Definitions Controlled Unclassified Information – CUI

WORKING HOURSSHIFT HOURS (as applicable)
Hours may be estimatedWorking Shift / Hoursoperating hours
Straight TimeBase wages before differentials are appliedDay Shift
Night shift
Regular8am to 5pm1st Shift
duty hours2nd Shift
3rd Shift
Regular OverBefore 8am and after 5pm4th Shift
Time (OT)
Swing / Hoot Owl
Meal HoursNoon to 1pm (may be premium meal hour)
6pm to 7-pmNormal work day hours
Midnight to 1am
6am to 7am** Note: Hours stated may be changed as operations or mission scope dictates.

UNITS OF MEASURE

MTONMeasurement Tons (measure of volume)1 MTON = 40 cubic feet (1.13 cubic meters)
HRHour = 1 HR = 60 minutes
DYDay = 1 DY = 24 hours
MTHMonth = 1 MTH = 30 days
EAEach
SQFTSquare Feet (measure of area)1' SQFT = 144'' inchs dimensions 12''x12''
SQMTSquare Meter (measure of area)1 SQFT = 0.0929 square meters
1 CFT = 1728 cubic inches 12"x12"x12"
BNDBundle
PCPiece (one each)
ROLLRoll ( roll of wire)
MIMile (measure of distance) = 1 Mile = 5280 feet ( 1,609.34 meters )
TRIPSTrip = 1 Trip, as described in the PWS (if applicable)
LTLong Ton = 1 LT = 2,240 pounds ( 1,016.05 kilograms )
LBSUS. Pounds = 1 LBS = 0.45 kilograms
KGkg = 1 kg = 2.204 pounds
MTONMTON recorded and billed to the sponsor will be applied to the gross cube (40 cubic feet = 1 MTON) of the container.

COMMODITY HANDLING METHODS (includes all standard lashing & Unlashing, blocking and bracing cargo)

LO/LOLift On / Lift Off - includes all standard lashing,( a ) Shore Crane Type (Fixed Port Gantry or Port Mobile Container Crane (i.e. Gottwald))
& Unlashing, blocking and bracing cargo( b ) Ships Gear, Ships crane
RO/RORoll On / Roll Off - includes all standard lashing,( c ) Vehicle rolling under Own Power - Containers loaded by ramp
& Unlashing, blocking and bracing cargo
TO/TOTow On / Tow Off - includes all standard lashing,( d ) Trailers towed by Contractor Equipment or Gov't vehicles
& Unlashing, blocking and bracing cargo( e ) Inoperable Vehicles being towed

RO/RO Containers, loaded by contractor trailer Containers loaded onto trailers, bomb carts, MIFI's, or other equipment, otherwise trailered into RORO vessels and unloaded, stowed and lashed

CONTAINER - BREAK BULK DEFINITIONS
20Explosives, in crates, boxes, tubs, tubes
25Milvan - Containers packed with explosives. Explosives placed in containers are classified as containers.
40Break-Bulk cargo, Non-explosive, Non-ISO cornered , includes M7 FRS, shelters, shop sets, ISU-90/60, mind rollers, blade boxes, skid mounted generators,
crates, 463L pallets,
44Cargo transporters (CONEX) ISO Fitted, loaded/empty - INCLUDE QUADCONS, BICONS, TRICONS, stackable tank modules, SINGLE OR LESS THAN TEU
45Milvan - Containers (non-explosives). All containers ISO Fitted 20'-40' empty or full, includes ISO 20' FRC-Fuel tank moduals, ISO hippo,
ISO 20' stackable flat racks, ISO FPU/BOH
VEHICLE CATEGORY DEFINITIONS
60 - MEDIUM VEHICLE25,001 US. pounds to 60,000 pounds 11,340.26 kg to 27,215.54 kg 11.161 LT to 26.786 LT
60 - GOVERNMENT VEHICLES, UNBOXED, weighing 25,001lbs. to 60,000lbs. per unit
Includes but not limited to: trucks, tractors, track vehicles, semi-trailer vans, mobile cranes, construction equipment (track or wheel), road graders,
rock crushers, busses, boats (trailered/cradled).

61 - LIGHT VEHICLE 25,000 pounds or less 11,339.81 kilograms or less 11.16 long tons

61 - GOVERNMENT VEHICLES, UNBOXED, weighing 25,000lbs. or less per unit includes but limited to: trucks, ambulances, tractors, POV, engineer construction equipment,
personnel carriers, boats or boats on cradles) engineer construction equipment, tracked vehicles and boats (trailered/cradled).

67 - HEAVY VEHICLE 60,001 pounds or more 27,216 kg. or more 26.786 LT or more

67 - GOVERNMENT VEHICLES, UNBOXED, weighing 60,000lbs. per unit or more includes but not limited to: trucks, tractors, vans, track vehicles, HETS, MRAPs, Heavy mobile cranes,
tracked or wheeled engineer construction equipment, and boats (trailered/cradled).

Summary

OFFEROR NAME:YOUR ORG NAME HERE
INSTRUCTIONS TO OFFEROR:
- Input Offeror Name in cell C1 above.
- Input unit rates in ALL yellow highlighted cells in the "Schedule" sheet (enter 0 if you do not wish to offer a price).
- Offeror should consider that all proposed unit rates will apply to the entire period of performance, to include options and extensions, upon award.
- This spreadsheet will populate the Total Evaluated Price based upon unit prices input in the highlighted cells of the "Schedule" sheet.
SUMMARY for Port of Bremerhaven_StevedoringControlled Unclassified Information – CUI
Base YearOPY-1OPY-2IPY-3OPY-46mo Extension
Port of Bremerhaven Stevedoring$ 42,000.00$ 42,000.00$ 42,000.00$ 42,000.00$ 42,000.00$ 21,000.00
Schedule Totals$ 42,000.00$ 42,000.00$ 42,000.00$ 42,000.00$ 42,000.00$ 21,000.00
Ceiling Totals$ 10,500.00$ 10,500.00$ 10,500.00$ 10,500.00$ 10,500.00$ 5,250.00
Lifecycle Totals$ 52,500.00$ 52,500.00$ 52,500.00$ 52,500.00$ 52,500.00$ 26,250.00
TOTAL PROPOSED PRICE (TPP) (1 Year Base plus 4-1 Year Options plus 6-Month Extension)$ 231,000.00
TOTAL CEILING COST (25% of TTP)$ 57,750.00
TOTAL LIFECYCLE ( TTP + Ceiling)$ 288,750.00
↓↓↓ PORT SCHEDULE SUMMARY BELOW ↓↓↓
SUMMARY Port of Bremerhaven StevedoringControlled Unclassified Information – CUI
Base YearOption Year - 1Option Year - 2Option Year - 3Option Year - 46mo Extension
Schedule1A1aLASHING ONLY$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Schedule 1A2a UNLASHING ONLY $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 2 EXTRA LABOR $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 3A DETENTION $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 3B OVERTIME - SHIFT DIFFERENTIALS $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 4 EQUIPMENT $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 7 LUMBER / DUNNAGE $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Schedule 8 MISCELLANEOUS $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 21,000.00

TOTAL $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 42,000.00 $ 21,000.00

