Exhibit_G_-_Bid_Price_Sheet_25-B-70IF.xlsx
XLSX spreadsheet 48 KB Posted
- Attached to
- Hurricane Nicole Seawall Extensions and Repairs for 14th, 15th, and 29th Avenues in New Smyrna Beach
- Solicitation number
- 25-B-70IF
- Issued by
- Volusia County, Florida
About this file
The document is a Bid Price Sheet (Exhibit G) for a Hurricane Nicole Seawall Extension and Repair project involving three separate locations: 14th Avenue, 15th Avenue, and 29th Avenue. The project involves multiple construction activities including mobilization, environmental compliance, demolition, and seawall repair across three distinct sites. Each location requires similar scope items such as sheet pile bulkhead installation, concrete cap work, fill material placement, helical anchors, and temporary traffic control. The bid includes lump sum and unit-based pricing for various construction elements, with quantities varying by site (e.g., fill material ranges from 15-65 cubic yards, sheet pile bulkhead from 38-73 linear feet).
The bid price sheet shows zero dollar amounts for all line items, suggesting this might be a template or placeholder document. The total bid includes provisions for a Payment and Performance Bond and requires a Flood Insurance Policy, which will not be part of the evaluation criteria. Bidders must provide line item pricing for all three avenue locations to be considered for award. The document uses standard construction measurement units including Lump Sum (LS), Linear Foot (LF), Cubic Yard (CY), and Each (EA) for quantifying and pricing various project components. The project appears to be a post-Hurricane Nicole infrastructure restoration effort focusing on seawall and coastal protection infrastructure.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hurricane Nicole Dune Walkover Exhibit G - Bid Price Sheet 25-B-70IF Hurricane Nicole Seawall Extension and Repair 14th Ave.
| Contractor's Cost | |||||
| ITEM No. | DESCRIPTION | QUANTITY | UNIT | PRICE / UNIT | PRICE |
| 1 | Mobilization and Demobilization | 1 | LS | $ - 0 | $ - 0 |
| 2 | Construction Survey and As-Built Survey | 1 | LS | $ - 0 | $ - 0 |
| 3 | Environmental Compliance | 1 | LS | $ - 0 | $ - 0 |
| 4 | Temporary Traffic Control | 1 | LS | $ - 0 | $ - 0 |
| 5 | Demolition, Hauling and Disposal | 1 | LS | $ - 0 | $ - 0 |
| 6 | Fill Material | 40 | CY | $ - 0 | $ - 0 |
| 7 | UC 75 Sheet Pile Bulkhead | 38 | LF | $ - 0 | $ - 0 |
| 8 | Concrete Cap | 38 | LF | $ - 0 | $ - 0 |
| 9 | Concrete Plug | 1 | LS | $ - 0 | $ - 0 |
| 10 | Helical Anchors | 5 | EA | $ - 0 | $ - 0 |
| Sub Total | $ - 0 | ||||
| LS=Lump Sum; LF= Linear Foot; CY=Cubic Yard; SY= Square Yard; SF= Square Foot; EA= Each; TN=Ton | |||||
| Hurricane Nicole Seawall Extension and Repair 15th Ave. | |||||
| Contractor's Cost | |||||
| ITEM No. | DESCRIPTION | QUANTITY | UNIT | PRICE / UNIT | PRICE |
| 1 | Mobilization and Demobilization | 1 | LS | $ - 0 | $ - 0 |
| 2 | Construction Survey and As-Built Survey | 1 | LS | $ - 0 | $ - 0 |
| 3 | Environmental Compliance | 1 | LS | $ - 0 | $ - 0 |
| 4 | Temporary Traffic Control | 1 | LS | $ - 0 | $ - 0 |
| 5 | Demolition, Hauling and Disposal | 1 | LS | $ - 0 | $ - 0 |
| 6 | Fill Material | 15 | CY | $ - 0 | $ - 0 |
| 7 | U75 Sheet Pile Bulkhead | 73 | LF | $ - 0 | $ - 0 |
| 8 | Concrete Cap | 73 | LF | $ - 0 | $ - 0 |
| 9 | Timber Railing | 141 | LF | $ - 0 | $ - 0 |
| 10 | Concrete Plug | 1 | LS | $ - 0 | $ - 0 |
| 11 | Helical Anchors | 9 | EA | $ - 0 | $ - 0 |
| Sub Total | $ - 0 | ||||
| LS=Lump Sum; LF= Linear Foot; CY=Cubic Yard; SY= Square Yard; SF= Square Foot; EA= Each; TN=Ton | |||||
| Hurricane Nicole Seawall Extension and Repair 29th Ave. | |||||
| Contractor's Cost | |||||
| ITEM No. | DESCRIPTION | QUANTITY | UNIT | PRICE / UNIT | PRICE |
| 1 | Mobilization and Demobilization | 1 | LS | $ - 0 | $ - 0 |
| 2 | Construction Survey and As-Built Survey | 1 | LS | $ - 0 | $ - 0 |
| 3 | Environmental Compliance | 1 | LS | $ - 0 | $ - 0 |
| 4 | Temporary Traffic Control | 1 | LS | $ - 0 | $ - 0 |
| 5 | Demolition, Hauling and Disposal | 1 | LS | $ - 0 | $ - 0 |
| 6 | Fill Material | 65 | CY | $ - 0 | $ - 0 |
| 7 | U75 Sheet Pile Bulkhead | 58 | LF | $ - 0 | $ - 0 |
| 8 | Timber Railing | 161 | LF | $ - 0 | $ - 0 |
| 9 | Concrete Cap | 58 | LF | $ - 0 | $ - 0 |
| 10 | Concrete Plugs | 1 | LS | $ - 0 | $ - 0 |
| 11 | Helical Anchors | 7 | EA | $ - 0 | $ - 0 |
| Sub Total | $ - 0 | ||||
| LS=Lump Sum; LF= Linear Foot; CY=Cubic Yard; SY= Square Yard; SF= Square Foot; EA= Each; TN=Ton | |||||
| Subtotal Bid Price for 14th Avenue, 15th Avenue, and 29th Avenues | $ - 0 | ||||
| Payment and Performance Bond | $ - 0 | ||||
| Total Bid price for 14th Avenue, 15th Avenue, and 29th Avenues | $ - 0 |
| Flood Insurance Policy Pricing* | $ - 0 |
| *Pricing for Flood Insurance is required for this project; however, it will not be included as part of the evaluation. |
Line item pricing for 14th, 15th, and 29th are all required to be considered for award.
image1.jpeg image2.jpeg