About this file

The document is a Bid Price Sheet (Exhibit G) for a Hurricane Nicole Seawall Extension and Repair project involving three separate locations: 14th Avenue, 15th Avenue, and 29th Avenue. The project involves multiple construction activities including mobilization, environmental compliance, demolition, and seawall repair across three distinct sites. Each location requires similar scope items such as sheet pile bulkhead installation, concrete cap work, fill material placement, helical anchors, and temporary traffic control. The bid includes lump sum and unit-based pricing for various construction elements, with quantities varying by site (e.g., fill material ranges from 15-65 cubic yards, sheet pile bulkhead from 38-73 linear feet).

The bid price sheet shows zero dollar amounts for all line items, suggesting this might be a template or placeholder document. The total bid includes provisions for a Payment and Performance Bond and requires a Flood Insurance Policy, which will not be part of the evaluation criteria. Bidders must provide line item pricing for all three avenue locations to be considered for award. The document uses standard construction measurement units including Lump Sum (LS), Linear Foot (LF), Cubic Yard (CY), and Each (EA) for quantifying and pricing various project components. The project appears to be a post-Hurricane Nicole infrastructure restoration effort focusing on seawall and coastal protection infrastructure.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hurricane Nicole Dune Walkover Exhibit G - Bid Price Sheet 25-B-70IF Hurricane Nicole Seawall Extension and Repair 14th Ave.

Contractor's Cost
ITEM No.DESCRIPTIONQUANTITYUNITPRICE / UNITPRICE
1Mobilization and Demobilization1LS$ - 0$ - 0
2Construction Survey and As-Built Survey1LS$ - 0$ - 0
3Environmental Compliance1LS$ - 0$ - 0
4Temporary Traffic Control1LS$ - 0$ - 0
5Demolition, Hauling and Disposal1LS$ - 0$ - 0
6Fill Material40CY$ - 0$ - 0
7UC 75 Sheet Pile Bulkhead38LF$ - 0$ - 0
8Concrete Cap38LF$ - 0$ - 0
9Concrete Plug1LS$ - 0$ - 0
10Helical Anchors5EA$ - 0$ - 0
Sub Total$ - 0
LS=Lump Sum; LF= Linear Foot; CY=Cubic Yard; SY= Square Yard; SF= Square Foot; EA= Each; TN=Ton
Hurricane Nicole Seawall Extension and Repair 15th Ave.
Contractor's Cost
ITEM No.DESCRIPTIONQUANTITYUNITPRICE / UNITPRICE
1Mobilization and Demobilization1LS$ - 0$ - 0
2Construction Survey and As-Built Survey1LS$ - 0$ - 0
3Environmental Compliance1LS$ - 0$ - 0
4Temporary Traffic Control1LS$ - 0$ - 0
5Demolition, Hauling and Disposal1LS$ - 0$ - 0
6Fill Material15CY$ - 0$ - 0
7U75 Sheet Pile Bulkhead73LF$ - 0$ - 0
8Concrete Cap73LF$ - 0$ - 0
9Timber Railing141LF$ - 0$ - 0
10Concrete Plug1LS$ - 0$ - 0
11Helical Anchors9EA$ - 0$ - 0
Sub Total$ - 0
LS=Lump Sum; LF= Linear Foot; CY=Cubic Yard; SY= Square Yard; SF= Square Foot; EA= Each; TN=Ton
Hurricane Nicole Seawall Extension and Repair 29th Ave.
Contractor's Cost
ITEM No.DESCRIPTIONQUANTITYUNITPRICE / UNITPRICE
1Mobilization and Demobilization1LS$ - 0$ - 0
2Construction Survey and As-Built Survey1LS$ - 0$ - 0
3Environmental Compliance1LS$ - 0$ - 0
4Temporary Traffic Control1LS$ - 0$ - 0
5Demolition, Hauling and Disposal1LS$ - 0$ - 0
6Fill Material65CY$ - 0$ - 0
7U75 Sheet Pile Bulkhead58LF$ - 0$ - 0
8Timber Railing161LF$ - 0$ - 0
9Concrete Cap58LF$ - 0$ - 0
10Concrete Plugs1LS$ - 0$ - 0
11Helical Anchors7EA$ - 0$ - 0
Sub Total$ - 0
LS=Lump Sum; LF= Linear Foot; CY=Cubic Yard; SY= Square Yard; SF= Square Foot; EA= Each; TN=Ton
Subtotal Bid Price for 14th Avenue, 15th Avenue, and 29th Avenues$ - 0
Payment and Performance Bond$ - 0
Total Bid price for 14th Avenue, 15th Avenue, and 29th Avenues$ - 0
Flood Insurance Policy Pricing*$ - 0
*Pricing for Flood Insurance is required for this project; however, it will not be included as part of the evaluation.