&"Times New Roman,Bold"&18&K00B050UNCLASSIFIED // FOR OFFICIAL USE ONLY - FOUO

BASE

Controlled Unclassified Information – CUI (after form is completed)
STEVEDORING & RELATED TERMINAL SERVICESPERIOD OF PERFORMANCE:1 May 2022through30 Apr 2023
LOCATION:Port of Bremerhaven Stevedoringinput start dateinput final end date
Attachment #Attachment 2_Rev 02
BASE YEAR SCHEDULE TOTALS$ - 0
Line ItemCategoryScheduleCommodityDescriptionUnit of DurationEstimated DurationUnit of MeasureUnit PriceUnit QuantityExtended Price
1Commodity1A1aLASHING ONLY (loading Vessel)20EXPLOSIVES PAYABLE AT THE EXPLOSIVE RATEMTON96$ - 0
2Commodity1A1aLASHING ONLY (loading Vessel)25MILVAN-CONTAINERS PACKED W/ EXPLOSIVES PAYABLE AT THE EXPLOSIVE RATEEA10$ - 0
3Commodity1A1aLASHING ONLY (loading Vessel)35AIRCRAFT, WHOLE OR UNBOXEDEA50$ - 0
4Commodity1A1aLASHING ONLY (loading Vessel)40GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) (Breakbulk)MTON100$ - 0
5Commodity1A1aLASHING ONLY (loading Vessel)44CONTAINERS OTHER THAN TEU - SINGLE - W/ISO - Quadcons, Tricons, BiconsEA100$ - 0
6Commodity1A1aLASHING ONLY (loading Vessel)45MILVAN - CONTAINERS 20'/40' PACKED W/ NON-EXPLOSIVES - ISO (TEU configured) Conex, Quadcons, Tricons, Bicons ))EA205$ - 0
7Commodity1A1aLASHING ONLY (loading Vessel)60MEDIUM VEHICLES OR TRAILERS - (Vehicles 25,001lbs - 60,000lbs)EA450$ - 0
8Commodity1A1aLASHING ONLY (loading Vessel)61LIGHT VEHICLES OR TRAILERS - (Vehicles Less than 25,000lbs - )EA1400$ - 0
9Commodity1A1aLASHING ONLY (loading Vessel)67HEAVY VEHICLES OR TRAILERS - (Vehicles More than 60,000lbs)EA150$ - 0
TOTAL 1A1a - Lashing Only$ - 0
10Commodity1A2aUNLASHING ONLY (discharging vessel)20EXPLOSIVES PAYABLE AT THE EXPLOSIVE RATEMTON96$ - 0
11Commodity1A2aUNLASHING ONLY (discharging vessel)25MILVAN-CONTAINERS PACKED W/ EXPLOSIVES PAYABLE AT THE EXPLOSIVE RATEEA10$ - 0
12Commodity1A2aUNLASHING ONLY (discharging vessel)35AIRCRAFT, WHOLE OR UNBOXEDEA50$ - 0
13Commodity1A2aUNLASHING ONLY (discharging vessel)40GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) (Breakbulk)MTON100$ - 0
14Commodity1A2aUNLASHING ONLY (discharging vessel)44CONTAINERS OTHER THAN TEU - SINGLE - W/ISO - Quadcons, Tricons, BiconsEA100$ - 0
15Commodity1A2aUNLASHING ONLY (discharging vessel)45MILVAN-CONTAINERS 20'/40' PACKED W/ NON-EXPLOSIVES - ISO (TEU configured) Conex, Quadcons, Tricons, Bicons ))EA205$ - 0
16Commodity1A2aUNLASHING ONLY (discharging vessel)60MEDIUM VEHICLES OR TRAILERS - (Vehicles 25,001lbs - 60,000lbs)EA450$ - 0
17Commodity1A2aUNLASHING ONLY (discharging vessel)61LIGHT VEHICLES OR TRAILERS - (Vehicles Less than 25,000lbs - )EA1400$ - 0
18Commodity1A2aUNLASHING ONLY (discharging vessel)67HEAVY VEHICLES OR TRAILERS - (Vehicles More than 60,000lbs)EA150$ - 0
TOTAL 1A2a Unlashing Only$ - 0
19Work Day
20Manhours2EXTRA LABOR (XL)First Shift 0600-1400Laborer/LasherHR50$ - 0
21Manhours2EXTRA LABOR (XL)Forklift OperatorHR50$ - 0
22Manhours2EXTRA LABOR (XL)ForemanHR50$ - 0
23Manhours2EXTRA LABOR (XL)Crane OperatorHR50$ - 0
24Manhours2EXTRA LABOR (XL)Second shift 1430-2030Laborer/LasherHR30$ - 0
25Manhours2EXTRA LABOR (XL)Forklift OperatorHR30$ - 0
26Manhours2EXTRA LABOR (XL)ForemanHR30$ - 0
27Manhours2EXTRA LABOR (XL)Crane OperatorHR30$ - 0
28Manhours2EXTRA LABOR (XL)Third shift 2030-0600Laborer/LasherHR5$ - 0
29Manhours2EXTRA LABOR (XL)Forklift OperatorHR5$ - 0
30Manhours2EXTRA LABOR (XL)ForemanHR5$ - 0
31Manhours2EXTRA LABOR (XL)Crane OperatorHR5$ - 0
Saturday
32Manhours2EXTRA LABOR (XL)First shift 0600-1400Laborer/LasherHR50$ - 0
33Manhours2EXTRA LABOR (XL)Forklift OperatorHR50$ - 0
34Manhours2EXTRA LABOR (XL)ForemanHR50$ - 0
35Manhours2EXTRA LABOR (XL)Crane OperatorHR50$ - 0
36Manhours2EXTRA LABOR (XL)Second Shift 1430-2030Laborer/LasherHR30$ - 0
37Manhours2EXTRA LABOR (XL)Forklift OperatorHR30$ - 0
38Manhours2EXTRA LABOR (XL)ForemanHR30$ - 0
39Manhours2EXTRA LABOR (XL)Crane OperatorHR30$ - 0
40Manhours2EXTRA LABOR (XL)Third Shift 2030-0600Laborer/LasherHR5$ - 0
41Manhours2EXTRA LABOR (XL)Forklift OperatorHR5$ - 0
42Manhours2EXTRA LABOR (XL)ForemanHR5$ - 0
43Manhours2EXTRA LABOR (XL)Crane OperatorHR5$ - 0
Sunday-Holiday
44Manhours2EXTRA LABOR (XL)First Shift 0600-1200Laborer/LasherHR20$ - 0
45Manhours2EXTRA LABOR (XL)Forklift OperatorHR20$ - 0
46Manhours2EXTRA LABOR (XL)ForemanHR20$ - 0
47Manhours2EXTRA LABOR (XL)Crane OperatorHR20$ - 0
48Manhours2EXTRA LABOR (XL)Second Shift 1200-1800Laborer/LasherHR6$ - 0
49Manhours2EXTRA LABOR (XL)Forklift OperatorHR6$ - 0
50Manhours2EXTRA LABOR (XL)ForemanHR6$ - 0
51Manhours2EXTRA LABOR (XL)Crane OperatorHR6$ - 0
52Manhours2EXTRA LABOR (XL)Third Shift 1800-2400Laborer/LasherHR5$ - 0
53Manhours2EXTRA LABOR (XL)Forklift OperatorHR5$ - 0
54Manhours2EXTRA LABOR (XL)ForemanHR5$ - 0
55Manhours2EXTRA LABOR (XL)Crane OperatorHR5$ - 0
56Manhours2EXTRA LABOR (XL)Forth Shift 2400-0600Laborer/LasherHR3$ - 0
57Manhours2EXTRA LABOR (XL)Forklift OperatorHR3$ - 0
58Manhours2EXTRA LABOR (XL)ForemanHR3$ - 0
59Manhours2EXTRA LABOR (XL)Crane OperatorHR3$ - 0
Pre-Festday
60Manhours2EXTRA LABOR (XL)First shift 0600-1200Laborer/LasherHR4$ - 0
61Manhours2EXTRA LABOR (XL)Forklift OperatorHR4$ - 0
62Manhours2EXTRA LABOR (XL)ForemanHR4$ - 0
63Manhours2EXTRA LABOR (XL)Crane OperatorHR4$ - 0
TOTAL 2 Extra Labor (XL)$ - 0
Work Day$ - 0
64Manhours3ADETENTIONFirst Shift 0600-1400Laborer/LasherHR50$ - 0
65Manhours3ADETENTIONForklift OperatorHR50$ - 0
66Manhours3ADETENTIONForemanHR50$ - 0
67Manhours3ADETENTIONCrane OperatorHR50$ - 0
68Manhours3ADETENTIONSecond shift 1430-2030Laborer/LasherHR30$ - 0
69Manhours3ADETENTIONForklift OperatorHR30$ - 0
70Manhours3ADETENTIONForemanHR30$ - 0
71Manhours3ADETENTIONCrane OperatorHR30$ - 0
