Hurricane_Nicole_Seawall_Extension_and_Repairs_14th_15th_29th_Ave_New_Smyrna_Beach_-_Bid_Tab.xlsx
XLSX spreadsheet 47 KB Posted
- Attached to
- Hurricane Nicole Seawall Extensions and Repairs for 14th, 15th, and 29th Avenues in New Smyrna Beach
- Solicitation number
- 25-B-70IF
- Issued by
- Volusia County, Florida
About this file
This document is a bid tabulation (bid tab) spreadsheet for Hurricane Nicole Seawall Extension and Repair projects in New Smyrna Beach, covering three specific locations: 14th Avenue, 15th Avenue, and 29th Avenue. The project involves post-hurricane infrastructure restoration, including demolition, seawall repairs, and coastal protection measures. Each location has a similar scope of work with consistent line items such as mobilization, environmental compliance, temporary traffic control, demolition, fill material placement, sheet pile bulkhead installation, concrete capping, timber railing, and helical anchor installation.
The bid tab shows standardized line items across all three locations, with varying quantities of materials and installations. For 14th Avenue, the project includes 38 linear feet of sheet pile bulkhead and 5 helical anchors; 15th Avenue involves 73 linear feet of bulkhead and 9 helical anchors; and 29th Avenue encompasses 58 linear feet of bulkhead and 7 helical anchors. Interestingly, the spreadsheet contains placeholder pricing with zero dollar amounts, suggesting this might be a preliminary or template document prepared for the bidding process. The total project appears to be focused on coastal resilience and storm damage repair following Hurricane Nicole, with specific engineering and construction interventions to restore and protect the shoreline infrastructure.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hurricane Nicole Dune Walkover
| Hurricane Nicole Seawall Extension and Repair 14th Ave . | |||||
| Contractor's Cost | |||||
| ITEM No. | DESCRIPTION | QUANTITY | UNIT | PRICE / UNIT | PRICE |
| 1 | Mobilization and Demobilization | 1 | LS | $ - 0 | $ - 0 |
| 2 | Construction Survey and As-Built Survey | 1 | LS | $ - 0 | $ - 0 |
| 3 | Environmental Compliance | 1 | LS | $ - 0 | $ - 0 |
| 4 | Temporary Traffic Control | 1 | LS | $ - 0 | $ - 0 |
| 5 | Demolition, Hauling and Disposal | 1 | LS | $ - 0 | $ - 0 |
| 6 | Fill Material | 40 | CY | $ - 0 | $ - 0 |
| 7 | UC 75 Sheet Pile Bulkhead | 38 | LF | $ - 0 | $ - 0 |
| 8 | Concrete Cap | 38 | LF | $ - 0 | $ - 0 |
| 9 | Concrete Plug | 1 | LS | $ - 0 | $ - 0 |
| 10 | Helical Anchors | 5 | EA | $ - 0 | $ - 0 |
| Sub Total | $ - 0 | ||||
| LS=Lump Sum; LF= Linear Foot; CY=Cubic Yard; SY= Square Yard; SF= Square Foot; EA= Each; TN=Ton | |||||
| Hurricane Nicole Seawall Extension and repair 15th Ave. | |||||
| Contractor's Cost | |||||
| ITEM No. | DESCRIPTION | QUANTITY | UNIT | PRICE / UNIT | PRICE |
| 1 | Mobilization and Demobilization | 1 | LS | $ - 0 | $ - 0 |
| 2 | Construction Survey and As-Built Survey | 1 | LS | $ - 0 | $ - 0 |
| 3 | Environmental Compliance | 1 | LS | $ - 0 | $ - 0 |
| 4 | Temporary Traffic Control | 1 | LS | $ - 0 | $ - 0 |
| 5 | Demolition, Hauling and Disposal | 1 | LS | $ - 0 | $ - 0 |
| 6 | Fill Material | 15 | CY | $ - 0 | $ - 0 |
| 7 | U75 Sheet Pile Bulkhead | 73 | LF | $ - 0 | $ - 0 |
| 8 | Concrete Cap | 73 | LF | $ - 0 | $ - 0 |
| 9 | Timber Railing | 141 | LF | $ - 0 | $ - 0 |
| 10 | Concrete Plug | 1 | LS | $ - 0 | $ - 0 |
| 11 | Helical Anchors | 9 | EA | $ - 0 | $ - 0 |
| Sub Total | $ - 0 | ||||
| LS=Lump Sum; LF= Linear Foot; CY=Cubic Yard; SY= Square Yard; SF= Square Foot; EA= Each; TN=Ton | |||||
| Hurricane Nicole Seawall Extension and Repair 29th Ave | |||||
| Contractor's Cost | |||||
| ITEM No. | DESCRIPTION | QUANTITY | UNIT | PRICE / UNIT | PRICE |
| 1 | Mobilization and Demobilization | 1 | LS | $ - 0 | $ - 0 |
| 2 | Construction Survey and As-Built Survey | 1 | LS | $ - 0 | $ - 0 |
| 3 | Environmental Compliance | 1 | LS | $ - 0 | $ - 0 |
| 4 | Temporary Traffic Control | 1 | LS | $ - 0 | $ - 0 |
| 5 | Demolition, Hauling and Disposal | 1 | LS | $ - 0 | $ - 0 |
| 6 | Fill Material | 65 | CY | $ - 0 | $ - 0 |
| 7 | U75 Sheet Pile Bulkhead | 58 | LF | $ - 0 | $ - 0 |
| 8 | Timber Railing | 161 | LF | $ - 0 | $ - 0 |
| 9 | Concrete Cap | 58 | LF | $ - 0 | $ - 0 |
| 10 | Concrete Plugs | 1 | LS | $ - 0 | $ - 0 |
| 11 | Helical Anchors | 7 | EA | $ - 0 | $ - 0 |
| Sub Total | $ - 0 | ||||
| LS=Lump Sum; LF= Linear Foot; CY=Cubic Yard; SY= Square Yard; SF= Square Foot; EA= Each; TN=Ton |
Total $ - 0 image1.jpeg image2.jpeg