer’s study were designed or conducted for the purpose of mold prevention. Proper implementation of the recommendations conveyed in this report will not of itself be sufficient to prevent mold from growing in or on the structure involved.
Rely, on Your GBC-Member Geotechnical Engineer for Additional Assistance Membership in the Geotechnical Business Council of the Geoprofessional Business Association exposes geotechnical engineers to a wide array of risk-confrontation techniques that can be of genuine benefit for everyone involved with a construction project. Confer with you GBC-Member geotechnical engineer for more information.
8811 Colesville Road/Suite G106, Silver Spring, MD 20910 Telephone: 301/565-2733 Facsimile: 301/589-2017 e-mail: info@geoprofessional.org www.geoprofessional.org
Copyright 2015 by Geoprofessional Business Association (GBA). Duplication, reproduction, or copying of this document, or its contents, in whole or in part, by any means whatsoever, is strictly prohibited, except with GBA’s specific written permission. Excerpting, quoting, or otherwise extracting wording from this document is permitted only with the express written permission of GBA, and only for purposes of scholarly research or book review. Only members of GBA may use this document as a complement to or as an element of a geotechnical-engineering report. Any other firm, individual, or other entity that so uses this document without being a GBA member could be commiting negligent or intentional (fraudulent) misrepresentation.
WARRANTY
Universal Engineering Sciences has prepared this report for our client for his exclusive use, in accordance with generally accepted soil and foundation engineering practices, and makes no other warranty either expressed or implied as to the professional advice provided in the report.
UNANTICIPATED SOIL CONDITIONS
The analysis and recommendations submitted in this report are based upon the data obtained from soil borings performed at the locations indicated on the Boring Location Plan. This report does not reflect any variations which may occur between these borings.
The nature and extent of variations between borings may not become known until excavation begins. If variations appear, we may have to re-evaluate our recommendations after performing on-site observations and noting the characteristics of any variations.
CHANGED CONDITIONS
We recommend that the specifications for the project require that the contractor immediately notify Universal Engineering Sciences, as well as the owner, when subsurface conditions are encountered that are different from those present in this report.
No claim by the contractor for any conditions differing from those anticipated in the plans, specifications, and those found in this report, should be allowed unless the contractor notifies the owner and Universal Engineering Sciences of such changed conditions. Further, we recommend that all foundation work and site improvements be observed by a representative of Universal Engineering Sciences to monitor field conditions and changes, to verify design assumptions and to evaluate and recommend any appropriate modifications to this report.
MISINTERPRETATION OF SOIL ENGINEERING REPORT
Universal Engineering Sciences is responsible for the conclusions and opinions contained within this report based upon the data relating only to the specific project and location discussed herein. If the conclusions or recommendations based upon the data presented are made by others, those conclusions or recommendations are not the responsibility of Universal Engineering Sciences.
CHANGED STRUCTURE OR LOCATION
This report was prepared in order to aid in the evaluation of this project and to assist the architect or engineer in the design of this project. If any changes in the design or location of the structure as outlined in this report are planned, or if any structures are included or added that are not discussed in the report, the conclusions and recommendations contained in this report shall not be considered valid unless the changes are reviewed and the conclusions modified or approved by Universal Engineering Sciences.
USE OF REPORT BY BIDDERS
Bidders who are examining the report prior to submission of a bid are cautioned that this report was prepared as an aid to the designers of the project and it may affect actual construction operations.
Bidders are urged to make their own soil borings, test pits, test caissons or other investigations to determine those conditions that may affect construction operations. Universal Engineering Sciences cannot be responsible for any interpretations made from this report or the attached boring logs with regard to their adequacy in reflecting subsurface conditions which will affect construction operations.
STRATA CHANGES
Strata changes are indicated by a definite line on the boring logs which accompany this report. However, the actual change in the ground may be more gradual. Where changes occur between soil samples, the location of the change must necessarily be estimated using all available information and may not be shown at the exact depth.
OBSERVATIONS DURING DRILLING
Attempts are made to detect and/or identify occurrences during drilling and sampling, such as: water level, boulders, zones of lost circulation, relative ease or resistance to drilling progress, unusual sample recovery, variation of driving resistance, obstructions, etc.; however, lack of mention does not preclude their presence.
WATER LEVELS
Water level readings have been made in the drill holes during drilling and they indicate normally occurring conditions. Water levels may not have been stabilized at the last reading. This data has been reviewed and interpretations made in this report. However, it must be noted that fluctuations in the level of the groundwater may occur due to variations in rainfall, temperature, tides, and other factors not evident at the time measurements were made and reported. Since the probability of such variations is anticipated, design drawings and specifications should accommodate such possibilities and construction planning should be based upon such assumptions of variations.
LOCATION OF BURIED OBJECTS
All users of this report are cautioned that there was no requirement for Universal Engineering Sciences to attempt to locate any man-made buried objects during the course of this exploration and that no attempt was made by Universal Engineering Sciences to locate any such buried objects. Universal Engineering Sciences cannot be responsible for any buried man-made objects which are subsequently encountered during construction that are not discussed within the text of this report.
TIME
This report reflects the soil conditions at the time of exploration. If the report is not used in a reasonable amount of time, significant changes to the site may occur and additional reviews may be required.
CONSTRAINTS & RESTRICTIONS
The intent of this document is to bring to your attention the potential concerns and the basic limitations of a typical geotechnical report.
| Profiles.pdf |
| Sheets and Views |
| Layout1 |
| SP-A-2.pdf |
| Sheets and Views |
| A-2 |
| SP-A-3.pdf |
| Sheets and Views |
| A-3 |
File details come from the government source that posted it. Updated .