72Manhours3ADETENTIONThird shift 2030-0600Laborer/LasherHR5$ - 0
73Manhours3ADETENTIONForklift OperatorHR5$ - 0
74Manhours3ADETENTIONForemanHR5$ - 0
75Manhours3ADETENTIONCrane OperatorHR5$ - 0
Saturday
76Manhours3ADETENTIONFirst shift 0600-1400Laborer/LasherHR50$ - 0
77Manhours3ADETENTIONForklift OperatorHR50$ - 0
78Manhours3ADETENTIONForemanHR50$ - 0
79Manhours3ADETENTIONCrane OperatorHR50$ - 0
80Manhours3ADETENTIONSecond Shift 1430-2030Laborer/LasherHR30$ - 0
81Manhours3ADETENTIONForklift OperatorHR30$ - 0
82Manhours3ADETENTIONForemanHR30$ - 0
83Manhours3ADETENTIONCrane OperatorHR30$ - 0
84Manhours3ADETENTIONThird Shift 2030-0600Laborer/LasherHR5$ - 0
85Manhours3ADETENTIONForklift OperatorHR5$ - 0
86Manhours3ADETENTIONForemanHR5$ - 0
87Manhours3ADETENTIONCrane OperatorHR5$ - 0
Sunday-Holiday
88Manhours3ADETENTIONFirst Shift 0600-1200Laborer/LasherHR20$ - 0
89Manhours3ADETENTIONForklift OperatorHR20$ - 0
90Manhours3ADETENTIONForemanHR20$ - 0
91Manhours3ADETENTIONCrane OperatorHR20$ - 0
92Manhours3ADETENTIONSecond Shift 1200-1800Laborer/LasherHR6$ - 0
93Manhours3ADETENTIONForklift OperatorHR6$ - 0
94Manhours3ADETENTIONForemanHR6$ - 0
95Manhours3ADETENTIONCrane OperatorHR6$ - 0
96Manhours3ADETENTIONThird Shift 1800-2400Laborer/LasherHR5$ - 0
97Manhours3ADETENTIONForklift OperatorHR5$ - 0
98Manhours3ADETENTIONForemanHR5$ - 0
99Manhours3ADETENTIONCrane OperatorHR5$ - 0
100Manhours3ADETENTIONForth Shift 2400-0600Laborer/LasherHR3$ - 0
101Manhours3ADETENTIONForklift OperatorHR3$ - 0
102Manhours3ADETENTIONForemanHR3$ - 0
103Manhours3ADETENTIONCrane OperatorHR3$ - 0
Pre-Festday
104Manhours3ADETENTIONFirst shift 0600-1200Laborer/LasherHR4$ - 0
105Manhours3ADETENTIONForklift OperatorHR4$ - 0
106Manhours3ADETENTIONForemanHR4$ - 0
107Manhours3ADETENTIONCrane OperatorHR4$ - 0
3A DETENTION TOTAL$ 50.00$ - 0
Work Day
108Manhours3BSHIFT DIFFERENTIALSFirst Shift 0600-1400Laborer/LasherHR25$ - 0
109Manhours3BSHIFT DIFFERENTIALSForklift OperatorHR25$ - 0
110Manhours3BSHIFT DIFFERENTIALSForemanHR25$ - 0
111Manhours3BSHIFT DIFFERENTIALSCrane OperatorHR25$ - 0
112Manhours3BSHIFT DIFFERENTIALSSecond shift 1430-2030Laborer/LasherHR15$ - 0
113Manhours3BSHIFT DIFFERENTIALSForklift OperatorHR15$ - 0
114Manhours3BSHIFT DIFFERENTIALSForemanHR15$ - 0
115Manhours3BSHIFT DIFFERENTIALSCrane OperatorHR15$ - 0
116Manhours3BSHIFT DIFFERENTIALSThird shift 2030-0600Laborer/LasherHR10$ - 0
117Manhours3BSHIFT DIFFERENTIALSForklift OperatorHR10$ - 0
118Manhours3BSHIFT DIFFERENTIALSForemanHR10$ - 0
119Manhours3BSHIFT DIFFERENTIALSCrane OperatorHR10$ - 0
Saturday
120Manhours3BSHIFT DIFFERENTIALSFirst shift 0600-1400Laborer/LasherHR15$ - 0
121Manhours3BSHIFT DIFFERENTIALSForklift OperatorHR15$ - 0
122Manhours3BSHIFT DIFFERENTIALSForemanHR15$ - 0
123Manhours3BSHIFT DIFFERENTIALSCrane OperatorHR15$ - 0
124Manhours3BSHIFT DIFFERENTIALSSecond Shift 1430-2030Laborer/LasherHR10$ - 0
125Manhours3BSHIFT DIFFERENTIALSForklift OperatorHR10$ - 0
126Manhours3BSHIFT DIFFERENTIALSForemanHR10$ - 0
127Manhours3BSHIFT DIFFERENTIALSCrane OperatorHR10$ - 0
128Manhours3BSHIFT DIFFERENTIALSThird Shift 2030-0600Laborer/LasherHR3$ - 0
129Manhours3BSHIFT DIFFERENTIALSForklift OperatorHR3$ - 0
130Manhours3BSHIFT DIFFERENTIALSForemanHR3$ - 0
131Manhours3BSHIFT DIFFERENTIALSCrane OperatorHR3$ - 0
Sunday-Holiday
132Manhours3BSHIFT DIFFERENTIALSFirst Shift 0600-1200Laborer/LasherHR10$ - 0
133Manhours3BSHIFT DIFFERENTIALSForklift OperatorHR10$ - 0
134Manhours3BSHIFT DIFFERENTIALSForemanHR10$ - 0
135Manhours3BSHIFT DIFFERENTIALSCrane OperatorHR10$ - 0
136Manhours3BSHIFT DIFFERENTIALSSecond Shift 1200-1800Laborer/LasherHR10$ - 0
137Manhours3BSHIFT DIFFERENTIALSForklift OperatorHR10$ - 0
138Manhours3BSHIFT DIFFERENTIALSForemanHR10$ - 0
139Manhours3BSHIFT DIFFERENTIALSCrane OperatorHR10$ - 0
140Manhours3BSHIFT DIFFERENTIALSThird Shift 1800-2400Laborer/LasherHR5$ - 0
141Manhours3BSHIFT DIFFERENTIALSForklift OperatorHR5$ - 0
142Manhours3BSHIFT DIFFERENTIALSForemanHR5$ - 0
143Manhours3BSHIFT DIFFERENTIALSCrane OperatorHR5$ - 0
144Manhours3BSHIFT DIFFERENTIALSForth Shift 2400-0600Laborer/LasherHR3$ - 0
145Manhours3BSHIFT DIFFERENTIALSForklift OperatorHR3$ - 0
146Manhours3BSHIFT DIFFERENTIALSForemanHR3$ - 0
147Manhours3BSHIFT DIFFERENTIALSCrane OperatorHR3$ - 0
Pre-Festday
148Manhours3BSHIFT DIFFERENTIALSFirst shift 0600-1200Laborer/LasherHR3$ - 0
149Manhours3BSHIFT DIFFERENTIALSForklift OperatorHR3$ - 0
150Manhours3BSHIFT DIFFERENTIALSForemanHR3$ - 0
151Manhours3BSHIFT DIFFERENTIALSCrane OperatorHR3$ - 0
Work Day
152Manhours3BOVERTIME DIFFERENTIALSFirst Shift 0600-1400Laborer/LasherHR25$ - 0
153Manhours3BOVERTIME DIFFERENTIALSForklift OperatorHR25$ - 0
154Manhours3BOVERTIME DIFFERENTIALSForemanHR25$ - 0
155Manhours3BOVERTIME DIFFERENTIALSCrane OperatorHR25$ - 0
156Manhours3BOVERTIME DIFFERENTIALSSecond shift 1430-2030Laborer/LasherHR15$ - 0
157Manhours3BOVERTIME DIFFERENTIALSForklift OperatorHR15$ - 0
158Manhours3BOVERTIME DIFFERENTIALSForemanHR15$ - 0
159Manhours3BOVERTIME DIFFERENTIALSCrane OperatorHR15$ - 0
160Manhours3BOVERTIME DIFFERENTIALSThird shift 2030-0600Laborer/LasherHR10$ - 0
161Manhours3BOVERTIME DIFFERENTIALSForklift OperatorHR10$ - 0
162Manhours3BOVERTIME DIFFERENTIALSForemanHR10$ - 0
163Manhours3BOVERTIME DIFFERENTIALSCrane OperatorHR10$ - 0
Saturday
164Manhours3BOVERTIME DIFFERENTIALSFirst shift 0600-1400Laborer/LasherHR15$ - 0
165Manhours3BOVERTIME DIFFERENTIALSForklift OperatorHR15$ - 0
166Manhours3BOVERTIME DIFFERENTIALSForemanHR15$ - 0
167Manhours3BOVERTIME DIFFERENTIALSCrane OperatorHR15$ - 0
168Manhours3BOVERTIME DIFFERENTIALSSecond Shift 1430-2030Laborer/LasherHR10$ - 0
169Manhours3BOVERTIME DIFFERENTIALSForklift OperatorHR10$ - 0
170Manhours3BOVERTIME DIFFERENTIALSForemanHR10$ - 0
171Manhours3BOVERTIME DIFFERENTIALSCrane OperatorHR10$ - 0
172Manhours3BOVERTIME DIFFERENTIALSThird Shift 2030-0600Laborer/LasherHR3$ - 0
173Manhours3BOVERTIME DIFFERENTIALSForklift OperatorHR3$ - 0
174Manhours3BOVERTIME DIFFERENTIALSForemanHR3$ - 0
175Manhours3BOVERTIME DIFFERENTIALSCrane OperatorHR3$ - 0
Sunday-Holiday
176Manhours3BOVERTIME DIFFERENTIALSFirst Shift 0600-1200Laborer/LasherHR10$ - 0
177Manhours3BOVERTIME DIFFERENTIALSForklift OperatorHR10$ - 0
178Manhours3BOVERTIME DIFFERENTIALSForemanHR10$ - 0
179Manhours3BOVERTIME DIFFERENTIALSCrane OperatorHR10$ - 0
180Manhours3BOVERTIME DIFFERENTIALSSecond Shift 1200-1800Laborer/LasherHR10$ - 0
181Manhours3BOVERTIME DIFFERENTIALSForklift OperatorHR10$ - 0
182Manhours3BOVERTIME DIFFERENTIALSForemanHR10$ - 0
183Manhours3BOVERTIME DIFFERENTIALSCrane OperatorHR10$ - 0
184Manhours3BOVERTIME DIFFERENTIALSThird Shift 1800-2400Laborer/LasherHR5$ - 0
185Manhours3BOVERTIME DIFFERENTIALSForklift OperatorHR5$ - 0
186Manhours3BOVERTIME DIFFERENTIALSForemanHR5$ - 0
187Manhours3BOVERTIME DIFFERENTIALSCrane OperatorHR5$ - 0
188Manhours3BOVERTIME DIFFERENTIALSForth Shift 2400-0600Laborer/LasherHR3$ - 0
189Manhours3BOVERTIME DIFFERENTIALSForklift OperatorHR3$ - 0
190Manhours3BOVERTIME DIFFERENTIALSForemanHR3$ - 0
191Manhours3BOVERTIME DIFFERENTIALSCrane OperatorHR3$ - 0
Pre-Festday
192Manhours3BOVERTIME DIFFERENTIALSFirst shift 0600-1200Laborer/LasherHR3$ - 0
193Manhours3BOVERTIME DIFFERENTIALSForklift OperatorHR3$ - 0
194Manhours3BOVERTIME DIFFERENTIALSForemanHR3$ - 0
195Manhours3BOVERTIME DIFFERENTIALSCrane OperatorHR3$ - 0
TOTAL 3B Overtime Differentials$ - 0
Line ItemCategoryScheduleDescriptionUnit of DurationEstimated DurationUnit of MeasureUnit PriceUnit QuantityExtended Price
196Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 3.01 LT - 7 LT capacityHR1EA1$ - 0
197Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 7.01 LT - 10 LT capacityHR1EA1$ - 0
198Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 10.01 LT - 15 LT capacityHR1EA1$ - 0
199Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 15.01 LT - 25 LT capacityHR1EA1$ - 0
200Manhours4EQUIPMENT RENTAL (EQR)CONTAINER HANDLER / VANCARRIER-REACHSTACKER - top lift, 80,000 LB lifting capacityHR1EA1$ - 0
201Manhours4EQUIPMENT RENTAL (EQR)LIGHT SETS, 1000 wattDY1EA2$ - 0
TOTAL 4 Equipment Rental$ - 0
202Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSLumber and Related Services- Construction of Crates and Crating MotorcyclesBND1$ - 0
203Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALS2" x 4" x 8" - PC CUT LUMBER - ISPM# CERTIFIEDPC10$ - 0
204Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALS4" x 4" x 8" - PC - CUT LUMBER - ISPM# CERTIFIEDPC10$ - 0
205Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALS6" x 6" x 10" - PC - CUT LUMBER - ISPM# CERTIFIEDPC5$ - 0
206Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALS6" x 6" x 12" - PC - CUT LUMBER - ISPM# CERTIFIEDPC5$ - 0
207Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALS4" x 8" x 1/2" - PLYWOOD SHEETEA10$ - 0
208Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALS4" x 8" x 1" - PLYWOOD SHEETEA5$ - 0
209Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALS#8 - Nail, Steel, 75mm length, 25kg per boxBOX1$ - 0
210Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALS#16 - 120mm length, 25kg per boxBOX1$ - 0
211Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSSecuring Belt (polyester ratchet strap) CW200. breaking load 8.5 tEA10$ - 0
212Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSLashing Material- Chain, 6 links. Breaking Load: Grade 30 to 43EA10$ - 0
213Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSLashing Material- Chain, 12 links. Breaking Load: Grade 30 to 43EA10$ - 0
214Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSLashing Material- Shackle, 3 to.. Breaking Load: 15 to. (17 ton shackle)EA10$ - 0
215Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSLashing Material- Shackle, 4.7 to. (G-4161). Breaking Load: 28 to. (23 ton shackle)EA10$ - 0
216Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSLashing Material- Turnbuckle 1 1/8''. Breaking Load: Grade 43EA10$ - 0
217Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSPolyester line, whiteMeter33$ - 0
218Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSScotchtape, Nylonroll5$ - 0
219Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSStrip Iron 16mm rollroll1$ - 0
220Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSStrip iron 32mm rollroll1$ - 0
221Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSWire, 16 mm.. SpoolEA1$ - 0
222Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSClips for Wire, 16 mm.BOX/BAG1$ - 0
TOTAL 7 Lumber/Dunnage/Materials$ - 0
223Miscellaneous8MISCELLANEOUSOUT-OF-POCKET POOLMTH12USD$ 3,500.001$ 42,000.00
224MiscellaneousMISCELLANEOUSOOP expense Item 1 - added for Task order development$ - 00$ - 0this line does not calulate into cost
225MiscellaneousMISCELLANEOUSOOP expense Item 2 - added for Task order development$ - 00$ - 0this line does not calulate into cost
226MiscellaneousMISCELLANEOUSOOP expense Item 3 - added for Task order development$ - 00$ - 0this line does not calulate into cost
227MiscellaneousMISCELLANEOUSOOP expense Item 4 - added for Task order development$ - 00$ - 0this line does not calulate into cost
228MiscellaneousMISCELLANEOUSOOP expense Item 5 - added for Task order development$ - 00$ - 0this line does not calulate into cost
229Miscellaneous8MISCELLANEOUS OOP TotalTotal OOP exspense for ITEMS 1 through 5 above$ - 0this line totals 1-5 above and into cost
TOTAL 8 Miscellanious OOP$ - 0

OPY-1

Controlled Unclassified Information – CUI (after form is completed)
STEVEDORING & RELATED TERMINAL SERVICESPERIOD OF PERFORMANCE:1 May 2023through30 Apr 2024
LOCATION:Port of Bremerhaven Stevedoringinput start dateinput final end date
Attachment #Attachment 2_Rev 02
OPTION YEAR - 1_ SCHEDULE TOTALS$ 42,000.00
Line ItemCategoryScheduleCommodityDescriptionUnit of DurationEstimated DurationUnit of MeasureUnit PriceUnit QuantityExtended Price
1Commodity1A1aLASHING ONLY (loading Vessel)20EXPLOSIVES PAYABLE AT THE EXPLOSIVE RATEMTON96$ - 0
2Commodity1A1aLASHING ONLY (loading Vessel)25MILVAN-CONTAINERS PACKED W/ EXPLOSIVES PAYABLE AT THE EXPLOSIVE RATEEA10$ - 0
3Commodity1A1aLASHING ONLY (loading Vessel)35AIRCRAFT, WHOLE OR UNBOXEDEA50$ - 0
4Commodity1A1aLASHING ONLY (loading Vessel)40GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) (Breakbulk)MTON100$ - 0
5Commodity1A1aLASHING ONLY (loading Vessel)44CONTAINERS OTHER THAN TEU - SINGLE - W/ISO - Quadcons, Tricons, BiconsEA100$ - 0
6Commodity1A1aLASHING ONLY (loading Vessel)45MILVAN - CONTAINERS 20'/40' PACKED W/ NON-EXPLOSIVES - ISO (TEU configured) Conex, Quadcons, Tricons, Bicons ))EA205$ - 0
7Commodity1A1aLASHING ONLY (loading Vessel)60MEDIUM VEHICLES OR TRAILERS - (Vehicles 25,001lbs - 60,000lbs)EA450$ - 0
8Commodity1A1aLASHING ONLY (loading Vessel)61LIGHT VEHICLES OR TRAILERS - (Vehicles Less than 25,000lbs - )EA1400$ - 0
9Commodity1A1aLASHING ONLY (loading Vessel)67HEAVY VEHICLES OR TRAILERS - (Vehicles More than 60,000lbs)EA150$ - 0
TOTAL 1A1a - Lashing Only$ - 0
10Commodity1A2aUNLASHING ONLY (discharging vessel)20EXPLOSIVES PAYABLE AT THE EXPLOSIVE RATEMTON96$ - 0
11Commodity1A2aUNLASHING ONLY (discharging vessel)25MILVAN-CONTAINERS PACKED W/ EXPLOSIVES PAYABLE AT THE EXPLOSIVE RATEEA10$ - 0
12Commodity1A2aUNLASHING ONLY (discharging vessel)35AIRCRAFT, WHOLE OR UNBOXEDEA50$ - 0
13Commodity1A2aUNLASHING ONLY (discharging vessel)40GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) (Breakbulk)MTON100$ - 0
14Commodity1A2aUNLASHING ONLY (discharging vessel)44CONTAINERS OTHER THAN TEU - SINGLE - W/ISO - Quadcons, Tricons, BiconsEA100$ - 0
15Commodity1A2aUNLASHING ONLY (discharging vessel)45MILVAN-CONTAINERS 20'/40' PACKED W/ NON-EXPLOSIVES - ISO (TEU configured) Conex, Quadcons, Tricons, Bicons ))EA205$ - 0
16Commodity1A2aUNLASHING ONLY (discharging vessel)60MEDIUM VEHICLES OR TRAILERS - (Vehicles 25,001lbs - 60,000lbs)EA450$ - 0
17Commodity1A2aUNLASHING ONLY (discharging vessel)61LIGHT VEHICLES OR TRAILERS - (Vehicles Less than 25,000lbs - )EA1400$ - 0
18Commodity1A2aUNLASHING ONLY (discharging vessel)67HEAVY VEHICLES OR TRAILERS - (Vehicles More than 60,000lbs)EA150$ - 0
TOTAL 1A2a Unlashing Only$ - 0
19Work Day
20Manhours2EXTRA LABOR (XL)First Shift 0600-1400Laborer/LasherHR50$ - 0
21Manhours2EXTRA LABOR (XL)Forklift OperatorHR50$ - 0
22Manhours2EXTRA LABOR (XL)ForemanHR50$ - 0
23Manhours2EXTRA LABOR (XL)Crane OperatorHR50$ - 0
24Manhours2EXTRA LABOR (XL)Second shift 1430-2030Laborer/LasherHR30$ - 0
25Manhours2EXTRA LABOR (XL)Forklift OperatorHR30$ - 0
26Manhours2EXTRA LABOR (XL)ForemanHR30$ - 0
27Manhours2EXTRA LABOR (XL)Crane OperatorHR30$ - 0
28Manhours2EXTRA LABOR (XL)Third shift 2030-0600Laborer/LasherHR5$ - 0
29Manhours2EXTRA LABOR (XL)Forklift OperatorHR5$ - 0
30Manhours2EXTRA LABOR (XL)ForemanHR5$ - 0
31Manhours2EXTRA LABOR (XL)Crane OperatorHR5$ - 0
Saturday
32Manhours2EXTRA LABOR (XL)First shift 0600-1400Laborer/LasherHR50$ - 0
33Manhours2EXTRA LABOR (XL)Forklift OperatorHR50$ - 0
34Manhours2EXTRA LABOR (XL)ForemanHR50$ - 0
35Manhours2EXTRA LABOR (XL)Crane OperatorHR50$ - 0
36Manhours2EXTRA LABOR (XL)Second Shift 1430-2030Laborer/LasherHR30$ - 0
37Manhours2EXTRA LABOR (XL)Forklift OperatorHR30$ - 0
38Manhours2EXTRA LABOR (XL)ForemanHR30$ - 0
39Manhours2EXTRA LABOR (XL)Crane OperatorHR30$ - 0
40Manhours2EXTRA LABOR (XL)Third Shift 2030-0600Laborer/LasherHR5$ - 0
41Manhours2EXTRA LABOR (XL)Forklift OperatorHR5$ - 0
42Manhours2EXTRA LABOR (XL)ForemanHR5$ - 0
43Manhours2EXTRA LABOR (XL)Crane OperatorHR5$ - 0
Sunday-Holiday
44Manhours2EXTRA LABOR (XL)First Shift 0600-1200Laborer/LasherHR20$ - 0
45Manhours2EXTRA LABOR (XL)Forklift OperatorHR20$ - 0
46Manhours2EXTRA LABOR (XL)ForemanHR20$ - 0
47Manhours2EXTRA LABOR (XL)Crane OperatorHR20$ - 0
48Manhours2EXTRA LABOR (XL)Second Shift 1200-1800Laborer/LasherHR6$ - 0
49Manhours2EXTRA LABOR (XL)Forklift OperatorHR6$ - 0
50Manhours2EXTRA LABOR (XL)ForemanHR6$ - 0
51Manhours2EXTRA LABOR (XL)Crane OperatorHR6$ - 0
52Manhours2EXTRA LABOR (XL)Third Shift 1800-2400Laborer/LasherHR5$ - 0
53Manhours2EXTRA LABOR (XL)Forklift OperatorHR5$ - 0
54Manhours2EXTRA LABOR (XL)ForemanHR5$ - 0
55Manhours2EXTRA LABOR (XL)Crane OperatorHR5$ - 0
56Manhours2EXTRA LABOR (XL)Forth Shift 2400-0600Laborer/LasherHR3$ - 0
57Manhours2EXTRA LABOR (XL)Forklift OperatorHR3$ - 0
58Manhours2EXTRA LABOR (XL)ForemanHR3$ - 0
59Manhours2EXTRA LABOR (XL)Crane OperatorHR3$ - 0
Pre-Festday
60Manhours2EXTRA LABOR (XL)First shift 0600-1200Laborer/LasherHR4$ - 0
61Manhours2EXTRA LABOR (XL)Forklift OperatorHR4$ - 0
62Manhours2EXTRA LABOR (XL)ForemanHR4$ - 0
63Manhours2EXTRA LABOR (XL)Crane OperatorHR4$ - 0
TOTAL 2 Extra Labor (XL)$ - 0
Work Day
64Manhours3ADETENTIONFirst Shift 0600-1400Laborer/LasherHR50$ - 0
65Manhours3ADETENTIONForklift OperatorHR50$ - 0
66Manhours3ADETENTIONForemanHR50$ - 0
67Manhours3ADETENTIONCrane OperatorHR50$ - 0
68Manhours3ADETENTIONSecond shift 1430-2030Laborer/LasherHR30$ - 0
69Manhours3ADETENTIONForklift OperatorHR30$ - 0
70Manhours3ADETENTIONForemanHR30$ - 0
71Manhours3ADETENTIONCrane OperatorHR30$ - 0
72Manhours3ADETENTIONThird shift 2030-0600Laborer/LasherHR5$ - 0
73Manhours3ADETENTIONForklift OperatorHR5$ - 0
74Manhours3ADETENTIONForemanHR5$ - 0
75Manhours3ADETENTIONCrane OperatorHR5$ - 0
Saturday
76Manhours3ADETENTIONFirst shift 0600-1400Laborer/LasherHR50$ - 0
77Manhours3ADETENTIONForklift OperatorHR50$ - 0
78Manhours3ADETENTIONForemanHR50$ - 0
79Manhours3ADETENTIONCrane OperatorHR50$ - 0
80Manhours3ADETENTIONSecond Shift 1430-2030Laborer/LasherHR30$ - 0
81Manhours3ADETENTIONForklift OperatorHR30$ - 0
82Manhours3ADETENTIONForemanHR30$ - 0
83Manhours3ADETENTIONCrane OperatorHR30$ - 0
84Manhours3ADETENTIONThird Shift 2030-0600Laborer/LasherHR5$ - 0
85Manhours3ADETENTIONForklift OperatorHR5$ - 0
86Manhours3ADETENTIONForemanHR5$ - 0
87Manhours3ADETENTIONCrane OperatorHR5$ - 0
Sunday-Holiday
88Manhours3ADETENTIONFirst Shift 0600-1200Laborer/LasherHR20$ - 0
89Manhours3ADETENTIONForklift OperatorHR20$ - 0
90Manhours3ADETENTIONForemanHR20$ - 0
91Manhours3ADETENTIONCrane OperatorHR20$ - 0
92Manhours3ADETENTIONSecond Shift 1200-1800Laborer/LasherHR6$ - 0
93Manhours3ADETENTIONForklift OperatorHR6$ - 0
94Manhours3ADETENTIONForemanHR6$ - 0
95Manhours3ADETENTIONCrane OperatorHR6$ - 0
96Manhours3ADETENTIONThird Shift 1800-2400Laborer/LasherHR5$ - 0
97Manhours3ADETENTIONForklift OperatorHR5$ - 0
98Manhours3ADETENTIONForemanHR5$ - 0
99Manhours3ADETENTIONCrane OperatorHR5$ - 0
100Manhours3ADETENTIONForth Shift 2400-0600Laborer/LasherHR3$ - 0
101Manhours3ADETENTIONForklift OperatorHR3$ - 0
102Manhours3ADETENTIONForemanHR3$ - 0
103Manhours3ADETENTIONCrane OperatorHR3$ - 0
Pre-Festday
104Manhours3ADETENTIONFirst shift 0600-1200Laborer/LasherHR4$ - 0
105Manhours3ADETENTIONForklift OperatorHR4$ - 0
106Manhours3ADETENTIONForemanHR4$ - 0
107Manhours3ADETENTIONCrane OperatorHR4$ - 0
3A DETENTION TOTAL$ 50.00$ - 0
Work Day
108Manhours3BSHIFT DIFFERENTIALSFirst Shift 0600-1400Laborer/LasherHR25$ - 0
109Manhours3BSHIFT DIFFERENTIALSForklift OperatorHR25$ - 0
110Manhours3BSHIFT DIFFERENTIALSForemanHR25$ - 0
111Manhours3BSHIFT DIFFERENTIALSCrane OperatorHR25$ - 0
112Manhours3BSHIFT DIFFERENTIALSSecond shift 1430-2030Laborer/LasherHR15$ - 0
113Manhours3BSHIFT DIFFERENTIALSForklift OperatorHR15$ - 0
114Manhours3BSHIFT DIFFERENTIALSForemanHR15$ - 0
115Manhours3BSHIFT DIFFERENTIALSCrane OperatorHR15$ - 0
116Manhours3BSHIFT DIFFERENTIALSThird shift 2030-0600Laborer/LasherHR10$ - 0
117Manhours3BSHIFT DIFFERENTIALSForklift OperatorHR10$ - 0
118Manhours3BSHIFT DIFFERENTIALSForemanHR10$ - 0
119Manhours3BSHIFT DIFFERENTIALSCrane OperatorHR10$ - 0
Saturday
120Manhours3BSHIFT DIFFERENTIALSFirst shift 0600-1400Laborer/LasherHR15$ - 0
121Manhours3BSHIFT DIFFERENTIALSForklift OperatorHR15$ - 0
122Manhours3BSHIFT DIFFERENTIALSForemanHR15$ - 0
123Manhours3BSHIFT DIFFERENTIALSCrane OperatorHR15$ - 0
124Manhours3BSHIFT DIFFERENTIALSSecond Shift 1430-2030Laborer/LasherHR10$ - 0
125Manhours3BSHIFT DIFFERENTIALSForklift OperatorHR10$ - 0
126Manhours3BSHIFT DIFFERENTIALSForemanHR10$ - 0
127Manhours3BSHIFT DIFFERENTIALSCrane OperatorHR10$ - 0
128Manhours3BSHIFT DIFFERENTIALSThird Shift 2030-0600Laborer/LasherHR3$ - 0
129Manhours3BSHIFT DIFFERENTIALSForklift OperatorHR3$ - 0
130Manhours3BSHIFT DIFFERENTIALSForemanHR3$ - 0
131Manhours3BSHIFT DIFFERENTIALSCrane OperatorHR3$ - 0
Sunday-Holiday
132Manhours3BSHIFT DIFFERENTIALSFirst Shift 0600-1200Laborer/LasherHR10$ - 0
133Manhours3BSHIFT DIFFERENTIALSForklift OperatorHR10$ - 0
134Manhours3BSHIFT DIFFERENTIALSForemanHR10$ - 0
135Manhours3BSHIFT DIFFERENTIALSCrane OperatorHR10$ - 0
136Manhours3BSHIFT DIFFERENTIALSSecond Shift 1200-1800Laborer/LasherHR10$ - 0
137Manhours3BSHIFT DIFFERENTIALSForklift OperatorHR10$ - 0
138Manhours3BSHIFT DIFFERENTIALSForemanHR10$ - 0
139Manhours3BSHIFT DIFFERENTIALSCrane OperatorHR10$ - 0
140Manhours3BSHIFT DIFFERENTIALSThird Shift 1800-2400Laborer/LasherHR5$ - 0
141Manhours3BSHIFT DIFFERENTIALSForklift OperatorHR5$ - 0
142Manhours3BSHIFT DIFFERENTIALSForemanHR5$ - 0
143Manhours3BSHIFT DIFFERENTIALSCrane OperatorHR5$ - 0
144Manhours3BSHIFT DIFFERENTIALSForth Shift 2400-0600Laborer/LasherHR3$ - 0
145Manhours3BSHIFT DIFFERENTIALSForklift OperatorHR3$ - 0
146Manhours3BSHIFT DIFFERENTIALSForemanHR3$ - 0
147Manhours3BSHIFT DIFFERENTIALSCrane OperatorHR3$ - 0
Pre-Festday
148Manhours3BSHIFT DIFFERENTIALSFirst shift 0600-1200Laborer/LasherHR3$ - 0
149Manhours3BSHIFT DIFFERENTIALSForklift OperatorHR3$ - 0
150Manhours3BSHIFT DIFFERENTIALSForemanHR3$ - 0
151Manhours3BSHIFT DIFFERENTIALSCrane OperatorHR3$ - 0
Work Day
152Manhours3BOVERTIME DIFFERENTIALSFirst Shift 0600-1400Laborer/LasherHR25$ - 0
153Manhours3BOVERTIME DIFFERENTIALSForklift OperatorHR25$ - 0
154Manhours3BOVERTIME DIFFERENTIALSForemanHR25$ - 0
155Manhours3BOVERTIME DIFFERENTIALSCrane OperatorHR25$ - 0
156Manhours3BOVERTIME DIFFERENTIALSSecond shift 1430-2030Laborer/LasherHR15$ - 0
157Manhours3BOVERTIME DIFFERENTIALSForklift OperatorHR15$ - 0
158Manhours3BOVERTIME DIFFERENTIALSForemanHR15$ - 0
159Manhours3BOVERTIME DIFFERENTIALSCrane OperatorHR15$ - 0
160Manhours3BOVERTIME DIFFERENTIALSThird shift 2030-0600Laborer/LasherHR10$ - 0
161Manhours3BOVERTIME DIFFERENTIALSForklift OperatorHR10$ - 0
162Manhours3BOVERTIME DIFFERENTIALSForemanHR10$ - 0
163Manhours3BOVERTIME DIFFERENTIALSCrane OperatorHR10$ - 0
Saturday
164Manhours3BOVERTIME DIFFERENTIALSFirst shift 0600-1400Laborer/LasherHR15$ - 0
165Manhours3BOVERTIME DIFFERENTIALSForklift OperatorHR15$ - 0
166Manhours3BOVERTIME DIFFERENTIALSForemanHR15$ - 0
167Manhours3BOVERTIME DIFFERENTIALSCrane OperatorHR15$ - 0
168Manhours3BOVERTIME DIFFERENTIALSSecond Shift 1430-2030Laborer/LasherHR10$ - 0
169Manhours3BOVERTIME DIFFERENTIALSForklift OperatorHR10$ - 0
170Manhours3BOVERTIME DIFFERENTIALSForemanHR10$ - 0
171Manhours3BOVERTIME DIFFERENTIALSCrane OperatorHR10$ - 0
172Manhours3BOVERTIME DIFFERENTIALSThird Shift 2030-0600Laborer/LasherHR3$ - 0
173Manhours3BOVERTIME DIFFERENTIALSForklift OperatorHR3$ - 0
174Manhours3BOVERTIME DIFFERENTIALSForemanHR3$ - 0
175Manhours3BOVERTIME DIFFERENTIALSCrane OperatorHR3$ - 0
Sunday-Holiday
176Manhours3BOVERTIME DIFFERENTIALSFirst Shift 0600-1200Laborer/LasherHR10$ - 0
177Manhours3BOVERTIME DIFFERENTIALSForklift OperatorHR10$ - 0
178Manhours3BOVERTIME DIFFERENTIALSForemanHR10$ - 0
179Manhours3BOVERTIME DIFFERENTIALSCrane OperatorHR10$ - 0
180Manhours3BOVERTIME DIFFERENTIALSSecond Shift 1200-1800Laborer/LasherHR10$ - 0
181Manhours3BOVERTIME DIFFERENTIALSForklift OperatorHR10$ - 0
182Manhours3BOVERTIME DIFFERENTIALSForemanHR10$ - 0
183Manhours3BOVERTIME DIFFERENTIALSCrane OperatorHR10$ - 0
184Manhours3BOVERTIME DIFFERENTIALSThird Shift 1800-2400Laborer/LasherHR5$ - 0
185Manhours3BOVERTIME DIFFERENTIALSForklift OperatorHR5$ - 0
186Manhours3BOVERTIME DIFFERENTIALSForemanHR5$ - 0
187Manhours3BOVERTIME DIFFERENTIALSCrane OperatorHR5$ - 0
188Manhours3BOVERTIME DIFFERENTIALSForth Shift 2400-0600Laborer/LasherHR3$ - 0
189Manhours3BOVERTIME DIFFERENTIALSForklift OperatorHR3$ - 0
190Manhours3BOVERTIME DIFFERENTIALSForemanHR3$ - 0
191Manhours3BOVERTIME DIFFERENTIALSCrane OperatorHR3$ - 0
Pre-Festday
192Manhours3BOVERTIME DIFFERENTIALSFirst shift 0600-1200Laborer/LasherHR3$ - 0
193Manhours3BOVERTIME DIFFERENTIALSForklift OperatorHR3$ - 0
194Manhours3BOVERTIME DIFFERENTIALSForemanHR3$ - 0
195Manhours3BOVERTIME DIFFERENTIALSCrane OperatorHR3$ - 0
TOTAL 3B Overtime Differentials$ - 0
Line ItemCategoryScheduleDescriptionUnit of DurationEstimated DurationUnit of MeasureUnit PriceUnit QuantityExtended Price
196Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 3.01 LT - 7 LT capacityHR1EA1$ - 0
197Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 7.01 LT - 10 LT capacityHR1EA1$ - 0
198Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 10.01 LT - 15 LT capacityHR1EA1$ - 0
199Manhours4EQUIPMENT RENTAL (EQR)FORKLIFT, 15.01 LT - 25 LT capacityHR1EA1$ - 0
200Manhours4EQUIPMENT RENTAL (EQR)CONTAINER HANDLER / VANCARRIER-REACHSTACKER - top lift, 80,000 LB lifting capacityHR1EA1$ - 0
201Manhours4EQUIPMENT RENTAL (EQR)LIGHT SETS, 1000 wattDY1EA2$ - 0
TOTAL 4 Equipment Rental$ - 0
202Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSLumber and Related Services- Construction of Crates and Crating MotorcyclesBND1$ - 0
203Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALS2" x 4" x 8" - PC CUT LUMBER - ISPM# CERTIFIEDPC10$ - 0
204Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALS4" x 4" x 8" - PC - CUT LUMBER - ISPM# CERTIFIEDPC10$ - 0
205Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALS6" x 6" x 10" - PC - CUT LUMBER - ISPM# CERTIFIEDPC5$ - 0
206Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALS6" x 6" x 12" - PC - CUT LUMBER - ISPM# CERTIFIEDPC5$ - 0
207Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALS4" x 8" x 1/2" - PLYWOOD SHEETEA10$ - 0
208Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALS4" x 8" x 1" - PLYWOOD SHEETEA5$ - 0
209Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALS#8 - Nail, Steel, 75mm length, 25kg per boxBOX1$ - 0
210Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALS#16 - 120mm length, 25kg per boxBOX1$ - 0
211Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSSecuring Belt (polyester ratchet strap) CW200. breaking load 8.5 tEA10$ - 0
212Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSLashing Material- Chain, 6 links. Breaking Load: Grade 30 to 43EA10$ - 0
213Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSLashing Material- Chain, 12 links. Breaking Load: Grade 30 to 43EA10$ - 0
214Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSLashing Material- Shackle, 3 to.. Breaking Load: 15 to. (17 ton shackle)EA10$ - 0
215Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSLashing Material- Shackle, 4.7 to. (G-4161). Breaking Load: 28 to. (23 ton shackle)EA10$ - 0
216Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSLashing Material- Turnbuckle 1 1/8''. Breaking Load: Grade 43EA10$ - 0
217Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSPolyester line, whiteMeter33$ - 0
218Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSScotchtape, Nylonroll5$ - 0
219Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSStrip Iron 16mm rollroll1$ - 0
220Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSStrip iron 32mm rollroll1$ - 0
221Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSWire, 16 mm.. SpoolEA1$ - 0
222Miscellaneous7LUMBER / DUNNAGE / LASHING MATERIALSClips for Wire, 16 mm.BOX/BAG1$ - 0
TOTAL 7 Lumber/Dunnage/Materials$ - 0
223Miscellaneous8MISCELLANEOUSOUT-OF-POCKET POOLMTH12USD$ 3,500.001$ 42,000.00
224MiscellaneousMISCELLANEOUSOOP expense Item 1 - added for Task order development$ - 00$ - 0this line does not calulate into cost
225MiscellaneousMISCELLANEOUSOOP expense Item 2 - added for Task order development$ - 00$ - 0this line does not calulate into cost
226MiscellaneousMISCELLANEOUSOOP expense Item 3 - added for Task order development$ - 00$ - 0this line does not calulate into cost
227MiscellaneousMISCELLANEOUSOOP expense Item 4 - added for Task order development$ - 00$ - 0this line does not calulate into cost
228MiscellaneousMISCELLANEOUSOOP expense Item 5 - added for Task order development$ - 00$ - 0this line does not calulate into cost
229Miscellaneous8MISCELLANEOUS OOP TotalTotal OOP exspense for ITEMS 1 through 5 above$ - 0this line totals 1-5 above and into cost
TOTAL 8 Miscellanious OOP$ 42,000.00

OPY-2

Controlled Unclassified Information – CUI (after form is completed)
STEVEDORING & RELATED TERMINAL SERVICESPERIOD OF PERFORMANCE:1 May 2024through30 Apr 2025
LOCATION:Port of Bremerhaven Stevedoringinput start dateinput final end date
Attachment #Attachment 2_Rev 02
OPTION YEAR - 2_ SCHEDULE TOTALS$ 42,000.00
Line ItemCategoryScheduleCommodityDescriptionUnit of DurationEstimated DurationUnit of MeasureUnit PriceUnit QuantityExtended Price
1Commodity1A1aLASHING ONLY (loading Vessel)20EXPLOSIVES PAYABLE AT THE EXPLOSIVE RATEMTON96$ - 0
2Commodity1A1aLASHING ONLY (loading Vessel)25MILVAN-CONTAINERS PACKED W/ EXPLOSIVES PAYABLE AT THE EXPLOSIVE RATEEA10$ - 0
3Commodity1A1aLASHING ONLY (loading Vessel)35AIRCRAFT, WHOLE OR UNBOXEDEA50$ - 0
4Commodity1A1aLASHING ONLY (loading Vessel)40GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) (Breakbulk)MTON100$ - 0
5Commodity1A1aLASHING ONLY (loading Vessel)44CONTAINERS OTHER THAN TEU - SINGLE - W/ISO - Quadcons, Tricons, BiconsEA100$ - 0
6Commodity1A1aLASHING ONLY (loading Vessel)45MILVAN - CONTAINERS 20'/40' PACKED W/ NON-EXPLOSIVES - ISO (TEU configured) Conex, Quadcons, Tricons, Bicons ))EA205$ - 0
7Commodity1A1aLASHING ONLY (loading Vessel)60MEDIUM VEHICLES OR TRAILERS - (Vehicles 25,001lbs - 60,000lbs)EA450$ - 0
8Commodity1A1aLASHING ONLY (loading Vessel)61LIGHT VEHICLES OR TRAILERS - (Vehicles Less than 25,000lbs - )EA1400$ - 0
9Commodity1A1aLASHING ONLY (loading Vessel)67HEAVY VEHICLES OR TRAILERS - (Vehicles More than 60,000lbs)EA150$ - 0
TOTAL 1A1a - Lashing Only$ - 0
10Commodity1A2aUNLASHING ONLY (discharging vessel)20EXPLOSIVES PAYABLE AT THE EXPLOSIVE RATEMTON96$ - 0
11Commodity1A2aUNLASHING ONLY (discharging vessel)25MILVAN-CONTAINERS PACKED W/ EXPLOSIVES PAYABLE AT THE EXPLOSIVE RATEEA10$ - 0
12Commodity1A2aUNLASHING ONLY (discharging vessel)35AIRCRAFT, WHOLE OR UNBOXEDEA50$ - 0
13Commodity1A2aUNLASHING ONLY (discharging vessel)40GENERAL CARGO NOT OTHERWISE SPECIFIED (NOS) (Breakbulk)MTON100$ - 0
14Commodity1A2aUNLASHING ONLY (discharging vessel)44CONTAINERS OTHER THAN TEU - SINGLE - W/ISO - Quadcons, Tricons, BiconsEA100$ - 0
15Commodity1A2aUNLASHING ONLY (discharging vessel)45MILVAN-CONTAINERS 20'/40' PACKED W/ NON-EXPLOSIVES - ISO (TEU configured) Conex, Quadcons, Tricons, Bicons ))EA205$ - 0
16Commodity1A2aUNLASHING ONLY (discharging vessel)60MEDIUM VEHICLES OR TRAILERS - (Vehicles 25,001lbs - 60,000lbs)EA450$ - 0
17Commodity1A2aUNLASHING ONLY (discharging vessel)61LIGHT VEHICLES OR TRAILERS - (Vehicles Less than 25,000lbs - )EA1400$ - 0
18Commodity1A2aUNLASHING ONLY (discharging vessel)67HEAVY VEHICLES OR TRAILERS - (Vehicles More than 60,000lbs)EA150$ - 0
TOTAL 1A2a Unlashing Only$ - 0
19Work Day
20Manhours2EXTRA LABOR (XL)First Shift 0600-1400Laborer/LasherHR50$ - 0
21Manhours2EXTRA LABOR (XL)Forklift OperatorHR50$ - 0
22Manhours2EXTRA LABOR (XL)ForemanHR50$ - 0
23Manhours2EXTRA LABOR (XL)Crane OperatorHR50$ - 0
24Manhours2EXTRA LABOR (XL)Second shift 1430-2030Laborer/LasherHR30$ - 0
25Manhours2EXTRA LABOR (XL)Forklift OperatorHR30$ - 0
26Manhours2EXTRA LABOR (XL)ForemanHR30$ - 0
27Manhours2EXTRA LABOR (XL)Crane OperatorHR30$ - 0
28Manhours2EXTRA LABOR (XL)Third shift 2030-0600Laborer/LasherHR5$ - 0
29Manhours2EXTRA LABOR (XL)Forklift OperatorHR5$ - 0
30Manhours2EXTRA LABOR (XL)ForemanHR5$ - 0
31Manhours2EXTRA LABOR (XL)Crane OperatorHR5$ - 0
Saturday
32Manhours2EXTRA LABOR (XL)First shift 0600-1400Laborer/LasherHR50$ - 0
33Manhours2EXTRA LABOR (XL)Forklift OperatorHR50$ - 0
34Manhours2EXTRA LABOR (XL)ForemanHR50$ - 0
35Manhours2EXTRA LABOR (XL)Crane OperatorHR50$ - 0
36Manhours2EXTRA LABOR (XL)Second Shift 1430-2030Laborer/LasherHR30$ - 0
37Manhours2EXTRA LABOR (XL)Forklift OperatorHR30$ - 0
38Manhours2EXTRA LABOR (XL)ForemanHR30$ - 0
39Manhours2EXTRA LABOR (XL)Crane OperatorHR30$ - 0
40Manhours2EXTRA LABOR (XL)Third Shift 2030-0600Laborer/LasherHR5$ - 0
41Manhours2EXTRA LABOR (XL)Forklift OperatorHR5$ - 0
42Manhours2EXTRA LABOR (XL)ForemanHR5$ - 0